CN103321450A - Typhoon-resistant reinforcing treatment method for color prefabricated houses - Google Patents

Typhoon-resistant reinforcing treatment method for color prefabricated houses Download PDF

Info

Publication number
CN103321450A
CN103321450A CN2013102519140A CN201310251914A CN103321450A CN 103321450 A CN103321450 A CN 103321450A CN 2013102519140 A CN2013102519140 A CN 2013102519140A CN 201310251914 A CN201310251914 A CN 201310251914A CN 103321450 A CN103321450 A CN 103321450A
Authority
CN
China
Prior art keywords
depression bar
typhoon
wire rope
color
buried dowel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102519140A
Other languages
Chinese (zh)
Inventor
石瑞先
张随宽
陈兵兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN2013102519140A priority Critical patent/CN103321450A/en
Publication of CN103321450A publication Critical patent/CN103321450A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The invention discloses a typhoon-resistant reinforcing treatment method for color prefabricated houses. The typhoon-resistant reinforcing treatment method is characterized by steps of 1, setting buried anchor bars on the ground under front and back cornices of a color prefabricated house and reserving steel wire rope fixing holes at ends of the buried anchor bars protruded from the ground, 2, arranging steel pipes of the diameter phi of 48mm longitudinally at lower force-bearing positions along the direction perpendicular to the roof boarding from ends of the cornices and taking the steel pipes as longitudinal horizontal struts for temporary stabilization, 3, arranging the steel pipes of the diameter phi of 48mm on the longitudinal horizontal struts in the direction perpendicular to the longitudinal horizontal struts and taking the steel pipes as transverse horizontal struts, 4, winding joints of the longitudinal horizontal struts and the transverse horizontal struts by long steel wire ropes so as to fix the same, and 5, arranging anti-collision signs. By the typhoon-resistant reinforcing treatment method for the color prefabricated houses, firmness of the color prefabricated houses is guaranteed during typhoon, safety of personal and property are guaranteed, maintenance of the color prefabricated houses after being damaged by typhoon each time is omitted, and waste of resources is avoided.

Description

The platform reinforcing and processing method is prevented in the colored steel room
Technical field
The present invention relates to house typhoon protection technical field, especially relate to the anti-platform consolidation process technology in colored steel room, is that typhoon, large wind process method are effectively resisted in a kind of colored steel room.
Background technology
Conventional colored steel room reinforces, and often adopts self-contained stayed mast to carry out fastening, has only satisfied the homeostasis demand; During typhoon, the dependence such as roofing, exterior wall self rivet and typhoon contend with.Each typhoon one mistake, impaired the lighter needs the colored steel room is reinforced again; Severe one need be built the colored steel room again.
Often log in the area for the coastal typhoon that waits, anti-platform is an emphasis, the interim colored steel room of especially on engineering, building, and difficult point especially.The colored steel room that reinforces according to conventional method or adopt the simple colored steel room that reinforces of iron wire, after each experience typhoon, all can suffer in various degree damage in addition with roofing throw, metope blows down, and causes serious loss.
Certain super-huge iron and steel villager Relocation and Settlement residential quarter projects, in building the resettlement residential quarter, the colored steel room is erected with seats up to a hundred, and each typhoon all has the colored steel room and is wiped out situation; Because resettlement residential quarter construction period is longer, the colored steel room whenever can experience several times typhoon every year, according to a conventional method the colored steel room is reinforced, and is difficult to guarantee that the colored steel room is not damaged in typhoon.
Summary of the invention
Purpose of the present invention is exactly the problem that exists for prior art, provide the colored steel room to prevent the platform reinforcing and processing method, for strengthening colored steel room opposing typhoon ability, guarantee safety, the Cost reduction overlapping investment of human, financial, and material resources, change conventional colored steel room self fastening screw reinforcing, iron wire Simplified Method of Strengthening, adopt two-way steel pipe as uniform depression bar, utilize steel wire and buried dowel to link the treatment measures of reinforcing, guarantee that the colored steel room is not damaged in typhoon.
The object of the present invention is achieved like this: the platform reinforcing and processing method is prevented in the colored steel room, it is characterized in that: carry out according to the following steps:
1, buried dowel is set: on the vertical lower ground of before and after the colored steel room, cornicing, interval 3600mm arranges buried dowel, buried dowel surpasses the front and back approximately 100mm that cornices, and buried dowel give prominence to ground 50~100mm, and in the fixing wire rope aperture of buried dowel outstanding termination, ground reservation.Described buried dowel according to ground soil property situation, or is directly implanted reinforcing bar or the reinforced concrete foundation counterweight is set at soil layer, and reserves dowel.
2, the vertical equity depression bar is set: vertical roof panel direction is vertically placed Φ 48mm steel pipe in load position, bottom from the end of cornicing, the interval is 1500mm approximately, stablize as the vertical equity depression bar, vertical equity depression bar lap position can adopt fastener or iron wire to link temporarily.
3, the transverse horizontal depression bar is set: at piecemeal wall and wall middle part C shaped steel stud is arranged, place horizontal Φ 48mm steel pipe at vertical equity depression bar upper vertical vertical equity depression bar, the interval is 1800mm approximately, as the transverse horizontal depression bar, 100~the 200mm that cornices after in face of the outstanding colored steel house of transverse horizontal depression bar, and link with bottom vertical equity depression bar.
4, fixing wire rope: adopt elongated wire rope, twine firmly in vertical and horizontal horizontal struts junction, establish a latch closure in the outstanding end of cornicing of front and back transverse horizontal depression bar and hang down to buried dowel position, adopt the U-shape lock button that the buried dowel of wire rope and outstanding ground is linked firmly.
5, crashproof sign is set: with before buried dowel is connected, wear pvc pipe at wire rope at wire rope, and be coated with the colored marking lacquer at the PVC plastic pipe, in case the workman collides wire rope.The high approximately 1800mm of PVC plastic pipe, the workman is convenient to identification and is got final product.
Compared with prior art, advantage of the present invention is: guarantee the fastness of colored steel room when typhoon comes, guarantee the safety of human, financial, and material resources, avoided each typhoon again to keep in repair the colored steel room later, resource avoids waste.Reinforcement material can also be reused, and has saved material and cost.
Description of drawings
Fig. 1: the anti-platform in colored steel room is reinforced side elevational view.
Among the figure: 1, buried dowel 2, crashproof sign 3, wire rope 4, vertical equity depression bar 5, transverse horizontal depression bar.
The specific embodiment
For further describing the present invention, the invention will be further described below in conjunction with embodiment and accompanying drawing.
As shown in the figure, the platform reinforcing and processing method is prevented in the colored steel room, it is characterized in that: carry out according to the following steps:
1, buried dowel 1 is set: on the vertical lower ground of before and after the colored steel room, cornicing, interval 3600mm arranges buried dowel 1, buried dowel 1 surpasses the front and back approximately 100mm that cornices, buried dowel 1 outstanding ground 50~100mm, and reserve fixedly wire rope 3 apertures in buried dowel 1 outstanding termination, ground.Described buried dowel 1 according to ground soil property situation, or is directly implanted reinforcing bar or the reinforced concrete foundation counterweight is set at soil layer, and reserves dowel.
2, vertical equity depression bar 4 is set: vertical roof panel direction is vertically placed Φ 48mm steel pipe in load position, bottom from the end of cornicing, the interval is 1500mm approximately, stablize as vertical equity depression bar 4, vertical equity depression bar 4 lap positions can adopt fastener or iron wire to link temporarily.
3, transverse horizontal depression bar 5 is set: at piecemeal wall and wall middle part C shaped steel stud is arranged, place horizontal Φ 48mm steel pipe at vertical equity depression bar upper vertical vertical equity depression bar 4, the interval is 1800mm approximately, as transverse horizontal depression bar 5,100~the 200mm that cornices after in face of the outstanding colored steel houses of transverse horizontal depression bar 5, and link with bottom vertical equity depression bar 4.
4, fixing wire rope 3: adopt elongated wire rope 3, twine firmly in vertical and horizontal horizontal struts 4,5 junctions, establish a latch closure in front and back transverse horizontal depression bar 5 outstanding ends of cornicing and hang down to buried dowel 1 position, adopt the U-shape lock button that the buried dowel 1 in wire rope 3 and outstanding ground is linked firmly.
5, crashproof sign 2 is set: with before buried dowel 1 is connected, wear pvc pipe at wire rope 3 at wire rope 3, and be coated with the colored marking lacquer at the PVC plastic pipe, in case the workman collides wire rope 3.The high approximately 1800mm of PVC plastic pipe, the workman is convenient to identification and is got final product.
Certain super-huge iron and steel villager Relocation and Settlement residential quarter projects, the colored steel room that adopts the present invention to reinforce has experienced repeatedly typhoon and without damage, has avoided repeating to reprocess the colored steel room.Simultaneously, guaranteed the safety of human, financial, and material resources, successful.

Claims (1)

1. the platform reinforcing and processing method is prevented in the colored steel room, it is characterized in that: carry out according to the following steps:
1), buried dowel (1) is set: on the vertical lower ground of before and after the colored steel room, cornicing, interval 3600mm arranges buried dowel (1), buried dowel (1) surpasses the front and back approximately 100mm that cornices, buried dowel (1) is given prominence to ground 50~100mm, and reserves fixedly wire rope (3) aperture in the outstanding termination, ground of buried dowel (1).Described buried dowel (1) according to ground soil property situation, or is directly implanted reinforcing bar or the reinforced concrete foundation counterweight is set at soil layer, and reserves dowel.
2), vertical equity depression bar (4) is set: vertical roof panel direction is vertically placed Φ 48mm steel pipe in load position, bottom from the end of cornicing, the interval is 1500mm approximately, stablize as vertical equity depression bar (4), vertical equity depression bar (4) lap position can adopt fastener or iron wire to link temporarily.
3), transverse horizontal depression bar (5) is set: at piecemeal wall and wall middle part C shaped steel stud is arranged, place horizontal Φ 48mm steel pipe at vertical equity depression bar (4) upper vertical vertical equity depression bar (4), the interval is 1800mm approximately, as transverse horizontal depression bar (5), 100~the 200mm that cornices after in face of the outstanding colored steel house of transverse horizontal depression bar (5), and link with bottom vertical equity depression bar (4).
4), fixing wire rope (3): adopt elongated wire rope (3), twine firmly in vertical and horizontal horizontal struts (4,5) junction, establish a latch closure in the outstanding end of cornicing of front and back transverse horizontal depression bars (5) and hang down to buried dowel (1) position, adopt the U-shape lock button that wire rope (3) and the buried dowel in outstanding ground (1) are linked firmly.
5), crashproof sign (2) is set:, wear pvc pipe at wire rope (3), and be coated with the colored marking lacquer at the PVC plastic pipe, in case the workman collides wire rope (3) with before buried dowel (1) is connected at wire rope (3).The high approximately 1800mm of PVC plastic pipe, the workman is convenient to identification and is got final product.
CN2013102519140A 2013-06-24 2013-06-24 Typhoon-resistant reinforcing treatment method for color prefabricated houses Pending CN103321450A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102519140A CN103321450A (en) 2013-06-24 2013-06-24 Typhoon-resistant reinforcing treatment method for color prefabricated houses

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102519140A CN103321450A (en) 2013-06-24 2013-06-24 Typhoon-resistant reinforcing treatment method for color prefabricated houses

Publications (1)

Publication Number Publication Date
CN103321450A true CN103321450A (en) 2013-09-25

Family

ID=49190472

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102519140A Pending CN103321450A (en) 2013-06-24 2013-06-24 Typhoon-resistant reinforcing treatment method for color prefabricated houses

Country Status (1)

Country Link
CN (1) CN103321450A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103629497A (en) * 2013-11-29 2014-03-12 国家电网公司 Wind-resistant bracket of high-altitude test robot
CN105201223A (en) * 2015-10-20 2015-12-30 浙江乔兴建设集团有限公司 Windproof reinforcing structure used for temporary board houses on soil
CN106836931A (en) * 2017-03-13 2017-06-13 中国十七冶集团有限公司 The coastal big facility typhoon protection that faces of engineering reinforces locking means
CN108625481A (en) * 2018-05-16 2018-10-09 中国水利水电第四工程局有限公司 A kind of movable plank house typhoon protection device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007321499A (en) * 2006-06-02 2007-12-13 Venture Bolt:Kk Reinforcing device of wooden framework house
CN202324688U (en) * 2011-12-01 2012-07-11 雅致集成房屋股份有限公司 Disaster relief placement mobile house
CN202530816U (en) * 2011-12-19 2012-11-14 中建三局第一建设工程有限责任公司 A hurricane-shielding reinforcing device of a prefabricated house
CN202645037U (en) * 2012-06-19 2013-01-02 中国十七冶集团有限公司 Anti-typhoon simple and easy protection device for movable board room

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007321499A (en) * 2006-06-02 2007-12-13 Venture Bolt:Kk Reinforcing device of wooden framework house
CN202324688U (en) * 2011-12-01 2012-07-11 雅致集成房屋股份有限公司 Disaster relief placement mobile house
CN202530816U (en) * 2011-12-19 2012-11-14 中建三局第一建设工程有限责任公司 A hurricane-shielding reinforcing device of a prefabricated house
CN202645037U (en) * 2012-06-19 2013-01-02 中国十七冶集团有限公司 Anti-typhoon simple and easy protection device for movable board room

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103629497A (en) * 2013-11-29 2014-03-12 国家电网公司 Wind-resistant bracket of high-altitude test robot
CN103629497B (en) * 2013-11-29 2016-03-02 国家电网公司 The wind resistant support of altitude test robot
CN105201223A (en) * 2015-10-20 2015-12-30 浙江乔兴建设集团有限公司 Windproof reinforcing structure used for temporary board houses on soil
CN106836931A (en) * 2017-03-13 2017-06-13 中国十七冶集团有限公司 The coastal big facility typhoon protection that faces of engineering reinforces locking means
CN108625481A (en) * 2018-05-16 2018-10-09 中国水利水电第四工程局有限公司 A kind of movable plank house typhoon protection device

Similar Documents

Publication Publication Date Title
CN103321450A (en) Typhoon-resistant reinforcing treatment method for color prefabricated houses
CN106193311A (en) Modular assembled building structure
CN204876199U (en) Restraint overlap joint structure is concentrated to precast shear wall vertical reinforcement
CN108999281A (en) A kind of novel precast concrete bean column node and its construction method
CN109184030A (en) A kind of assembly concrete shear wall Type Composite Structure System and installation method
CN205875417U (en) Construction structures is connected with pre -buried straight screw sleeve to rearmounted girder iron muscle
Satpute et al. Building design using cold formed steel section
WO2017024844A1 (en) Bolt connection structure between column and beam in aluminum alloy house
CN106836600A (en) A kind of reinforcing bar composite floor for power transformation engineering
CN103255892A (en) Installing device of veneers or stone curtain walls and construction method for dry hanging veneers or stone curtain walls
CN106437261B (en) A kind of concrete frame seismic reinforcing structure using expanded metal lath
CN109184029A (en) A kind of fabricated shear wall Type Composite Structure System and installation method being easily installed
CN211143116U (en) Be applicable to floor division hole basement retaining wall structure
CN103821259B (en) The combined steel plate shearing force wall that a kind of tensile force of belt supports
CN204475536U (en) With the precast member for reinforcing bar concrete that rigid joint connects
CN204676533U (en) A kind of soil-nail wall support system based on the recyclable technique of assembling
CN102561555A (en) Method for connecting wallboard components of precast concrete shear wall structure
CN206091502U (en) Use concrete frame antidetonation reinforced structure of steel sheet net
CN212562625U (en) Wind-resistant reinforcing structure of prefabricated house
CN211058013U (en) Assembled house
CN204266111U (en) Deep foundation ditch steel trestle
CN204715720U (en) The attachment supporting arrangement of the attachment type raise scaffold outside the building section of receipts within the walls
CN111608377B (en) Comprehensive construction method for building overhanging scaffold
CN206800625U (en) Novel light energy-saving environmental-protection hollow pre-fabricated panels frame structure
CN111608376B (en) Comprehensive construction method for shaping component

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130925