CN103362131A - 一种基坑支护用复合竹筋喷锚支护及其施工方法 - Google Patents

一种基坑支护用复合竹筋喷锚支护及其施工方法 Download PDF

Info

Publication number
CN103362131A
CN103362131A CN2013103346238A CN201310334623A CN103362131A CN 103362131 A CN103362131 A CN 103362131A CN 2013103346238 A CN2013103346238 A CN 2013103346238A CN 201310334623 A CN201310334623 A CN 201310334623A CN 103362131 A CN103362131 A CN 103362131A
Authority
CN
China
Prior art keywords
bamboo
shotcrete
combined bolting
foundation pit
pit supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103346238A
Other languages
English (en)
Other versions
CN103362131B (zh
Inventor
张军阳
陆英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi City great Zhu geo-technology Co., Ltd
Original Assignee
JIANGSU ZHENGFANGYUAN CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ZHENGFANGYUAN CONSTRUCTION GROUP Co Ltd filed Critical JIANGSU ZHENGFANGYUAN CONSTRUCTION GROUP Co Ltd
Priority to CN201310334623.8A priority Critical patent/CN103362131B/zh
Publication of CN103362131A publication Critical patent/CN103362131A/zh
Application granted granted Critical
Publication of CN103362131B publication Critical patent/CN103362131B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

本发明涉及一种基坑支护用复合竹筋喷锚支护及其施工方法,属于市政施工技术领域。首先采用深层搅拌桩进行土体加固施工,然后分层开挖,在一定坡度的土体上设置竹筋锚喷。此竹筋锚喷结构包括面板,还包括竹锚杆、竹筋、竹钉和短钢筋等。竹锚杆尾部横向钻孔,安装20cm长的两根ф10钢筋,与面板形成整体。本发明不仅具有施工成本低和绿色环保的优点,并且适合于土层条件比较差的地区使用。

Description

一种基坑支护用复合竹筋喷锚支护及其施工方法
技术领域
本发明涉及一种基坑支护用复合竹筋喷锚支护及其施工方法,属于市政施工技术领域。 
背景技术
我国东部地区地表土层分布情况为上层土质较好,一般为粘土或亚粘土,下层有软卧层,当基坑达到一定深度时,采用普通的土钉墙支护结构,无法保证其基坑边坡稳定。采用传统的围护桩支护体系(如灌注桩加内支撑等)则投资较高。 
发明内容
本发明的目的是克服上述不足之处,提供提供一种施工成本低且适合于特殊地层条件地区使用的复合竹筋锚喷支护结构。 
按照本发明提供的技术方案,一种基坑支护用复合竹筋喷锚支护,包括基坑,所述基坑由若干组上层土体、平台和下层土体组成,平台位于上层土体和下层土体之间;所述平台中均设置有一根深层搅拌桩,基坑的表面覆盖有一层第一混凝土面板; 
所述第一混凝土面板上设置有若干个通孔,每个通孔中安插有一根竹锚杆;每根竹锚杆的四周均设置有一层竹筋网;所述竹筋网通过若干根竹钉固定在第一混凝土面板上;竹筋网上方还铺设有一层第二混凝土面板。
所述竹锚杆的尾端通过钢筋与竹筋网绑扎连接。所述钢筋的一端固定于竹锚杆的尾端的通孔中。所述竹锚杆上设置有若干个铁丝***。所述竹锚杆上每隔2m设置有一个铁丝***。 
所述通孔孔距为1-2m,孔径为50-100mm,孔道向下角度为0-20°。所述通孔中还注射有水泥浆。 
所述竹筋网的网格距离为230-270mm。 
所述第二混凝土面板(2-2)的厚度为70-80mm。 
所述基坑支护用复合竹筋喷锚支护的施工方法,步骤如下: 
(1)深层搅拌桩的施工:在软卧土层进行深层搅拌桩的施工,步聚如下:
a、对待施工的土层进行平整,进行工艺性试桩,数量不少于3根;
b、搅拌机安装到位,桩位对中偏差不大于20mm,导向架和搅拌轴应与地面垂直,垂直度偏差不大于1.5%;
c、预搅下沉至设计加固深度后,边喷混凝土浆边搅拌提升至预定的停浆面;
d、重复钻进搅拌达设计要求;
e、提升搅拌设备,关闭机械;
即得到加工好的深层搅拌桩;
(2)基坑的挖掘:沿搅深层搅拌桩进行分层开挖得到上层土体、平台和下层土体;其中上层土体放坡坡度不小于1:0.5,下层土体放坡坡度不小于1:1;
(3)插杆:在步骤(2)挖掘的基坑中沿着基坑土地表面喷射第一混凝土面板;在所得的第一混凝土面板上钻锚杆孔,得到若干个通孔,成孔后放入设置好铁丝***的竹锚杆;然后在通孔中注入水泥浆;
(4)固定:在步骤(3)插杆完毕得到的若干根竹锚杆四周铺设竹筋网,并通过竹钉固定在初喷的第一混凝土面板上;然后在竹锚杆尾部的预留孔内***两根钢筋,并与竹筋网绑扎固定;
(5)复喷:在步骤(4)固定所得的竹筋网上复喷一层第二混凝土面板;
(6)重复:重复上述(1)-(5)步骤,直到到达基坑底部。本发明的有益效果:由于本发明采用竹筋喷锚土钉与混凝土深层搅拌桩相结合的方案来制作支护,使其不仅具有施工成本低和绿色环保的优点,并且适合于土层条件比较差的地区使用。
本发明的有益效果:由于本发明采用竹筋喷锚土钉与混凝土深层搅拌桩相结合的方案来制作支护,使其不仅具有施工成本低和绿色环保的优点,并且适合于土层条件比较差的地区使用。 
本发明利用深层搅拌桩先对下层软卧土体进行加固,有利于下层土质的稳定性。本发明采用竹杆代替传统的钢筋作为土钉,竹锚杆与面板之间采用短钢筋锚固连接。这种支护结构中竹锚杆表面积大,能够更合理地利用土体的自承能力,注浆后与土体的粘结效果和加固土体效果明显;竹锚杆的柔性大,耐久性好,不易锈蚀。 
本发明还采用竹筋网代替传统的钢筋网。以上支护结构不需要消耗价格昂贵的钢筋,原材料及人工成本都大大降低了,施工需要的设备简单,施工方便,施工速度快,工程造价低。并且,采用竹锚杆做土钉完全能够满足挡土结构受力的要求。 
附图说明
图1 本发明结构剖视图。 
图2 本发明A局部放大图。 
图3 本发明A局部横截面图。 
附图标记说明:1、深层搅拌桩,2-1、第一混凝土面板,2-2、第二混凝土面板,3、竹锚杆,4、竹筋网,5、竹钉,6、钢筋,7、基坑,8、上层土体,9、下层土体,10、通孔,11、平台。 
具体实施方式
实施例1 
如图1-3所示,一种基坑支护用复合竹筋喷锚支护,包括基坑7,所述基坑7由若干组上层土体8、平台11和下层土体9组成,平台11位于上层土体8和下层土体9之间;所述平台11中均设置有一根深层搅拌桩1,基坑7的表面覆盖有一层第一混凝土面板2-1;
所述第一混凝土面板2-1上设置有若干个通孔10,每个通孔10中安插有一根竹锚杆3;每根竹锚杆3的四周均设置有一层竹筋网4;所述竹筋网4通过若干根竹钉5固定在第一混凝土面板2-1上;竹筋网4上方还铺设有一层第二混凝土面板2-2。
所述竹锚杆3的尾端通过钢筋6与竹筋网4绑扎连接。所述钢筋6的一端固定于竹锚杆3的尾端的通孔中。所述竹锚杆3上设置有若干个铁丝***7。所述竹锚杆3上每隔2m设置有一个铁丝***7。 
所述通孔10孔距为1-2m,孔径为50-100mm,孔道向下角度为0-20°。所述通孔10中还注射有水泥浆。 
所述竹筋网4的网格距离为230-270mm。所述第二混凝土面板2-2的厚度为70-80mm。 
实施例2 
所述基坑支护用复合竹筋喷锚支护的施工方法,步骤如下:
(1)深层搅拌桩的施工:在软卧土层进行深层搅拌桩的施工,步聚如下:
a、对待施工的土层进行平整,进行工艺性试桩,数量不少于3根;
b、搅拌机安装到位,桩位对中偏差不大于20mm,导向架和搅拌轴应与地面垂直,垂直度偏差不大于1.5%;
c、预搅下沉至设计加固深度后,边喷混凝土浆边搅拌提升至预定的停浆面;
d、重复钻进搅拌达设计要求;
e、提升搅拌设备,关闭机械;
即得到加工好的深层搅拌桩;
(2)基坑的挖掘:沿搅深层搅拌桩进行分层开挖得到上层土体、平台和下层土体;其中上层土体放坡坡度不小于1:0.5,下层土体放坡坡度不小于1:1;
(3)插杆:在步骤(2)挖掘的基坑中沿着基坑土地表面喷射第一混凝土面板;在所得的第一混凝土面板上钻锚杆孔,得到若干个通孔,成孔后放入设置好铁丝***的竹锚杆;然后在通孔中注入水泥浆;
(4)固定:在步骤(3)插杆完毕得到的若干根竹锚杆四周铺设竹筋网,并通过竹钉固定在初喷的第一混凝土面板上;然后在竹锚杆尾部的预留孔内***两根钢筋,并与竹筋网绑扎固定;
(5)复喷:在步骤(4)固定所得的竹筋网上复喷一层第二混凝土面板;
(6)重复:重复上述(1)-(5)步骤,直到到达基坑底部。
实施例3 
首先在软卧土层进行深层搅拌桩1的施工,然后沿搅拌桩1将上层土体8按不小于1:1的放坡比例进行分层开挖,然后在开挖土体上初喷30mm厚喷射第一混凝土面板2-1,然后钻锚杆孔,孔间距一般在1-2m之间,孔径在50~100mm之间,孔道向下角度一般在0~20°范围内,成孔后放入设置好铁丝***7的竹锚杆3,然后注入水泥浆,其强度不小于M10。再铺设竹筋网4,竹筋4的网格距一般在250mm左右,并用竹钉5固定在初喷的第一混凝土面板2-1上。然后在竹锚杆3尾部预留孔内***两根20cm长的ф10钢筋6,并与竹筋网4绑扎固定。最后复喷70mm~80mm第二混凝土面板2-2。
然后再入下一层土体开挖施工,直至基坑底部,最后与搅拌桩形成整体的复合竹筋喷锚支护结构。 

Claims (10)

1.一种基坑支护用复合竹筋喷锚支护,包括基坑(7),所述基坑(7)由若干组上层土体(8)、平台(11)和下层土体(9)组成,平台(11)位于上层土体(8)和下层土体(9)之间;其特征是:所述平台(11)中均设置有一根深层搅拌桩(1),基坑(7)的表面覆盖有一层第一混凝土面板(2-1);
所述第一混凝土面板(2-1)上设置有若干个通孔(10),每个通孔(10)中安插有一根竹锚杆(3);每根竹锚杆(3)的四周均设置有一层竹筋网(4);所述竹筋网(4)通过若干根竹钉(5)固定在第一混凝土面板(2-1)上;竹筋网(4)上方还铺设有一层第二混凝土面板(2-2)。
2.如权利要求1所述基坑支护用复合竹筋喷锚支护,其特征是:所述竹锚杆(3)的尾端通过钢筋(6)与竹筋网(4)绑扎连接。
3.如权利要求2所述基坑支护用复合竹筋喷锚支护,其特征是:所述钢筋(6)的一端固定于竹锚杆(3)的尾端的通孔中。
4.如权利要求1所述基坑支护用复合竹筋喷锚支护,其特征是:所述竹锚杆(3)上设置有若干个铁丝***(7)。
5.如权利要求4所述基坑支护用复合竹筋喷锚支护,其特征是:所述竹锚杆(3)上每隔2m设置有一个铁丝***(7)。
6.如权利要求1所述基坑支护用复合竹筋喷锚支护,其特征是:所述通孔(10)孔距为1-2m,孔径为50-100mm,孔道向下角度为0-20°。
7.如权利要求1所述基坑支护用复合竹筋喷锚支护,其特征是:所述通孔(10)中还注射有水泥浆。
8.如权利要求1所述基坑支护用复合竹筋喷锚支护,其特征是:所述竹筋网(4)的网格距离为230-270mm。
9.如权利要求1所述基坑支护用复合竹筋喷锚支护,其特征是:所述第二混凝土面板(2-2)的厚度为70-80mm。
10.权利要求1所述基坑支护用复合竹筋喷锚支护的施工方法,其特征是步骤如下:
(1)深层搅拌桩的施工:在软卧土层进行深层搅拌桩(1)的施工,步聚如下:
a、对待施工的土层进行平整,进行工艺性试桩,数量不少于3根;
b、搅拌机安装到位,桩位对中偏差不大于20mm,搅拌机导向架和搅拌轴应与地面垂直,垂直度偏差不大于1.5%;
c、搅拌机预搅下沉至设计加固深度后,边喷混凝土浆边搅拌提升至预定的停浆面;
d、重复钻进搅拌达设计要求;
e、提升搅拌机,并关闭;即得到加工好的深层搅拌桩;
(2)基坑的挖掘:沿搅深层搅拌桩(1)进行分层开挖得到上层土体(8)、平台(11)和下层土体(9);其中上层土体(8)放坡坡度不小于1:0.5,下层土体放坡坡度不小于1:1;
(3)插杆:在步骤(2)挖掘的基坑(7)中沿着基坑(7)土地表面喷射第一混凝土面板(2-1);在所得的第一混凝土面板(2-1)上钻锚杆孔,得到若干个通孔(10),成孔后放入设置好铁丝***(7)的竹锚杆(3);然后在通孔(10)中注入水泥浆;
(4)固定:在步骤(3)插杆完毕得到的若干根竹锚杆(3)四周铺设竹筋网(4),并通过竹钉(6)固定在初喷的第一混凝土面板(2-1)上;然后在竹锚杆(3)尾部的预留孔内***两根钢筋(5),并与竹筋网(4)绑扎固定;
(5)复喷:在步骤(4)固定所得的竹筋网(4)上复喷一层第二混凝土面板(2-2);
(6)重复:重复上述(1)-(5)步骤,直到到达基坑底部。
CN201310334623.8A 2013-08-02 2013-08-02 一种基坑支护用复合竹筋喷锚支护及其施工方法 Expired - Fee Related CN103362131B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310334623.8A CN103362131B (zh) 2013-08-02 2013-08-02 一种基坑支护用复合竹筋喷锚支护及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310334623.8A CN103362131B (zh) 2013-08-02 2013-08-02 一种基坑支护用复合竹筋喷锚支护及其施工方法

Publications (2)

Publication Number Publication Date
CN103362131A true CN103362131A (zh) 2013-10-23
CN103362131B CN103362131B (zh) 2015-10-28

Family

ID=49364337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310334623.8A Expired - Fee Related CN103362131B (zh) 2013-08-02 2013-08-02 一种基坑支护用复合竹筋喷锚支护及其施工方法

Country Status (1)

Country Link
CN (1) CN103362131B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213566A (zh) * 2014-09-26 2014-12-17 安徽水利开发股份有限公司 双排注浆桩与拉锚喷层联合支护结构
CN105297747A (zh) * 2015-11-03 2016-02-03 三峡大学 一种边坡加固方法及其绿化加固骨架
CN106939607A (zh) * 2017-03-28 2017-07-11 湘潭大学 一种让压复合竹筋锚喷支护基坑及其施工方法
CN106988321A (zh) * 2017-05-08 2017-07-28 湘潭大学 一种杂填土基坑用竹筋支护体系及其施工方法
CN107380351A (zh) * 2017-07-05 2017-11-24 中交天航环保工程有限公司 一种人工锚及其在松软泥质航道中的施工方法
CN108797608A (zh) * 2018-06-21 2018-11-13 江苏地基工程有限公司 一种装配式竹篾基坑护坡及其施工方法
CN110080248A (zh) * 2019-06-03 2019-08-02 河南城建学院 近水深基坑支护结构
CN113668550A (zh) * 2021-08-04 2021-11-19 深圳宏业基岩土科技股份有限公司 淤泥质地质条件基坑支护施工方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62129414A (ja) * 1985-11-28 1987-06-11 Nisshoku Corp 法枠工における注入アンカ−工法
CN101148882A (zh) * 2007-10-29 2008-03-26 中铁二院工程集团有限责任公司 破碎软弱岩质路堑高边坡稳定开挖方法
CN201137148Y (zh) * 2007-12-25 2008-10-22 杭州南方土木工程咨询有限公司 双排毛竹桩复合土钉围护***
CN101696574A (zh) * 2009-10-30 2010-04-21 河南国网宝泉抽水蓄能有限公司 高陡边坡生态防护方法
CN101748741A (zh) * 2009-12-18 2010-06-23 中冶交通工程技术有限公司 一种混凝土支护结构的施工方法
CN102021906A (zh) * 2010-12-16 2011-04-20 河南省新开元路桥工程咨询有限公司 深层搅拌桩处治软土地基的方法
CN102235007A (zh) * 2010-04-27 2011-11-09 中国华冶科工集团有限公司 上钉下桩组合的深基支护方法
CN203403423U (zh) * 2013-08-02 2014-01-22 江苏正方园建设集团有限公司 一种基坑支护用复合竹筋喷锚支护

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62129414A (ja) * 1985-11-28 1987-06-11 Nisshoku Corp 法枠工における注入アンカ−工法
CN101148882A (zh) * 2007-10-29 2008-03-26 中铁二院工程集团有限责任公司 破碎软弱岩质路堑高边坡稳定开挖方法
CN201137148Y (zh) * 2007-12-25 2008-10-22 杭州南方土木工程咨询有限公司 双排毛竹桩复合土钉围护***
CN101696574A (zh) * 2009-10-30 2010-04-21 河南国网宝泉抽水蓄能有限公司 高陡边坡生态防护方法
CN101748741A (zh) * 2009-12-18 2010-06-23 中冶交通工程技术有限公司 一种混凝土支护结构的施工方法
CN102235007A (zh) * 2010-04-27 2011-11-09 中国华冶科工集团有限公司 上钉下桩组合的深基支护方法
CN102021906A (zh) * 2010-12-16 2011-04-20 河南省新开元路桥工程咨询有限公司 深层搅拌桩处治软土地基的方法
CN203403423U (zh) * 2013-08-02 2014-01-22 江苏正方园建设集团有限公司 一种基坑支护用复合竹筋喷锚支护

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213566A (zh) * 2014-09-26 2014-12-17 安徽水利开发股份有限公司 双排注浆桩与拉锚喷层联合支护结构
CN104213566B (zh) * 2014-09-26 2016-05-25 安徽水利开发股份有限公司 双排注浆桩与拉锚喷层联合支护结构
CN105297747A (zh) * 2015-11-03 2016-02-03 三峡大学 一种边坡加固方法及其绿化加固骨架
CN106939607A (zh) * 2017-03-28 2017-07-11 湘潭大学 一种让压复合竹筋锚喷支护基坑及其施工方法
CN106939607B (zh) * 2017-03-28 2021-05-04 湘潭大学 一种让压复合竹筋锚喷支护基坑及其施工方法
CN106988321A (zh) * 2017-05-08 2017-07-28 湘潭大学 一种杂填土基坑用竹筋支护体系及其施工方法
CN107380351A (zh) * 2017-07-05 2017-11-24 中交天航环保工程有限公司 一种人工锚及其在松软泥质航道中的施工方法
CN107380351B (zh) * 2017-07-05 2023-09-12 中交天航环保工程有限公司 一种人工锚及其在松软泥质航道中的施工方法
CN108797608A (zh) * 2018-06-21 2018-11-13 江苏地基工程有限公司 一种装配式竹篾基坑护坡及其施工方法
CN110080248A (zh) * 2019-06-03 2019-08-02 河南城建学院 近水深基坑支护结构
CN113668550A (zh) * 2021-08-04 2021-11-19 深圳宏业基岩土科技股份有限公司 淤泥质地质条件基坑支护施工方法
CN113668550B (zh) * 2021-08-04 2023-03-07 深圳宏业基岩土科技股份有限公司 淤泥质地质条件基坑支护施工方法

Also Published As

Publication number Publication date
CN103362131B (zh) 2015-10-28

Similar Documents

Publication Publication Date Title
CN103362131B (zh) 一种基坑支护用复合竹筋喷锚支护及其施工方法
CN102444142B (zh) 一种群桩改柱扩建地下室及其施工工法
CN101338679B (zh) 深井大断面松散围岩巷道支护方法
CN102051881B (zh) 柔性面层土钉墙支护体系及其施工方法
CN204418187U (zh) 地铁保护区域土钉墙结合双排桩深基坑复合支护结构
CN106049505A (zh) 一种深基坑支撑支护体系的施工方法
CN201891116U (zh) 柔性面层土钉墙支护体系
CN106522236B (zh) 基坑支护的结构及施工方法
CN102352632A (zh) 一种锚杆板桩组合结构及其加固斜坡一侧高填方体的方法
CN105386454B (zh) 一种用于输电塔的联合装配式基础
CN103452120B (zh) 一种用于基坑支护的高强预应力管桩的桩顶冠梁结构及其施工方法
CN101285309A (zh) 高层建筑深基坑复合支护方法
CN102912798A (zh) 一种复合土钉墙基坑支护方法
CN102912808A (zh) 螺旋cfg桩结合水泥搅拌桩复合地基施工方法
CN204825928U (zh) 一种基坑支护
CN110616740A (zh) 一种地铁矿山法建成区间扩建成渡线段的结构及其施工方法
CN206599785U (zh) 一种排桩锚拉水泥土桩连续墙支护结构
CN201801843U (zh) 一种带锚碇结构的水上重力式挡土结构
KR100947627B1 (ko) 터널의 강화 그라우팅구조 및 이를 적용한 터널 시공방법
CN104532855A (zh) 一种深厚泥炭质土层中的组合桩支护结构
CN201649076U (zh) 一种人字型单排单向旋喷搅拌加筋组合支护桩
CN103953053B (zh) 斜面浇筑植生型生态混凝土防溢出装置及施工方法
CN203174614U (zh) 预应力锚索桩板墙
CN203403423U (zh) 一种基坑支护用复合竹筋喷锚支护
CN203373753U (zh) 基坑桩锚护壁混凝土锚索冠梁结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Chen Jiadong

Inventor after: Xue Zhirong

Inventor after: Bie Xiaoyong

Inventor after: Wu Liang

Inventor after: Liu Jianzhong

Inventor after: Xu Jinshan

Inventor after: Wang Xiaojian

Inventor after: Zhang Junyang

Inventor after: Lu Ying

Inventor before: Zhang Junyang

Inventor before: Lu Ying

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20160229

Address after: 214000 Changjiang Road 5-1-501 (Dongfang Ginza), New District, Jiangsu, Wuxi

Patentee after: Wuxi City great Zhu geo-technology Co., Ltd

Patentee after: Jiangsu Zhengfangyuan Construction Group Co., Ltd.

Address before: 11, building 214043, block B, Guoxin building, 72 North Street, Beitang District, Jiangsu, Wuxi

Patentee before: Jiangsu Zhengfangyuan Construction Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151028

Termination date: 20200802

CF01 Termination of patent right due to non-payment of annual fee