CN103276806B CN201310232123.3A CN201310232123A CN103276806B CN 103276806 B CN103276806 B CN 103276806B CN 201310232123 A CN201310232123 A CN 201310232123A CN 103276806 B CN103276806 B CN 103276806B
Authority
CN
China
Prior art keywords
truss
girder
single channel
section steel
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310232123.3A
Other languages
Chinese (zh)
Other versions
CN103276806A (en
Inventor
刘学春
田辰
张爱林
赵越
胡婷婷
惠怡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rizhao Weiye Tools Co ltd
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CN201310232123.3A priority Critical patent/CN103276806B/en
Publication of CN103276806A publication Critical patent/CN103276806A/en
Application granted granted Critical
Publication of CN103276806B publication Critical patent/CN103276806B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

A kind of industrialization assembling hetermorphiscal column steel work prestressing force accentric support frame system, belong to technical field of structural engineering, comprise assembling truss plate, assembling column and prestressing force accentric support component, described assembling truss plate comprises lattice truss beam and floor; Described assembling truss plate is prefabricated in the factory, mutually spliced by the bean column node of assembling truss plate by its beam-ends shrouding and assembling column at the construction field (site), described assembling column adopts bolt scene to be spliced to form multilayer truss slab frame construction at interlayer; On the basis of described truss slab frame construction, prestressing force accentric support component is at the bottom of the post with the girder truss in assembling truss plate and assembling column as lateral resistant member or top is connected; Described assembling truss plate, assembling column and prestressing force accentric support component are all prefabricated in the factory, and job site is assembled by bolt.

Description

A kind of industrialization assembling hetermorphiscal column steel work prestressing force eccentrical braces
Technical field
The present invention relates to a kind of industrialization assembling hetermorphiscal column steel work prestressing force accentric support frame system, belong to technical field of structural engineering.
Background technology
China's annual town and country newly constructed house area 2,000,000,000 square metres, wherein more than 80% is high energy consumption building, and unit of China building area energy consumption is more than 2 times of developed country.Join in a common effort meter according to Chinese steel, within 2011, China's output of steel breaks through 700,000,000 tons of high pointes, and within continuous 16 years, be sure to occupy countries in the world output of steel the first, developed country's steel building area accounts for overall floorage more than 50%, and Japan accounts for 80%, and China is less than 4%.China is as the maximum country of construction scope in the world, steel output, and the development of house (comprising house) steel work is seriously delayed.
At present, be in the starting stage both at home and abroad to the system research of high-rise steel structure house, the system innovation of industrialization assembling high-rise steel structure is imperative.Have employed a large amount of welding during traditional housing building of steel-structure construction, speed of application is slow, seriously polluted to environment, the most important thing is that the quality of weld seam should not control, has a strong impact on the security performance of building.
Current prestressed cable is only used in beam-string structure, does not also use in high-level structure, adopts prestressed cable in engineering, also not have realization as high-rise lateral resistant member.Traditional steel frame structural system, the lateral rigidity of structure is difficult to meet the demands, be out of shape larger, easily cause the destruction of non-structural element, the how high-rise assembling type steel structure framework-prestressing force eccentrical braces of industrialization, the basis of steel frame adds the eccentric drag-line of horizontal and vertical prestressing force support, improve the lateral rigidity of structure, improve the deformation performance of structure.
Traditional structure design with analyze, generally frame construction beam-column node processing is become desirable rigid joint or hinged joint.Because rigid joint bearing capacity and rigidity are all very large, are thus usually considered to a kind of ideal shock-resistant node form and are widely used in the node connection design of earthquake zone frame construction.But earthquake experience shows: the reinforcing beam Column border node of building connects and occurred brittle fracture in various degree.Adopt the steel framed structure of welding rigid joint, because of ductility of joint difference, brittle fracture easily occurs, and difficulty of construction is also large; Though hinged joint simple structure but rigidity and energy-dissipating property poor, unfavorable to the antidetonation of structure; Only have the structures with semi-rigid joints of connected mode simple and fast to have the two advantage concurrently, there is higher strength and stiffness and ductile performance and energy-dissipating property preferably, thus reduce earthquake to a great extent.
Summary of the invention
The present invention proposes a kind of assembling hetermorphiscal column steel work prestressing force eccentrical braces belonging to technical field of structural engineering.Its object is in the production and construction of steel structure system, by modularization, batch production, standardization and assemblingization combine, achieve factorial praluction, on-the-spot quick assembling, under the prerequisite ensureing construction quality, improve speed of application, decrease the construction period, reduce construction costs.This structural system can the Fast Installation of realization body steel structure frame and lateral resistant member, and can resist earthquake and wind load, embodies the advantage of steel work.And beam-column node of the present invention connects employing structures with semi-rigid joints, and the initial anti-side rigidity of Semi-rigid Connection Steel Frame is less, but ductility factor is comparatively large, and energy dissipation capacity is fine, can meet the design object of antidetonation under rarely occurred earthquake effect well.
Described assembling type steel structure hetermorphiscal column prestressing force eccentrical braces, this assembling type steel structure prestressing force eccentrical braces is sandwich construction, and every Rotating fields comprises assembling truss plate, hetermorphiscal column and prestressing force accentric support component;
Described assembling truss plate comprises lattice truss beam and floor, described lattice truss beam, by beam-ends shrouding, is connected with other lattice truss beams or column, forms truss slab frame construction, again floor to be placed in truss plate framework structure and to connect, forming assembling truss plate; Described assembling truss plate is prefabricated in the factory, and is mutually spliced by the bean column node of assembling truss plate by its beam-ends shrouding and hetermorphiscal column at the construction field (site), and hetermorphiscal column adopts bolt scene to be spliced to form multilayer truss slab frame construction at interlayer; Described assembling truss plate, hetermorphiscal column are all prefabricated in the factory, and job site is assembled by bolt.
Described industrialization assembling type steel structure hetermorphiscal column prestressing force eccentrical braces, its assembling truss plate comprises two kinds of specifications, is respectively A plate and B plate;
Described A plate comprises the long girder 15 of double flute steel truss, double flute steel truss girder 16, the long beam 17 of single channel-section steel truss, single channel-section steel girder truss 18, junction plate I 19, junction plate II 20, junction plate III 21 and floor 22, junction plate II 20 is shown in Figure of description 16, the part that corner post accounts for is removed by set square, the part of then stretching out beam all has bolt hole, conveniently be connected with beam bolt, junction plate III 21 is shown in Figure of description 17, the part that three-dimensional post accounts for is removed by set square, the part of then stretching out beam all has bolt hole, conveniently be connected with beam bolt, double flute steel truss girder 16 and the long girder 15 of double flute steel truss are mutually vertical and be connected by junction plate II 20, the beam-ends that junction plate II 20 is welded in double flute steel truss girder 16 and the long girder 15 of double flute steel truss winds up top, the other end of double flute steel truss girder 16 is connected with the long beam 17 of single channel-section steel truss with double flute steel truss long girder 15 level, and the long beam 17 of double flute steel truss girder 16 and single channel-section steel truss is connected by junction plate I 19, the beam-ends that junction plate I 19 is welded in double flute steel truss girder 16 and the long beam 17 of single channel-section steel truss winds up top, the other end of the long beam of single channel-section steel truss 17 is connected with single channel-section steel girder truss 18, the long girder of double flute steel truss 15 is relative with single channel-section steel truss long beam 17 level, single channel-section steel girder truss 18 is relative with double flute steel truss girder 16 level, and single channel-section steel girder truss 18 is all weldingly connected with junction plate I 19 with the beam-ends upper chord of the long beam 17 of single channel-section steel truss, the other end of single channel-section steel girder truss 18 passes through junction plate III 21 with the long girder 15 of double flute steel truss and is connected, and the beam-ends that junction plate III 21 is welded in single channel-section steel girder truss 18 and the long girder 15 of double flute steel truss winds up top, the top-bottom chord of each girder truss end is all connected with a beam-ends seal plate welding, the long girder of described double flute steel truss 15, double flute steel truss girder 16, the long beam of single channel-section steel truss 17, single channel-section steel girder truss 18 form a rectangular frame, the same connecting method, the long girder of double flute steel truss 15, double flute steel truss girder 16, the long beam of single channel-section steel truss 17, single channel-section steel girder truss 18 form a rectangular frame, each framework connects and composes the under(-)chassis of a splicing, each framework splicing is alignd by single channel-section steel girder truss 18 and is connected with bolt, and the long girder 15 of each double flute steel truss is positioned on straight line, and the long beam 17 of each single channel-section steel truss is positioned on straight line, truss slab frame construction is connected with floor 22 by girder truss upper chord upper anchoring, thus forms truss floor A, all components prefabricated and assembling all in the factory of described A plate,
Described B plate comprises the long beam 17 of single channel-section steel truss, the long girder 17 ' of single channel-section steel truss, double flute steel truss girder 16, single channel-section steel girder truss 18, junction plate I 19, junction plate III 21, junction plate IV 23 and floor 22, junction plate IV 23 is shown in Figure of description 21, the part that four-way post accounts for is removed by set square, the part of then stretching out beam all has bolt hole, conveniently be connected with beam bolt, the two ends beam 17 long with single channel-section steel truss respectively of double flute steel truss girder 16, the long girder 17 ' of single channel-section steel truss is mutually vertical to be connected, the connection junction plate I 19 of double flute steel truss girder 16 and the long beam 17 of single channel-section steel truss, the beam-ends that junction plate I 19 is welded in double flute steel truss girder 16 and the long beam 17 of single channel-section steel truss winds up edge, the connection junction plate III 21 of double flute steel truss girder 16 and the long girder (17 ') of single channel-section steel truss, the beam-ends that junction plate III 21 is welded in double flute steel truss girder 16 and the long girder 17 ' of single channel-section steel truss winds up top, the long beam of single channel-section steel truss 17, single channel-section steel truss long girder 17 ' other end are connected respectively with the two ends of single channel-section steel girder truss 18, the connection junction plate I 19 of single channel-section steel girder truss 18 and the long beam 17 of single channel-section steel truss, the connection junction plate IV 23 of the long girder of single channel-section steel truss 17 ' and single channel-section steel girder truss 18, the beam-ends that junction plate I 19 is welded in single channel-section steel girder truss 18 and the long beam 17 of single channel-section steel truss winds up edge, and junction plate IV 23 is welded in the long girder of single channel-section steel truss 17 ' and the beam-ends of single channel-section steel girder truss 18 and winds up top, thus the long beam of single channel-section steel truss 17 is relative with single channel-section steel truss long girder 17 ' level, double flute steel truss girder 16 is relative with single channel-section steel girder truss 18 level, the top-bottom chord of each girder truss end is all connected with a beam-ends seal plate welding, junction plate III 21, the part that junction plate IV 23 stretches out beam all has bolt hole, the long beam of described single channel-section steel truss 17, the long girder 17 ' of single channel-section steel truss, double flute steel truss girder 16 and single channel-section steel girder truss 18 form a rectangular frame, the same connecting method, the long beam of single channel-section steel truss 17, the long girder 17 ' of single channel-section steel truss, double flute steel truss girder 16 and single channel-section steel girder truss 18 form a rectangular frame, each framework connects and composes the under(-)chassis of a splicing, each framework splicing is alignd by single channel-section steel girder truss 18 and is connected with bolt, and the long girder 17 ' of each single channel-section steel truss is positioned on straight line, and the long beam 17 of each single channel-section steel truss is positioned on straight line, truss slab frame construction is connected with floor 22 by girder truss upper chord upper anchoring, thus forms truss floor B, all components prefabricated and assembling all in the factory of described B plate,
Hetermorphiscal column 14 comprises three kinds of cylindricality formulas: two-way column 12, three-dimensional column 8 and central post 11, two-way column 12 is the hollow pillar of L-type and junction plate 7 by cross section, node supporting plate 7 ', floor 10, shrouding 9 forms, three-dimensional column 8 is T-shaped hollow pillar and junction plate 7 by cross section, node supporting plate (7 '), floor 10, shrouding 9 forms, central post 11 is cross hollow pillar and junction plate 7 by cross section, node supporting plate 7 ', floor 10, shrouding 9 forms, by junction plate 7, the side being welded on hetermorphiscal column 14 of node supporting plate 7 ' level respectively, then be welded in hetermorphiscal column 14 by parallel at least one floor 10 between junction plate 7 with node supporting plate 7 ', junction plate 7, node supporting plate 7 ' all weld with one block of node shrouding 9 away from one end of post mutually with floor 10 at least together, the same way in the adjacent side of hetermorphiscal column 14 thus form two to node column and two-way column 12, the hetermorphiscal column 14 in addition same way in both sides thus form three-dimensional node column and three-dimensional column 8, other three same ways in side of hetermorphiscal column 14 thus form four-way node column and central post 11, wherein junction plate 7, shrouding 9, node supporting plate 7 ' all have bolt hole, splice with beam-ends shrouding and beam upper cover plate bolt, the splicing of hetermorphiscal column 14 is by the welded post scab 13 respectively of four sides inside central post 11, post scab 13 is consistent with the shape of hetermorphiscal column, post scab 13 the latter half is welded with hetermorphiscal column, the first half has threaded bolt hole, relative with the bolt hole on the downside of another hetermorphiscal column, with bolt, column is spliced.Equally can strong weld such as hetermorphiscal column 14 above and hetermorphiscal column 14 below, described three kinds of hetermorphiscal column all complete at produce in factory; Hollow or placing of concrete in the middle of steel pipe;
In industrialization assembling type steel structure hetermorphiscal column prestressing force eccentrical braces of the present invention, its hetermorphiscal column and truss floor A and truss floor B carry out scene by bolt and splice, the connection features of truss floor A and hetermorphiscal column is, the double flute steel truss girder 16 of node 1 place A plate is bolted with corner post 12 two pieces of gusset plates 7 with the junction plate II 20 that the long girder 15 of double flute steel truss welds, double flute steel truss girder 16 and double flute steel truss long girder 15 lower edge end are placed on corner post 12 two blocks of node supporting plates 7 ' respectively, and lower edge end has bolt hole, be connected with by bolt with node supporting plate, two single channel-section steel girder trusses 18 of node 2 place A plate are bolted with side column 8 three pieces of gusset plates 7 with the junction plate III 21 that two long girders 15 of double flute steel truss weld, two single channel-section steel girder trusses 18 and two double flute steel truss long girder 15 lower edge ends are placed on side column 8 three blocks of node supporting plates 7 ' respectively, and lower edge end has bolt hole, be connected with by bolt with node supporting plate, and the beam-ends shrouding that each girder truss has bolt hole all adopts bolt to be connected with the node shrouding 9 of respective beam Column border node, and node 3 place double flute steel truss girder 16 and the long girder 17 of single channel-section steel truss are connected by junction plate I 19, the beam-ends that junction plate I 19 is welded in double flute steel truss girder 16 and the long girder 17 of single channel-section steel truss winds up edge, the single channel-section steel girder truss 18 in two, node 4 place respectively beam 17 long with single channel-section steel truss is connected by junction plate I 19, the beam-ends that junction plate I 19 is welded in single channel-section steel girder truss 18 and the long girder 17 of single channel-section steel truss winds up edge, thus completes the connection of A plate and column,
The connection features of truss floor B and hetermorphiscal column is, the double flute steel truss girder 16 of node 5 place B plate is bolted with side column 8 three pieces of gusset plates 7 with the junction plate III 21 that the long beam 17 of single channel-section steel truss welds, double flute steel truss girder 16 and single channel-section steel truss long beam 17 lower edge end are placed on side column 8 three blocks of node supporting plates 7 ' respectively, and lower edge end has bolt hole, be connected with by bolt with node supporting plate; Two single channel-section steel girder trusses 18 of node 6 place B plate are bolted with central post 11 3 pieces of gusset plates 7 with the junction plate IV 23 that two long girders 17 ' of single channel-section steel truss weld, two single channel-section steel girder trusses 18 and two single channel-section steel truss long girder 17 ' lower edge ends are distinguished on centering post 11 3 blocks of node supporting plates 7 ', and lower edge end has bolt hole, be connected with by bolt with node supporting plate; And the beam-ends shrouding that each girder truss has bolt hole all adopts bolt to be connected with the node shrouding 9 of respective beam Column border node, thus completes the connection of B plate and column;
Truss floor A and truss floor B intersection connection features are, the long beam of single channel-section steel truss 17 of A plate and the stitching position of the long beam of single channel-section steel truss 17 of corresponding B plate are at least the end of the long beam of single channel-section steel truss 17 of A plate and the long beam 17 of single channel-section steel truss of B plate, middle part and 1/4th places, and all splicings all adopt bolt to carry out scene to splice;
In industrialization assembling type steel structure hetermorphiscal column prestressing force eccentrical braces, described prestressing force accentric support component is made up of prestressed cable 28 and otic placode, otic placode in factory by welding or bolt is connected at the bottom of the post of frame construction, top or girder truss 24 top-bottom chord place, prestressed cable 28 is connected by bolt at the construction field (site) with the otic placode of every story frame structure top and bottom, forms framework-eccentrically braces structure; Prestressed cable 28 is by tightening Shi Hanzhang by adapter sleeve 25; Described prestressed cable is high strength rod iron, or uses high strength steel strand, high strength type steel beam column, or uses high strength rod iron, high strength steel strand or the high strength type steel beam column of being with damper.
Involved beam splices by top-bottom chord and web member the girder truss formed, and web member becomes 30 degree of-60 angle spent with chord member; And being divided into single-beam and twin beams, single-beam arranges connecting hole every one section of fixed range, and being convenient to be spliced by two panels single-beam with bolt when the splicing of plate and plate becomes twin beams, and for twin beams, web member connects and uses bolt to connect or use welding, all completes in factory process;
Described floor uses profiled steel sheet combination floor, or reinforced concrete floor, or OSB shaving board.
Beneficial effect of the present invention is, in industrialization assembling shaped pile frame-steel plate shear force wall steel structure system, the hetermorphiscal column adopted more effectively saves space, the beam adopted is all girder truss, because the belly space of beam is comparatively large, is convenient to pipeline and passes, effectively add the clear height in room.Described industrialization assembling hetermorphiscal column steel structure frame system, bolt is adopted to carry out site assembly completely, eliminate traditional Site Welding mode and concreting mode, effectively ensure that construction quality, completely avoid the environment pollution that concreting and welded steel cause, realize " anhydrous, without fire, dustless " of site operation three without standard, decrease the generation of the hazardous accidents such as fire.And Lateral Resistant System effectively can improve the lateral rigidity of structure, improves the deformation performance of structure, structure is made to have larger safety reservior.The present invention, when component is removed, can recycle efficiently, decrease building waste, the real theory achieving environmental protection, is the steel structure system of a kind of green, sustainable development.
Accompanying drawing explanation
Fig. 1 is assembling truss plate of the present invention splicing layout plan
Fig. 2 (a) is that gusset plate truss of angle steel single-beam schematic diagram is not with by assembling truss plate of the present invention
Fig. 2 (b) is that gusset plate truss of angle steel twin beams schematic diagram is not with by assembling truss plate of the present invention
Fig. 3 (a) is assembling truss strip gusset plate truss of angle steel single-beam schematic diagram of the present invention
Fig. 3 (b) is assembling truss strip gusset plate truss of angle steel single-beam schematic diagram of the present invention
Fig. 4 (a) is assembling truss strip gusset plate channel-section steel truss single-beam schematic diagram of the present invention
Fig. 4 (b) is assembling truss strip gusset plate channel-section steel truss twin beams schematic diagram of the present invention
Fig. 5 (a) is assembling truss strip gusset plate Square Steel Tubes Truss single-beam schematic diagram of the present invention
Fig. 5 (b) is assembling truss strip gusset plate Square Steel Tubes Truss twin beams schematic diagram of the present invention
Fig. 6 is assembling truss plate three-dimensional bean column node schematic diagram of the present invention
Fig. 7 is assembling truss plate four-way bean column node schematic diagram of the present invention
Fig. 8 is that assembling truss plate two of the present invention is to bean column node schematic diagram
Fig. 9 is hetermorphiscal column of the present invention splicing schematic diagram
Figure 10 is assembling truss plate A unit decomposition figure of the present invention
Figure 11 is that assembling truss plate A unit splicing of the present invention completes figure
Figure 12 is assembling truss plate unit B exploded view of the present invention
To be that assembling truss plate unit B of the present invention is assembled complete figure to Figure 13
Figure 14 is assembling truss plate A, B of the present invention and the assembled exploded view of column
Figure 15 is assembling truss plate A, B of the present invention and column is assembled completes figure
Figure 16 is assembling truss plate node 1 exploded view in accompanying drawing of the present invention
Figure 17 is assembling truss plate node 2 exploded view in accompanying drawing of the present invention
Figure 18 is assembling truss plate node 3 exploded view in accompanying drawing of the present invention
Figure 19 is assembling truss plate node 4 exploded view in accompanying drawing of the present invention
Figure 20 is assembling truss plate assembly node 5 exploded view in accompanying drawing of the present invention
Figure 21 is assembling truss plate assembly node 6 exploded view in accompanying drawing of the present invention
Figure 22 is assembling truss plate assembly node 7 exploded view in accompanying drawing of the present invention
Figure 23 is assembling type steel structure prestressing force center of the present invention splayed support frame system schematic diagram
Figure 24 is assembling type steel structure prestressing force center of the present invention timbering with rafter arch sets's frame system schematic diagram
Figure 25 is assembling type steel structure prestressing force center of the present invention V-shaped support frame system schematic diagram
Figure 26 is assembling type steel structure prestressing force center of the present invention monocline bar-Type supporting framework system schematic diagram
Figure 27 is the connected node detail drawing of industrialization assembling hetermorphiscal column steel work prestressing force accentric support frame system otic placode I of the present invention and prestressed cable
Figure 28 is the connected node detail drawing of assembling type steel structure prestressing force eccentrical braces otic placode II of the present invention and prestressed cable
Figure 29 is the connected node detail drawing of industrialization assembling hetermorphiscal column steel work prestressing force accentric support frame system otic placode of the present invention and hetermorphiscal column
Figure 30 is individual layer industrialization assembling hetermorphiscal column steel work prestressing force accentric support Framework Architecture schematic diagram of the present invention.
1. top-bottom chord I in figure, 2. web member I, 3. gusset plate, 4. web member II, 5. top-bottom chord II, 6. top-bottom chord III, 7. gusset plate, 7 '. node supporting plate 8. side column, 9. node shrouding, 10. node floor, 11. central posts, 12. corner posts, 13. post scabs, 14. hetermorphiscal column, the long girder of 15. double flute steel truss, 16. double flute steel truss girders, the long girder of 17. single channel-section steel truss, the long girder of 17'. mono-channel-section steel truss, 18. single channel-section steel girder trusses, 19. junction plates I (triangle), 20. junction plates II, 21. junction plate III 22. floors, 23. junction plate IV 24. girder trusses, 25. adapter sleeves, 26. otic placode I, 27. otic placode II, 28. prestressed cables.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in detail:
As shown in Figure 1, assembling truss plate of the present invention splices with the mode of ABBBBA and hetermorphiscal column.
As shown in Figure 4, in industrialization assembling hetermorphiscal column steel work prestressing force accentric support frame system of the present invention, the girder truss that involved beam is made up of channel-section steel and angle splice joint, comprise top-bottom chord 5, web member 4, wherein top-bottom chord 5 adopts channel-section steel, web member 4 adopts angle steel, and be divided into single steel channel beam and double flute girder steel, single steel channel beam arranges connecting hole every one section of fixed range, be convenient to two panels list steel channel beam be spliced with bolt when the splicing of plate and plate become double flute girder steel, for double flute girder steel, the connection of channel-section steel uses bolt to connect or uses welding, all complete in factory process,
As shown in Figure 2, the girder truss that involved beam is made up of angle splice joint, comprise top-bottom chord 1, web member 2, wherein top-bottom chord 1 and web member 2 all adopt angle steel, and are divided into single angle beam and double angle beam, and single angle beam arranges connecting hole every one section of fixed range, be convenient to two panels single angle beam be spliced with bolt when the splicing of plate and plate become double angle beam, for double angle beam, the connection of angle steel uses bolt to connect or uses welding, all completes in factory process;
As shown in Figure 3, or use and splice by angle steel and gusset plate the girder truss formed, comprise top-bottom chord 1, web member 4 and gusset plate 3, wherein top-bottom chord 1 and web member 4 all adopt angle steel, and be divided into single angle beam and double angle beam, single angle beam arranges connecting hole every one section of fixed range, be convenient to two panels single angle beam be spliced with bolt when the splicing of plate and plate become double angle beam, for double angle beam, angle steel uses bolt be connected or use welding with the connection of gusset plate, all completes in factory process;
As shown in Figure 5, or use by angle steel, the girder truss of square steel pipe and gusset plate splicing composition, comprise top-bottom chord 6, web member 4 and gusset plate 3, wherein top-bottom chord 6 adopts square steel pipe, web member 4 adopts angle steel, and be divided into folk prescription steel tubular beam and both sides' steel tubular beam, folk prescription steel tubular beam arranges connecting hole every one section of fixed range, be convenient to two panels folk prescription steel tubular beam be spliced with bolt when the splicing of plate and plate become both sides' steel tubular beam, for both sides' steel tubular beam, angle steel, square steel pipe uses bolt to be connected with the connection of gusset plate, or use welding, all complete in factory process,
For above four kinds of section forms of beams, the connecting method that single-beam is spliced into twin beams by bolt has good rigidity and stability.Because the belly space of girder truss is comparatively large, is convenient to pipeline and passes, effectively add the clear height in room.
In industrialization assembling hetermorphiscal column steel work prestressing force accentric support frame system of the present invention, as shown in accompanying drawing 6,7,8, its hetermorphiscal column 14 is made up of three kinds of hetermorphiscal column 8/11/12, junction plate 7, node supporting plate 7 ', floor 10, shrouding 9, its bean column node has three kinds of forms, is respectively two to node, three-dimensional node and four-way node; Difference according to its bean column node can be divided into the column of 3 kinds of forms, is respectively two-way column 12, three-dimensional column 8 and central post 11; By the side being welded on hetermorphiscal column 14 of junction plate 7, node supporting plate 7 ' level respectively, be then welded in hetermorphiscal column 14 by parallel for twice floor 10 between junction plate 7 with node supporting plate 7 '; Junction plate 7, node supporting plate 7 ' all weld with one block of node shrouding 9 mutually with the other end of two pieces of floors 10, the same way in the adjacent side of hetermorphiscal column 14 thus formed two to node column and two-way column 12; The hetermorphiscal column 14 in addition same way in both sides thus form three-dimensional node column and three-dimensional column 8; Other three same ways in side of hetermorphiscal column 14 thus form four-way node column and central post 11; Wherein junction plate 7, shrouding 9, node supporting plate 7 ' all have bolt hole, splice with beam-ends shrouding and beam upper cover plate bolt; Described three kinds of hetermorphiscal column all complete at produce in factory;
In industrialization assembling hetermorphiscal column steel work prestressing force accentric support frame system, as shown in Figure 9, the splicing of described hetermorphiscal column 14 is by the welded post scab 13 respectively of four sides inside central post 11, post scab 13 the latter half is welded with hetermorphiscal column, the first half has threaded bolt hole, relative with the bolt hole on the downside of another hetermorphiscal column, with bolt, column is spliced; Equally can strong weld such as upper lower props.
In industrialization assembling hetermorphiscal column steel work prestressing force accentric support frame system, as accompanying drawing 10, shown in 11, described A plate comprises the long girder 15 of double flute steel truss, double flute steel truss girder 16, the long girder 17 of single channel-section steel truss, single channel-section steel girder truss 18, junction plate I 19, junction plate II 20, junction plate III 21 and floor 22, it is characterized in that: double flute steel truss girder 16 and the long girder 15 of double flute steel truss are mutually vertical and be connected by junction plate III 21, the beam-ends that junction plate III 21 is welded in double flute steel truss girder 16 and the long girder 15 of double flute steel truss winds up top, the other end of double flute steel truss girder 16 is connected with the long girder 17 of single channel-section steel truss with double flute steel truss long girder 15 level, and the long girder 17 of double flute steel truss girder 16 and single channel-section steel truss is connected by junction plate I 19, the beam-ends that junction plate I 19 is welded in double flute steel truss girder 16 and the long girder 17 of single channel-section steel truss winds up top, the other end of the long girder of single channel-section steel truss 17 is connected with single channel-section steel girder truss 18, the long girder of double flute steel truss 15 is relative with single channel-section steel truss long girder 17 level, single channel-section steel girder truss 18 is relative with double flute steel truss girder 16 level, and single channel-section steel girder truss 18 is all weldingly connected with junction plate I 19 with the beam-ends upper chord of the long girder 17 of single channel-section steel truss, the other end of single channel-section steel girder truss 18 passes through junction plate III 21 with the long girder 15 of double flute steel truss and is connected, and the beam-ends that junction plate III 21 is welded in single channel-section steel girder truss 18 and the long girder 15 of double flute steel truss winds up top, the top-bottom chord of each girder truss end is all connected with a beam-ends seal plate welding, junction plate II 20, the part that junction plate III 21 stretches out beam all has bolt hole, the long girder of described double flute steel truss 15, double flute steel truss girder 16, the long girder of single channel-section steel truss 17, single channel-section steel girder truss 18 form a rectangular frame A 1, the same connecting method, the long girder of double flute steel truss 15, double flute steel truss girder 16, the long girder of single channel-section steel truss 17, single channel-section steel girder truss 18 form a rectangular frame A 2, each framework is with A 1a 2connect the under(-)chassis of formation one splicing, each framework splicing is alignd by single channel-section steel girder truss 18 and is connected with bolt, and the long girder 15 of each double flute steel truss is positioned on straight line, and the long girder 17 of each single channel-section steel truss is positioned on straight line, truss slab frame construction is connected with floor 22 by girder truss upper chord upper anchoring, thus forms truss floor A, all components prefabricated and assembling all in the factory of described A plate,
In industrialization assembling hetermorphiscal column steel work prestressing force accentric support frame system, as accompanying drawing 12, shown in 13, described B plate comprises the long girder 17 of single channel-section steel truss, the long girder 17 ' of single channel-section steel truss, double flute steel truss girder 16, single channel-section steel girder truss 18, junction plate I 19, junction plate III 21, junction plate IV 23 and floor 22, it is characterized in that: the two ends girder 17 long with single channel-section steel truss respectively of double flute steel truss girder 16, the long girder 17 ' of single channel-section steel truss is mutually vertical to be connected, the connection junction plate I 19 of double flute steel truss girder 16 and the long girder 17 of single channel-section steel truss, the beam-ends that junction plate I 19 is welded in double flute steel truss girder 16 and the long girder 17 of single channel-section steel truss winds up edge, the connection junction plate III 21 of double flute steel truss girder 16 and the long girder 17 ' of single channel-section steel truss, the beam-ends that junction plate III 21 is welded in double flute steel truss girder 16 and the long girder 17 ' of single channel-section steel truss winds up top, the long girder of single channel-section steel truss 17, single channel-section steel truss long girder 17 ' other end are connected respectively with the two ends of single channel-section steel truss secondary beam 18, the connection junction plate I 19 of single channel-section steel truss secondary beam 18 and the long girder 17 of single channel-section steel truss, the connection junction plate IV 23 of the long girder of single channel-section steel truss 17 ' and single channel-section steel girder truss 18, the beam-ends that junction plate I 19 is welded in single channel-section steel girder truss 18 and the long girder 17 of single channel-section steel truss winds up edge, and junction plate IV 23 is welded in the long girder of single channel-section steel truss 17 ' and the beam-ends of single channel-section steel girder truss 18 and winds up top, thus the long girder of single channel-section steel truss 17 is relative with single channel-section steel truss long girder 17 ' level, double flute steel truss girder 16 is relative with single channel-section steel girder truss 18 level, the top-bottom chord of each girder truss end is all connected with a beam-ends seal plate welding, junction plate III 21, the part that junction plate IV 23 stretches out beam all has bolt hole, the long girder of described single channel-section steel truss 17, the long girder 17 ' of single channel-section steel truss, double flute steel truss girder 16 and single channel-section steel girder truss 18 form a rectangular frame B 1, the same connecting method, the long girder of single channel-section steel truss 17, the long girder 17 ' of single channel-section steel truss, double flute steel truss girder 16 and single channel-section steel girder truss 18 form a rectangular frame B 2, each framework is with B 1b 2connect the under(-)chassis of formation one splicing, each framework splicing is alignd by single channel-section steel girder truss 18 and is connected with bolt, and the long girder 17 ' of each single channel-section steel truss is positioned on straight line, and the long girder 17 of each single channel-section steel truss is positioned on straight line, truss slab frame construction is connected with floor 22 by girder truss upper chord upper anchoring, thus forms truss floor B, all components prefabricated and assembling all in the factory of described B plate,
In industrialization assembling hetermorphiscal column steel work prestressing force accentric support frame system of the present invention, as accompanying drawing 14, shown in 15, its hetermorphiscal column and truss floor A and truss floor B carry out scene by bolt and splice, the connection features of truss floor A and hetermorphiscal column is, the double flute steel truss girder 16 of node 1 place A plate is bolted with corner post 12 two pieces of gusset plates 7 with the junction plate II 20 that the long girder 15 of double flute steel truss welds, double flute steel truss girder 16 and double flute steel truss long girder 15 lower edge end are placed on corner post 12 two blocks of node supporting plates 7 ' respectively, and lower edge end has bolt hole, be connected with by bolt with node supporting plate, two single channel-section steel girder trusses 18 of node 2 place A plate are bolted with side column 8 three pieces of gusset plates 7 with the junction plate III 21 that two long girders 15 of double flute steel truss weld, two single channel-section steel girder trusses 18 and two double flute steel truss long girder 15 lower edge ends are placed on side column 8 three blocks of node supporting plates 7 ' respectively, and lower edge end has bolt hole, be connected with by bolt with node supporting plate, and the beam-ends shrouding that each girder truss has bolt hole all adopts bolt to be connected with the node shrouding 9 of respective beam Column border node, and node 3 place double flute steel truss girder 16 and the long girder 17 of single channel-section steel truss are connected by junction plate I 19, the beam-ends that junction plate I 19 is welded in double flute steel truss girder 16 and the long girder 17 of single channel-section steel truss winds up edge, the single channel-section steel girder truss 18 in two, node 4 place respectively girder 17 long with single channel-section steel truss is connected by junction plate I 19, the beam-ends that junction plate I 19 is welded in single channel-section steel girder truss 18 and the long girder 17 of single channel-section steel truss winds up edge, thus completes the connection of A plate and column,
The connection features of truss floor B and hetermorphiscal column is, the double flute steel truss girder 16 of node 5 place B plate is bolted with side column 8 three pieces of gusset plates 7 with the junction plate III 21 that the long girder 17 of single channel-section steel truss welds, double flute steel truss girder 16 and single channel-section steel truss long girder 17 lower edge end are placed on side column 8 three blocks of node supporting plates 7 ' respectively, and lower edge end has bolt hole, be connected with by bolt with node supporting plate; Two single channel-section steel girder trusses 18 of node 6 place B plate are bolted with central post 11 3 pieces of gusset plates 7 with the junction plate IV 23 that two long girders 17 ' of single channel-section steel truss weld, two single channel-section steel girder trusses 18 and two single channel-section steel truss long girder 17 ' lower edge ends are distinguished on centering post 11 3 blocks of node supporting plates 7 ', and lower edge end has bolt hole, be connected with by bolt with node supporting plate; And the beam-ends shrouding that each girder truss has bolt hole all adopts bolt to be connected with the node shrouding 9 of respective beam Column border node, thus completes the connection of B plate and column;
Truss floor A and truss floor B intersection connection features are, the long girder of single channel-section steel truss 17 and the stitching position of the long girder of single channel-section steel truss 17 of corresponding B plate of A plate are at least the end of the long girder of single channel-section steel truss 17 of A plate and the long girder 17 of single channel-section steel truss of B plate, middle part and 1/4th places, all splicings all adopt bolt to carry out scene splicing;
In sum, the joint form that formed by A, B splicing, overall floor has node 4, node 7 two kinds different in stitching portion.
In above-mentioned industrialization assembling hetermorphiscal column steel work prestressing force accentric support frame system, as shown in accompanying drawing 16,17,18,19, make the exploded detail of assembling truss plate node 1,2,3,4 respectively; As shown in accompanying drawing 20,21,22, make the assembling exploded detail of assembling truss plate assembly node 5,6,7 respectively;
In industrialization assembling hetermorphiscal column steel work prestressing force accentric support frame system of the present invention, as shown in accompanying drawing 23,24,25,26, described lateral resisting prestressing force center support form is respectively the support of eccentric splayed, the eccentric timbering with rafter arch sets of prestressing force, the support of prestressing force eccentric V-shaped, the eccentric monocline flow resistance of rod-support of prestressing force, it is characterized in that, two ends of described prestressing force accentric support component 28 are prestressed cable heads, mid portion adopts prestressed cable, or prestress steel pull bar; The end of described otic placode I26 and otic placode II27 comprises junction plate, by employing bolt, otic placode I26 and otic placode II27 is connected to the edge of a wing place of beam, prestressing force accentric support 28 is connected with otic placode II27 with otic placode I26 by prestressed cable head, overall formation prestressing force eccentrically braces structure system; Described prestressed cable is high strength rod iron, or uses high strength steel strand, high strength type steel beam column, or uses high strength rod iron, high strength steel strand or the high strength type steel beam column of being with damper.
In industrialization assembling hetermorphiscal column steel work prestressing force accentric support frame system of the present invention, as shown in Figure 27, give the connected node detail drawing of otic placode I and prestressed cable; As shown in Figure 28, give the connected node detail drawing of otic placode II and prestressed cable, as shown in Figure 29, make the exploded detail at prestressing force accentric support component 28 and girder truss connected node place.Accompanying drawing 30 gives the schematic diagram of industrialization assembling hetermorphiscal column steel work prestressing force accentric support frame system part layer.

Claims (2)

1. an industrialization assembling hetermorphiscal column steel work prestressing force accentric support frame system, it is characterized in that, this assembling hetermorphiscal column steel work prestressing force accentric support frame system is sandwich construction, and every Rotating fields comprises assembling truss plate, hetermorphiscal column and prestressing force accentric support component;
Hetermorphiscal column (14) comprises three kinds of cylindricality formulas: two-way column (12), three-dimensional column (8) and central post (11), two-way column (12) is the hollow pillar of L-type and junction plate (7) by cross section, node supporting plate (7 '), floor (10), shrouding (9) forms, three-dimensional column (8) is T-shaped hollow pillar and junction plate (7) by cross section, node supporting plate (7 '), floor (10), shrouding (9) forms, central post (11) is cross hollow pillar and junction plate (7) by cross section, node supporting plate (7 '), floor (10), shrouding (9) forms, by junction plate (7), the side being welded on hetermorphiscal column (14) of node supporting plate (7 ') level respectively, then be welded in hetermorphiscal column (14) in between node supporting plate (7 ') by parallel at least one floor (10) at junction plate (7), junction plate (7), node supporting plate (7 ') all weld with one piece of node shrouding (9) away from one end of post mutually with floor (10) at least together, the same way in hetermorphiscal column (14) adjacent side thus form two to node column and two-way column (12), hetermorphiscal column (14) the in addition same way in both sides thus form three-dimensional node column and three-dimensional column (8), other three same ways in side of hetermorphiscal column (14) thus form four-way node column and central post (11), wherein junction plate (7), shrouding (9), node supporting plate (7 ') all have bolt hole, splice with beam-ends shrouding and beam upper cover plate bolt, the splicing of hetermorphiscal column (14) is by four sides, central post (11) inner side welded post scab (13) respectively, post scab (13) is consistent with the shape of hetermorphiscal column, post scab (13) the latter half is welded with hetermorphiscal column, the first half has threaded bolt hole, relative with the bolt hole on the downside of another hetermorphiscal column, with bolt, column is spliced, equally can strong weld such as hetermorphiscal column (14) above and hetermorphiscal column (14) below, the hollow parts of hetermorphiscal column (14) is hollow or placing of concrete,
Described assembling truss plate comprises lattice truss beam and floor, described lattice truss beam, by beam-ends shrouding, is connected with lattice girder truss or is connected with column, forms truss slab frame construction, again floor to be placed in truss plate framework structure and to connect, forming assembling truss plate; Assembling truss plate comprises two kinds of specifications, is respectively A plate, B plate;
Described A plate comprises the long girder of double flute steel truss (15), double flute steel truss girder (16), the single long beam of channel-section steel truss (17), single channel-section steel girder truss (18), junction plate I (19), junction plate II (20), junction plate III (21) and floor (22), junction plate II (20), the part that corner post accounts for is removed by set square, the part of then stretching out beam all has bolt hole, conveniently be connected with beam bolt, junction plate III (21), the part that three-dimensional post accounts for is removed by set square, the part of then stretching out beam all has bolt hole, conveniently be connected with beam bolt, double flute steel truss girder (16) and the long girder of double flute steel truss (15) are mutually vertical and be connected by junction plate II (20), the beam-ends that junction plate II (20) is welded in double flute steel truss girder (16) and the long girder of double flute steel truss (15) winds up top, the other end of double flute steel truss girder (16) is connected with the single channel-section steel truss long beam (17) parallel with the long girder of double flute steel truss (15), and double flute steel truss girder (16) is connected by junction plate I (19) with the long beam of single channel-section steel truss (17), the beam-ends that junction plate I (19) is welded in double flute steel truss girder (16) and the long beam of single channel-section steel truss (17) winds up top, the other end of the single long beam of channel-section steel truss (17) is connected with single channel-section steel girder truss (18), the long girder of double flute steel truss (15) is relative with single channel-section steel truss long beam (17) level, single channel-section steel girder truss (18) is relative with double flute steel truss girder (16) level, and single channel-section steel girder truss (18) is all weldingly connected with junction plate I (19) with the beam-ends upper chord of the long beam of single channel-section steel truss (17), the other end of single channel-section steel girder truss (18) is connected by junction plate III (21) with the long girder of double flute steel truss (15), and the beam-ends that junction plate III (21) is welded in single channel-section steel girder truss (18) and the long girder of double flute steel truss (15) winds up top, the top-bottom chord of each girder truss end is all connected with a beam-ends seal plate welding, the long girder of described double flute steel truss (15), double flute steel truss girder (16), the long beam of single channel-section steel truss (17), single channel-section steel girder truss (18) form a rectangular frame, the same connecting method, the long girder of double flute steel truss (15), double flute steel truss girder (16), the long beam of single channel-section steel truss (17), single channel-section steel girder truss (18) form a rectangular frame, each framework connects and composes the under(-)chassis of a splicing, each framework splicing is alignd by single channel-section steel girder truss (18) and connects with bolt, and the long girder of each double flute steel truss (15) is positioned on straight line, and the long beam of each single channel-section steel truss (17) is positioned on straight line, truss slab frame construction is connected with floor (22) by girder truss upper chord upper anchoring, thus forms truss floor A,
Described B plate comprises the long beam of single channel-section steel truss (17), the long girder (17 ') of single channel-section steel truss, double flute steel truss girder (16), single channel-section steel girder truss (18), junction plate I (19), junction plate III (21), junction plate IV (23) and floor (22), junction plate IV (23), the part that four-way post accounts for is removed by set square, the part of then stretching out beam all has bolt hole, conveniently be connected with beam bolt, the two ends of double flute steel truss girder (16) respectively with the long beam of single channel-section steel truss (17), the long girder (17 ') of single channel-section steel truss is mutually vertical to be connected, the connection junction plate I (19) of double flute steel truss girder (16) and the long beam of single channel-section steel truss (17), the beam-ends that junction plate I (19) is welded in double flute steel truss girder (16) and the long beam of single channel-section steel truss (17) winds up edge, the connection junction plate III (21) of double flute steel truss girder (16) and the long girder (17 ') of single channel-section steel truss, the beam-ends that junction plate III (21) is welded in double flute steel truss girder (16) and the long girder (17 ') of single channel-section steel truss winds up top, the single long beam of channel-section steel truss (17), single channel-section steel truss long girder (17 ') other end is connected respectively with the two ends of single channel-section steel girder truss (18), the connection junction plate I (19) of single channel-section steel girder truss (18) and the long beam of single channel-section steel truss (17), the connection junction plate IV (23) of the single channel-section steel long girder of truss (17 ') and single channel-section steel girder truss (18), the beam-ends that junction plate I (19) is welded in single channel-section steel girder truss (18) and the long beam of single channel-section steel truss (17) winds up edge, the beam-ends that junction plate IV (23) is welded in the single long girder of channel-section steel truss (17 ') and single channel-section steel girder truss (18) winds up top, thus the long beam of single channel-section steel truss (17) is relative with single channel-section steel truss long girder (17 ') level, double flute steel truss girder (16) is relative with single channel-section steel girder truss (18) level, the top-bottom chord of each girder truss end is all connected with a beam-ends seal plate welding, junction plate III (21), the part that junction plate IV (23) stretches out beam all has bolt hole, the long beam of described single channel-section steel truss (17), the single long girder of channel-section steel truss (17 '), double flute steel truss girder (16) and single channel-section steel girder truss (18) form a rectangular frame, the same connecting method, the long beam of single channel-section steel truss (17), the single long girder of channel-section steel truss (17 '), double flute steel truss girder (16) and single channel-section steel girder truss (18) form a rectangular frame, each framework connects and composes the under(-)chassis of a splicing, each framework splicing is alignd by single channel-section steel girder truss (18) and connects with bolt, and the long girder (17 ') of each single channel-section steel truss is positioned on straight line, and the long beam of each single channel-section steel truss (17) is positioned on straight line, truss slab frame construction is connected with floor (22) by girder truss upper chord upper anchoring, thus forms truss floor B, in industrialization assembling hetermorphiscal column steel work prestressing force accentric support frame system, A plate, B plate are spliced by arrangement mode AB...BA, and what middle ellipsis represented is multiple BB arrangement modes, is connected between AB by screw,
Involved beam splices by top-bottom chord and web member the girder truss formed, and web member becomes 30 degree of-60 angle spent with chord member; And being divided into single-beam and twin beams, single-beam arranges connecting hole every one section of fixed range, and being convenient to be spliced by two panels single-beam with bolt when the splicing of plate and plate becomes twin beams;
Or involved beam is the girder truss be spliced by top-bottom chord, web member and gusset plate, wherein top-bottom chord uses angle steel, or uses U-steel, or user's steel pipe, and web member becomes 30 degree of-60 angle spent with chord member; And being divided into single-beam and twin beams, single-beam arranges connecting hole every one section of fixed range, and being convenient to be spliced by two panels single-beam with bolt when the splicing of plate and plate becomes twin beams;
The pillar place of the connection twice beam in total framework adopts two-way column (12), connects the pillar place of three road beams employing three-dimensional column (8), connects the pillar place of four road beams employing central post (11), is mutually spliced by the bean column node of assembling truss plate by its beam-ends shrouding and hetermorphiscal column at the construction field (site);
Described assembling truss plate is connected by bolt with hetermorphiscal column at bean column node place, forms frame construction; Described prestressing force accentric support component is made up of prestressed cable (28) and otic placode, otic placode is by welding or bolt is connected at the bottom of the post of frame construction, top or girder truss (24) top-bottom chord place, prestressed cable (28) is connected by bolt at the construction field (site) with the otic placode of every story frame structure top and bottom, forms framework-eccentrically braces structure; Prestressed cable (28) is by tightening Shi Hanzhang by adapter sleeve (25);
When A plate, B plate splice, the long beam of single channel-section steel truss (17) of A plate and the stitching position of the long beam of single channel-section steel truss (17) of corresponding B plate are at least the end of the long beam of single channel-section steel truss (17) of A plate and the long beam of single channel-section steel truss (17) of B plate, middle part and 1/4th places, all splicings all adopt bolt to carry out scene splicing.
2. according to system according to claim 1, it is characterized in that, described floor uses profiled steel sheet combination floor, or reinforced concrete floor, or OSB shaving board.
CN201310232123.3A 2013-06-10 2013-06-10 A kind of industrialization assembling hetermorphiscal column steel work prestressing force eccentrical braces Active CN103276806B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310232123.3A CN103276806B (en) 2013-06-10 2013-06-10 A kind of industrialization assembling hetermorphiscal column steel work prestressing force eccentrical braces

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310232123.3A CN103276806B (en) 2013-06-10 2013-06-10 A kind of industrialization assembling hetermorphiscal column steel work prestressing force eccentrical braces

Publications (2)

Publication Number Publication Date
CN103276806A CN103276806A (en) 2013-09-04
CN103276806B true CN103276806B (en) 2015-08-26

Family

ID=49059412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310232123.3A Active CN103276806B (en) 2013-06-10 2013-06-10 A kind of industrialization assembling hetermorphiscal column steel work prestressing force eccentrical braces

Country Status (1)

Country Link
CN (1) CN103276806B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103898964A (en) * 2014-03-20 2014-07-02 北京工业大学 Prestressed and eccentric supporting system of modularized multi-high-rise assembly-type steel structure
CN103882948B (en) * 2014-03-20 2016-04-27 北京工业大学 Industrialized modular how high-rise assembling type steel structure prestressing force eccentrical braces
CN103993672A (en) * 2014-04-25 2014-08-20 四川大学 Tenon type connecting joint structure of low-rise fabricated composite wall house
CN104047380B (en) * 2014-05-15 2016-07-06 中国建筑股份有限公司 Assembled girder steel seam T-shaped mixing coupled wall and construction method thereof
CN104164941B (en) * 2014-07-23 2016-06-08 华北水利水电大学 Steel frame prestressing force junked tire dwelling house system
AU2014268276A1 (en) * 2014-11-28 2016-06-16 Hickory Design Pty Ltd Method of Constructing a Core in Modular Construction
CN106592765A (en) * 2017-02-17 2017-04-26 北京工业大学 End plate assembly type angle steel truss beam-column joint connecting device with function capable of being recovered
CN109252604A (en) * 2018-09-07 2019-01-22 广西大学 A kind of shear wall with short piers of built-in prestressing combination diagonal brace

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09256461A (en) * 1996-03-19 1997-09-30 Daiwa House Ind Co Ltd Non-welded column and beam joint structure for capital
JP2001303666A (en) * 2000-04-24 2001-10-31 Kajima Corp Joint section structure between reinforced concrete column and steel frame beam
CN1752366A (en) * 2004-09-23 2006-03-29 万平华 Method for assembling building
CN101818521A (en) * 2010-04-20 2010-09-01 东南大学 Steel joint precast and assembled reinforced concrete frame structure
CN102979170A (en) * 2012-11-26 2013-03-20 北京工业大学 Multi-story high-rise assembled steel structure prestressed eccentrically-braced system
CN102979173A (en) * 2012-11-26 2013-03-20 北京工业大学 Industrialized assembled multi-story high-rise steel structure prestressed eccentrically-braced system
CN102979175A (en) * 2012-11-26 2013-03-20 北京工业大学 Industrialized multi-story high-rise assembled steel structure frame - prestressed eccentrically-braced system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09256461A (en) * 1996-03-19 1997-09-30 Daiwa House Ind Co Ltd Non-welded column and beam joint structure for capital
JP2001303666A (en) * 2000-04-24 2001-10-31 Kajima Corp Joint section structure between reinforced concrete column and steel frame beam
CN1752366A (en) * 2004-09-23 2006-03-29 万平华 Method for assembling building
CN101818521A (en) * 2010-04-20 2010-09-01 东南大学 Steel joint precast and assembled reinforced concrete frame structure
CN102979170A (en) * 2012-11-26 2013-03-20 北京工业大学 Multi-story high-rise assembled steel structure prestressed eccentrically-braced system
CN102979173A (en) * 2012-11-26 2013-03-20 北京工业大学 Industrialized assembled multi-story high-rise steel structure prestressed eccentrically-braced system
CN102979175A (en) * 2012-11-26 2013-03-20 北京工业大学 Industrialized multi-story high-rise assembled steel structure frame - prestressed eccentrically-braced system

Also Published As

Publication number Publication date
CN103276806A (en) 2013-09-04

Similar Documents

Publication Publication Date Title
CN102979175B (en) Industrialized multi-story high-rise assembled steel structure frame - prestressed eccentrically-braced system
CN103276833B (en) A kind of industrialization assembling shaped pile frame-steel plate shear force wall steel structure system
CN102979178B (en) Industrialized multi-story high-rise assembled steel structure frame - eccentrically-braced system
CN103276806B (en) A kind of industrialization assembling hetermorphiscal column steel work prestressing force eccentrical braces
CN102995744B (en) Industrialized multi-high-rise assembly type steel structure frame-pre-stressed center support system
CN103276804B (en) A kind of industrialization assembling hetermorphiscal column steel work prestressing force center support system
CN102979168B (en) Industrialized multi-story high-rise assembled steel structure frame - centrally-braced system
CN103290920B (en) A kind of assembling type steel structure center support frame system
CN103266660B (en) A kind of industrialization assembling post through beam steel flanged beam steel structure frame prestressing force eccentrical braces
CN103206015B (en) A kind of assembling type steel structure accentric support frame system
CN103276809B (en) A kind of assembled many Tall Steels shaped pile frame-steel plate shear wall structure system
CN103206010A (en) Assembled steel structure prestress eccentric bracing frame system
CN103290925B (en) The through steel structure frame eccentrical braces of a kind of industrialization assembling post
CN103290921B (en) A kind of through steel structure frame system of industrialization assembled post
CN103276802B (en) A kind of many Tall Steels of industrialization assembled Framed Structure with Special-Shaped Columns system
CN103276799B (en) A kind of industrialization assembling post through beam steel flanged beam steel structure frame eccentrical braces
CN103410220A (en) Industrially assembled multiple high-rise steel special-shaped column frame-eccentric supporting system
CN103276832A (en) Hollow irregular column multi-layer high-rise assembling steel frame-steel plate shear wall system
CN103195164A (en) Assembly prestress center support system for steel structure
CN103410217B (en) A kind of assembling many Tall Steels shaped pile frame-prestressing force eccentrical braces
CN103290922B (en) A kind of industrialization assembling post through beam steel flanged beam steel structure frame system
CN103276796B (en) Industrialized assembly type special-shaped column steel structure frame-eccentric support system
CN103276801B (en) A kind of assembling many Tall Steels shaped pile frame-prestressing force center support system
CN103276805B (en) A kind of industrialization assembling hetermorphiscal column steel structure frame-center support system
CN103276792B (en) A kind of industrialization assembling post through steel structure frame prestressing force eccentrical braces

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191218

Address after: 313000 1-C, building 1, No. 656, Qixing Road, high tech Zone, Wuxing District, Huzhou City, Zhejiang Province

Patentee after: Huzhou xinbeilian Network Technology Co.,Ltd.

Address before: 100000 Beijing Haidian District Huayuan Road No. 2 peony building 4 floor 1424 room

Patentee before: Beijing Zhonglian Technology Service Co.,Ltd.

Effective date of registration: 20191218

Address after: 100000 Beijing Haidian District Huayuan Road No. 2 peony building 4 floor 1424 room

Patentee after: Beijing Zhonglian Technology Service Co.,Ltd.

Address before: 100124 Chaoyang District, Beijing Ping Park, No. 100

Patentee before: Beijing University of Technology

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201218

Address after: 276800 Li Jia Hu Village, happy town, Arashiyama District, Rizhao City, Shandong

Patentee after: Rizhao Weiye Tools Co.,Ltd.

Address before: 313000 1-C, building 1, No. 656 Qixing Road, high tech Zone, Wuxing District, Huzhou City, Zhejiang Province

Patentee before: Huzhou xinbeilian Network Technology Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: An industrial assembled prestressed eccentric support system for special-shaped column steel structure

Effective date of registration: 20220218

Granted publication date: 20150826

Pledgee: Lanshan Branch of Rizhao Bank Co.,Ltd.

Pledgor: Rizhao Weiye Tools Co.,Ltd.

Registration number: Y2022980001638