CN103334587B - Wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method thereof - Google Patents

Wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method thereof Download PDF

Info

Publication number
CN103334587B
CN103334587B CN201310230037.9A CN201310230037A CN103334587B CN 103334587 B CN103334587 B CN 103334587B CN 201310230037 A CN201310230037 A CN 201310230037A CN 103334587 B CN103334587 B CN 103334587B
Authority
CN
China
Prior art keywords
template
fill plate
inverted trapezoidal
support post
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310230037.9A
Other languages
Chinese (zh)
Other versions
CN103334587A (en
Inventor
杨益铨
黄跃森
陈伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN ERJIAN CONSTRUCTION GROUP Corp
Original Assignee
FUJIAN ERJIAN CONSTRUCTION GROUP Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN ERJIAN CONSTRUCTION GROUP Corp filed Critical FUJIAN ERJIAN CONSTRUCTION GROUP Corp
Priority to CN201310230037.9A priority Critical patent/CN103334587B/en
Publication of CN103334587A publication Critical patent/CN103334587A/en
Application granted granted Critical
Publication of CN103334587B publication Critical patent/CN103334587B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The present invention relates to a kind of wooden bamboo matter horizontal shuttering Quick assembling-disassembling structure and method, it is characterized in that: comprise the template be located at below build floor to be poured, described template is provided with the trapezoid fill plate in order to template dismounting, is provided with inverted trapezoidal fill plate between described template.The present invention's wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method, be not only conducive to the handling facilitating template, and can reduce the turn around time of template.

Description

Wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method thereof
technical field:
The present invention relates to a kind of wooden bamboo matter horizontal shuttering Quick assembling-disassembling structure and method.
background technology:
Model sheetinstallat and the dismounting of existing floor are loaded down with trivial details especially, particularly cause template dismounting very difficult, not only consuming time because template expands extruding after having built cement material during dismounting, and easily cause the damage of template; In addition, according to national building standard, requiring after concrete floor slab placement could dismantle for more than 28 days, otherwise easily cause the distortion of cement floor, therefore causing the template needing to be equipped with many cover floors when building city high rise building.
summary of the invention:
The object of the present invention is to provide a kind of wooden bamboo matter horizontal shuttering Quick assembling-disassembling structure and method, this wooden bamboo matter horizontal shuttering Quick assembling-disassembling structure is simple, reasonable in design, be conducive to the handling facilitating template, this wooden bamboo matter horizontal shuttering rapid-assembling/disassembling method, not only be conducive to the handling facilitating template, improve workmanship, and the turn around time of template can be reduced.
The present invention's wood bamboo matter horizontal shuttering Quick assembling-disassembling structure, it is characterized in that: comprise the template be located at below build floor to be poured, described template is provided with the trapezoid fill plate in order to template dismounting, is provided with inverted trapezoidal fill plate between described template.
Erect below above-mentioned inverted trapezoidal fill plate and between ground and be provided with support post, between described support post and inverted trapezoidal fill plate, be provided with Fang Liang.
Above-mentioned support post is provided with removing device, and described removing device comprises the fagging be fixed on support post and the vertical supporting bar be threaded in for support shuttering crossbeam on fagging.
Above-mentioned template crossbeam is i beam or Fang Liang.
The veneer that above-mentioned template, trapezoidal fill plate and inverted trapezoidal fill plate are glued together by multi-layered sheet.
The sheet material that above-mentioned template, trapezoidal fill plate and inverted trapezoidal fill plate are spliced by row's pin chips or fine bamboo strip.
The trapezoid fill plate that the present invention's wood bamboo matter horizontal shuttering Quick assembling-disassembling structure is provided with by first dismantling template, thus unload removing template extruding force in the horizontal direction, as long as the bonding force overcome when dismantling template between template and floor is (when there being increase release agent, bonding force is very little), be so very easily detachable template, time saving and energy saving.
The both ends of above-mentioned template side are provided with shrinkage pool groove in order to dismounting, and the medium position of described template side is also provided with shrinkage pool groove.
Above-mentioned template one side is provided with fin, and another side correspondence of described template is provided with the groove for docking fin.
Steel bushing is arranged with in above-mentioned shrinkage pool groove.
In two groove steel bushings, reinforcing bar is equipped with during above-mentioned adjacent two square template split.
The present invention's wood bamboo matter horizontal shuttering rapid-assembling/disassembling method, it is characterized in that: when mounted, first removing device and support post are linked into an integrated entity, then after vertically setting one by one, template crossbeam and template is spread successively at support bar, simultaneously spread Fang Liang and inverted trapezoidal fill plate successively in support post upper end, carried out the design height of adjusting template by the height of threaded adjusting support bar, can start to lay reinforcing bar etc. after the design height of trapezoid fill plate, inverted trapezoidal fill plate and template all regulates; After concrete floor slab placement three to a couple of days gets final product turn support bar, the template crossbeam making it support declines one section of 5-30cm distance, then to leave behind trapezoid fill plate, then other template is just easy to pull down, or template of leaving behind in the shrinkage pool groove stretching into template by drag hook, make trapezoid fill plate, template drops on only has on 5-30cm distance template crossbeam with it, and be unlikely to directly to fall on the ground, within then 20-30 days, remove support post, Fang Liang and inverted trapezoidal fill plate again.
The present invention's wood bamboo matter horizontal shuttering rapid-assembling/disassembling method, after watering build floor three to a couple of days can first decline after template crossbeam dismantles the trapezoid fill plate that template is provided with, thus unload removing template extruding force in the horizontal direction, as long as the bonding force overcome when dismantling template between template and floor is (when there being increase release agent, bonding force is very little), be so very easily detachable template, time saving and energy saving.Thus make the turnaround time of template foreshorten to 3 to 4 days from original 28 days, decrease the turnaround time of template, decrease the outfit quantity of template, reduce cost of production.
accompanying drawing illustrates:
Fig. 1 is organigram of the present invention;
Fig. 2 is the organigram that the present invention removes removing device;
Fig. 3 a is the organigram of veneer;
Fig. 3 b is Fig. 3 a upward view;
Fig. 4 a is the organigram of the sheet material that the thin bamboo batten of a row is spliced;
Fig. 4 b is Fig. 4 a upward view.
Fig. 5 is the organigram of the another kind of embodiment of template;
Fig. 6 is the organigram of two template splits.
detailed description of the invention:
The present invention's wood bamboo matter horizontal shuttering Quick assembling-disassembling structure, comprise the template 2 be located at below build floor 1 to be poured, described template is provided with the trapezoid fill plate 4 in order to template dismounting, is provided with inverted trapezoidal fill plate 3 between described template.
The template adopted and trapezoidal fill plate can be the veneers (as shown in Figure 3) glued together by multi-layered sheet 201, also can be the sheet material (as shown in Figure 4) be spliced by row's pin chips or fine bamboo strip 202.The sheet material adopting veneer or be spliced by row's fine bamboo strip, pin chips, as template, can strengthen the support strength of floor.
In order to better support, erect below above-mentioned inverted trapezoidal fill plate 3 and between ground and be provided with support post 5, between described support post 5 and inverted trapezoidal fill plate 3, be provided with a tree, used in making timber for boats beam 11.Level interval between two support posts 5 is less than 2 meters.Support post is steel pipe support.
For the ease of the dismounting of template, above-mentioned support post 5 is provided with removing device 6, and described removing device 6 comprises the fagging 7 be fixed on support post and the vertical supporting bar 9 be threaded in for support shuttering crossbeam 8 on fagging.
In order to design needs, above-mentioned template crossbeam can be i beam or other brace summer.
The trapezoid fill plate that the present invention's wood bamboo matter horizontal shuttering Quick assembling-disassembling structure is provided with by first dismantling template, thus unload removing template extruding force in the horizontal direction, as long as the bonding force overcome when dismantling template between template and floor is (when there being increase release agent, bonding force is very little), be so very easily detachable template, time saving and energy saving.
For the ease of dismounting template, the both ends of above-mentioned template 2 side are provided with shrinkage pool groove 12 in order to dismounting, and the medium position of described template side is also provided with shrinkage pool groove 12.
In order to the positioning stablity of each template is reliable, above-mentioned template one side is provided with fin 13, and another side correspondence of described template is provided with the groove 14 for docking fin.
In order to make to be not easy to damage shrinkage pool groove and firm for coordinating, in above-mentioned shrinkage pool groove 12, be arranged with steel bushing 15.In two groove steel bushings, reinforcing bar 16 is equipped with during above-mentioned adjacent two square template split.
The present invention's wood bamboo matter horizontal shuttering rapid-assembling/disassembling method, it is characterized in that: when mounted, first removing device and support post are linked into an integrated entity, then after vertically setting one by one, template crossbeam and template is spread successively at support bar, simultaneously spread Fang Liang and inverted trapezoidal fill plate successively in support post upper end, carried out the design height of adjusting template by the height of threaded adjusting support bar, can start to lay reinforcing bar etc. after the design height of trapezoid fill plate, inverted trapezoidal fill plate and template all regulates; After concrete floor slab placement three to a couple of days gets final product turn support bar, the template crossbeam making it support declines one section of 5-30cm distance, then to leave behind trapezoid fill plate, then other template is just easy to pull down, or template of leaving behind in the shrinkage pool groove stretching into template by drag hook, make trapezoid fill plate, template drops on only has on 5-30cm distance template crossbeam with it, and be unlikely to directly to fall on the ground, within then 20-30 days, remove support post, Fang Liang and inverted trapezoidal fill plate again.
The present invention's wood bamboo matter horizontal shuttering rapid-assembling/disassembling method, after watering build floor three to a couple of days can first decline after template crossbeam dismantles the trapezoid fill plate that template is provided with, thus unload removing template extruding force in the horizontal direction, as long as the bonding force overcome when dismantling template between template and floor is (when there being increase release agent, bonding force is very little), be so very easily detachable template, time saving and energy saving.Thus make the turnaround time of template foreshorten to 3 to 4 days from original 28 days, decrease the turnaround time of template, decrease the outfit quantity of template, reduce cost of production.
The foregoing is only preferred embodiment of the present invention, all equalizations done according to the present patent application the scope of the claims change and modify, and all should belong to covering scope of the present invention.

Claims (1)

1. a wooden bamboo matter horizontal shuttering rapid-assembling/disassembling method, it is characterized in that: wooden bamboo matter horizontal shuttering Quick assembling-disassembling structure comprises the template be located at below build floor to be poured, described template is provided with the trapezoid fill plate in order to template dismounting, inverted trapezoidal fill plate is provided with between described template, erect below described inverted trapezoidal fill plate and between ground and be provided with support post, Fang Liang is provided with between described support post and inverted trapezoidal fill plate, described support post is provided with removing device, described removing device comprises the fagging be fixed on support post and the vertical supporting bar be threaded in for support shuttering crossbeam on fagging, described template crossbeam is i beam or Fang Liang, described template, the veneer that trapezoidal fill plate and inverted trapezoidal fill plate are glued together by multi-layered sheet or described template, the sheet material that trapezoidal fill plate and inverted trapezoidal fill plate are spliced by row's pin chips or fine bamboo strip, the both ends of described template side are provided with shrinkage pool groove in order to dismounting, the medium position of described template side is also provided with shrinkage pool groove, described template one side is provided with fin, another side correspondence of described template is provided with for inlaying the groove establishing fin, steel bushing is arranged with in described shrinkage pool groove, in two groove steel bushings, reinforcing bar is equipped with during adjacent two square template split, when mounted, first removing device and support post are linked into an integrated entity, then after vertically setting one by one, template crossbeam and template is spread successively at support bar, spread Fang Liang and inverted trapezoidal fill plate successively in support post upper end simultaneously, carried out the design height of adjusting template by the height of threaded adjusting support bar, can start to lay reinforcing bar etc. after the design height of trapezoid fill plate, inverted trapezoidal fill plate and template all regulates, after concrete floor slab placement three to a couple of days gets final product turn support bar, the template crossbeam making it support declines one section of 5-30cm distance, then to leave behind trapezoid fill plate, then other template is just easy to pull down, or template of leaving behind in the shrinkage pool groove stretching into template by drag hook, make trapezoid fill plate, template drops on only has on 5-30cm distance template crossbeam with it, and be unlikely to directly to fall on the ground, within then 20-30 days, remove support post, Fang Liang and inverted trapezoidal fill plate again.
CN201310230037.9A 2013-06-09 2013-06-09 Wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method thereof Active CN103334587B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310230037.9A CN103334587B (en) 2013-06-09 2013-06-09 Wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310230037.9A CN103334587B (en) 2013-06-09 2013-06-09 Wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method thereof

Publications (2)

Publication Number Publication Date
CN103334587A CN103334587A (en) 2013-10-02
CN103334587B true CN103334587B (en) 2015-11-18

Family

ID=49242789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310230037.9A Active CN103334587B (en) 2013-06-09 2013-06-09 Wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method thereof

Country Status (1)

Country Link
CN (1) CN103334587B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019222896A1 (en) * 2018-05-21 2019-11-28 增城市碧桂园物业发展有限公司 Floor panel and construction method thereof
CN109208896B (en) * 2018-10-09 2021-10-29 武汉市欣之林木业有限公司 Use method of detachable building template
CN109208898B (en) * 2018-10-09 2021-03-12 中匠华湄模板制造有限公司 Use method of building combined template
CN109208894B (en) * 2018-10-09 2021-03-09 中国矿业大学工程咨询研究院(江苏)有限公司 Use method of detachable floor formwork of building
CN109208895B (en) * 2018-10-09 2021-02-19 天津九为新材料有限公司 Combined building template
CN109610816A (en) * 2018-12-12 2019-04-12 广东志特新材料科技有限公司 A kind of aluminium alloy Quick-action type template system and its construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2220505Y (en) * 1995-03-16 1996-02-21 单军前 Combined steel shuttering
CN2232954Y (en) * 1995-07-11 1996-08-14 唐国成 Building slab quick dismounting pillar
CN2366484Y (en) * 1998-05-26 2000-03-01 黄汉屏 Adjustable type supporting apparatus structure able to be early dismantlement
KR20050029967A (en) * 2003-09-24 2005-03-29 고려개발 주식회사 Support frame assembly for supporting concrete slab form and form setting method using the same
CN203361652U (en) * 2013-06-09 2013-12-25 福建省二建建设集团有限公司 Rapid assembly and disassembly structure of horizontal wood-bamboo formworks

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2220505Y (en) * 1995-03-16 1996-02-21 单军前 Combined steel shuttering
CN2232954Y (en) * 1995-07-11 1996-08-14 唐国成 Building slab quick dismounting pillar
CN2366484Y (en) * 1998-05-26 2000-03-01 黄汉屏 Adjustable type supporting apparatus structure able to be early dismantlement
KR20050029967A (en) * 2003-09-24 2005-03-29 고려개발 주식회사 Support frame assembly for supporting concrete slab form and form setting method using the same
CN203361652U (en) * 2013-06-09 2013-12-25 福建省二建建设集团有限公司 Rapid assembly and disassembly structure of horizontal wood-bamboo formworks

Also Published As

Publication number Publication date
CN103334587A (en) 2013-10-02

Similar Documents

Publication Publication Date Title
CN103334587B (en) Wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method thereof
CN105696789A (en) Vertical aluminum mould building system and construction method thereof
CN204298825U (en) Foundation ditch builds elephant trunk supporting and regulating device
CN203594213U (en) Flexible assembling and disassembling bearing truss
CN206337811U (en) A kind of skyscraper aluminum alloy pattern plate structure
CN207122129U (en) A kind of early removing system built for provided with floor slab with beam, harden structure
CN104818844A (en) Normalized support system and construction method of weather-proof PVC (polyvinyl chloride) composite plastic template
CN204983649U (en) Big inclination cylinder steel form
CN201802072U (en) Stress clamping device and system
CN102912977A (en) Mold used for pouring shaped stair
CN109457814A (en) Towering and major diameter building top cover construction method based on Bailey bracket structure
CN203361652U (en) Rapid assembly and disassembly structure of horizontal wood-bamboo formworks
CN103556815A (en) Building template system
CN201695674U (en) Modular cantilever concrete structure pouring framework
CN203640266U (en) Building template system
CN203007848U (en) T beam middle transverse diaphragm casting tooling
CN205046843U (en) Reinforcing apparatus's stair template of marking time in middle of installation
CN204645608U (en) Weather-proof PVC composite plastic template normalization support system
CN204920213U (en) Stair template
CN204212418U (en) A kind of primary-secondary beam connector
CN203361637U (en) Assembly structure for wood-bamboo column formwork
CN203905326U (en) Construction form for construction of roof exhaust pipe piers
CN202031328U (en) Fixing device of outer formwork for casting outer concrete wall on floor slab of building
CN103485423B (en) The method of ater-casting indwelling
CN202299426U (en) Back shoring and counter bracing mechanism for formwork erection of building deformation joint

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant