CN103266906B - Method for verifying state of mine ventilation system by self-adjusting tunnel wind resistance parameters - Google Patents

Method for verifying state of mine ventilation system by self-adjusting tunnel wind resistance parameters Download PDF

Info

Publication number
CN103266906B
CN103266906B CN201310161756.XA CN201310161756A CN103266906B CN 103266906 B CN103266906 B CN 103266906B CN 201310161756 A CN201310161756 A CN 201310161756A CN 103266906 B CN103266906 B CN 103266906B
Authority
CN
China
Prior art keywords
tunnel
ventilation
value
windage
mine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310161756.XA
Other languages
Chinese (zh)
Other versions
CN103266906A (en
Inventor
程健维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201310161756.XA priority Critical patent/CN103266906B/en
Publication of CN103266906A publication Critical patent/CN103266906A/en
Application granted granted Critical
Publication of CN103266906B publication Critical patent/CN103266906B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ventilation (AREA)

Abstract

A, arranging a wind speed sensor for measuring ventilation volume in a tunnel with large underground wind resistance change; b. arranging a wind speed sensor for measuring ventilation quantity in a wind channel of a main mine ventilator; c. setting the roadway with large wind resistance change and the roadway where the main ventilator is located into a fixed air volume branch in the data input process of the mine ventilation network resolving program to obtain the ventilation volume and the ventilation resistance value of other roadways in the whole mine; d. setting the ventilation volume of the tunnel with the fixed air volume branch to be fixed, and calculating the resistance value of the corresponding tunnel according to the air pressure balance relation of each branch of the loop where the fixed air volume branch is positioned; e. and replacing the obtained calculated wind resistance value of the tunnel with larger wind resistance change with the existing wind resistance value of the tunnel with larger measured wind resistance change to be a new value, and judging whether the state of the mine ventilation system is good or not.

Description

The method of the checking mine ventilation system state of a kind of tunnel windage parameters self-tuning
Technical field
The present invention relates to a kind of method verifying mine ventilation system ventilation state.
Background technology
Mine ventilation system is one of composition subsystem important in mine production system.The main effect of mine ventilation system is that (1) provides fresh distinguished and admirable, to ensure the health of personnel for underground work personnel; (2) by fresh distinguished and admirable diluting effect, the pernicious gas of down-hole based on gas is diluted, discharge, assemble in order to avoid cause and the accidents such as gas explosion occur.So can mine ventilation system normally work and be directly connected to the safety in production of mine.
At present, a large amount of monitoring and controlling system uses widely at underground coal mine, and the underground monitoring data of magnanimity, as tunnel windage value, ventilation etc., can be easy to obtained, but these data not yet obtain fully effective utilization.
On the other hand, Mine Ventilation Network Solution is the allocation of the amount of air process solving wind net based on the windage of known Feng Wangge branch, the Mine Ventilation Network Solution of current enforcement mine ventilation system, the simulation completing ventilation state is broken through as a kind of technology of routine.But basic data (referring to the windage value in tunnel, the parameter of coal master's blower fan, the air quantity etc. of mining face under mine, development end) required for Mine Ventilation Network Solution is generally first manually carried out mine ventilation system measure of resistance work at the scene and is obtained.Due to the continuity of producing, digging tunnel and work plane position are all constantly changing, and the inevitable delayed and on-site actual situations of the basic data obtained by measure of resistance work, therefore also can only react the situation of a mine ventilation system period.
To sum up, the monitored data obtained in real time down-hole and Mine Ventilation Network Solution are simulated these two aspects and are combined, realize the real-time update of mine ventilation network data, complete real-time resolving, then theory is resolved ventilation to compare with actual measurement ventilation, the ventilation state of reflection mine ventilation system is very necessary.
Summary of the invention
The technical problem that the present invention solves: the method that the checking mine ventilation system state of a kind of tunnel windage parameters self-tuning is provided, improve that current monitoring mining data user rate is not high, some tunnel variable windage measured value is delayed, the technical problem of on-site actual situations cannot be reflected.
For solving the problems of the technologies described above, the present invention adopts following technical scheme:
A method for the checking mine ventilation system state of tunnel windage parameters self-tuning, comprises the following steps:
A, in the tunnel that down-hole windage changes greatly, arrange air velocity transducer for measuring ventilation;
B, in mine main ventilator air channel, arrange air velocity transducer for measuring ventilation;
C, fixing air quantity branch is arranged in the tunnel (referring to have the tunnel of driving face) windage changed greatly and tunnel, main fan place in Mine Ventilation Network Solution program in data entry process, (this is a kind of method of Ventilation Network Solution, as long as in solution process, given corresponding program symbol flag, software program is understood, and these tunnels are the branches being set to fixing air quantity, in operation afterwards, these tunnels just do not participate in calculating), Mine Ventilation Network Solution is carried out in conjunction with the existing each tunnel windage value measured, the tunnel that Mine Ventilation Network Solution procedure stipulation is set to fixing air quantity branch does not participate in calculating, obtain ventilation and the flowing resistance value in other tunnels in full mine,
D, the ventilation in tunnel being set to fixing air quantity branch are fixing, and flowing resistance value is then the Resistance Value calculating corresponding tunnel according to each branch in fixing loop, air quantity branch place by pressure balance relation; According to the relational expression H=RQ of ventilation and resistance 2solve windage change greatly the current state in tunnel under calculating windage value, wherein H is Resistance Value, and R is windage value, and Q is ventilation value;
E, the calculating windage value in the tunnel windage obtained in steps d changed greatly replace the existing windage value that corresponding acoustic wind hinder the tunnel changed greatly becomes new value, and all the other tunnel windages are worth constant;
F, remove in Mine Ventilation Network Solution program original fixing air quantity branch heading input program symbol flag arrange, three feature point values of the fan performance curve of the main ventilation of current for mine running are updated in Mine Ventilation Network Solution program, carry out resolving according to the Mine Ventilation Network Solution program under normal natural wind condition in conjunction with the windage value that each tunnel is new, obtain the theory in each tunnel is resolved under current ventilation state ventilation value and flowing resistance value.
The first time Ventilation Network Solution of above process is carry out under the condition of given value through leading portion timing based on existing each tunnel windage value, and second time is resolved, and is that the network of tunnel windage value after upgrading resolves.
The method of the checking mine ventilation system state of this tunnel windage parameters self-tuning is reasonably utilized the tunnel windage value of existing mensuration, and make Ventilation Network Solution acquisition dash amount in theory become possibility compared with carrying out between on-the-spot actual measured results in real time.The theory being changed greatly tunnel by contrast windage resolves ventilation and field measurement ventilation, determines whether the fluctuation of mine ventilation network is in acceptable scope, namely whether is within 15%, judges that whether mine ventilation network is in a safe condition; Simultaneously by the ventilation resolving each tunnel that ventilation and monitoring mining monitoring system record theoretical under the current state of any tunnel of contrast (mainly windage value change greatly tunnel), judge that whether mine ventilation network is in a safe condition.
Beneficial effect: in the present invention, first utilize in the tunnel and mine main ventilator air channel changed greatly in down-hole windage and air velocity transducer is set in order to measure the ventilation in corresponding tunnel, the existing windage value in each tunnel obtained in conjunction with the mine ventilation system measure of resistance work in period the last period successively completes twice different conditions and to go down into a mine Ventilation Network Solution, obtains the theory in each tunnel under current state and resolves ventilation.The ventilation value resolved and become compared with carrying out between flowing resistance value with on-the-spot actual measured results on the spot may and make mine ventilation network judgement whether in a safe condition.
Accompanying drawing explanation
Fig. 1 is the handling process of the inventive method;
Fig. 2 is the Study on mine ventilation network graph of the embodiment of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is further described.
Fig. 2 is the Study on mine ventilation network graph of the embodiment of the present invention, and this ventilation network comprises altogether 10 tunnels, 7 nodes, and wherein No. 1 and No. 2 tunnels are two coal-faces in system, and No. 3 tunnels are system main fan branch.Can predict, due to constantly carrying out of mining activity, the physical dimension in No. 1 and No. 2 tunnel changes all at any time, and therefore these two tunnels belong to the branch that windage changes greatly.
The windage value in each tunnel existing obtained by the mine ventilation system measure of resistance work in period the last period is as shown in table 1.
Table 1 tunnel initial windage value summary sheet
Tunnel sequence number Initial point End point Windage value (kg/m 7)
1 75 82 0.108
2 75 82 0.13
3 88 1 0.007
4 1 3 0.149
5 3 62 0.0157
6 62 70 0.0584
7 70 75 0.004
8 70 82 0.2
9 62 88 0.563
10 82 88 0.017
Suppose that will carry out real-time network to present operation ventilation system resolves, checking mine ventilation system ventilation state, comprises the following steps that (see Fig. 2, initial point end point is the numeral with circle in Fig. 2, represent the intersection point in tunnel, the numeral tunnel sequence number not with circle):
A, in the tunnel 1 and 2 that down-hole windage changes greatly, arrange air velocity transducer for measuring ventilation, the actual ventilation value obtained is listed in table 2;
B, in mine main ventilator tunnel 3, arrange air velocity transducer for measuring ventilation, the actual ventilation value obtained is listed in table 2;
C, the tunnel 1 and 2 windage changed greatly and main fan tunnel 3 are arranged to the fixing air quantity branch windage value also combined in the existing each tunnel windage value and table 1 measured and are carried out Mine Ventilation Network Solution program (" coal-mining simulation system V1.0 " that existing program is developed as China Mining University) and resolve, for simulating actual ventilation state, ensure that the ventilation being set to the branch in fixing tunnel is constant, Mine Ventilation Network Solution procedure stipulation is set to tunnel and the tunnel 1 of fixing air quantity branch, 2, 3 do not participate in calculating, obtain ventilation and the flowing resistance value in other 4-10 tunnels in full mine, the results are shown in Table 2,
Table 2 arranges fixing air quantity branch condition lower network calculation result
D, do not participate in first time Mine Ventilation Network Solution process because of fixing air quantity branch and tunnel 1,2,3, therefore calculate the resistance in corresponding tunnel 1,2,3 by pressure balance relation according to each branch parameter in fixing air quantity branch and loop, place, tunnel 1,2,3, be recorded in table 3; According to the relational expression H=RQ of ventilation and resistance 2the ventilation value that substitution air velocity transducer records and the Resistance Value calculated by pressure balance relation, solve the calculating windage value under the current state in the tunnel 1 and 2 that windage changes greatly, namely be the new windage value of reality in the tunnel 1 and 2 that current windage changes greatly, be recorded in table 3, wherein H is Resistance Value, and R is windage value, and Q is ventilation value; Table 2 is windage in conjunction with other tunnels existing and actual measurement air quantity instantly, arranges fixed value and substitutes into network and resolve, so the resistance that this situation resolves down the tunnel 1,2,3 calculated is not accurate enough.Because calculate the Resistance Value in variable windage tunnel with pressure balance, 1 in table 2,2, the Resistance Value in 3 tunnels do not meet pressure balance relation (therefore not providing) in the loop, the solution meeting balance provides in table 3.
Program computation method of the present invention is similar to circuit theory, and air quantity is equivalent to electric current, and resistance is equivalent to voltage, for a closed-loop path, and the pressure on its loop and must be zero.The tunnel of aforementioned fixing air quantity branch does not participate in calculating, and after network resolves, the flowing resistance value in other tunnels can all obtain.In order to make fixing air quantity branch place loop (closed-loop path) blast and be zero, program around this principle, provide a Resistance Value, namely list by table 3.
Air quantity branch relevant parameters fixed by table 3
The windage value in the existing tunnel 1 and 2 measured of calculating windage value replacement in the tunnel 1 and the 2 e. windage obtained in steps d changed greatly becomes new value, and the windage value in other 3-10 tunnels remains unchanged;
F, in network solver, remove the setting in original fixing air quantity branch and tunnel 1,2,3, three feature point values of the fan performance curve of the main ventilation of current for mine shown in table 4 running are updated in Mine Ventilation Network Solution program and go, carry out according to the Mine Ventilation Network Solution under normal natural splitting condition in conjunction with each tunnel new windage value simultaneously, obtain the theory in each tunnel under current ventilation state and resolve ventilation value and flowing resistance value, be recorded in as in table 5.
The characteristic point of the fan performance curve of the main ventilation of the current running of table 4
Sequence number Main ventilation fan delivery (m 3/s) Main fan blast (Pa)
1 51 3500
2 58.5 3100
3 66 2300
The theoretical calculation result of ventilation system ventilation parameter under table 5 current state
Theory is resolved compared with ventilation carries out with actual measurement ventilation, find for three tunnels being originally set to fixing air quantity branch, namely 1,2 and 3, theory shown in its table 5 resolves measured result difference small (within 15%) in ventilation and table 2, proves that the fluctuation of mine ventilation network is in acceptable scope.On the other hand, if the ventilation comparative result difference in any tunnel is very large in table 2 and table 5, then proves to there is safety problem in current mine ventilation network, need arouse attention.
The above is only the preferred embodiment of the present invention; be noted that for those skilled in the art; under the premise without departing from the principles of the invention, can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (2)

1. a method for the checking mine ventilation system state of tunnel windage parameters self-tuning, is characterized in that comprising the following steps:
A, in the tunnel that down-hole windage changes greatly, arrange air velocity transducer for measuring ventilation;
B, in mine main ventilator air channel, arrange air velocity transducer for measuring ventilation;
Namely c, tunnel windage changed greatly refer to have the tunnel of driving face and tunnel, main fan place to be arranged to fixing air quantity branch in data entry process in Mine Ventilation Network Solution program, Mine Ventilation Network Solution is carried out in conjunction with the existing each tunnel windage value measured, the tunnel that Mine Ventilation Network Solution procedure stipulation is set to fixing air quantity branch does not participate in calculating, and obtains ventilation and the flowing resistance value in other tunnels in full mine;
D, the ventilation in tunnel being set to fixing air quantity branch are fixing, and flowing resistance value is then the respective value calculated by pressure balance relation according to each branch in fixing loop, air quantity branch place; According to the relational expression H=RQ of ventilation and resistance 2solve these windages change greatly the current state in tunnel under calculating windage value, wherein H is Resistance Value, and R is windage value, and Q is ventilation value;
The existing windage value that e, the calculating windage value in the tunnel windage obtained in steps d changed greatly replace these tunnels becomes new value, and all the other tunnel windages values are constant;
F, in Mine Ventilation Network Solution program, remove the traffic sign placement of the input program code of original fixing air quantity branch heading, three feature point values of the fan performance curve of the main ventilation of current for mine running are updated in Mine Ventilation Network Solution program, carry out resolving according to the Mine Ventilation Network Solution program under normal natural wind condition in conjunction with the windage value that each tunnel is new, obtain the Theory Solution in each tunnel calculates under current ventilation state ventilation value and flowing resistance value.
2.2. the method for the checking mine ventilation system state of tunnel according to claim 1 windage parameters self-tuning, it is characterized in that the first time Ventilation Network Solution of above process is is carry out under the condition of given value through leading portion timing based on existing each tunnel windage value, and second time is resolved, and is that the network of tunnel windage value after upgrading resolves.
CN201310161756.XA 2013-05-03 2013-05-03 Method for verifying state of mine ventilation system by self-adjusting tunnel wind resistance parameters Expired - Fee Related CN103266906B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310161756.XA CN103266906B (en) 2013-05-03 2013-05-03 Method for verifying state of mine ventilation system by self-adjusting tunnel wind resistance parameters

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310161756.XA CN103266906B (en) 2013-05-03 2013-05-03 Method for verifying state of mine ventilation system by self-adjusting tunnel wind resistance parameters

Publications (2)

Publication Number Publication Date
CN103266906A CN103266906A (en) 2013-08-28
CN103266906B true CN103266906B (en) 2015-01-14

Family

ID=49010560

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310161756.XA Expired - Fee Related CN103266906B (en) 2013-05-03 2013-05-03 Method for verifying state of mine ventilation system by self-adjusting tunnel wind resistance parameters

Country Status (1)

Country Link
CN (1) CN103266906B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110878707A (en) * 2019-12-12 2020-03-13 山东科技大学 Method for diagnosing abnormity of mine ventilation system based on real-time monitoring of air volume

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603691B (en) * 2013-11-28 2016-08-17 煤炭科学技术研究院有限公司 A kind of mine ventilation dynamic resolving and analysis early warning method and system
CN103939123B (en) * 2014-04-30 2015-07-15 卢新明 State recognition method for mine ventilation system
CN104390760A (en) * 2014-10-20 2015-03-04 中国矿业大学 Wind resistance test method for vertical material transporting and feeding
CN104732065B (en) * 2015-02-13 2017-08-04 中南大学 Mine Ventilation Network Solution method and mine ventilation network forecasting system
CN105756697B (en) * 2016-05-05 2018-01-02 中国矿业大学 A kind of safe adjustment control method of mine ventilation system Dynamic stage
CN108090235A (en) * 2016-11-21 2018-05-29 辽宁工程技术大学 The failure tunnel for influencing relational matrix based on windage-distinguished and admirable variation determines method
CN106777528B (en) * 2016-11-25 2017-11-21 山东蓝光软件有限公司 The holographic forecast method of mine air-required volume
CN106703866A (en) * 2017-03-09 2017-05-24 辽宁工程技术大学 Method for distributing mine wind speed sensor
CN108266219A (en) * 2018-01-23 2018-07-10 辽宁工程技术大学 Mine ventilation system resistive-switching single fault source diagnostic method based on air quantity feature
CN108412548A (en) * 2018-03-14 2018-08-17 中煤科工集团重庆研究院有限公司 Mine roadway gas distribution dynamic cloud picture generation method and analysis early warning system
CN109342003A (en) * 2018-09-20 2019-02-15 鞍钢集团矿业有限公司 Use for laboratory mine coating leaks out simulated behavior detection device and method
CN109281698B (en) * 2018-09-29 2020-04-24 天地(常州)自动化股份有限公司 Mine ventilation resistance determination data processing method based on relative pressure
CN109506720B (en) * 2018-12-14 2024-06-14 李�杰 Device and method for accurately measuring air quantity of large-section roadway
CN110566259B (en) * 2019-09-26 2021-04-13 辽宁工程技术大学 Ventilation system resistance variation type fault diagnosis method based on air volume and air pressure monitoring value
CN110852501B (en) * 2019-11-05 2023-09-22 辽宁工程技术大学 Mine resistance-reducing optimization method based on genetic algorithm
CN111691910B (en) * 2020-04-20 2022-05-20 辽宁工程技术大学 Air window is adjusted in colliery of accurate definite air volume
CN113586155A (en) * 2021-08-27 2021-11-02 中钢集团马鞍山矿山研究总院股份有限公司 Intelligent ventilation regulation and control system and method for metal mine underground operation place
CN116663210B (en) * 2023-05-15 2024-02-02 北京龙软科技股份有限公司 Conversion method and system for three-dimensional roadway space relation to ventilation network calculation model
CN117875509B (en) * 2024-01-17 2024-07-19 昆明理工大学 Mine ventilation quantity prediction method and system based on BP neural network

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1670151A1 (en) * 1989-07-03 1991-08-15 Erokhin Sergej Yu Method for airing extraction areas during layer mining
RU2255224C1 (en) * 2003-11-17 2005-06-27 Институт угля и углехимии Сибирского отделения Российской Академии Наук (ИУУ СО РАН) Method for ventilating cleaning faces during extraction of highly gaseous coal beds by long columns
CN102465708A (en) * 2010-11-12 2012-05-23 平安煤矿瓦斯治理国家工程研究中心有限责任公司 Mine ventilation information processing system and method
CN102650214A (en) * 2012-05-31 2012-08-29 中煤科工集团重庆研究院 Early warning method and system for on-line monitoring and analysis of mine ventilation system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1670151A1 (en) * 1989-07-03 1991-08-15 Erokhin Sergej Yu Method for airing extraction areas during layer mining
RU2255224C1 (en) * 2003-11-17 2005-06-27 Институт угля и углехимии Сибирского отделения Российской Академии Наук (ИУУ СО РАН) Method for ventilating cleaning faces during extraction of highly gaseous coal beds by long columns
CN102465708A (en) * 2010-11-12 2012-05-23 平安煤矿瓦斯治理国家工程研究中心有限责任公司 Mine ventilation information processing system and method
CN102650214A (en) * 2012-05-31 2012-08-29 中煤科工集团重庆研究院 Early warning method and system for on-line monitoring and analysis of mine ventilation system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
矿井通风在线监测及动态分析预警;杨守国;《煤矿安全》;20110810(第8期);第29-32页 *
矿井通风***安全可靠性评价软件设计及应用;陈开岩等;《中国矿业大学学报》;20030730;第32卷(第4期);第394-399页 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110878707A (en) * 2019-12-12 2020-03-13 山东科技大学 Method for diagnosing abnormity of mine ventilation system based on real-time monitoring of air volume
CN110878707B (en) * 2019-12-12 2020-11-20 山东科技大学 Method for diagnosing abnormity of mine ventilation system based on real-time monitoring of air volume

Also Published As

Publication number Publication date
CN103266906A (en) 2013-08-28

Similar Documents

Publication Publication Date Title
CN103266906B (en) Method for verifying state of mine ventilation system by self-adjusting tunnel wind resistance parameters
CN104564120B (en) Operation state control decision making method of mine ventilation system
CN103603691B (en) A kind of mine ventilation dynamic resolving and analysis early warning method and system
CN102650214B (en) Early warning method and system for on-line monitoring and analysis of mine ventilation system
CN203035263U (en) Underground ventilation monitoring system
CN103939123A (en) State recognition method for mine ventilation system
Wang et al. Intelligent safety adjustment of branch airflow volume during ventilation-on-demand changes in coal mines
RU2587192C1 (en) Method for monitoring air consumption in network of mines and system therefor
CN104603832A (en) Methods and systems for improved time cost and accuracy of energy usage baselining
CN103837363B (en) Gas dynamical disaster affects pilot system and method to mine ventilation network
CN103643997B (en) A kind of computational methods of gas emission of little wind speed driving face
Wei et al. The use of 3D simulation system in mine ventilation management
CN103983313A (en) Method for determining resistance coefficient of pipe network and method for measuring air volume of pipe network
CN104775841A (en) Ventilation network security division partitioning method oriented to mine air points
CN104747224A (en) Ventilation complexity analysis method based on mine ventilation equivalent area
Szlązak et al. Analysis of connecting a forcing fan to a multiple fan ventilation network of a real-life mine
CN114528674A (en) Natural gas long-distance pipeline network flow calculating and voting method and system
CN105894706B (en) A kind of forest fire prediction technique and its system
CN102323998A (en) Method for checking wind-friction resistance value of mine roadway
CN104268126B (en) Multi-modal automatic recognition method for air duct parameters of mine ventilation system
CN107341621A (en) A kind of distributed mine ventilation real-time resolving and analysis and early warning method and system
Kanam et al. A review on underground mine ventilation system
CN109753624B (en) Mine ventilation resistance measuring method based on characteristic roadway
CN116008585A (en) Tunnel air quantity determining method
CN204511521U (en) Mine special explosion venting parameter on-line determination device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150114

Termination date: 20150503

EXPY Termination of patent right or utility model