CN103359602B - Insulating hook pulley assembly device - Google Patents

Insulating hook pulley assembly device Download PDF

Info

Publication number
CN103359602B
CN103359602B CN201210082462.3A CN201210082462A CN103359602B CN 103359602 B CN103359602 B CN 103359602B CN 201210082462 A CN201210082462 A CN 201210082462A CN 103359602 B CN103359602 B CN 103359602B
Authority
CN
China
Prior art keywords
hook
suspension hook
insulation
pulley
frame plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210082462.3A
Other languages
Chinese (zh)
Other versions
CN103359602A (en
Inventor
方明勋
齐忠昱
王林华
王书宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Aluminum and Magnesium Engineering and Research Institute Co Ltd
Original Assignee
Shenyang Aluminum and Magnesium Engineering and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Aluminum and Magnesium Engineering and Research Institute Co Ltd filed Critical Shenyang Aluminum and Magnesium Engineering and Research Institute Co Ltd
Priority to CN201210082462.3A priority Critical patent/CN103359602B/en
Publication of CN103359602A publication Critical patent/CN103359602A/en
Application granted granted Critical
Publication of CN103359602B publication Critical patent/CN103359602B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses an insulating hook pulley assembly device. The insulating hook pulley assembly device comprises a hook, a hook beam, a hook frame plate, a hook nut and a pulley, wherein the hook beam is arranged on the hook frame plate, the hook is fixed on the hook beam through the hook nut, the hook beam is fixed on the hook frame plate through a first insulating component, the pulley shaft of the pulley is fixed on the hook frame plate through a second insulating component, and rubber check blocks are mounted at the two ends of a trunnion of the hook beam and matched with locating sliding grooves formed on the bottom of a main trolley. The insulating hook pulley assembly device disclosed by the invention has the advantages that two types of insulation is formed between the hook and the pulley through the first insulating component, the second insulating component, and the rubber check blocks to ensure the safety of a worker for lifting a heavy object in an electrolytic plant; and the hook pulley assembly and the locating sliding grooves on the bottom of the main trolley co-work to achieve the stability of the lifted object in a transportation process.

Description

A kind of insulation suspension hook assembly pulley device
Technical field
The present invention relates to a kind of insulation suspension hook assembly pulley device, be particularly useful for electrolytic cell and concentrate overhaul to carry the special insulation suspension hook assembly pulley device of overhead traveling crane.
Background technology
The repair method of electrolytic cell is generally after electrolytic cell has a power failure cooling, carries out tearing a series of service works such as groove, pot shell repairing, brickwork and superstructure installation open in original place, completes an electrolytic cell maintenance process and about needs about 50 days; Expansion is improved constantly along with electrolytic aluminium factory production scale and electrolysis grooved, the repairing work load of electrolytic cell is also increasing, this in-situ trouble method not only the repairing time long, affect electrolytic aluminium output, and cause environmental pollution, the working condition of workman is poor, and potential safety hazard is many, and electrolytic cell repairing quality cannot ensure; It is visual plant in movement system that electrolytic cell concentrates overhaul to carry overhead traveling crane, because of its need in potroom handling electrolytic bath shell, require that its suspension hook group has insulating properties.A kind of in existing suspension hook group technique is adopted by securing member felt pad and insulation sleeve to be surrounded the object making it to reach insulation, also has a kind of nylon pulley that adopts to realize insulation.Front kind of technology insulating point is too much, and make installation and overhaul more complicated, add the labour intensity of workman, rear kind of technology manufacturing cost is too high; Again because carrying overhead traveling crane will carry out long-distance transportation with electrolytic bath shell, walk to stop easily to cause in process and hang thing and rock, so require that suspension hook has certain anti-shake function.
Summary of the invention
For solving the problems of the technologies described above, the invention provides the assembly pulley device of a kind of electrolytic cell carrying overhead traveling crane special isolation suspension hook.Concrete scheme is as follows:
A kind of insulation suspension hook assembly pulley device, comprise suspension hook, lifting beam with hook, suspension hook frame plate, hook nut, pulley, described suspension hook frame plate arranges lifting beam with hook, described suspension hook is fixed on described lifting beam with hook by described hook nut; Described lifting beam with hook is fixed on suspension hook frame plate by an insulation assembly; The pulley spindle of described pulley is fixed on suspension hook frame plate by No. two insulation assemblies; The two ends of lifting beam with hook gudgeon are provided with rubber block, rubber block coordinates with the positioning runner arranged bottom main carriage, when lifting hook pulley group rises to highest point, rubber block slips in the positioning runner bottom main carriage, described lifting beam with hook is fixedly installed reinforcing ring, described reinforcing ring is arranged on insulation sleeve cylindrical, between the outside that described reinforcing ring is arranged on suspension hook frame plate and rubber block.
A described insulation assembly comprises insulation sleeve and felt pad, and described insulation sleeve is arranged between gudgeon and suspension hook frame plate; Described felt pad is arranged between lifting beam with hook and suspension hook frame plate.
Described No. two insulation assemblies comprise insulation sleeve and felt pad, and described insulation sleeve is arranged between pulley spindle and suspension hook frame plate, and described felt pad is arranged between pulley and suspension hook frame plate.
Described pulley is 4, and every two is one group.
Advantageous effect of the present invention: by an insulation assembly and No. two insulation assemblies and rubber block, not only make between suspension hook and pulley, to define twice insulation, ensure that the security of workman when potroom hoisting heavy, and make the positioning runner acting in conjunction bottom lifting hook pulley group and main carriage realize hanging the stability of thing in handling process; Owing to arranging reinforcing ring 15, lifting surface area strengthens, and reduces pressure, is not only conducive to protecting insulation sleeve 11, and adds service life and the security of lifting hook pulley group.
Accompanying drawing explanation
Fig. 1 is the front view of insulation suspension hook assembly pulley;
Fig. 2 is the A-A sectional view of Fig. 1;
Fig. 3 is the B-B sectional view of Fig. 1;
Fig. 4 is the installation diagram of insulation suspension hook assembly pulley and dolly positioning runner;
In figure: 1. suspension hook, 2. suspension hook frame plate, 3. lifting beam with hook, 4. hook nut, 5. pulley, 6. insulation assembly, 7. rubber block, 8. a pulley spindle, 9. No. two insulation assemblies, 10. felt pads, 11. insulation sleeves, 12. positioning runners, 13. main carriages, 15. reinforcing rings, 301. gudgeons.
Detailed description of the invention
Below embodiments of the invention are described in detail by reference to the accompanying drawings, but protection scope of the present invention not limit by embodiment.
As shown in Figures 1 to 4, suspension hook assembly pulley device is insulated by a suspension hook 1, two suspension hook frame plates 2, a lifting beam with hook 3, hook nut 4 and four pulleys, 5, two pulley spindles 8, the compositions such as lifting beam with hook end block 7, insulation assembly 6 and No. two insulation assemblies 9.
Suspension hook 1 is installed on lifting beam with hook 3 by hook nut 4, and the gudgeon 301 of lifting beam with hook 3 is arranged on suspension hook frame plate 2 by an insulation assembly 6, realizes the insulation of suspension hook 1 and suspension hook frame plate 2; Pulley 5 is respectively installed on two pulley spindles 8, and pulley spindle 8 is arranged on suspension hook frame plate 2 by No. two insulation assemblies 9, realizes the insulation of pulley 5 and suspension hook frame plate 2, thus realizes insulating from suspension hook 1 to the twice of pulley 5; The two ends of lifting beam with hook 3 gudgeon are provided with rubber block 7, and its effect is when lifting hook pulley group rises to highest point, and rubber block 7 slips in the positioning runner 12 bottom main carriage 13, thus realize hanging the stable of thing in handling process.
A described insulation assembly 6 comprises insulation sleeve 11 and felt pad 10, and described insulation sleeve 11 is arranged between gudgeon 301 and suspension hook frame plate 2; Described felt pad 10 is arranged between lifting beam with hook 3 and suspension hook frame plate 2;
Described No. two insulation assemblies 9 comprise insulation sleeve 11 and felt pad 10, and described insulation sleeve 11 is arranged between pulley spindle 8 and suspension hook frame plate 2, and described felt pad 10 is arranged between pulley 5 and suspension hook frame plate 2; Described insulation sleeve 11 is for realizing radial insulation, and described felt pad is used for realizing axial dielectric;
For solving because stress concentrates brought insulation sleeve to damage in hoisting process, described lifting beam with hook 3 is fixedly installed reinforcing ring 15, and described reinforcing ring 15 is arranged on insulation sleeve 11 cylindrical.
Principle of the present invention is as follows:
By an insulation assembly 6 and No. two insulation assemblies 9, suspension hook 1 is made to be arranged between two suspension hook frame plates 2, form insulation between suspension hook frame plate 2 and pulley 5, thus make whole lifting hook pulley group have twice insulation, ensure that the security of workman when potroom hoisting heavy.The rubber block 7 being fixed on lifting beam with hook 3 two ends can realize hanging the stability of thing in handling process with the positioning runner bottom main carriage jointly, and realizes the secondary insulating of suspension hook 1 and dolly 13.Owing to arranging reinforcing ring 15, lifting surface area strengthens, and reduces pressure, is not only conducive to protecting insulation sleeve 11, and adds service life and the security of lifting hook pulley group.

Claims (4)

1. an insulation suspension hook assembly pulley device, comprises suspension hook, lifting beam with hook, suspension hook frame plate, hook nut, and pulley, is characterized in that: described suspension hook frame plate arranges lifting beam with hook, and described suspension hook is fixed on described lifting beam with hook by described hook nut; Described lifting beam with hook is fixed on suspension hook frame plate by an insulation assembly; The pulley spindle of described pulley is fixed on suspension hook frame plate by No. two insulation assemblies; The two ends of lifting beam with hook gudgeon are provided with rubber block, rubber block coordinates with the positioning runner arranged bottom main carriage, when lifting hook pulley group rises to highest point, rubber block slips in the positioning runner bottom main carriage, described lifting beam with hook is fixedly installed reinforcing ring, described reinforcing ring is arranged on insulation sleeve cylindrical, between the outside that described reinforcing ring is arranged on suspension hook frame plate and rubber block.
2. insulation suspension hook assembly pulley device according to claim 1, is characterized in that: a described insulation assembly comprises insulation sleeve and felt pad, and described insulation sleeve is arranged between gudgeon and suspension hook frame plate; Described felt pad is arranged between lifting beam with hook and suspension hook frame plate.
3. insulation suspension hook assembly pulley device according to claim 1, is characterized in that: described No. two insulation assemblies comprise insulation sleeve and felt pad, and described insulation sleeve is arranged between pulley spindle and suspension hook frame plate, and described felt pad is arranged between pulley and suspension hook frame plate.
4. insulation suspension hook assembly pulley device according to claim 1, is characterized in that: described pulley is 4, and every two is one group.
CN201210082462.3A 2012-03-26 2012-03-26 Insulating hook pulley assembly device Active CN103359602B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210082462.3A CN103359602B (en) 2012-03-26 2012-03-26 Insulating hook pulley assembly device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210082462.3A CN103359602B (en) 2012-03-26 2012-03-26 Insulating hook pulley assembly device

Publications (2)

Publication Number Publication Date
CN103359602A CN103359602A (en) 2013-10-23
CN103359602B true CN103359602B (en) 2015-04-29

Family

ID=49362002

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210082462.3A Active CN103359602B (en) 2012-03-26 2012-03-26 Insulating hook pulley assembly device

Country Status (1)

Country Link
CN (1) CN103359602B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104694956B (en) * 2013-12-10 2017-11-10 沈阳铝镁设计研究院有限公司 A kind of positioner and localization method of electrolytic cell transfer car(buggy)
CN113800378B (en) * 2021-08-26 2023-09-26 上海宝冶集团有限公司 Insulating device for working tower crane near electromagnetic wave source and construction method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04112189A (en) * 1990-08-31 1992-04-14 Taisei Corp Insulated hook block for crane
JPH0654683U (en) * 1993-01-07 1994-07-26 三菱重工業株式会社 Insulation hook
CN201010432Y (en) * 2007-03-06 2008-01-23 江阴凯澄起重机械有限公司 Insulated cargo hook device
CN201052942Y (en) * 2007-04-24 2008-04-30 隆镔企业有限公司 Insulation construction for crane
CN201116262Y (en) * 2007-09-20 2008-09-17 贵阳铝镁设计研究院 Soft hook aluminium discharging bogie deviation preventing structure
CN201272256Y (en) * 2008-09-19 2009-07-15 辽宁省电力有限公司营口供电公司 Insulated three-sheave block double hook hoist

Also Published As

Publication number Publication date
CN103359602A (en) 2013-10-23

Similar Documents

Publication Publication Date Title
CN201864454U (en) Lifting appliance of centralized overhauling transportation system of electrolytic cell
CN103359602B (en) Insulating hook pulley assembly device
CN103023229A (en) Linear movement core sleeving assembly method of large motor stator
CN203728399U (en) Hook specially for transporting drying rolls in lifting way
CN105155416A (en) Integral slippage and vertical rotation device for steel pylon
CN209974130U (en) Strip steel back washing section drying roll replacing device
CN103803403B (en) A kind of squeeze roll handling hook special
CN203434492U (en) Combination-type electric hoisting apparatus
CN102153017B (en) Bridge crane trolley for mine
CN105174156A (en) Hoisting assembling frame for electrical equipment
CN205151660U (en) Automatic jacking device of quick -witted maintenance of conical rollers down of ring of passing through many hands or places
CN204198264U (en) Electric block drift angle lifting auxiliary device
CN204224123U (en) A kind of suspension hoisting device installing base husband Saite stove
CN102229408A (en) Bridge crane for mine
CN203813320U (en) Tool for live exchange of 220 kV narrow base tower strain insulator string
CN103084409B (en) Pressure constant width machine pinch roll changes system
CN202022668U (en) Mine bridge crane
CN203813334U (en) Right-angle yoke plate clamp for live exchange of 220 kV strain insulator string
CN203248599U (en) Counterweight self-detached structure of rotary drilling rig and rotary drilling rig
CN102311042A (en) Lifting appliance of transport system for intensive overhaul of electrolytic bath and lifting method
CN212387573U (en) Super large bearing lifting device assembly
CN203660778U (en) Multifunctional motor overhauling device
CN216638762U (en) Movable pulley block structure suitable for large-angle diagonal-pulling working condition gantry hoist
CN205146883U (en) Bearing frame dismounting device
CN202022660U (en) Bridge crane trolley used for mine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant