CN103266902A - Layout design method of underground cavern group - Google Patents

Layout design method of underground cavern group Download PDF

Info

Publication number
CN103266902A
CN103266902A CN2013102343139A CN201310234313A CN103266902A CN 103266902 A CN103266902 A CN 103266902A CN 2013102343139 A CN2013102343139 A CN 2013102343139A CN 201310234313 A CN201310234313 A CN 201310234313A CN 103266902 A CN103266902 A CN 103266902A
Authority
CN
China
Prior art keywords
rock
cavern
main
stress
underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102343139A
Other languages
Chinese (zh)
Other versions
CN103266902B (en
Inventor
张勇
肖平西
王仁坤
宋胜武
杨建宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Original Assignee
Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group filed Critical Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority to CN201310234313.9A priority Critical patent/CN103266902B/en
Publication of CN103266902A publication Critical patent/CN103266902A/en
Application granted granted Critical
Publication of CN103266902B publication Critical patent/CN103266902B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a layout design method of an underground cavern group applied to a water conservancy and hydropower project and an underground storage. According to the layout method, main factors influencing the stability of surrounding rock of the underground caverns, especially, the rock strength stress ratio which is the essential factor can be fully taken into consideration. The method comprises the following steps of: firstly determining the positions of main caverns, determining the axial line directions of the main caverns, determining the thicknesses of rock pillars among the main caverns, and finally determining the shapes of the main caverns, wherein in the process of determining the thicknesses of the rock pillars among the main caverns, the thicknesses of the rock pillars are 1.0-2.5-time mean than excavation span between two adjacent main caverns and are 0.5-0.8 times that of the height of the big one in the adjacent two main caverns. Compared with the layout design with a design plan provided by a using traditional layout method, the layout design with the layout method disclosed by the invention is more scientific; and especially, in a highland stress environment and in a condition with relatively low surrounding rock strength, the phenomena of the deformation and destruction of the surrounding rock after the surrounding rock of the underground cavern group is excavation-unloaded can be greatly reduced or the deformation and destruction degrees of the surrounding rock can be reduced.

Description

Underground hole group layout design method
Technical field
The present invention relates to a kind of underground chamber method for arranging, especially a kind of underground hole group layout design method at Hydraulic and Hydro-Power Engineering, underground storage engineering application.
Background technology
In fields such as Hydraulic and Hydro-Power Engineering, underground storage engineerings, the reasonable Arrangement design problem that all relates to underground hole group, western China underground workshop particularly, its cavity group is larger, often be in the high mountain gorge area, have characteristics such as cavern's buried depth is big, geostatic stress is high, geological conditions complexity, thereby make the stable and safety problem of large underground hole group country rock become very outstanding.The relevant expert in rock mechanics field and underground engineering construction person more and more clearly recognized in recent years, rock fundamental strength, geostatic stress, surrounding rock structure surface development feature, supporting intensity are to determine the stable key factor of underground engineering wall rock, and the promptness of cavern excavation size and group hole effect, construction and excavation order, blasting method, supporting etc. also all can cause certain influence to surrounding rock of chamber stable; And under the essentially identical situation of other conditions, different rock strength stress ratios will cause the underground hole group country rock to show different deformation failure features.By rational layout design, and after taking reasonable excavation and supporting measure, can solve the stable and safety problem of stable and the safety problem, particularly high-ground stress environment large underground hole group country rock of large underground hole group country rock preferably.Therefore, reasonably layout design is the prerequisite that guarantees large underground hole group adjoining rock stability and safety.
The layout design of underground hole group comprises the working contents such as determine of position, cavern, cavern's longitudinal axis, cavern's spacing and hole shape.When carrying out the underground hole group layout by the layout design method that has traditional large underground hole group now, generally only consider factors such as geostatic stress size and Orientation, rock mass discontinuity development characteristics, cavern's size, internal placement requirement, factors such as rock strength stress ratio, site district geostatic stress distribution characteristics are not considered.
Owing to do not consider this most important factor of rock strength stress ratio, layout by the definite large underground hole group master cavern of existing method is unreasonable, thereby may cause the underground hole group country rock under high-ground stress environment, the relatively low condition of country rock intensity that comparatively serious surrouding rock deformation breakoff phenomenon takes place after the cavern excavation off-load,, country rock pressure breaks big as the lax degree of depth of country rock rock burst, timeliness large deformation, country rock etc. threaten engineering safety also to cause the duration to lag behind and investment increases.
Very complicated as certain underground workshop geological conditions, the cavity group scale is big, actual measurement plant area major principal stress is 20.0~35.7MPa, belong to the high-ground stress condition together with power station, two beaches, waterfall ditch power station, power station, land owned by officials etc., but its rock uniaxiality strength only is 60~75MPa, and its rock strength is obviously on the low side.The large deformation of surrounding rock of chamber timeliness has appearred in the construction and excavation process, the obvious changing of the relative positions in high abutment wall crack, main building downstream haunch country rock cleavage fracture, rock mass scales off, country rock off-load catastrophe phenomenons such as top layer rock mass pressure break, hole week relax zone depth capacity has reached 2~5 times and sustainable development of common engineering simultaneously, plastic zone connection between main cavern in the numerical computations model, anchor shaft anchor cable value of thrust overrun condition is comparatively serious, the deformation failure situation of its surrounding rock of chamber and the stressed overrun condition of supporting are more than power station, two beaches, waterfall ditch power station, the power station, land owned by officials is serious, and by the surrouding rock deformation destructiveness of brae gusset rock (rock pillar) apparently higher than away from the brae side, the deformation failure degree of country rock is also apparently higher than general place near the larger structural plane, bring threat for surrounding rock of chamber stability and construction period personnel device security, make cavity group in the excavation supporting process, run into stern challenge, this project stops excavation and implements to add strong supporting for this reason, causes investment to increase, the about one-year age of duration hysteresis.Think the reason of above-mentioned deformation failure situation main with the geostatic stress height surrounding rock structure surface development such as relatively low, the tomography of rock strength and lamprophyre arteries and veins, factors such as the position, cavern is nearer far from the brae, cavern's spacing is too small, supporting relevant.
Therefore, must invent a kind of large underground hole group layout design method of more science, in order to when carrying out the underground hole group layout, consider rock fundamental strength, geostatic stress feature, these three key factors of rock mass discontinuity development characteristics and be easy to realization.
Summary of the invention
Technical problem to be solved by this invention provides a kind of more science and can reduce the underground hole group layout design method of construction risk of design scheme that makes.
The present invention solves the underground hole group layout design method that its technical problem adopts, at first determine position, main cavern, determine main cavern axis direction then, determine the rock pillar thickness between the main cavern again, determine main cavern hole shape at last, when the rock pillar thickness of determining between the main cavern, the rock pillar one-tenth-value thickness 1/10 is 1.0~2.5 times of average excavation span of adjacent main cavern and is 0.5~0.8 times of the greater height in adjacent two main caverns.
Further be, when position, definite main cavern, if construction ground is location, valley, river, with the brae to massif with interior riverbank geostatic stress be divided into geostatic stress district, river valley, away from the stress control zone primitively of river valley geomorgy, transition region three parts between the said two devices; Geostatic stress district, river valley further is divided into the stress relaxation district of area of stress concentration and a domatic band of riverbed one band again; Brae stress relaxation band and area of stress concentration should be avoided in the position of large underground hole group master cavern, and surpass the extremely unsettled transition of stress area edge of stress distribution.
Further be, when the rock strength stress ratio is 2.0~4.0, the rock pillar one-tenth-value thickness 1/10 is taken as 2.0~2.5 times of average excavation span of adjacent main cavern, and the rock strength stress ratio was near near 2.0 o'clock values higher limit, the rock strength stress ratio is required to be 0.7~0.8 times of big cavern height simultaneously near near 4.0 o'clock values lower limit; The rock strength stress ratio is 4.0~7.0 o'clock, the rock pillar one-tenth-value thickness 1/10 is taken as 1.5~2.0 times of average excavation span of adjacent cavern, and the rock strength stress ratio near near 7.0 o'clock values lower limit, is required to be 0.6~0.7 times of big cavern height near near 4.0 o'clock values higher limit simultaneously; The rock strength stress ratio is greater than 7.0 o'clock, and the rock pillar one-tenth-value thickness 1/10 is taken as 1.0~1.5 times of average excavation span of adjacent cavern, and the rock strength stress ratio near 7.0 the time near higher limit value, be required to be 0.5~0.6 times of big cavern height simultaneously.
Further be, when definite main cavern hole shape, according to function main cavern is divided into underground main building, transformer chamber and down stream surge-chamber three classes, the hole shape of underground main building and transformer chamber is adopted circular arch stalk shape or avette, and down stream surge-chamber adopts cylindrical shape or gallery shape.
Further be that when the rock strength stress ratio was 2.0~4.0, down stream surge-chamber adopted cylindrical shape; When the rock strength stress ratio less than 2.0 the time, underground main building and transformer chamber adopt avette.
Further be that the underground main building of circular arch stalk shape and the parameter of transformer chamber are determined in the following ways: the rock strength stress ratio is 2.0~4.0, and the crown ratio of rise to span of circular arch stalk shape section gets 1/3.0~1/3.5; The rock strength stress ratio is 4.0~7.0 o'clock, and the crown ratio of rise to span of circular arch stalk shape section gets 1/3.5~1/4.0; The rock strength stress ratio was greater than 7.0 o'clock, and the crown ratio of rise to span of circular arch stalk shape section gets 1/4.0~1/4.5.
The invention has the beneficial effects as follows: the large underground hole group layout design method that the present invention proposes, main base area stress characteristics, rock strength stress ratio and surrounding rock structure surface development feature are carried out the underground hole group layout design, its essence is according to the underground chamber architectural feature, surrounding rock structure feature and supporting capacity (rock strength), load characteristics (being geostatic stress) etc. is carried out the layout design of underground hole group, this method for arranging can comprehensively consider to influence the stable principal element of underground rock cavern, this most important factor of rock strength stress ratio particularly, carry out layout design according to this method for arranging, the design scheme that proposes with respect to traditional method for arranging is science more, particularly at the high-ground stress environment, under the relatively low condition of country rock intensity, can reduce the deformation failure phenomenon of underground hole group country rock country rock after the excavation off-load significantly or reduce its order of severity, can reduce the reinforcement support cost of country rock, reduce duration hysteresis risk, the construction period security risk, security of operation.
The specific embodiment
Below the invention will be further described.
The present invention at first determines position, main cavern, determine main cavern axis direction then, determine the rock pillar thickness between the main cavern again, determine main cavern hole shape at last, when position, definite main cavern, at first record the rock strength stress ratio on construction ground, when the rock strength stress ratio was 2.0~4.0, main cavern outer rim should be greater than 400m to the rock mass thickness of brae face; The rock strength stress ratio is 4.0~7.0 o'clock, and main cavern outer rim is 200~400m to the rock mass thickness value of brae face; The rock strength stress ratio was greater than 7.0 o'clock, and main cavern outer rim is 150~200m to the rock mass thickness of brae face.The rock strength stress ratio refers to the saturated uniaxial compressive strength of rock and the rock mass ratio of stress major principal stress value initially, consistent with the definition of " rock strength stress ratio " among the GB50287-2006 " hydraulic power project geological mapping standard ", also available " country rock strength-stress ratio ", " rock stress strength ratio ", " surrouding rock stress strength ratio " index substitute " rock stress strength ratio " among the present invention certainly.When carrying out layout design, all adopt " rock strength stress ratio " this index, this index had both been considered rock fundamental strength, these two factors of geostatic stress level simultaneously, it is again the rock mass main foundation of stress grading initially, its physical significance is similar to the bearing capacity safety factor of underground rock cavern, be the rock strength stress ratio when high surrounding rock of chamber bearing capacity safety factor big, surrounding rock of chamber bearing capacity safety factor was little when the rock strength stress ratio was low.Judge in macroscopic view on the basis of underground hole group site district stress field feature, determine the position of underground hole group master cavern according to rock strength stress ratio and surrounding rock structure surface development feature.
In location, valley, river, can with the brae to massif with interior riverbank geostatic stress be divided into geostatic stress district, river valley, away from the stress control zone primitively of river valley geomorgy, transition region three parts between the said two devices.Geostatic stress district, river valley can further be divided into the stress relaxation district of area of stress concentration and a domatic band of riverbed one band again.Brae stress relaxation band and area of stress concentration should be avoided in the position of large underground hole group master cavern, and surpass the extremely unsettled transition of stress area edge of stress distribution.
The rock strength stress ratio is crossed when low (as less than 2.0, for ambient stress) highly, should not arrange large underground hole groups such as underground workshop; When the rock strength stress ratio is low (as 2.0~4.0, being the high-ground stress environment), large underground hole group master cavern outer rim should be greater than 400m to the rock mass thickness of brae face; (as 4.0~7.0, be medium ground stress environment) when the rock strength stress ratio is medium, the large underground hole group outer rim can be taken as 200~400m to the rock mass thickness of brae face; (as greater than 7.0, be low ground stress environment) when the rock strength stress ratio is high, large underground hole group master cavern outer rim is to the desirable 150~200m of rock mass thickness of brae face.The position of underground hole group master cavern should be avoided to oblique nuclear portion area and active fault, and the scales such as inactive regional faults, common tomography and influence band thereof of as far as possible avoiding are than the macrostructure face.
The method of the position, definite large underground hole group master cavern that the present invention proposes, determine the position of underground hole group master cavern according to site stress field feature, rock strength stress ratio and country rock structural feature, its essence is the layout design of carrying out underground hole group according to underground rock cavern architectural feature and supporting capacity (rock strength), load characteristics (being geostatic stress), the problem that can avoid traditional design method to cause.Organically combine the middle rock mass of GB50287-2006 " hydraulic power project geological mapping standard " stress grading mode initially, be applicable to the underground hole group layout design under the various geostatic stress levels.Proposed comparatively concrete quantizating index, be convenient to the designer and use.
Under the prerequisite that satisfies structure function and general arrangement requirement, according to the rock strength stress ratio and take into account the longitudinal axis orientation, main cavern that geostatic stress orientation, surrounding rock structure surface development feature are finally determined underground hole group.
When country rock primary structure face trend was than mitre with main cavern axis direction, structural plane often only occurred in regional area to the influence of cavity group, can guarantee the stability at these positions after taking corresponding reinforcement measure.Longitudinal axis orientation, main cavern and major principal stress orientation adopt less angle, can reduce excavation back cavern's bias voltage and the factor of stress concentration, prevent rock burst or reduce the rock burst rank, reduce high abutment wall lateral deformation, thereby are conducive to the stable of high abutment wall; But when the angle in longitudinal axis orientation, main cavern and major principal stress orientation is too small, again to unfavorable with stablizing of main cavern vertically arranged other surrounding rock of chamber in longitudinal axis orientation.
According to building the engineering successful case, the angle of the longitudinal axis orientation of large underground hole and rock mass primary structure face trend generally should not be less than 40 °, more preferably greater than 60 °; Longitudinal axis orientation, main cavern and the major principal stress angle of large underground hole group are generally 15~40 °.Reduction along with the rock strength stress ratio, the deformation failure of surrounding rock of chamber is gradually from based on surrounding rock structure face control type, to structural plane and the compound control type transition of stress, until the deformation failure that takes place based on the Stress Control type, determine that according to the rock strength stress ratio method and the principle in longitudinal axis orientation, cavern is as follows:
When a) the rock strength stress ratio is big (as greater than 7.0, low ground stress environment), the deformation failure of surrounding rock of chamber is controlled by surrounding rock structure face factor mainly, the selection in longitudinal axis orientation, cavern is to consider the structural plane factor, under guaranteeing that angle that main cavern longitudinal axis and rock mass primary structure face move towards is greater than 60 ° prerequisite, the angle of taking into account main cavern longitudinal axis and major principal stress orientation 15~40 ° with interior value and as far as possible little, also note that the influence of structural plane;
When b) the rock strength stress ratio is medium (as 4.0~7.0, medium ground stress environment), the deformation failure of surrounding rock of chamber mainly shows as structural plane and the compound control type of stress but the structural plane factor is preponderated, all should pay attention to structural plane and geostatic stress factor when longitudinal axis orientation, cavern is selected, the angle that should guarantee main cavern longitudinal axis and rock mass primary structure face trend simultaneously greater than 40 °, and the angle in major principal stress orientation in 40 °;
When c) the rock strength stress ratio is low (as 2.0~4.0, the high-ground stress environment), the deformation failure of surrounding rock of chamber mainly shows as structural plane and the compound control type of stress, stress factors begins to bring into play leading role and two factors deterioration wall rock condition that can influence each other, medium rock burst may take place in hard rock, there are hard rock season cracking and secular distortion problem, moderate finite deformation may take place in soft rock, when selecting, longitudinal axis orientation, cavern all should pay attention to especially structural plane and geostatic stress factor, the angle in main cavern longitudinal axis and major principal stress orientation is more little in 15~30 ° of scope values and the more low value of rock strength stress ratio, and the angle of main cavern longitudinal axis and rock mass primary structure face trend is in value more than 40 °;
D) the rock strength stress ratio is crossed when low (as less than 2.0, ambient stress highly), the deformation failure deformation failure phenomenon of surrounding rock of chamber is serious, mainly show as the compound control type of structural plane and stress and destroy, deformation failure is ageing obviously, and hard rock may take place strongly~strong rock burst on active, large deformation or rheology may take place to continue in soft rock, should not arrange large underground hole group, mainly consider the geostatic stress factor when selecting longitudinal axis orientation, main cavern, can be parallel with the major principal stress orientation;
When e) longitudinal axis orientation, main cavern is selected, note also the influence of second principal stress, when first principal stress and second principal stress answer value near the time, according to first principal stress or second principal stress in horizontal component the greater be less angle, be than the principle of mitre with rock mass primary structure face and select longitudinal axis orientation, main cavern.
Determine rock pillar thickness between the underground hole group master cavern according to the rock strength stress ratio, the overall principle is: rock pillar thickness got the small value when the rock strength stress ratio was high, otherwise then got big value.The method in the longitudinal axis orientation, definite large underground hole group master cavern that the present invention proposes, base area stress characteristics, rock strength stress ratio and surrounding rock structure surface development feature are determined the longitudinal axis orientation of main cavern, its essence is the layout design of carrying out underground hole group according to underground rock cavern architectural feature and supporting capacity (rock strength), load characteristics (being geostatic stress), the problem that can avoid traditional design method to cause.
When design and construction rock pillar thickness, specify with the example that is defined as of rock pillar thickness between the underground workshop master cavern.When the distance between the main cavern of underground power house is big surrounding rock of chamber is stablized favourablely, can be reduced the risk that the rock pillar plastic zone between the main cavern is communicated with, but can corresponding increase construction investment and long-term electric energy loss.According to statistics, both at home and abroad the rock pillar thickness between the adjacent main cavern of large hydropower station underground power house is about 0.8~2.5 times (most of between 1~2 times) of the average excavation span of 0.5~0.8 times (most of between 0.6~0.8 times) of big cavern height and adjacent cavern.Therefore, might as well select rock pillar thickness according to the size of rock strength stress ratio again with 1.0~2.5 times of the average excavation span of adjacent cavern as main cavern rock pillar thickness a reference value, at last with 0.5~0.8 times of big cavern height as the verification index.Rock pillar thickness between the underground workshop master cavern is value as follows:
When a) the rock strength stress ratio is low (as 2.0~4.0, the high-ground stress environment), be taken as 2.0~2.5 times of average excavation span of adjacent cavern, and the rock strength stress ratio was near near 2.0 o'clock values higher limit, get during conditions permit as far as possible bigger to reduce the uncertain risk in the construction in later period process, the rock strength stress ratio was near near 4.0 o'clock values lower limit, and whether verification satisfies 0.7~0.8 times index request of big cavern height.According to said method the large hydropower station underground power house rock pillar thickness of Que Dinging is about 50~60m, on average excavates span and approaching than the rock pillar one-tenth-value thickness 1/10 between the main cavern of big cavern high computational by the cavern.
When b) the rock strength stress ratio is medium (as 4.0~7.0, medium ground stress environment), be taken as 1.5~2.0 times of average excavation span of adjacent cavern, and the rock strength stress ratio was near near 4.0 o'clock values higher limit, near near 7.0 o'clock values lower limit, and whether verification satisfied 0.6~0.7 times index request of big cavern height.With the average span 25m in cavern, the large hydropower station underground power house of height 70m is example, according to said method the large hydropower station underground power house rock pillar thickness of Que Dinging is about 40~50m, and on average excavates span and approaching than the rock pillar one-tenth-value thickness 1/10 between the main cavern of big cavern high computational by the cavern.
When c) the rock strength stress ratio is big when (as greater than 7.0), be taken as 1.0~1.5 times of average excavation span of adjacent cavern, and the rock strength stress ratio near 7.0 the time near higher limit value, and whether verification satisfies 0.5~0.6 times index request of big cavern height.Because the deformation failure of surrounding rock of chamber is controlled by the rock mass discontinuity factor mainly under this situation, the rock pillar one-tenth-value thickness 1/10 between the main cavern depends primarily on big cavern height.With the average span 25m in cavern, the large hydropower station underground power house of height 70m is example, and according to said method rock pillar thickness is about 35~40m between the main cavern of Que Dinging.
The method of the rock pillar thickness between definite large underground hole group master cavern that the present invention proposes, recently determine rock pillar thickness between the main cavern according to cavern's size and rock strength stress, its essence is architectural feature, surrounding rock structure feature and the supporting capacity (rock strength) according to underground chamber, the layout design that load characteristics (being geostatic stress) is carried out underground hole group, the problem that can avoid traditional design method to cause.
When definite main cavern hole shape, main cavern generally is divided into underground main building, transformer chamber and down stream surge-chamber three classes.Determine the reasonable hole shape of large underground hole according to rock strength stress, the overall principle is: the weak surrounding rock that the rock strength stress ratio is low should adopt oval or circular cross section; If adopt circular arch stalk shape section, should adopt bigger crown ratio of rise to span (ratio of rise and cavern span).
Being defined as example with the hole shape of large hydropower station underground power house three big caverns specifies.For ease of factors such as construction and crag crane girder structural configuration, underground main building and transformer chamber generally adopt circular arch stalk shape; When the rock strength stress ratio less than 2.0 the time, underground main building and transformer chamber should adopt avette.Down stream surge-chamber generally adopts cylindrical shape and two kinds of arrangements of gallery shape.According to numerical analysis achievement and practical engineering experience, the country rock off-load of the high abutment wall of gallery shape surge-chamber and mid-board is lax and the block stable problem is comparatively outstanding, under the situation of geological conditions complexity, rock strength stress ratio low (as 2.0~4.0), should adopt the cylindrical shape surge-chamber.The crown ratio of rise to span method of determining underground workshop circular arch stalk shape section is: when the rock strength stress ratio is low (as 2.0~4.0), get 1/3.0~1/3.5; (as less than 4.0~7.0) got 1/3.5~1/4.0 when the rock strength stress ratio was medium; When (as greater than 7.0), get 1/4.0~1/4.5 when the rock strength stress ratio is big.
What the present invention proposed determines the method for large underground hole group master cavern hole shape according to the rock strength stress ratio, its essence is the layout design of carrying out underground hole group according to underground rock cavern supporting capacity (rock strength), the problem that can avoid traditional design method to cause.

Claims (6)

1. underground hole group layout design method, at first determine position, main cavern, determine main cavern axis direction then, determine the rock pillar thickness between the main cavern again, determine main cavern hole shape at last, it is characterized in that: when the rock pillar thickness of determining between the main cavern, the rock pillar one-tenth-value thickness 1/10 is 1.0~2.5 times of average excavation span of adjacent main cavern and is 0.5~0.8 times of the greater height in adjacent two main caverns.
2. underground hole group layout design method as claimed in claim 1, it is characterized in that: when position, definite main cavern, if construction ground is location, valley, river, with the brae to massif with interior riverbank geostatic stress be divided into geostatic stress district, river valley, away from the stress control zone primitively of river valley geomorgy, transition region three parts between the said two devices; Geostatic stress district, river valley further is divided into the stress relaxation district of area of stress concentration and a domatic band of riverbed one band again; Brae stress relaxation band and area of stress concentration should be avoided in the position of large underground hole group master cavern, and surpass the extremely unsettled transition of stress area edge of stress distribution.
3. underground hole group layout design method as claimed in claim 1, it is characterized in that: when the rock strength stress ratio is 2.0~4.0, the rock pillar one-tenth-value thickness 1/10 is taken as 2.0~2.5 times of average excavation span of adjacent main cavern, and the rock strength stress ratio was near near 2.0 o'clock values higher limit, the rock strength stress ratio is required to be 0.7~0.8 times of big cavern height simultaneously near near 4.0 o'clock values lower limit; The rock strength stress ratio is 4.0~7.0 o'clock, the rock pillar one-tenth-value thickness 1/10 is taken as 1.5~2.0 times of average excavation span of adjacent cavern, and the rock strength stress ratio near near 7.0 o'clock values lower limit, is required to be 0.6~0.7 times of big cavern height near near 4.0 o'clock values higher limit simultaneously; The rock strength stress ratio is greater than 7.0 o'clock, and the rock pillar one-tenth-value thickness 1/10 is taken as 1.0~1.5 times of average excavation span of adjacent cavern, and the rock strength stress ratio near 7.0 the time near higher limit value, be required to be 0.5~0.6 times of big cavern height simultaneously.
4. as claim 1,2 or 3 described underground hole group layout design methods, it is characterized in that: when definite main cavern hole shape, according to function main cavern is divided into underground main building, transformer chamber and down stream surge-chamber three classes, the hole shape of underground main building and transformer chamber is adopted circular arch stalk shape or avette, and down stream surge-chamber adopts cylindrical shape or gallery shape.
5. underground hole group layout design method as claimed in claim 4 is characterized in that: when the rock strength stress ratio was 2.0~4.0, down stream surge-chamber adopted cylindrical shape; When the rock strength stress ratio less than 2.0 the time, underground main building and transformer chamber adopt avette.
6. underground hole group layout design method as claimed in claim 4, it is characterized in that: the underground main building of circular arch stalk shape and the parameter of transformer chamber are determined in the following ways: the rock strength stress ratio is 2.0~4.0, and the crown ratio of rise to span of circular arch stalk shape section gets 1/3.0~1/3.5; The rock strength stress ratio is 4.0~7.0 o'clock, and the crown ratio of rise to span of circular arch stalk shape section gets 1/3.5~1/4.0; The rock strength stress ratio was greater than 7.0 o'clock, and the crown ratio of rise to span of circular arch stalk shape section gets 1/4.0~1/4.5.
CN201310234313.9A 2013-06-14 2013-06-14 Layout design method of underground cavern group Active CN103266902B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310234313.9A CN103266902B (en) 2013-06-14 2013-06-14 Layout design method of underground cavern group

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310234313.9A CN103266902B (en) 2013-06-14 2013-06-14 Layout design method of underground cavern group

Publications (2)

Publication Number Publication Date
CN103266902A true CN103266902A (en) 2013-08-28
CN103266902B CN103266902B (en) 2015-06-17

Family

ID=49010556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310234313.9A Active CN103266902B (en) 2013-06-14 2013-06-14 Layout design method of underground cavern group

Country Status (1)

Country Link
CN (1) CN103266902B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104005776A (en) * 2014-05-28 2014-08-27 中国电建集团成都勘测设计研究院有限公司 Large-sized underground cavern group arrangement method
CN104005777A (en) * 2014-05-28 2014-08-27 中国电建集团成都勘测设计研究院有限公司 Large-sized underground cavern group arrangement designing method
CN104064233A (en) * 2014-06-13 2014-09-24 长江勘测规划设计研究有限责任公司 Underground nuclear plant with nuclear island cavern groups distributed in L shape
CN106194222A (en) * 2016-09-05 2016-12-07 中国电建集团成都勘测设计研究院有限公司 The underground chamber group structure being applicable under large ground pressure and construction technology thereof
CN106295011A (en) * 2016-08-12 2017-01-04 中国电建集团成都勘测设计研究院有限公司 A kind of method determining large underground hole surrounding rock supporting intensity
CN106638508A (en) * 2016-11-18 2017-05-10 中国电建集团成都勘测设计研究院有限公司 Method for selecting axis of large cavern under high ground stress condition
CN108168921A (en) * 2017-11-23 2018-06-15 中国电建集团华东勘测设计研究院有限公司 Underground hole group Rock pillar stability evaluation method
CN108871262A (en) * 2018-03-23 2018-11-23 长江水利委员会长江科学院 Great burying cavern extrusion pressing type country rock large deformation method of discrimination

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1984002741A1 (en) * 1983-01-14 1984-07-19 Boliden Ab A method in the excavation of underground caverns in rock
JPH03257299A (en) * 1990-03-07 1991-11-15 Ishikawajima Constr Materials Co Ltd Center pillar bearing/replacing construction method in multiple-connected tunnel lining
CN1676880A (en) * 2005-04-20 2005-10-05 太原理工大学 Rock salt deposit horizontal chamber type oil-gas depot and its building method
CN102226403A (en) * 2011-03-30 2011-10-26 中铁一局集团有限公司 Construction method of large-span subway station main body by using arched cover method and station main body structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1578407A1 (en) * 1988-05-12 1990-07-15 Макеевский Инженерно-Строительный Институт Method of restoring mine workings

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1984002741A1 (en) * 1983-01-14 1984-07-19 Boliden Ab A method in the excavation of underground caverns in rock
JPH03257299A (en) * 1990-03-07 1991-11-15 Ishikawajima Constr Materials Co Ltd Center pillar bearing/replacing construction method in multiple-connected tunnel lining
CN1676880A (en) * 2005-04-20 2005-10-05 太原理工大学 Rock salt deposit horizontal chamber type oil-gas depot and its building method
CN102226403A (en) * 2011-03-30 2011-10-26 中铁一局集团有限公司 Construction method of large-span subway station main body by using arched cover method and station main body structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张孝松: "龙滩水电站地下洞室群布置及监控设计", 《岩石力学与工程学报》, vol. 24, no. 21, 15 November 2005 (2005-11-15), pages 3983 - 3989 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104005777A (en) * 2014-05-28 2014-08-27 中国电建集团成都勘测设计研究院有限公司 Large-sized underground cavern group arrangement designing method
CN104005776B (en) * 2014-05-28 2016-03-09 中国电建集团成都勘测设计研究院有限公司 A kind of large-scale underground cavern group arrangement method
CN104005777B (en) * 2014-05-28 2016-08-17 中国电建集团成都勘测设计研究院有限公司 A kind of large-scale underground cavern group arrangement design method
CN104005776A (en) * 2014-05-28 2014-08-27 中国电建集团成都勘测设计研究院有限公司 Large-sized underground cavern group arrangement method
CN104064233A (en) * 2014-06-13 2014-09-24 长江勘测规划设计研究有限责任公司 Underground nuclear plant with nuclear island cavern groups distributed in L shape
CN104064233B (en) * 2014-06-13 2016-08-17 长江勘测规划设计研究有限责任公司 Nuclear island cavity group L-shaped arranges underground nuclear power station
CN106295011B (en) * 2016-08-12 2020-02-04 中国电建集团成都勘测设计研究院有限公司 Method for determining support strength of surrounding rock of large underground cavern
CN106295011A (en) * 2016-08-12 2017-01-04 中国电建集团成都勘测设计研究院有限公司 A kind of method determining large underground hole surrounding rock supporting intensity
CN106194222A (en) * 2016-09-05 2016-12-07 中国电建集团成都勘测设计研究院有限公司 The underground chamber group structure being applicable under large ground pressure and construction technology thereof
CN106638508B (en) * 2016-11-18 2019-03-08 中国电建集团成都勘测设计研究院有限公司 Huge underground cavity axis selection method under large ground pressure
CN106638508A (en) * 2016-11-18 2017-05-10 中国电建集团成都勘测设计研究院有限公司 Method for selecting axis of large cavern under high ground stress condition
CN108168921A (en) * 2017-11-23 2018-06-15 中国电建集团华东勘测设计研究院有限公司 Underground hole group Rock pillar stability evaluation method
CN108871262A (en) * 2018-03-23 2018-11-23 长江水利委员会长江科学院 Great burying cavern extrusion pressing type country rock large deformation method of discrimination
CN108871262B (en) * 2018-03-23 2019-06-18 长江水利委员会长江科学院 Great burying cavern extrusion pressing type country rock large deformation method of discrimination

Also Published As

Publication number Publication date
CN103266902B (en) 2015-06-17

Similar Documents

Publication Publication Date Title
CN103291331A (en) Underground cavern group layout method
CN103266902A (en) Layout design method of underground cavern group
CN103291316A (en) Large-scale underground cavern group arrangement design method
CN103291332A (en) Large-scale underground cavern group arrangement method
Lin et al. Experimental study on cracking, reinforcement, and overall stability of the Xiaowan super-high arch dam
CN104005777B (en) A kind of large-scale underground cavern group arrangement design method
Wu et al. Analysis of working behavior of Jinping-I Arch Dam during initial impoundment
CN102877854B (en) Double-layer molded composite lining for weak surrounding rock tunnel
CN203822325U (en) Steel grating steel arch frame combined support for initial stage of expansibility soil layer tunnel
CN205475257U (en) A composite pile anchor supporting construction for deepening excavation
CN102518147B (en) Anchoring and retaining structure for reducing support height of existing overhigh retaining wall
CN104005776B (en) A kind of large-scale underground cavern group arrangement method
Cheng et al. Stability analysis regarding underground cavern group of Songyang pumped storage power station
CN205171386U (en) Interim mound in aquatic suitable for bridge erection
CN203729280U (en) Water retaining structure of lower sluice gate for blocking lower water head flow-guiding hole
CN201330388Y (en) Pumped storage power station buried steel bifurcated pipe and wall rock union forced structure
Xu et al. Stress and Deformation Analysis for the Concrete Face Rockfill Dam of Wuyue Pumped Storage Power Station
Zheng et al. Research on Seismic Assessment of Gravity Dam Based on Performance Analysis
CN204238191U (en) A kind of arrangement of high water head fish pass
CN2465022Y (en) Permeation-proof underground high-pressure water pipe made of double-layer concrete and steel sheet
CN203614911U (en) Shallow sea reclamation area submarine pipeline protection device
Huang et al. Analysis on the Impact of the Status of the Fresh-Old Concrete Bonding Interface on Dam Safety
An et al. Study on simulation method of prestressed anchor cable reinforcement for large toppling slopes
Lekkas Zipingpu Concrete Face Rockfill Dam Failures caused by the 8.0 R Earthquake on the 12th May 2008 (Chengdu, China)
Chen-tao Analysis on dam safety behavior based on 3D dynamic finite element

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant after: Chengdu Hydroelectric Investigation & Design Institute of SPC

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant before: Chengdu Hydroelectric Investigation & Design Institute of China Hydropower Consu

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF CHINA HYDROPOWER CONSU TO: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC

C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant after: Co., Ltd of Chengdu survey and design academy of electricity Jian group of China

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant before: Chengdu Hydroelectric Investigation & Design Institute of SPC

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC TO: CHINA POWER GROUP CHENGDU INVESTIGATION DESIGN + RESEARCH INSTITUTE CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant