CN103334587B - Wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method thereof - Google Patents
Wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method thereof Download PDFInfo
- Publication number
- CN103334587B CN103334587B CN201310230037.9A CN201310230037A CN103334587B CN 103334587 B CN103334587 B CN 103334587B CN 201310230037 A CN201310230037 A CN 201310230037A CN 103334587 B CN103334587 B CN 103334587B
- Authority
- CN
- China
- Prior art keywords
- template
- fill plate
- inverted trapezoidal
- support post
- crossbeam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Moulds, Cores, Or Mandrels (AREA)
Abstract
The present invention relates to a kind of wooden bamboo matter horizontal shuttering Quick assembling-disassembling structure and method, it is characterized in that: comprise the template be located at below build floor to be poured, described template is provided with the trapezoid fill plate in order to template dismounting, is provided with inverted trapezoidal fill plate between described template.The present invention's wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method, be not only conducive to the handling facilitating template, and can reduce the turn around time of template.
Description
technical field:
The present invention relates to a kind of wooden bamboo matter horizontal shuttering Quick assembling-disassembling structure and method.
background technology:
Model sheetinstallat and the dismounting of existing floor are loaded down with trivial details especially, particularly cause template dismounting very difficult, not only consuming time because template expands extruding after having built cement material during dismounting, and easily cause the damage of template; In addition, according to national building standard, requiring after concrete floor slab placement could dismantle for more than 28 days, otherwise easily cause the distortion of cement floor, therefore causing the template needing to be equipped with many cover floors when building city high rise building.
summary of the invention:
The object of the present invention is to provide a kind of wooden bamboo matter horizontal shuttering Quick assembling-disassembling structure and method, this wooden bamboo matter horizontal shuttering Quick assembling-disassembling structure is simple, reasonable in design, be conducive to the handling facilitating template, this wooden bamboo matter horizontal shuttering rapid-assembling/disassembling method, not only be conducive to the handling facilitating template, improve workmanship, and the turn around time of template can be reduced.
The present invention's wood bamboo matter horizontal shuttering Quick assembling-disassembling structure, it is characterized in that: comprise the template be located at below build floor to be poured, described template is provided with the trapezoid fill plate in order to template dismounting, is provided with inverted trapezoidal fill plate between described template.
Erect below above-mentioned inverted trapezoidal fill plate and between ground and be provided with support post, between described support post and inverted trapezoidal fill plate, be provided with Fang Liang.
Above-mentioned support post is provided with removing device, and described removing device comprises the fagging be fixed on support post and the vertical supporting bar be threaded in for support shuttering crossbeam on fagging.
Above-mentioned template crossbeam is i beam or Fang Liang.
The veneer that above-mentioned template, trapezoidal fill plate and inverted trapezoidal fill plate are glued together by multi-layered sheet.
The sheet material that above-mentioned template, trapezoidal fill plate and inverted trapezoidal fill plate are spliced by row's pin chips or fine bamboo strip.
The trapezoid fill plate that the present invention's wood bamboo matter horizontal shuttering Quick assembling-disassembling structure is provided with by first dismantling template, thus unload removing template extruding force in the horizontal direction, as long as the bonding force overcome when dismantling template between template and floor is (when there being increase release agent, bonding force is very little), be so very easily detachable template, time saving and energy saving.
The both ends of above-mentioned template side are provided with shrinkage pool groove in order to dismounting, and the medium position of described template side is also provided with shrinkage pool groove.
Above-mentioned template one side is provided with fin, and another side correspondence of described template is provided with the groove for docking fin.
Steel bushing is arranged with in above-mentioned shrinkage pool groove.
In two groove steel bushings, reinforcing bar is equipped with during above-mentioned adjacent two square template split.
The present invention's wood bamboo matter horizontal shuttering rapid-assembling/disassembling method, it is characterized in that: when mounted, first removing device and support post are linked into an integrated entity, then after vertically setting one by one, template crossbeam and template is spread successively at support bar, simultaneously spread Fang Liang and inverted trapezoidal fill plate successively in support post upper end, carried out the design height of adjusting template by the height of threaded adjusting support bar, can start to lay reinforcing bar etc. after the design height of trapezoid fill plate, inverted trapezoidal fill plate and template all regulates; After concrete floor slab placement three to a couple of days gets final product turn support bar, the template crossbeam making it support declines one section of 5-30cm distance, then to leave behind trapezoid fill plate, then other template is just easy to pull down, or template of leaving behind in the shrinkage pool groove stretching into template by drag hook, make trapezoid fill plate, template drops on only has on 5-30cm distance template crossbeam with it, and be unlikely to directly to fall on the ground, within then 20-30 days, remove support post, Fang Liang and inverted trapezoidal fill plate again.
The present invention's wood bamboo matter horizontal shuttering rapid-assembling/disassembling method, after watering build floor three to a couple of days can first decline after template crossbeam dismantles the trapezoid fill plate that template is provided with, thus unload removing template extruding force in the horizontal direction, as long as the bonding force overcome when dismantling template between template and floor is (when there being increase release agent, bonding force is very little), be so very easily detachable template, time saving and energy saving.Thus make the turnaround time of template foreshorten to 3 to 4 days from original 28 days, decrease the turnaround time of template, decrease the outfit quantity of template, reduce cost of production.
accompanying drawing illustrates:
Fig. 1 is organigram of the present invention;
Fig. 2 is the organigram that the present invention removes removing device;
Fig. 3 a is the organigram of veneer;
Fig. 3 b is Fig. 3 a upward view;
Fig. 4 a is the organigram of the sheet material that the thin bamboo batten of a row is spliced;
Fig. 4 b is Fig. 4 a upward view.
Fig. 5 is the organigram of the another kind of embodiment of template;
Fig. 6 is the organigram of two template splits.
detailed description of the invention:
The present invention's wood bamboo matter horizontal shuttering Quick assembling-disassembling structure, comprise the template 2 be located at below build floor 1 to be poured, described template is provided with the trapezoid fill plate 4 in order to template dismounting, is provided with inverted trapezoidal fill plate 3 between described template.
The template adopted and trapezoidal fill plate can be the veneers (as shown in Figure 3) glued together by multi-layered sheet 201, also can be the sheet material (as shown in Figure 4) be spliced by row's pin chips or fine bamboo strip 202.The sheet material adopting veneer or be spliced by row's fine bamboo strip, pin chips, as template, can strengthen the support strength of floor.
In order to better support, erect below above-mentioned inverted trapezoidal fill plate 3 and between ground and be provided with support post 5, between described support post 5 and inverted trapezoidal fill plate 3, be provided with a tree, used in making timber for boats beam 11.Level interval between two support posts 5 is less than 2 meters.Support post is steel pipe support.
For the ease of the dismounting of template, above-mentioned support post 5 is provided with removing device 6, and described removing device 6 comprises the fagging 7 be fixed on support post and the vertical supporting bar 9 be threaded in for support shuttering crossbeam 8 on fagging.
In order to design needs, above-mentioned template crossbeam can be i beam or other brace summer.
The trapezoid fill plate that the present invention's wood bamboo matter horizontal shuttering Quick assembling-disassembling structure is provided with by first dismantling template, thus unload removing template extruding force in the horizontal direction, as long as the bonding force overcome when dismantling template between template and floor is (when there being increase release agent, bonding force is very little), be so very easily detachable template, time saving and energy saving.
For the ease of dismounting template, the both ends of above-mentioned template 2 side are provided with shrinkage pool groove 12 in order to dismounting, and the medium position of described template side is also provided with shrinkage pool groove 12.
In order to the positioning stablity of each template is reliable, above-mentioned template one side is provided with fin 13, and another side correspondence of described template is provided with the groove 14 for docking fin.
In order to make to be not easy to damage shrinkage pool groove and firm for coordinating, in above-mentioned shrinkage pool groove 12, be arranged with steel bushing 15.In two groove steel bushings, reinforcing bar 16 is equipped with during above-mentioned adjacent two square template split.
The present invention's wood bamboo matter horizontal shuttering rapid-assembling/disassembling method, it is characterized in that: when mounted, first removing device and support post are linked into an integrated entity, then after vertically setting one by one, template crossbeam and template is spread successively at support bar, simultaneously spread Fang Liang and inverted trapezoidal fill plate successively in support post upper end, carried out the design height of adjusting template by the height of threaded adjusting support bar, can start to lay reinforcing bar etc. after the design height of trapezoid fill plate, inverted trapezoidal fill plate and template all regulates; After concrete floor slab placement three to a couple of days gets final product turn support bar, the template crossbeam making it support declines one section of 5-30cm distance, then to leave behind trapezoid fill plate, then other template is just easy to pull down, or template of leaving behind in the shrinkage pool groove stretching into template by drag hook, make trapezoid fill plate, template drops on only has on 5-30cm distance template crossbeam with it, and be unlikely to directly to fall on the ground, within then 20-30 days, remove support post, Fang Liang and inverted trapezoidal fill plate again.
The present invention's wood bamboo matter horizontal shuttering rapid-assembling/disassembling method, after watering build floor three to a couple of days can first decline after template crossbeam dismantles the trapezoid fill plate that template is provided with, thus unload removing template extruding force in the horizontal direction, as long as the bonding force overcome when dismantling template between template and floor is (when there being increase release agent, bonding force is very little), be so very easily detachable template, time saving and energy saving.Thus make the turnaround time of template foreshorten to 3 to 4 days from original 28 days, decrease the turnaround time of template, decrease the outfit quantity of template, reduce cost of production.
The foregoing is only preferred embodiment of the present invention, all equalizations done according to the present patent application the scope of the claims change and modify, and all should belong to covering scope of the present invention.
Claims (1)
1. a wooden bamboo matter horizontal shuttering rapid-assembling/disassembling method, it is characterized in that: wooden bamboo matter horizontal shuttering Quick assembling-disassembling structure comprises the template be located at below build floor to be poured, described template is provided with the trapezoid fill plate in order to template dismounting, inverted trapezoidal fill plate is provided with between described template, erect below described inverted trapezoidal fill plate and between ground and be provided with support post, Fang Liang is provided with between described support post and inverted trapezoidal fill plate, described support post is provided with removing device, described removing device comprises the fagging be fixed on support post and the vertical supporting bar be threaded in for support shuttering crossbeam on fagging, described template crossbeam is i beam or Fang Liang, described template, the veneer that trapezoidal fill plate and inverted trapezoidal fill plate are glued together by multi-layered sheet or described template, the sheet material that trapezoidal fill plate and inverted trapezoidal fill plate are spliced by row's pin chips or fine bamboo strip, the both ends of described template side are provided with shrinkage pool groove in order to dismounting, the medium position of described template side is also provided with shrinkage pool groove, described template one side is provided with fin, another side correspondence of described template is provided with for inlaying the groove establishing fin, steel bushing is arranged with in described shrinkage pool groove, in two groove steel bushings, reinforcing bar is equipped with during adjacent two square template split, when mounted, first removing device and support post are linked into an integrated entity, then after vertically setting one by one, template crossbeam and template is spread successively at support bar, spread Fang Liang and inverted trapezoidal fill plate successively in support post upper end simultaneously, carried out the design height of adjusting template by the height of threaded adjusting support bar, can start to lay reinforcing bar etc. after the design height of trapezoid fill plate, inverted trapezoidal fill plate and template all regulates, after concrete floor slab placement three to a couple of days gets final product turn support bar, the template crossbeam making it support declines one section of 5-30cm distance, then to leave behind trapezoid fill plate, then other template is just easy to pull down, or template of leaving behind in the shrinkage pool groove stretching into template by drag hook, make trapezoid fill plate, template drops on only has on 5-30cm distance template crossbeam with it, and be unlikely to directly to fall on the ground, within then 20-30 days, remove support post, Fang Liang and inverted trapezoidal fill plate again.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310230037.9A CN103334587B (en) | 2013-06-09 | 2013-06-09 | Wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310230037.9A CN103334587B (en) | 2013-06-09 | 2013-06-09 | Wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103334587A CN103334587A (en) | 2013-10-02 |
CN103334587B true CN103334587B (en) | 2015-11-18 |
Family
ID=49242789
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310230037.9A Active CN103334587B (en) | 2013-06-09 | 2013-06-09 | Wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103334587B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019222896A1 (en) * | 2018-05-21 | 2019-11-28 | 增城市碧桂园物业发展有限公司 | Floor panel and construction method thereof |
CN109208896B (en) * | 2018-10-09 | 2021-10-29 | 武汉市欣之林木业有限公司 | Use method of detachable building template |
CN109208898B (en) * | 2018-10-09 | 2021-03-12 | 中匠华湄模板制造有限公司 | Use method of building combined template |
CN109208894B (en) * | 2018-10-09 | 2021-03-09 | 中国矿业大学工程咨询研究院(江苏)有限公司 | Use method of detachable floor formwork of building |
CN109208895B (en) * | 2018-10-09 | 2021-02-19 | 天津九为新材料有限公司 | Combined building template |
CN109610816A (en) * | 2018-12-12 | 2019-04-12 | 广东志特新材料科技有限公司 | A kind of aluminium alloy Quick-action type template system and its construction method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2220505Y (en) * | 1995-03-16 | 1996-02-21 | 单军前 | Combined steel shuttering |
CN2232954Y (en) * | 1995-07-11 | 1996-08-14 | 唐国成 | Building slab quick dismounting pillar |
CN2366484Y (en) * | 1998-05-26 | 2000-03-01 | 黄汉屏 | Adjustable type supporting apparatus structure able to be early dismantlement |
KR20050029967A (en) * | 2003-09-24 | 2005-03-29 | 고려개발 주식회사 | Support frame assembly for supporting concrete slab form and form setting method using the same |
CN203361652U (en) * | 2013-06-09 | 2013-12-25 | 福建省二建建设集团有限公司 | Rapid assembly and disassembly structure of horizontal wood-bamboo formworks |
-
2013
- 2013-06-09 CN CN201310230037.9A patent/CN103334587B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2220505Y (en) * | 1995-03-16 | 1996-02-21 | 单军前 | Combined steel shuttering |
CN2232954Y (en) * | 1995-07-11 | 1996-08-14 | 唐国成 | Building slab quick dismounting pillar |
CN2366484Y (en) * | 1998-05-26 | 2000-03-01 | 黄汉屏 | Adjustable type supporting apparatus structure able to be early dismantlement |
KR20050029967A (en) * | 2003-09-24 | 2005-03-29 | 고려개발 주식회사 | Support frame assembly for supporting concrete slab form and form setting method using the same |
CN203361652U (en) * | 2013-06-09 | 2013-12-25 | 福建省二建建设集团有限公司 | Rapid assembly and disassembly structure of horizontal wood-bamboo formworks |
Also Published As
Publication number | Publication date |
---|---|
CN103334587A (en) | 2013-10-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103334587B (en) | Wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method thereof | |
CN105696789A (en) | Vertical aluminum mould building system and construction method thereof | |
CN204298825U (en) | Foundation ditch builds elephant trunk supporting and regulating device | |
CN203594213U (en) | Flexible assembling and disassembling bearing truss | |
CN206337811U (en) | A kind of skyscraper aluminum alloy pattern plate structure | |
CN207122129U (en) | A kind of early removing system built for provided with floor slab with beam, harden structure | |
CN104818844A (en) | Normalized support system and construction method of weather-proof PVC (polyvinyl chloride) composite plastic template | |
CN204983649U (en) | Big inclination cylinder steel form | |
CN201802072U (en) | Stress clamping device and system | |
CN102912977A (en) | Mold used for pouring shaped stair | |
CN109457814A (en) | Towering and major diameter building top cover construction method based on Bailey bracket structure | |
CN203361652U (en) | Rapid assembly and disassembly structure of horizontal wood-bamboo formworks | |
CN103556815A (en) | Building template system | |
CN201695674U (en) | Modular cantilever concrete structure pouring framework | |
CN203640266U (en) | Building template system | |
CN203007848U (en) | T beam middle transverse diaphragm casting tooling | |
CN205046843U (en) | Reinforcing apparatus's stair template of marking time in middle of installation | |
CN204645608U (en) | Weather-proof PVC composite plastic template normalization support system | |
CN204920213U (en) | Stair template | |
CN204212418U (en) | A kind of primary-secondary beam connector | |
CN203361637U (en) | Assembly structure for wood-bamboo column formwork | |
CN203905326U (en) | Construction form for construction of roof exhaust pipe piers | |
CN202031328U (en) | Fixing device of outer formwork for casting outer concrete wall on floor slab of building | |
CN103485423B (en) | The method of ater-casting indwelling | |
CN202299426U (en) | Back shoring and counter bracing mechanism for formwork erection of building deformation joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |