CN103337858A - 一种配电网***非线性负荷模型的建立方法 - Google Patents
一种配电网***非线性负荷模型的建立方法 Download PDFInfo
- Publication number
- CN103337858A CN103337858A CN2013102409579A CN201310240957A CN103337858A CN 103337858 A CN103337858 A CN 103337858A CN 2013102409579 A CN2013102409579 A CN 2013102409579A CN 201310240957 A CN201310240957 A CN 201310240957A CN 103337858 A CN103337858 A CN 103337858A
- Authority
- CN
- China
- Prior art keywords
- current source
- sinusoidal current
- load
- distribution network
- nonlinear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/40—Arrangements for reducing harmonics
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明一种配电网***非线性负荷模型的建立方法,属于配电网负荷模型建模技术领域;解决的技术问题是:提供一种通用的能够准确模拟实际负荷情况的非线性负荷模型;采用的技术方案是:按以下步骤进行:第一步:在仿真***中选择n个正弦电流源,第二步:设置每个正弦电流源的频率,第三步:设置每个正弦电流源的幅值,第四步:将上述n个正弦电流源相加,输出相加得到的电流源,该电流源即为配电网非线性负荷源模型;本发明适用于电力部门。
Description
技术领域
本发明一种配电网***非线性负荷模型的建立方法,属于配电网负荷模型建模技术领域。
背景技术
近年来,随着电力电子装置等非线性负荷在电力***中的广泛应用,由其产生的电力谐波对电网的污染日益严重,严重影响与用户直接联系的配电网***的电能质量,为了研究分析配电网***电能质量问题,计算机仿真技术是重要手段之一,在进行计算机仿真分析时,如何建立含有非线性负荷的线路负荷源模型是分析和仿真的关键。
配电网中接有各种负荷类型,包括线性、非线性、阻性、感性、容性等,现有的仿真分析中常常以某种非线性负荷模型来模拟实际负荷,这对一些专线供电用户可行,对于大部分非专线供电用户,接有各种线性、非线性负荷,并且负荷类型和大小都随时变化时,此时无法采用某一种或某几种类型的负荷源来模拟实际负荷情况,无法进行准确的模拟。
发明内容
本发明克服现有技术存在的不足,所要解决的技术问题是:提供一种通用的能够准确模拟实际负荷情况的非线性负荷模型。
为解决上述技术问题,本发明所采用的技术方案是:一种配电网***非线性负荷模型的建立方法,所述方法按以下步骤进行:
第一步:在仿真***中选择n个正弦电流源,其中n为总的谐波次数,进入第二步;
第二步:设置每个正弦电流源的频率,将n个正弦电流源依次编号1至n,根据公式fn=50nHz计算每个正弦电流源的频率,根据计算结果,依次设置每个正弦电流源的频率,进入第三步;
第三步:设置每个正弦电流源的幅值,幅值大小为依次为基波和各次谐波的幅值大小,进入第四步;
第四步:将上述n个正弦电流源相加,输出相加得到的电流源,该电流源即为配电网非线性负荷源模型。
本发明与现有技术相比具有的有益效果是:本发明采用频率不同的电流源相加来模拟配网***线路的负荷模型,不涉及具体的负载性质及类型,所建立的模型适用于任何线路及任何负载,随着负载的变化可方便地修改,模拟准确,并且通用性强。
附图说明
下面结合附图对本发明做进一步详细的说明:
图1是本发明谐波源模型的示意图;
图2是实施例一中正弦电流信号的示意图;
图3是实施例一中建立谐波源模型的示意图;
图中:1为正弦电流源,2为加法器,3为将正弦电流信号转换成正弦电流源的器件。
具体实施方式
如图1所示,本发明一种配电网***非线性负荷模型的建立方法,所述方法按以下步骤进行:
第一步:由于谐波源本质上为向电网注入谐波的电流源,且谐波能通过傅立叶分解为大于基波频率的正弦波,所以在仿真***中选择n个正弦电流源,其中n为总的谐波次数,然后进入第二步;
第二步:设置每个正弦电流源的频率,将n个正弦电流源依次编号1至n,根据公式fn=50nHz计算每个正弦电流源的频率,根据计算结果,依次设置每个正弦电流源的频率,如:基波频率为50HZ,二次谐波频率为100HZ……,n次谐波的频率为50nHZ,然后进入第三步;
第三步:设置每个正弦电流源的幅值,幅值大小依次为被模拟的实际线路中基波和各次谐波的幅值大小,然后进入第四步;
第四步:将上述n个正弦电流源相加,输出相加得到的电流源,该电流源即为配电网非线性负荷源模型。
本方法采用频率不同的电流源相加来模拟配网***线路的负荷模型,不涉及具体的负载性质及类型,所建立的模型适用于任何线路及任何负载,随着负载的变化可方便地修改,模拟准确,并且通用性强。
实施例一:下面以9次谐波为例,说明本方法在仿真软件matlab中的simulink中建立谐波源的方法:
第一步:在元件库里选择9个正弦电流源,如图2所示,进入第二步;
第二步:设置每个正弦电流源的频率,由于我国的工频f1=50Hz,根据谐波的概念二次谐波即为f2=100Hz,相应三次谐波f3=150Hz……9次谐波f9=450Hz,进入第三步;
第三步:设置每个正弦电流源的幅值,幅值大小即为谐波值的大小,进入第四步;
第四步:将设置好的正弦电流信号相加,然后输出,如图3所示,即得到含有2-9次谐波的非线性负荷源模型,可接入电网。
上面结合附图对本发明的实施例作了详细说明,但是本发明并不限于上述实施例,在本领域普通技术人员所具备的知识范围内,还可以在不脱离本发明宗旨的前提下作出各种变化,例如,本发明中第二步和第三步的顺序可以调换,该调换后的方法也因归为本专利申请所要保护的范围。
Claims (1)
1.一种配电网***非线性负荷模型的建立方法,其特征在于:所述方法按以下步骤进行:
第一步:在仿真***中选择n个正弦电流源,其中n为总的谐波次数,进入第二步;
第二步:设置每个正弦电流源的频率,将n个正弦电流源依次编号1至n,根据公式fn=50nHz计算每个正弦电流源的频率,根据计算结果,依次设置每个正弦电流源的频率,进入第三步;
第三步:设置每个正弦电流源的幅值,幅值大小为依次为基波和各次谐波的幅值大小,进入第四步;
第四步:将上述n个正弦电流源相加,输出相加得到的电流源,该电流源即为配电网非线性负荷源模型。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102409579A CN103337858A (zh) | 2013-06-18 | 2013-06-18 | 一种配电网***非线性负荷模型的建立方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102409579A CN103337858A (zh) | 2013-06-18 | 2013-06-18 | 一种配电网***非线性负荷模型的建立方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103337858A true CN103337858A (zh) | 2013-10-02 |
Family
ID=49245976
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013102409579A Pending CN103337858A (zh) | 2013-06-18 | 2013-06-18 | 一种配电网***非线性负荷模型的建立方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103337858A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104316894A (zh) * | 2014-10-16 | 2015-01-28 | 国家电网公司 | 一种电能表实际运行环境的仿真校验方法 |
CN109167352A (zh) * | 2018-09-14 | 2019-01-08 | 浙江大学 | 一种基于线性支路模型的非线性负荷交流网络等值方法 |
CN111308320A (zh) * | 2020-03-05 | 2020-06-19 | 天津农学院 | 一种活立木生物电电路模型及其各元件参数的确定方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN85100987A (zh) * | 1985-04-01 | 1986-08-20 | 杜克俭 | 谐波能量叠加控制装置 |
DE19819874A1 (de) * | 1998-04-27 | 1999-10-28 | Ruediger Bredtmann | Verfahren zur Kompensation von Stromoberschwingungen in elektrischen Energienetzen |
CN202384767U (zh) * | 2011-12-31 | 2012-08-15 | 重庆市大足县供电有限责任公司 | 一种新型的谐波源简化电路模型 |
-
2013
- 2013-06-18 CN CN2013102409579A patent/CN103337858A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN85100987A (zh) * | 1985-04-01 | 1986-08-20 | 杜克俭 | 谐波能量叠加控制装置 |
DE19819874A1 (de) * | 1998-04-27 | 1999-10-28 | Ruediger Bredtmann | Verfahren zur Kompensation von Stromoberschwingungen in elektrischen Energienetzen |
CN202384767U (zh) * | 2011-12-31 | 2012-08-15 | 重庆市大足县供电有限责任公司 | 一种新型的谐波源简化电路模型 |
Non-Patent Citations (2)
Title |
---|
胡伟等: "多谐波源网络谐波源建模与谐波叠加仿真", 《中国电力》 * |
邢颖等: "非线性负荷对电网电压和电流的影响", 《电气应用》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104316894A (zh) * | 2014-10-16 | 2015-01-28 | 国家电网公司 | 一种电能表实际运行环境的仿真校验方法 |
CN104316894B (zh) * | 2014-10-16 | 2017-10-17 | 国家电网公司 | 一种电能表实际运行环境的仿真校验方法 |
CN109167352A (zh) * | 2018-09-14 | 2019-01-08 | 浙江大学 | 一种基于线性支路模型的非线性负荷交流网络等值方法 |
CN111308320A (zh) * | 2020-03-05 | 2020-06-19 | 天津农学院 | 一种活立木生物电电路模型及其各元件参数的确定方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Dinavahi et al. | Real-time digital simulation of power electronic apparatus interfaced with digital controllers | |
CN105449713A (zh) | 考虑分布式电源特性的有源配电网智能软开关规划方法 | |
CN104298127B (zh) | 基于rt‑lab的微电网半数字半实物实时仿真*** | |
CN109599783B (zh) | 一种基于云平台的安全配电模拟屏***及其控制方法 | |
CN104316894A (zh) | 一种电能表实际运行环境的仿真校验方法 | |
CN104252550A (zh) | 一种基于fpga的高性能实时仿真方法 | |
CN106501755A (zh) | 一种基于动态负荷模型的智能电能表动态误差测量方法 | |
Abbood et al. | Data‐Driven Modeling of a Commercial Photovoltaic Microinverter | |
CN103337858A (zh) | 一种配电网***非线性负荷模型的建立方法 | |
Thiyagarajan et al. | Real time energy management and load forecasting in smart grid using compactrio | |
CN104361168A (zh) | 500kV交流直线杆塔电场仿真方法 | |
CN202393853U (zh) | 一种变电站数字化继电保护测试装置 | |
Yu et al. | Modeling and simulation analysis of single phase arc grounding fault based on MATLAB | |
Robert et al. | Hardware-In-the-Loop Simulation of a High Frequency Interleaved Converter based on a Low-Cost FPGA Platform | |
CN103971557A (zh) | 一种电网数字动态实时仿真*** | |
Bereš et al. | Digital pulse generator for multiphase bost converter | |
CN203287407U (zh) | 一种高压大功率多次谐波发生装置 | |
CN203811797U (zh) | 模拟电工/电子信号及数字信号电能表校验装置 | |
CN203104385U (zh) | 一种适用于电力***的多谐波信号发生装置 | |
Ufa et al. | Hard-and software of real time simulation tools of Electric Power System for adequate modeling power semiconductors in voltage source convertor based HVDC and FACTS | |
Darwish et al. | OrCAD vs Matlab Simulink in teaching power electronics | |
Atalik et al. | Design and implementation of an identifier system for inter-area power oscillations | |
Askarov et al. | Use of all-mode modeling complex for power systems with distributed generation | |
CN207008352U (zh) | 一种非线性信号模拟装置 | |
CN203204144U (zh) | 一种带虚拟电流源的现场检验装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C05 | Deemed withdrawal (patent law before 1993) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20131002 |