CN103323340A - Mechanical property test device and method of steel-concrete contact interface - Google Patents

Mechanical property test device and method of steel-concrete contact interface Download PDF

Info

Publication number
CN103323340A
CN103323340A CN2013102525584A CN201310252558A CN103323340A CN 103323340 A CN103323340 A CN 103323340A CN 2013102525584 A CN2013102525584 A CN 2013102525584A CN 201310252558 A CN201310252558 A CN 201310252558A CN 103323340 A CN103323340 A CN 103323340A
Authority
CN
China
Prior art keywords
measured
steel plate
plate
concrete block
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102525584A
Other languages
Chinese (zh)
Other versions
CN103323340B (en
Inventor
梁越
刘明维
王俊杰
刘楠楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Jiaotong University
Original Assignee
Chongqing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Jiaotong University filed Critical Chongqing Jiaotong University
Priority to CN201310252558.4A priority Critical patent/CN103323340B/en
Publication of CN103323340A publication Critical patent/CN103323340A/en
Application granted granted Critical
Publication of CN103323340B publication Critical patent/CN103323340B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention relates to a mechanical property test device and a method of a steel-concrete contact interface, aiming to test the mechanical property of the steel-concrete interface under different normal stress and normal rigidity conditions without friction factor interference. According to the device and the method, four tests of equal normal rigidity shearing, equal normal stress shearing, infinite normal rigidity shearing and interface tensile are finished by using a set of device. Besides, in the scheme, the interface normal load direction is horizontal and is perpendicular to the gravity direction and parallel to the sample and base contact surface, and the applying of the normal load does not cause friction which affects the test result, so that the accuracy of the test result is greatly improved. In the scheme, the contact interface area stays the same in the interface shearing process, and the test error caused by reduction of the shearing interface is avoided.

Description

A kind of steel-concrete contact interface mechanical property testing devices and methods therefor
Technical field
The invention belongs to material contact interface mechanics parameters field tests, specifically steel in the civil engineering work-concrete contact interface mechanical property testing.
Background technology
Along with the develop rapidly of national basis Facilities Construction, steel casing embedded rock pile is used for the national Important Project such as Longspan Bridge, high-rise building, large pier in a large number.Compare with conventional concrete stake or steel-pipe pile, the characteristics of steel casing embedded rock pile and similar steel tube concrete pile maximum are the effect of outer steel casing and the common bearing load of inner concrete, fractional load acts on steel casing surface, be passed to pile body inside by the interface between steel casing and the inner concrete and be passed to again ground, therefore, during the pile foundation stand under load between steel-concrete the mechanical characteristic of contact interface will directly affect the load-carrying properties of steel casing embedded rock pile.The mechanical characteristic at interface mainly comprises interface shearing characteristic and tensile characteristics, and wherein shear property comprises: shear stress is with cutting change in displacement rule, interfacial failure rule, and the residual strength Changing Pattern etc. that repeats interface under the shearing condition.
The interface shearing test is the basic skills that obtains steel-concrete interface shearing characteristic.Existing interface shearing test method and device generally derive from method and the device of Rock And Soil direct shear test, being about to steel plate to be measured and concrete to be measured is placed on respectively up and down in two shear boxs, fixing upper shear box is motionless, and apply certain vertical load at upper shear box top, then promote the down cut box with certain shear rate, make the contact interface between the bi-material produce shear displacemant, the relation in this process between record shear stress and the shear displacemant; Change different vertical loads and carry out revision test, the assay surface normal stress is on the impact of interface shearing characteristic.Class is steely-and concrete interface shearing attribute testing obtained certain achievement, but relevant test method and test unit have certain defective, as in order to destroy the interface normal stress to the impact of interface shearing characteristic, apply the vertical load identical with gravity direction at upper shear box top, the load that material is subject in the upper shear box is by box wall going down, together with the gravity of upper shear box self, make the certain friction force of generation between the upper and lower shear box; Simultaneously, the down cut box will place on the rigid base, under the effect of upper load, must also can produce friction force between down cut box and base.Steel-concrete interface shearing characteristic is different from traditional soil body shear test, is the simulation Practical Project, and the vertical load that applies is generally larger, and above two parts friction generally is difficult to ignore on the impact of test findings, and then affects the degree of accuracy of test findings.For traditional shear test, shear history median surface contact area also can reduce with the increase of shear displacemant, thereby makes test findings produce error.Simultaneously, for the tensile characteristics of steel-concrete contact interface, generally need to utilize other test unit to test, cause the waste of resource.
The mechanical characteristic of steel-concrete contact interface is not only relevant with the normal stress at interface, and is also relevant with the normal stiffness at interface, is subjected to simultaneously the impact of the factors such as abrasion resistance of roughness, the material at concrete intensity, interface.At present, traditional steel-concrete interface mechanics attribute testing is only more to the research of the shear property under the different normal stress conditions, not yet forms comprehensive, ripe steel-concrete interface mechanics characteristic measurement technology.
Summary of the invention
The purpose of this invention is to provide a kind of friction factor of avoiding and disturb, and can realize under different normal stresses, normal stiffness condition device to steel-concrete interface mechanics characteristic measurement.
For realizing that the technical scheme that the object of the invention adopts is such, a kind of steel-concrete contact interface mechanical property testing device comprises at least two guide rails that are horizontally disposed with and are parallel to each other.Lay base on the described guide rail, the two ends of described guide rail are separately installed with fixedly rigid baffle and movable rigid baffle.The plate face of described fixedly rigid baffle and movable rigid baffle is over against base, and the relative position of described fixedly rigid baffle and guide rail immobilizes, and described movable rigid baffle and base can slide along guide rail under external force.
Described base has a horizontal upper end face.During test, described upper surface carrying tested sample.Described tested sample comprises a steel plate to be measured that vertically is placed on the base, towards fixedly rigid baffle and movably rigid baffle, two plate faces of described steel plate to be measured cohere with concrete block I and concrete block II respectively two plate faces of described steel plate to be measured respectively.Described concrete block I contacts with the rigid cover plate I towards the fixing side of rigid baffle, and described concrete block II contacts with the rigid cover plate II towards the side of movable rigid baffle.During test, described rigid cover plate I and the web member I fixedly is installed between the rigid baffle, namely an end of the described web member I plate face, the other end that are connected to the rigid cover plate I is connected to the fixedly plate face of rigid baffle.Between described rigid cover plate II and the movable rigid baffle web member II is installed, namely an end of web member II is connected to the plate face of rigid cover plate II, the plate face that the other end is connected to movable rigid baffle.
One side of described guide rail has level and loads and measurement mechanism, and described level loads and the telescopic end of measurement mechanism is connected with described steel plate to be measured.During test, described level loads and measurement mechanism applies thrust or pulling force perpendicular to the guide rail direction to steel plate to be measured.
The described movable rigid baffle dorsad plate face of tested sample is connected with the pressure head of servo-hydraulic charger.During test, described servo-hydraulic charger applies the thrust that is parallel to the guide rail direction to movable rigid baffle.
Another object of the present invention is to adopt above-mentioned steel-concrete contact interface mechanical property testing device to wait the method for normal stiffness test, may further comprise the steps:
1) test steels plate size is on request cut into rectangle steel plate to be measured, described steel plate to be measured have two plate faces, up and down two end faces and about two end faces.The lower surface of described steel plate to be measured is shelved on the upper surface of described base also so that two plate faces of described steel plate to be measured are vertical with guide rail.The left side of described steel plate to be measured is connected with the telescopic end of horizontal loading apparatus.
2) in the both sides of described steel plate to be measured mold box and casting concrete are set, after maintenance, so that two plate faces of described steel plate to be measured cohere with concrete block I and concrete block II respectively.Cohere with steel plate to be measured the inboard of described concrete block I, the outside contacts with the rigid cover plate I.Cohere with steel plate to be measured the inboard of described concrete block II, the outside contacts with the rigid cover plate II.
3) restriction concrete block I and concrete block II are installed along the lateral confinement device I and the lateral confinement device II that move perpendicular to the guide rail direction at described upper surface.
4) in rigid cover plate I and fixing installation connecting element I between the rigid baffle, installation connecting element II between rigid cover plate II and movable rigid baffle.Described web member I and web member II are spring.
5) start the servo-hydraulic charger, make it apply default load to movable rigid baffle.Afterwards, the servo-hydraulic charger is locked, so that the position of movable rigid baffle is fixed.
6) start horizontal loading apparatus, make it apply thrust perpendicular to the guide rail direction to steel plate to be measured.So that shear failure occurs in the interface that steel plate to be measured contacts with the both sides concrete.
7) by horizontal loading apparatus steel plate to be measured is applied the pulling force opposite with the described thrust direction of step 6), make steel plate to be measured get back to initial position along the mobile route of step 6);
8) by horizontal loading apparatus steel plate to be measured is applied the thrust identical with the described thrust direction of step 6), the position when making steel plate to be measured get back to the step 6) termination;
9) repeating step 7)~8), until steel plate to be measured contacts the shear resistance at the interface rear end operation that tends towards stability with concrete.
Another object of the present invention is to adopt the described steel of preamble-concrete contact interface mechanical property testing device to wait the method for normal pressure test, may further comprise the steps:
1) test steels plate size is on request cut into rectangle steel plate to be measured, described steel plate to be measured have two plate faces, up and down two end faces and about two end faces.The lower surface of described steel plate to be measured is shelved on the upper surface of described base, and so that two plate faces of described steel plate to be measured are vertical with guide rail.The left side of described steel plate to be measured is connected with the telescopic end of horizontal loading apparatus.
2) in the both sides of described steel plate to be measured mold box and casting concrete are set, after maintenance, so that two plate faces of described steel plate to be measured cohere with concrete block I and concrete block II respectively.Cohere with steel plate to be measured the inboard of described concrete block I, the outside contacts with the rigid cover plate I.Cohere with steel plate to be measured the inboard of described concrete block II, the outside contacts with the rigid cover plate II.
3) restriction concrete block I and concrete block II are installed along the lateral confinement device I and the lateral confinement device II that move perpendicular to the guide rail direction at described upper surface.
4) in rigid cover plate I and fixing installation connecting element I between the rigid baffle, installation connecting element II between rigid cover plate II and movable rigid baffle.Described web member I and web member II are spring.
5) start the servo-hydraulic charger, make it apply default load to movable rigid baffle.After process of the test in, keep described default load constant.
6) start horizontal loading apparatus, make it apply thrust perpendicular to the guide rail direction to steel plate to be measured.So that shear failure occurs in the interface that steel plate to be measured contacts with the both sides concrete.
7) by horizontal loading apparatus steel plate to be measured is applied the pulling force opposite with the described thrust direction of step 6), make steel plate to be measured get back to initial position along the mobile route of step 6);
8) by horizontal loading apparatus steel plate to be measured is applied the thrust identical with the described thrust direction of step 6), the position when making steel plate to be measured get back to the step 6) termination;
9) repeating step 7)~8), until steel plate to be measured contacts the shear resistance at the interface rear end operation that tends towards stability with concrete.
Another object of the present invention is to adopt the described steel of preamble-concrete contact interface mechanical property testing device to carry out the method for infinitely great normal stiffness test, it is characterized in that, may further comprise the steps:
1) test steels plate size is on request cut into rectangle steel plate to be measured, described steel plate to be measured have two plate faces, up and down two end faces and about two end faces.The lower surface of described steel plate to be measured is shelved on the upper surface of described base, and so that two plate faces of described steel plate to be measured are vertical with guide rail.The left side of described steel plate to be measured is connected with the telescopic end of horizontal loading apparatus.
2) in the both sides of described steel plate to be measured mold box and casting concrete are set, after maintenance, so that two plate faces of described steel plate to be measured cohere with concrete block I and concrete block II respectively.Cohere with steel plate to be measured the inboard of described concrete block I, the outside contacts with the rigid cover plate I.Cohere with steel plate to be measured the inboard of described concrete block II, the outside contacts with the rigid cover plate II.
3) restriction concrete block I and concrete block II are installed along the lateral confinement device I and the lateral confinement device II that move perpendicular to the guide rail direction at described upper surface.
4) in rigid cover plate I and fixing installation connecting element I between the rigid baffle, installation connecting element II between rigid cover plate II and movable rigid baffle.Described web member I and web member II are rigid connecting rod.
5) start the servo-hydraulic charger, make it apply default load to movable rigid baffle.Afterwards, the servo-hydraulic charger is locked, so that the position of movable rigid baffle is fixed.
6) start horizontal loading apparatus, make it apply thrust perpendicular to the guide rail direction to steel plate to be measured.So that shear failure occurs in the interface that steel plate to be measured contacts with the both sides concrete.
7) by horizontal loading apparatus steel plate to be measured is applied the pulling force opposite with the described thrust direction of step 6), make steel plate to be measured get back to initial position along the mobile route of step 6);
8) by horizontal loading apparatus steel plate to be measured is applied the thrust identical with the described thrust direction of step 6), the position when making steel plate to be measured get back to the step 6) termination;
9) repeating step 7)~8), until steel plate to be measured contacts the shear resistance at the interface rear end operation that tends towards stability with concrete.
Another object of the present invention is to adopt the described steel of preamble-concrete contact interface mechanical property testing device to carry out steel-concrete contact interface tensile test, may further comprise the steps:
1) test steels plate size is on request cut into rectangle steel plate to be measured, described steel plate to be measured have two plate faces, up and down two end faces and about two end faces; The lower surface of described steel plate to be measured is shelved on the upper surface of described base, and so that two plate faces of described steel plate to be measured are vertical with guide rail; The left side of described steel plate to be measured is connected with the telescopic end of horizontal loading apparatus;
2) in the both sides of described steel plate to be measured mold box and casting concrete are set, after maintenance, so that two plate faces of described steel plate to be measured cohere with concrete block I and concrete block II respectively; Cohere with steel plate to be measured the inboard of described concrete block I, the outside is connected with the rigid cover plate I; Cohere with steel plate to be measured the inboard of described concrete block II, the outside is connected with the rigid cover plate II;
3) in rigid cover plate I and fixing installation connecting element I between the rigid baffle, installation connecting element II between rigid cover plate II and movable rigid baffle; Described web member I and web member II are rigid connecting rod;
4) start the servo-hydraulic charger, make it apply pulling force to movable rigid baffle; Until the surface of contact of steel plate to be measured and concrete block I or concrete block II destroys.
Useful technique effect of the present invention comprises:
1, can adopt a covering device finish the normal stiffness such as interface shear, etc. at least four kinds of tests such as normal stress shearing, the shearing of infinitely great normal stiffness, interface tension;
2, interface normal direction load loading direction level is vertical with gravity direction, and is parallel with the base surface of contact with sample, and not applying of normal direction load can bring the friction that affects test findings, greatly improved the degree of accuracy of test findings;
3, the contact interface area remains unchanged in the interface shearing process, can not produce the test error that shear interface reduces to bring.
Description of drawings
Device of the present invention can further specify by the indefiniteness embodiment that accompanying drawing provides.
Fig. 1 is the schematic diagram of the embodiment of the invention 2 and 3;
Fig. 2 is the schematic diagram of the embodiment of the invention 4.
Among the figure: the 1-level loads and measurement mechanism, 2-lateral confinement device I, 3-upper surface, 4-web member I, 5-is rigid baffle fixedly, 6-rigid cover plate I, 7-lateral confinement device II, 8-steel plate to be measured, 9-rigid cover plate II, the movable rigid baffle of 10-, 11-guide rail, 12-servo-hydraulic charger, 13-web member II, 15-tested sample, 16-base, 17-concrete block I, 18-concrete block II.
Embodiment
The invention will be further described below in conjunction with drawings and Examples, only limits to following embodiment but should not be construed the above-mentioned subject area of the present invention.In the situation that do not break away from the above-mentioned technological thought of the present invention, according to ordinary skill knowledge and customary means, make various replacements and change, all should be included in the scope of the present invention.
Embodiment 1:
The present embodiment discloses a kind of steel-concrete contact interface mechanical property testing device, comprises at least two guide rails 11 that are horizontally disposed with and are parallel to each other.Lay base 16 on the described guide rail 11, the two ends of described guide rail 11 are separately installed with fixedly rigid baffle 5 and movable rigid baffle 10.Because the position relationship of all parts is important in the present embodiment, further specifies: described " two ends of guide rail 11 " refer to two relative directions that the object that is placed on the guide rail 11 slides along guide rail.
A plate face of described fixedly rigid baffle 5 is towards base 16, and is same, and a plate face of movable rigid baffle 10 is also towards base 16, and namely base 16 is fixedly between rigid baffle 5 and the movable rigid baffle 10.Described fixedly rigid baffle 5 immobilizes with the relative position of guide rail 11, and described movable rigid baffle 10 and base 16 can slide along guide rail 11 under external force.Among the embodiment, described guide rail has longitudinally groove or ridge on 11 surfaces, and the parts that cooperate with described groove or ridge are all arranged at the bottom of described movable rigid baffle 10 and base 16, and its lower end is entrenched on the guide rail 11, and can slide along guide rail 11.
Described base 16 has a horizontal upper end face 3.During test, described upper surface 3 carrying tested sample 15.Described tested sample comprises a steel plate to be measured 8 that vertically is placed on the base 16, towards fixedly rigid baffle 5 and movably rigid baffle 10, two plate faces of described steel plate 8 to be measured cohere with concrete block I 17 and concrete block II 18 respectively two plate faces of described steel plate to be measured 8 respectively.Described concrete block I 17 contacts with rigid cover plate I 6 towards the fixing side of rigid baffle 5, and fixedly the side of rigid baffle 5 and steel plate to be measured 8 cohere described concrete block I 17 dorsad.Described concrete block II 18 contacts with rigid cover plate II 9 towards the side of movable rigid baffle 10, and described concrete block II 18 dorsad side and the steel plate to be measured 8 of movable rigid baffle 10 is cohered.The two ends of described steel plate to be measured 8 all protrude from concrete block I 17 and concrete block II 18, namely steel plate 8 to be measured perpendicular to the length of guide rail direction greater than concrete block II 18 and concrete block I 17 length perpendicular to the guide rail direction.
Two ends all stretch out the end face of concrete block I 17 and concrete block II 18.
Because the height of the plate face of described fixedly rigid baffle 5 and movable rigid baffle 10 all is higher than the height of base 16 upper surfaces.Described rigid cover plate I 6 and fixedly have web member I 4 between the rigid baffle 5.To be web member I 4 one ends surperficially be connected with rigid cover plate I 6, the other end is connected with the fixing surface of rigid baffle 5.
Has web member II 13 between described rigid cover plate II 9 and the movable rigid baffle 10.To be web member II 13 1 ends surperficially be connected with rigid cover plate II 9, the other end is connected with the fixing surface of rigid baffle 10.
Among the embodiment, described web member I 4 and web member II 13 are field-replaceable unit, and it can be volute spring, also can be the rigid metal bar.The two ends of volute spring and Metallic rod all have the coupling arrangement with the plate face, can change as required volute spring or Metallic rod.
Further, described web member I 4 and web member II 13 are can conversion rigidity or flexible parts.Wherein a kind of implementation is: web member (being web member I 4 and web member II 13) comprises the cylindrical shell I and is enclosed within the cylindrical shell II of cylindrical shell I outside, can lock by locking device between cylindrical shell I and the cylindrical shell II, volute spring is put in cylindrical shell I and cylindrical shell II inside.Described helical spring length is greater than cylindrical shell I and cylindrical shell II length separately, be less than or equal to cylindrical shell I and cylindrical shell II length add and.When locking between cylindrical shell I and the cylindrical shell II, web member (being web member I 4 and web member II 13) is rigid element; When not locking between cylindrical shell I and the cylindrical shell II, web member (being web member I 4 and web member II 13) is elastomeric element.
One side of described guide rail 11 has level and loads and measurement mechanism 1.When carrying out some test, described level loads and the telescopic end of measurement mechanism 1 is connected with described steel plate 8 to be measured, and described level loading and 1 pair of steel plate 8 to be measured of measurement mechanism apply thrust or the pulling force perpendicular to guide rail 11 directions.
The described movable rigid baffle 10 dorsad plate face of tested sample 15 is connected with the pressure head of servo-hydraulic charger 12.During test, 12 pairs of movable rigid baffles 10 of described servo-hydraulic charger apply thrust or the pulling force that is parallel to guide rail 11 directions.
In the present embodiment, the concrete in the tested sample have certain gravity and with the viscous force of base upper surface, therefore when push-and-pull steel plate to be measured, be difficult for sliding.But as preferred, concrete and base upper surface can be fixed.A kind of implementation is: the upper surface 3 of described base 16 connects lateral confinement device I 2 and lateral confinement device II 7.Described lateral confinement device I 2 and lateral confinement device II 7 restriction tested sample 15 are along the movement perpendicular to guide rail 11 directions.Be the upper surface 3 that the bottom of lateral confinement device I 2 and lateral confinement device II 7 is connected to base 16, concrete two end faces in the tested sample respectively same lateral confinement device I 2 contacts with lateral confinement device II 7, to limit the movement of concrete block.
Embodiment 2:
The present embodiment adopts embodiment 1 described steel-concrete contact interface mechanical property testing device to wait the method for normal stiffness test, may further comprise the steps:
1) test steels plate size is on request cut into rectangle steel plate 15 to be measured, described steel plate 15 to be measured have two plate faces, up and down two end faces and about two end faces.The lower surface of described steel plate 15 to be measured is shelved on the upper surface 3 of described base 16, and so that two plate faces of described steel plate to be measured 15 are vertical with guide rail 11.The left side of described steel plate to be measured is connected with the telescopic end of horizontal loading apparatus 1.
2) in the both sides of described steel plate 15 to be measured mold box and casting concrete are set, after maintenance, so that two plate faces of described steel plate to be measured cohere with concrete block I 17 and concrete block II 18 respectively.Cohere with steel plate 15 to be measured the inboard of described concrete block I 17, the outside contacts with rigid cover plate I 6, but do not connect.Cohere with steel plate 15 to be measured the inboard of described concrete block II 18, the outside contacts with rigid cover plate II 9, but do not connect.
3) restriction concrete block I and concrete block II are installed along the lateral confinement device I 2 and the lateral confinement device II 7 that move perpendicular to guide rail 11 directions at described upper surface 3.
4) in rigid cover plate I 6 and fixing installation connecting element I 4 between the rigid baffle 5, installation connecting element II 13 between rigid cover plate II 9 and movable rigid baffle 10.Described web member I 4 and web member II 13 are elastomeric element, and the present embodiment is volute spring.
5) start servo-hydraulic charger 12, make it apply default load to movable rigid baffle 10.Afterwards, the servo-hydraulic charger is locked, so that the position of movable rigid baffle 10 is fixed.Open the pressure transducer on the servo-hydraulic charger, measure the variation of normal pressure in the test process.
6) start horizontal loading apparatus 1, make it apply thrust perpendicular to guide rail 11 directions to steel plate 8 to be measured.So that shear failure occurs in the interface that steel plate 8 to be measured contacts with the both sides concrete.Carry out the interface shearing test with constant shear rate, and measure the variation of horizontal thrust in the shear displacemant increase process.
7) apply the pulling force opposite with the described thrust direction of step 6) by 1 pair of steel plate 8 to be measured of horizontal loading apparatus, make steel plate to be measured get back to initial position along the mobile route of step 6), and in this process, measure the variation of horizontal thrust in the variation of normal pressure and the shear displacemant increase process.
8) apply the thrust identical with the described thrust direction of step 6) by 1 pair of steel plate 8 to be measured of horizontal loading apparatus, make steel plate to be measured get back to the position of step 6) when stopping, and in this process, measure the variation of horizontal thrust in the variation of normal pressure and the shear displacemant increase process.
9) repeating step 7)~8), until steel plate to be measured 8 contacts the shear resistance at interface with concrete tend towards stability after, when namely the thrust that applies of step 7) equals pulling force that step 8) applies, end operation.
In the present embodiment, the amount of need measuring comprises: pulling force described in the displacement of steel plate, step 7) when thrust and shear failure described in load described in the step 5), the step 6) occur, and repeating step 7)~8) until steel plate to be measured 8 contacts pulling force after the shear resistance at interface tends towards stability or the size of thrust with concrete.Change normal stiffness, initial normal stress carry out revision test, by the interface shearing displacement of measurement in the test and the relation between relation, interface normal stress and the shear displacemant between the relation between the shear stress, concrete Normal Displacement to be measured and the shear displacemant, and the shearing rule of the remaining shear resistance assay surface under the shear action is repeated at the interface.
Embodiment 3:
A kind of method that adopts claim 1 or 2 described steel-concrete contact interface mechanical property testing device to wait the normal pressure test is characterized in that, may further comprise the steps:
1) test steels plate size is on request cut into rectangle steel plate 15 to be measured, described steel plate 15 to be measured have two plate faces, up and down two end faces and about two end faces.The lower surface of described steel plate 15 to be measured is shelved on the upper surface 3 of described base 16, and so that two plate faces of described steel plate to be measured 15 are vertical with guide rail 11.The left side of described steel plate to be measured is connected with the telescopic end of horizontal loading apparatus 1.
2) in the both sides of described steel plate 15 to be measured mold box and casting concrete are set, after maintenance, so that two plate faces of described steel plate to be measured cohere with concrete block I 17 and concrete block II 18 respectively.Cohere with steel plate 15 to be measured the inboard of described concrete block I 17, the outside contacts with rigid cover plate I 6, but do not connect.Cohere with steel plate 15 to be measured the inboard of described concrete block II 18, the outside contacts with rigid cover plate II 9, but do not connect.
3) restriction concrete block I and concrete block II are installed along the lateral confinement device I 2 and the lateral confinement device II 7 that move perpendicular to guide rail 11 directions at described upper surface 3.
4) in rigid cover plate I 6 and fixing installation connecting element I 4 between the rigid baffle 5, installation connecting element II 13 between rigid cover plate II 9 and movable rigid baffle 10.Described web member I 4 and web member II 13 are elastomeric element, and the present embodiment is volute spring.
5) start servo-hydraulic charger 12, make it apply default load to movable rigid baffle 10.After process of the test in, keep described default load constant.Open the displacement transducer on the servo-hydraulic charger, measure the variation of top of concrete Normal Displacement to be measured in the test process.
6) start horizontal loading apparatus 1, make it apply thrust perpendicular to guide rail 11 directions to steel plate 8 to be measured.So that shear failure occurs in the interface that steel plate 8 to be measured contacts with the both sides concrete.Carry out the interface shearing test with constant shear rate, and measure the variation of horizontal thrust in the shear displacemant increase process.
7) apply the pulling force opposite with the described thrust direction of step 6) by 1 pair of steel plate 8 to be measured of horizontal loading apparatus, make steel plate to be measured get back to initial position along the mobile route of step 6), and in this process, measure the variation of horizontal thrust in the variation of normal pressure and the shear displacemant increase process.
8) apply the thrust identical with the described thrust direction of step 6) by 1 pair of steel plate 8 to be measured of horizontal loading apparatus, the position when making steel plate to be measured get back to the step 6) termination; And the variation of in this process, measuring horizontal thrust in the variation of Normal Displacement and the shear displacemant increase process.
9) repeating step 7)~8), until steel plate to be measured 8 contacts the shear resistance at interface with concrete tend towards stability after, when namely the thrust that applies of step 7) equals pulling force that step 8) applies, end operation.
In the present embodiment, the amount of need measuring comprises: pulling force described in the displacement of steel plate, step 7) when thrust and shear failure described in load described in the step 5), the step 6) occur, and repeating step 7)~8) until steel plate to be measured 8 contacts pulling force after the shear resistance at interface tends towards stability or the size of thrust with concrete.Change normal stress and carry out revision test, according to the remaining shear resistance under the interface shearing displacement of measuring in the test and the relation between the shear stress and the interface repetition shear action, the shearing rule of assay surface.
Embodiment 4:
A kind of method that adopts claim 1 or 2 described steel-concrete contact interface mechanical property testing device to carry out infinitely great normal stiffness test is characterized in that, may further comprise the steps:
1) test steels plate size is on request cut into rectangle steel plate 15 to be measured, described steel plate 15 to be measured have two plate faces, up and down two end faces and about two end faces.The lower surface of described steel plate 15 to be measured is shelved on the upper surface 3 of described base 16, and so that two plate faces of described steel plate to be measured 15 are vertical with guide rail 11.The left side of described steel plate to be measured is connected with the telescopic end of horizontal loading apparatus 1.
2) in the both sides of described steel plate 15 to be measured mold box and casting concrete are set, after maintenance, so that two plate faces of described steel plate to be measured cohere with concrete block I 17 and concrete block II 18 respectively.Cohere with steel plate 15 to be measured the inboard of described concrete block I 17, the outside contacts with rigid cover plate I 6, but do not connect.Cohere with steel plate 15 to be measured the inboard of described concrete block II 18, the outside contacts with rigid cover plate II 9, but do not connect.
3) restriction concrete block I and concrete block II are installed along the lateral confinement device I 2 and the lateral confinement device II 7 that move perpendicular to guide rail 11 directions at described upper surface 3.
4) in rigid cover plate I 6 and fixing installation connecting element I 4 between the rigid baffle 5, installation connecting element II 13 between rigid cover plate II 9 and movable rigid baffle 10.Described web member I 4 and web member II 13 are rigid element, and the present embodiment is the rigid metal connecting link.
5) start servo-hydraulic charger 12, make it apply default load to movable rigid baffle 10.Afterwards, the servo-hydraulic charger is locked, so that the position of movable rigid baffle 10 is fixed.Open the pressure transducer on the servo-hydraulic charger, measure the variation of normal pressure in the test process.
6) start horizontal loading apparatus 1, make it apply thrust perpendicular to guide rail 11 directions to steel plate 8 to be measured.So that shear failure occurs in the interface that steel plate 8 to be measured contacts with the both sides concrete.Carry out the interface shearing test with constant shear rate, and measure the variation of horizontal thrust in the shear displacemant increase process.
7) apply the pulling force opposite with the described thrust direction of step 6) by 1 pair of steel plate 8 to be measured of horizontal loading apparatus, make steel plate to be measured get back to initial position along the mobile route of step 6); Carry out the interface shearing test with constant shear rate, and measure the variation of horizontal thrust in the shear displacemant increase process.
8) apply the thrust identical with the described thrust direction of step 6) by 1 pair of steel plate 8 to be measured of horizontal loading apparatus, the position when making steel plate to be measured get back to the step 6) termination; And the variation of in this process, measuring horizontal thrust in the variation of normal pressure and the shear displacemant increase process.
9) repeating step 7)~8), until steel plate to be measured 8 contacts the shear resistance at interface with concrete tend towards stability after, when namely the thrust that applies of step 7) equals pulling force that step 8) applies, end operation.
In the present embodiment, the amount of need measuring comprises: pulling force described in the displacement of steel plate, step 7) when thrust and shear failure described in load described in the step 5), the step 6) occur, and repeating step 7)~8) until steel plate to be measured 8 contacts pulling force after the shear resistance at interface tends towards stability or the size of thrust with concrete.Change initial normal stress and carry out revision test, by the interface shearing displacement of measurement in the test and the remaining shear resistance under the relation between the relation between the shear stress, interface normal stress and the shear displacemant and the interface repetition shear action, the shearing rule of assay surface.
Embodiment 5:
A kind of claim 1 or 2 described steel-concrete contact interface mechanical property testing device of adopting carries out the method for interface tensile test, may further comprise the steps:
1) test steels plate size is on request cut into rectangle steel plate 15 to be measured, described steel plate 15 to be measured have two plate faces, up and down two end faces and about two end faces.The lower surface of described steel plate 15 to be measured is shelved on the upper surface 3 of described base 16, and so that two plate faces of described steel plate to be measured 15 are vertical with guide rail 11.
2) in the both sides of described steel plate 15 to be measured mold box and casting concrete are set, after maintenance, so that two plate faces of described steel plate to be measured cohere with concrete block I 17 and concrete block II 18 respectively.Cohere with steel plate 15 to be measured the inboard of described concrete block I 17, the outside is connected with rigid cover plate I 6; Cohere with steel plate 15 to be measured the inboard of described concrete block II 18, the outside is connected with rigid cover plate II 9.Be rigid cover plate I 6 and rigid cover plate II 9 all with the concrete block anchoring.
3) in rigid cover plate I 6 and fixing installation connecting element I 4 between the rigid baffle 5, installation connecting element II 13 between rigid cover plate II 9 and movable rigid baffle 10.Described web member I 4 and web member II 13 are rigid connecting rod.When namely dragging movable rigid baffle 10, can drag rigid cover plate II 9.
4) start servo-hydraulic charger 12, make it apply pulling force to movable rigid baffle 10.Until the surface of contact of steel plate 15 to be measured and concrete block I 17 or concrete block II 18 destroys; Be that concrete block I 17 or concrete block II 18 break away from steel plate 15 to be measured.
The present embodiment can increase and measure the servo-hydraulic charger to the pulling force that rigid cover plate II 9 applies gradually by above-mentioned steps, the ultimate tensile stress when determining steel-concrete contact interface tensile failure
Change concrete strength and steel surface roughness, again make tested sample.Repeat above-mentioned steps and test, determine the relation between steel-concrete interface tensile characteristics and concrete strength, the interface roughness.

Claims (6)

1. steel-concrete contact interface mechanical property testing device is characterized in that: comprise two guide rails (11) that are horizontally disposed with and are parallel to each other at least; Lay base (16) on the described guide rail (11), the two ends of described guide rail (11) are separately installed with fixedly rigid baffle (5) and movable rigid baffle (10); A plate face of described fixedly rigid baffle (5) and movable rigid baffle (10) is towards base (16), described fixedly rigid baffle (5) immobilizes with the relative position of guide rail (11), and described movable rigid baffle (10) and base (16) can slide along guide rail (11) under external force;
Described base (16) has a horizontal upper end face (3); During test, described upper surface (3) carrying tested sample (15); Described tested sample (15) comprises steel plate to be measured (8), concrete block I (17) and concrete block II (18), described steel plate to be measured (8) vertically is placed on the upper surface (3) of base (16), towards fixedly rigid baffle (5) and movably rigid baffle (10), two plate faces of described steel plate to be measured (8) cohere with concrete block I (17) and concrete block II (18) respectively two plate faces of described steel plate to be measured (8) respectively; Described concrete block I (17) contacts with rigid cover plate I (6) towards the fixing side of rigid baffle (5), and described concrete block II (18) contacts with rigid cover plate II (9) towards the side of movable rigid baffle (10); During test, described rigid cover plate I (6) and web member I (4) fixedly is installed between the rigid baffle (5) is equipped with web member II (13) between described rigid cover plate II (9) and the movable rigid baffle (10);
One side of described guide rail (11) has level and loads and measurement mechanism (1); During test, described level loads and the telescopic end of measurement mechanism (1) is connected with described steel plate to be measured (8), and described level loading and measurement mechanism (1) apply thrust or pulling force perpendicular to guide rail (11) direction to steel plate to be measured (8);
Described movable rigid baffle (10) the dorsad plate face of tested sample (15) is connected with the pressure head of servo-hydraulic charger (12); During test, described servo-hydraulic charger (12) applies the thrust that is parallel to guide rail (11) direction to movable rigid baffle (10).
2. steel according to claim 1-concrete contact interface mechanical property testing device is characterized in that: upper surface (3) connection lateral confinement device I (2) and the lateral confinement device II (7) of described base (16); Described lateral confinement device I (2) and lateral confinement device II (7) restriction tested sample (15) are along the movement perpendicular to guide rail (11) direction.
3. a method that adopts claim 1 or 2 described steel-concrete contact interface mechanical property testing device to wait the normal stiffness test is characterized in that, may further comprise the steps:
1) test steels plate size is on request cut into rectangle steel plate to be measured (15), described steel plate to be measured (15) have two plate faces, up and down two end faces and about two end faces; The lower surface of described steel plate to be measured (15) is shelved on the upper surface (3) of described base (16), and so that two plate faces of described steel plate to be measured (15) are vertical with guide rail (11); The left side of described steel plate to be measured is connected with the telescopic end of horizontal loading apparatus (1);
2) in the both sides of described steel plate to be measured (15) mold box and casting concrete are set, after maintenance, so that two plate faces of described steel plate to be measured cohere with concrete block I (17) and concrete block II (18) respectively; Cohere with steel plate to be measured (15) inboard of described concrete block I (17), the outside contacts with rigid cover plate I (6); Cohere with steel plate to be measured (15) inboard of described concrete block II (18), the outside contacts with rigid cover plate II (9);
3) restriction concrete block I and concrete block II are installed along the lateral confinement device I (2) and the lateral confinement device II (7) that move perpendicular to guide rail (11) direction at described upper surface (3);
4) in rigid cover plate I (6) and fixing installation connecting element I (4) between the rigid baffle (5), installation connecting element II (13) between rigid cover plate II (9) and movable rigid baffle (10); Described web member I (4) and web member II (13) are spring;
5) start servo-hydraulic charger (12), make it apply default load to movable rigid baffle (10); Afterwards, the servo-hydraulic charger is locked, so that the position of movable rigid baffle (10) is fixed;
6) start horizontal loading apparatus (1), make it apply thrust perpendicular to guide rail (11) direction to steel plate to be measured (8); So that shear failure occurs in the interface that steel plate to be measured (8) contacts with the both sides concrete;
7) by horizontal loading apparatus (1) steel plate to be measured (8) is applied the pulling force opposite with the described thrust direction of step 6), make steel plate to be measured get back to initial position along the mobile route of step 6);
8) by horizontal loading apparatus (1) steel plate to be measured (8) is applied thrust with the described thrust equidirectional of step 6), make steel plate to be measured get back to the position of step 6) when stopping;
9) repeating step 7)~8), until steel plate to be measured (8) contacts the shear resistance at the interface rear end operation that tends towards stability with concrete.
4. a method that adopts claim 1 or 2 described steel-concrete contact interface mechanical property testing device to wait the normal pressure test is characterized in that, may further comprise the steps:
1) test steels plate size is on request cut into rectangle steel plate to be measured (15), described steel plate to be measured (15) have two plate faces, up and down two end faces and about two end faces; The lower surface of described steel plate to be measured (15) is shelved on the upper surface (3) of described base (16), and so that two plate faces of described steel plate to be measured (15) are vertical with guide rail (11); The left side of described steel plate to be measured is connected with the telescopic end of horizontal loading apparatus (1);
2) in the both sides of described steel plate to be measured (15) mold box and casting concrete are set, after maintenance, so that two plate faces of described steel plate to be measured cohere with concrete block I (17) and concrete block II (18) respectively; Cohere with steel plate to be measured (15) inboard of described concrete block I (17), the outside contacts with rigid cover plate I (6); Cohere with steel plate to be measured (15) inboard of described concrete block II (18), the outside contacts with rigid cover plate II (9);
3) restriction concrete block I and concrete block II are installed along the lateral confinement device I (2) and the lateral confinement device II (7) that move perpendicular to guide rail (11) direction at described upper surface (3);
4) in rigid cover plate I (6) and fixing installation connecting element I (4) between the rigid baffle (5), installation connecting element II (13) between rigid cover plate II (9) and movable rigid baffle (10); Described web member I (4) and web member II (13) are spring;
5) start servo-hydraulic charger (12), make it apply default load to movable rigid baffle (10); After process of the test in, keep described default load constant;
6) start horizontal loading apparatus (1), make it apply thrust perpendicular to guide rail (11) direction to steel plate to be measured (8); So that shear failure occurs in the interface that steel plate to be measured (8) contacts with the both sides concrete;
7) by horizontal loading apparatus (1) steel plate to be measured (8) is applied the pulling force opposite with the described thrust direction of step 6), make steel plate to be measured get back to initial position along the mobile route of step 6);
8) by horizontal loading apparatus (1) steel plate to be measured (8) is applied thrust with the described thrust equidirectional of step 6), make steel plate to be measured get back to the position of step 6) when stopping;
9) repeating step 7)~8), until steel plate to be measured (8) contacts the shear resistance at the interface rear end operation that tends towards stability with concrete.
5. a method that adopts claim 1 or 2 described steel-concrete contact interface mechanical property testing device to carry out infinitely great normal stiffness test is characterized in that, may further comprise the steps:
1) test steels plate size is on request cut into rectangle steel plate to be measured (15), described steel plate to be measured (15) have two plate faces, up and down two end faces and about two end faces; The lower surface of described steel plate to be measured (15) is shelved on the upper surface (3) of described base (16), and so that two plate faces of described steel plate to be measured (15) are vertical with guide rail (11); The left side of described steel plate to be measured is connected with the telescopic end of horizontal loading apparatus (1);
2) in the both sides of described steel plate to be measured (15) mold box and casting concrete are set, after maintenance, so that two plate faces of described steel plate to be measured cohere with concrete block I (17) and concrete block II (18) respectively; Cohere with steel plate to be measured (15) inboard of described concrete block I (17), the outside contacts with rigid cover plate I (6); Cohere with steel plate to be measured (15) inboard of described concrete block II (18), the outside contacts with rigid cover plate II (9);
3) restriction concrete block I and concrete block II are installed along the lateral confinement device I (2) and the lateral confinement device II (7) that move perpendicular to guide rail (11) direction at described upper surface (3);
4) in rigid cover plate I (6) and fixing installation connecting element I (4) between the rigid baffle (5), installation connecting element II (13) between rigid cover plate II (9) and movable rigid baffle (10); Described web member I (4) and web member II (13) are rigid connecting rod;
5) start servo-hydraulic charger (12), make it apply default load to movable rigid baffle (10); Afterwards, the servo-hydraulic charger is locked, so that the position of movable rigid baffle (10) is fixed;
6) start horizontal loading apparatus (1), make it apply thrust perpendicular to guide rail (11) direction to steel plate to be measured (8); So that shear failure occurs in the interface that steel plate to be measured (8) contacts with the both sides concrete;
7) by horizontal loading apparatus (1) steel plate to be measured (8) is applied the pulling force opposite with the described thrust direction of step 6), make steel plate to be measured get back to initial position along the mobile route of step 6);
8) by horizontal loading apparatus (1) steel plate to be measured (8) is applied thrust with the described thrust equidirectional of step 6), make steel plate to be measured get back to the position of step 6) when stopping;
9) repeating step 7)~8), until steel plate to be measured (8) contacts the shear resistance at the interface rear end operation that tends towards stability with concrete.
6. one kind is adopted claim 1 or 2 described steel-concrete contact interface mechanical property testing device to carry out the method for interface tensile test, it is characterized in that, may further comprise the steps:
1) test steels plate size is on request cut into rectangle steel plate to be measured (15), described steel plate to be measured (15) have two plate faces, up and down two end faces and about two end faces; The lower surface of described steel plate to be measured (15) is shelved on the upper surface (3) of described base (16), and so that two plate faces of described steel plate to be measured (15) are vertical with guide rail (11); The left side of described steel plate to be measured is connected with the telescopic end of horizontal loading apparatus (1);
2) in the both sides of described steel plate to be measured (15) mold box and casting concrete are set, after maintenance, so that two plate faces of described steel plate to be measured cohere with concrete block I (17) and concrete block II (18) respectively; Cohere with steel plate to be measured (15) inboard of described concrete block I (17), the outside is connected with rigid cover plate I (6); Cohere with steel plate to be measured (15) inboard of described concrete block II (18), the outside is connected with rigid cover plate II (9);
3) in rigid cover plate I (6) and fixing installation connecting element I (4) between the rigid baffle (5), installation connecting element II (13) between rigid cover plate II (9) and movable rigid baffle (10); Described web member I (4) and web member II (13) are rigid connecting rod;
4) start servo-hydraulic charger (12), make it apply pulling force to movable rigid baffle (10); Until the surface of contact of steel plate to be measured (15) and concrete block I (17) or concrete block II (18) destroys.
CN201310252558.4A 2013-06-24 2013-06-24 Mechanical property test device and method of steel-concrete contact interface Expired - Fee Related CN103323340B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310252558.4A CN103323340B (en) 2013-06-24 2013-06-24 Mechanical property test device and method of steel-concrete contact interface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310252558.4A CN103323340B (en) 2013-06-24 2013-06-24 Mechanical property test device and method of steel-concrete contact interface

Publications (2)

Publication Number Publication Date
CN103323340A true CN103323340A (en) 2013-09-25
CN103323340B CN103323340B (en) 2015-03-04

Family

ID=49192227

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310252558.4A Expired - Fee Related CN103323340B (en) 2013-06-24 2013-06-24 Mechanical property test device and method of steel-concrete contact interface

Country Status (1)

Country Link
CN (1) CN103323340B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103575644A (en) * 2013-11-06 2014-02-12 中交第二航务工程局有限公司 Test method for matching friction coefficient of contact surface of poured concrete
CN103645094A (en) * 2013-12-17 2014-03-19 中国水电顾问集团华东勘测设计研究院有限公司 Testing device for real mechanical properties of interface and testing method of testing device
CN103645043A (en) * 2013-12-18 2014-03-19 中交第二航务工程局有限公司 Combined type shear key stress test method
CN103884608A (en) * 2014-04-05 2014-06-25 湖南科技大学 Rock structure surface shearing device and method
CN104374648A (en) * 2014-11-20 2015-02-25 广州市建筑科学研究院有限公司 Test device and test method for testing kinetic shear characteristics between pipe piles and grouting soil bodies
CN104374649A (en) * 2014-11-20 2015-02-25 广州市建筑科学研究院有限公司 Testing device and method for observing shear deformation failure characteristics between tubular pile and grouting soil body
CN104931361A (en) * 2015-06-26 2015-09-23 青岛理工大学 Pile-soil interface shear simulation test method for open concrete pipe pile
CN105758737A (en) * 2016-04-22 2016-07-13 华北水利水电大学 Method and device for testing shear strength of rock and concrete bond interface
CN106092775A (en) * 2016-08-02 2016-11-09 吉林大学 Cement Concrete Deck Paving Course and floorings shearing strength at intersection stiffness test method
CN107655826A (en) * 2017-09-06 2018-02-02 河海大学 A kind of device and its measuring method for measuring steel and concrete interface shearing
WO2018068529A1 (en) * 2016-10-11 2018-04-19 深圳大学 In-situ test device and method for soft clay body
CN109060505A (en) * 2018-08-01 2018-12-21 清华大学 Soil tests soil container with structure interface

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080178683A1 (en) * 2007-01-31 2008-07-31 James Heathman Testing mechanical properties
CN101373174A (en) * 2008-07-16 2009-02-25 中国科学院武汉岩土力学研究所 Direct shear apparatus capable of directly measuring interface friction force
CN102879282A (en) * 2012-10-26 2013-01-16 浙江大学 Test piece and method for shear capacity testing of steel-concrete interface shear connecting piece

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080178683A1 (en) * 2007-01-31 2008-07-31 James Heathman Testing mechanical properties
CN101373174A (en) * 2008-07-16 2009-02-25 中国科学院武汉岩土力学研究所 Direct shear apparatus capable of directly measuring interface friction force
CN102879282A (en) * 2012-10-26 2013-01-16 浙江大学 Test piece and method for shear capacity testing of steel-concrete interface shear connecting piece

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵联桢等: "大型多功能冻土-结构接触面循环直剪***研制及应用", 《岩土工程学报》 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103575644B (en) * 2013-11-06 2016-04-27 中交第二航务工程局有限公司 Coupling casting concrete surface of contact test method of friction coefficient
CN103575644A (en) * 2013-11-06 2014-02-12 中交第二航务工程局有限公司 Test method for matching friction coefficient of contact surface of poured concrete
CN103645094A (en) * 2013-12-17 2014-03-19 中国水电顾问集团华东勘测设计研究院有限公司 Testing device for real mechanical properties of interface and testing method of testing device
CN103645094B (en) * 2013-12-17 2016-06-29 中国水电顾问集团华东勘测设计研究院有限公司 The true mechanical property testing device in interface and method of testing thereof
CN103645043A (en) * 2013-12-18 2014-03-19 中交第二航务工程局有限公司 Combined type shear key stress test method
CN103645043B (en) * 2013-12-18 2016-05-04 中交第二航务工程局有限公司 A kind of combined type shear connector stress test method of testing
CN103884608A (en) * 2014-04-05 2014-06-25 湖南科技大学 Rock structure surface shearing device and method
CN103884608B (en) * 2014-04-05 2016-03-30 湖南科技大学 A kind of rock structural face shear and method
CN104374649A (en) * 2014-11-20 2015-02-25 广州市建筑科学研究院有限公司 Testing device and method for observing shear deformation failure characteristics between tubular pile and grouting soil body
CN104374648A (en) * 2014-11-20 2015-02-25 广州市建筑科学研究院有限公司 Test device and test method for testing kinetic shear characteristics between pipe piles and grouting soil bodies
CN104374649B (en) * 2014-11-20 2017-07-25 广州市建筑科学研究院有限公司 A kind of experimental rig and method for being used to observe shear deformation breaks down feature between pile tube and the slip casting soil body
CN104931361A (en) * 2015-06-26 2015-09-23 青岛理工大学 Pile-soil interface shear simulation test method for open concrete pipe pile
CN104931361B (en) * 2015-06-26 2017-08-11 青岛理工大学 Pile-soil interface shear simulation test method for open concrete pipe pile
CN105758737A (en) * 2016-04-22 2016-07-13 华北水利水电大学 Method and device for testing shear strength of rock and concrete bond interface
CN106092775A (en) * 2016-08-02 2016-11-09 吉林大学 Cement Concrete Deck Paving Course and floorings shearing strength at intersection stiffness test method
CN106092775B (en) * 2016-08-02 2018-11-16 吉林大学 Cement Concrete Deck Paving Course and floorings shearing strength at intersection stiffness test method
WO2018068529A1 (en) * 2016-10-11 2018-04-19 深圳大学 In-situ test device and method for soft clay body
CN107655826A (en) * 2017-09-06 2018-02-02 河海大学 A kind of device and its measuring method for measuring steel and concrete interface shearing
CN109060505A (en) * 2018-08-01 2018-12-21 清华大学 Soil tests soil container with structure interface
CN109060505B (en) * 2018-08-01 2023-12-29 清华大学 Soil container for soil and structure contact surface test

Also Published As

Publication number Publication date
CN103323340B (en) 2015-03-04

Similar Documents

Publication Publication Date Title
CN103323340A (en) Mechanical property test device and method of steel-concrete contact interface
WO2018014466A1 (en) Drop hammer height adjusting device used for high strain detection of pile foundation
CN106501014A (en) Vertical load testing machine for domain tunnel structure
Sun et al. Failure investigation and replacement implementation of short suspenders in a suspension bridge
KR101864590B1 (en) Impact shear test apparatus.
CN105865690A (en) Steel strand prestress detection device and measuring method based on reverse pull method
CN102051858A (en) Jack loading triangular truss hanging basket and load test construction method thereof
CN203334187U (en) Bracket pre-pressing structure
CN204849607U (en) A continuous beam string basket pre -compaction device for bridge construction
CN109208488B (en) High pier pre-pressing device with high combined weight at high altitude and construction method thereof
CN103628422B (en) A kind of anti-force type dragging suspension basket prepressing device and implementation method thereof
CN204112240U (en) The overall prepressing device of Hanging Basket
Salih et al. Behaviour of timber-alternative railway sleeper materials under five-point bending
CN106351267A (en) Pile foundation bearing characteristic model testing device under down-pressing static load effect
CN107014670B (en) Testing device for multi-directional horizontal bearing capacity of single pile under composite load
CN203629965U (en) Dual-purpose testing device of tire reinforced soil structure drawing model
Yang et al. The load-slip characteristics of stud shear connector after hydrochloric acid corrosion
JP6103578B2 (en) Nondestructive inspection system, monitoring system, nondestructive inspection method and monitoring method for concrete structure using strain of concrete
CN211172116U (en) Experimental device for simulating influence of foundation pit excavation on bearing capacity of adjacent building foundation pile
CN114112692A (en) Tower column oblique self-balancing test device and test method thereof
Karkush et al. Effects of surcharge on the behavior of passive piles in sandy soil
Li et al. Fatigue life prognosis study of welded tubular joints in signal support structures
CN205825895U (en) A kind of quick measurement bridge pad comes to nothing the measuring instrument of degree
CN110616751A (en) Experimental device for simulating influence of foundation pit excavation on bearing capacity of adjacent building foundation pile
CN104458567A (en) Device and method for measuring local deviation friction coefficient of pre-stressed ribs

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150304

CF01 Termination of patent right due to non-payment of annual fee