CN103266693A - Integral assembly type composite partition wall seamless mounting structure - Google Patents

Integral assembly type composite partition wall seamless mounting structure Download PDF

Info

Publication number
CN103266693A
CN103266693A CN2013101301035A CN201310130103A CN103266693A CN 103266693 A CN103266693 A CN 103266693A CN 2013101301035 A CN2013101301035 A CN 2013101301035A CN 201310130103 A CN201310130103 A CN 201310130103A CN 103266693 A CN103266693 A CN 103266693A
Authority
CN
China
Prior art keywords
partition wall
partition board
compound
joint
mounting structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101301035A
Other languages
Chinese (zh)
Other versions
CN103266693B (en
Inventor
回中兴
孟青
徐晓军
吴海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haitian Construction Group Co ltd
Original Assignee
Zhejiang Haitian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Haitian Construction Group Co Ltd filed Critical Zhejiang Haitian Construction Group Co Ltd
Priority to CN201310130103.5A priority Critical patent/CN103266693B/en
Publication of CN103266693A publication Critical patent/CN103266693A/en
Application granted granted Critical
Publication of CN103266693B publication Critical patent/CN103266693B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses an integral assembly type composite partition wall seamless mounting structure. A composite partition wall is formed by splicing a plurality of groups of upper sections of partition wall boards and lower sections of partition wall boards, wherein steel columns are arranged between left and right adjacent groups of partition wall boards; cross beams are arranged between upper and lower adjacent groups of partition wall boards; the upper sections of partition wall boards in the upper partition wall board are fixed to a concrete top slab; the lower sections of partition wall boards in the lower partition wall board are fixed to a concrete bottom slab; and the left and right side faces of the composite partition wall are fixed to the structural wall surface and column surface. According to the integral assembly type composite partition wall seamless mounting structure, the problem of high probability of loosening and cracking of the composite partition wall is successfully solved, and meanwhile, the technical problem of high probability of board joint cracking between upper and lower sections of partition wall boards is solved.

Description

The seamless mounting structure of the whole compound partition wall of assembling
Technical field
The present invention relates to the compound partition wall mounting structure of a kind of whole assembling.
Background technology
For the compound partition wall of whole assembling, problem loosening and cracking appears after the installation easily.
And go up the joint partition board in the compound partition wall and be connected by the tenon fourth of the twelve Earthly Branches or bolt usually between the joint partition board down, the problem of slab-joint cracking appears between two partition boards easily.
Summary of the invention
Technical problem to be solved by this invention just provides the seamless mounting structure of the compound partition wall of a kind of whole assembling, solves compound partition wall and occurs problem loosening and cracking easily, solves the technical problem that occurs slab-joint cracking up and down between the two joint partition boards easily simultaneously.
For solving the problems of the technologies described above, the present invention adopts following technical scheme: the seamless mounting structure of the compound partition wall of whole assembling, compound partition wall saves partition board and descends the joint partition board to be spliced on some groups, wherein be provided with steel column between the adjacent two groups of partition boards in the left and right sides, be provided with crossbeam between two groups of neighbouring partition boards, fix and upward save partition board and concrete roof in the partition board of top, saving partition board and concrete floor in the partition board of below down fixes, compound partition wall left and right sides face and structure metope, cylinder is fixed, it is characterized in that: the described joint partition board bottom of going up is provided with connecting pin, the described partition board of joint down top is provided with the steel pin plate, described connecting pin is provided with the forward sawtooth, be provided with cotter way in the described steel pin plate, be provided with reverse sawtooth in the described cotter way, described connecting pin and steel pin plate are fastening by being connected of positive direction sawtooth; Last joint partition board top is fixed by L shaped steel plate and concrete roof, filling concrete mortar in the slit between last joint partition board top and concrete roof, under save the partition board bottom and fix by L shaped steel plate and concrete floor, filling concrete mortar in the slit between following joint partition board bottom and concrete floor; Described steel column is i iron, and wherein i iron left and right sides protuberance is embedded in the compound partition wall, filling concrete mortar in the slit between i iron and compound partition wall; Described crossbeam also is i iron, distance between the protuberance of steel column both sides is greater than the distance between the protuberance of crossbeam both sides, beam-end is fixedly welded on the steel column inner fovea part side, the described crossbeam protuberance of both sides up and down is embedded in the compound partition wall filling concrete mortar in the gap between crossbeam and compound partition wall; Described compound partition wall side is fixed by L shaped steel plate and structure metope, cylinder, filling concrete mortar in the slit between compound partition wall side and structure metope, cylinder, the plate seam surface between compound partition wall side and structure metope, cylinder are provided with the lamination layer structure of grid band and polymer mortar combination.
As preferably, the described joint partition board bottom of going up is provided with link slot, is equipped with steel plate in the described last link slot, and described connecting pin is fixed in the link slot.
As preferably, the described partition board of joint down top is provided with down link slot, and described descending in the link slot is equipped with steel plate, and described steel pin plate is located at down in the link slot, is provided with spring between described two ends, the steel pin plate left and right sides and following link slot left and right sides wall.
As preferably, described forward sawtooth is knuckle-tooth, the described reverse sawtooth side of being tooth.
As preferably, described steel column i iron external surface is smeared one deck Building Adhesive, and the corresponding i iron of described compound partition wall left and right sides protuberance is provided with dovetail groove.
As preferably, fix by nailing between the L shaped steel plate between described compound partition wall side and structure metope, cylinder and structure metope, cylinder.
As preferably, also be provided with expansion bolt between described compound partition wall and structure metope, cylinder and reinforce.
As preferably, described structure metope, cylinder side arrange a L shaped steel plate every 1m, and described expansion bolt is arranged between the two neighbouring L shaped steel plates, and the specification of described expansion bolt is 10mm * 160mm.
As preferably, the described joint both sides, partition board top of going up respectively are provided with a L shaped steel plate, and perhaps L shaped steel plate is arranged on and saves the partition board top middle portion, fixes by nailing between L shaped steel plate and concrete roof.
As preferably, described go up 90 between joint both sides, partition board top and concrete roof the degree corners be additional be pasted with the grid band, fix by nailing between described L shaped steel plate and structure metope, cylinder.
The present invention is connected and fixed by L shaped steel plate between compound partition wall and top concrete top board and bottom concrete floor, recharge cement mortar in the slit simultaneously, successfully solved the loosening problem that reaches cracking of easy appearance between compound partition wall and top concrete top board and the bottom concrete floor.
And, between compound partition wall and structure metope and cylinder, be connected and fixed by L shaped steel plate, recharge cement mortar in the slit simultaneously, plate seam surface between compound partition wall side and structure metope, cylinder is provided with the lamination layer structure of grid band and polymer mortar combination, has successfully solved to occur problem loosening and cracking between compound partition wall and structure metope and the cylinder easily.
Steel column is i-beam structure, wherein is embedded in the compound partition wall at i iron left and right sides protuberance, and filling concrete mortar in the slit between i iron and compound partition wall has so successfully solved the loosening problem that reaches cracking of easy appearance between compound partition wall and the steel column.
Crossbeam and steel column welding meanwhile is fixing, and the protuberance of both sides is embedded in the compound partition wall about the crossbeam, filling concrete mortar in the gap between crossbeam and compound partition wall has so successfully solved the loosening problem that reaches cracking of easy appearance between compound partition wall and the crossbeam.
In addition, the present invention has used the mechanical seamless theory of engagement to connect and has gone up joint partition board and following joint partition board, i.e. connecting pin insertion with the band saw profile of tooth is embedded in the link slot of partition board termination, connecting pin be hidden in flexible fastening by spring of the steel pin plate that has the reverse saw flute profile in the link slot, both are meshing with each other, thereby two sections partition boards are linked to be integral body, it can not only transmit pressure reliably, can also bear moment of flexure, shearing and pulling force, this structure has successfully solved the construction difficult problem of slab-joint cracking.
Description of drawings
Below in conjunction with the drawings and specific embodiments the present invention is further described:
Fig. 1 is first kind of syndeton schematic diagram of last joint partition board and concrete roof;
Fig. 2 is second kind of syndeton schematic diagram of last joint partition board and concrete roof;
Fig. 3 is for saving the syndeton schematic diagram of partition board and concrete floor down;
Fig. 4 is for saving partition board and concrete floor constructing structure schematic diagram down;
Fig. 5 is compound partition wall and structure metope and cylinder syndeton schematic diagram;
Fig. 6 is the structural representation that arranges of expansion bolt between compound partition wall and structure metope and cylinder;
Fig. 7 is compound partition wall and i iron steel column syndeton schematic diagram;
Fig. 8 is compound partition wall and crossbeam syndeton schematic diagram;
Fig. 9 is crossbeam and steel column syndeton vertical view;
Figure 10 is crossbeam and steel column syndeton lateral view;
Figure 11 is last joint partition board and saves partition board syndeton schematic diagram down.
The specific embodiment
Extremely shown in Figure 11 as Fig. 1, compound partition wall 1 saves partition board 10 and descends joint partition board 11 to be spliced on some groups, wherein be provided with steel column 24 between the adjacent two groups of partition boards in the left and right sides, be provided with crossbeam 25 between two groups of neighbouring partition boards, fix with concrete roof 20 and go up the joint partition board in the partition board of top, joint partition board and concrete floor 21 are fixing under in the partition board of below, and compound partition wall left and right sides face and structure metope, cylinder 23 are fixed.
As shown in Figure 1, on to save partition board 10 tops fixing with concrete roof 20 by L shaped steel plate 201, the described joint both sides, partition board 10 top of going up respectively are provided with a L shaped steel plate 201, and are fixing by nailing 202 between L shaped steel plate and concrete roof.Filling concrete mortar 203 in the slit between last joint partition board top and concrete roof.The described additional grid band of going up between joint both sides, partition board top and concrete roof 204 that is pasted with of 90 degree corners.
As shown in Figure 2, the L shaped steel plate that last joint partition board 10 and concrete roof are 20 also can be arranged on joint partition board top middle portion, last joint partition board top middle portion is provided with a dovetail groove, and L shaped steel plate one side is located in the dovetail groove, filling concrete mortar 203 in the dovetail groove.
As shown in Figure 3, following joint partition board bottom is fixing with concrete floor 21 by L shaped steel plate 201, and is fixing by nailing 202 between L shaped steel plate and concrete floor, filling concrete mortar 203 in the slit between following joint partition board bottom and concrete floor.Under save the partition board center bottom and be provided with a dovetail groove, L shaped steel plate one side is located in the dovetail groove, filling concrete mortar 203 in the dovetail groove.Be equipped with surface layer 210 on the concrete floor.
As shown in Figure 4, during the construction of following joint partition board and concrete floor, both sides, following joint partition board 11 bottom are carried on the back tightly by timber wedge 211, and filling concrete mortar 203 in the slit is then withdrawn from timber wedge after arriving intensity at last.
As shown in Figure 5, described compound partition wall side is fixed with structure metope, cylinder by L shaped steel plate 201, fixing by nailing 202 between L shaped steel plate and structure metope, cylinder, filling concrete mortar 203 in the slit between compound partition wall side and structure metope, cylinder, the plate seam surface between compound partition wall side and structure metope, cylinder are provided with the lamination layer structure of grid band 204 and polymer mortar 231 combinations.
As shown in Figure 6, described compound partition wall 1 and structure metope, 23 on cylinder also are provided with expansion bolt 232 reinforcings.Described structure metope, cylinder side arrange a L shaped steel plate every 1m, and described expansion bolt is arranged between the two neighbouring L shaped steel plates, and the specification of described expansion bolt is 10mm * 160mm.
As shown in Figure 7, described steel column is i iron, wherein i iron left and right sides protuberance is embedded in the compound partition wall, filling concrete mortar 203 in the slit between i iron and compound partition wall, described i iron external surface is smeared one deck Building Adhesive 242, and the corresponding i iron of described compound partition wall left and right sides protuberance is provided with dovetail groove.
Extremely shown in Figure 10 as Fig. 8, described crossbeam also is i iron, distance between the protuberance of steel column both sides is greater than the distance between the protuberance of crossbeam both sides, beam-end is fixedly welded on the steel column inner fovea part side, the described crossbeam protuberance of both sides up and down is embedded in the compound partition wall filling concrete mortar 203 in the gap between crossbeam and compound partition wall.
Figure 11 shows the joint partition board and saves the syndeton of partition board down, described joint partition board 10 bottoms of going up are provided with connecting pin 102, the described partition board of joint down 11 tops are provided with steel pin plate 112, described connecting pin 102 is provided with forward sawtooth 103, be provided with cotter way in the described steel pin plate 112, be provided with reverse sawtooth 113 in the described cotter way, described connecting pin 102 and steel pin plate 112 are fastening as a whole by being connected of positive direction sawtooth.Described joint partition board 10 tops of going up are provided with link slot 101, and described going up in the link slot is equipped with steel plate, and described connecting pin 102 is fixed in the link slot.Described following joint partition board 11 bottoms are provided with down link slot 111, are equipped with steel plate in the described following link slot, and described steel pin plate 112 is located at down in the link slot, is provided with spring 114 between described two ends, the steel pin plate left and right sides and following link slot left and right sides wall.Described forward sawtooth is knuckle-tooth, the described reverse sawtooth side of being tooth.
Carry out the link slot of joint partition board and following joint partition board in advance, then connecting pin and steel pin plate are embedded in the link slot of partition board termination, when last joint partition board is connected with following joint partition board, connecting pin inserts in the cotter way of steel pin plate, the positive direction sawtooth is connected, owing to the steel pin plate left and right sides is fastening by telescopic spring, be linked to be integral body thereby will go up the joint partition board and save partition board down simultaneously.
The present invention has used the mechanical seamless theory of engagement to be connected at the joint partition board with following saving between the partition board, namely the connecting pin with the band saw profile of tooth inserts in the following link slot that is embedded in down joint partition board termination, connecting pin be hidden in down the steel pin plate that has the reverse saw flute profile in the link slot and pass through the flexible fastening of spring, both are meshing with each other, thereby two sections partition boards are linked to be integral body, it can not only transmit pressure reliably, can also bear moment of flexure, shearing and pulling force, this structure has successfully solved the construction difficult problem of slab-joint cracking.
In addition, this partition board comprises the plant fiber-cement panel and is located at fibrous concrete in the partition board inner chamber that the plant fiber-cement panel surrounds.Be provided with dividing plate in the described partition board inner chamber, described dividing plate is divided into several holes with the partition board inner chamber, and described fibrous concrete is filled in the hole.Described hole be shaped as regular hexagon, described hole is arranged in cellular.Be provided with interface channel between the described hole, be embedded with bar planting in the described interface channel.The present invention's core material to partition wall on the basis of traditional partition board is improved, be provided with fibrous concrete as the core body synthetic materials, in addition, owing to further be provided with diaphragm structure, further make partition wall have tension, compressive property satisfying on the performance requirements such as sound insulation, insulation, fire prevention, waterproof, environmental protection, also promoted anti-seismic performance.

Claims (10)

1. the seamless mounting structure of the compound partition wall of whole assembling, compound partition wall (1) saves partition board (10) and descends joint partition board (11) to be spliced on some groups, wherein be provided with steel column (24) between the adjacent two groups of partition boards in the left and right sides, be provided with crossbeam (25) between two groups of neighbouring partition boards, and it is fixing upward to save partition board and concrete roof (20) in the partition board of top, it is fixing to save partition board and concrete floor (21) in the partition board of below down, compound partition wall left and right sides face and structure metope, cylinder (23) is fixing, it is characterized in that: the described joint partition board bottom of going up is provided with connecting pin (102), the described partition board of joint down top is provided with steel pin plate (112), described connecting pin is provided with forward sawtooth (103), be provided with cotter way in the described steel pin plate, be provided with reverse sawtooth (113) in the described cotter way, described connecting pin and steel pin plate are fastening by being connected of positive direction sawtooth; Last joint partition board top is fixing by L shaped steel plate (201) and concrete roof (20), filling concrete mortar (203) in the slit between last joint partition board top and concrete roof, under save the partition board bottom and fix filling concrete mortar (203) in the following slit of saving between partition board bottom and concrete floor by L shaped steel plate (201) and concrete floor; Described steel column is i iron, and wherein i iron left and right sides protuberance is embedded in the compound partition wall, filling concrete mortar (203) in the slit between i iron and compound partition wall; Described crossbeam also is i iron, distance between the protuberance of steel column both sides is greater than the distance between the protuberance of crossbeam both sides, beam-end is fixedly welded on the steel column inner fovea part side, the described crossbeam protuberance of both sides up and down is embedded in the compound partition wall filling concrete mortar (203) in the gap between crossbeam and compound partition wall; Described compound partition wall side is fixed by L shaped steel plate (201) and structure metope, cylinder, filling concrete mortar (203) in the slit between compound partition wall side and structure metope, cylinder, the plate seam surface between compound partition wall side and structure metope, cylinder are provided with the lamination layer structure of grid band (204) and polymer mortar (231) combination.
2. the seamless mounting structure of the compound partition wall of whole assembling according to claim 1 is characterized in that: the described joint partition board bottom of going up is provided with link slot (101), is equipped with steel plate in the described last link slot, and described connecting pin is fixed in the link slot.
3. the seamless mounting structure of the compound partition wall of whole assembling according to claim 2, it is characterized in that: the described partition board (11) of joint down top is provided with down link slot (111), be equipped with steel plate in the link slot under described, described steel pin plate (112) is located at down in the link slot, is provided with spring (114) between described two ends, the steel pin plate left and right sides and following link slot left and right sides wall.
4. the seamless mounting structure of the compound partition wall of whole assembling according to claim 3, it is characterized in that: described forward sawtooth is knuckle-tooth, the described reverse sawtooth side of being tooth.
5. the seamless mounting structure of the compound partition wall of whole assembling according to claim 1, it is characterized in that: described steel column i iron external surface is smeared one deck Building Adhesive (252), and the corresponding i iron of described compound partition wall left and right sides protuberance is provided with dovetail groove.
6. the seamless mounting structure of the compound partition wall of whole assembling according to claim 1 is characterized in that: fixing by nailing (202) between the L shaped steel plate between described compound partition wall side and structure metope, cylinder and structure metope, cylinder.
7. the seamless mounting structure of the compound partition wall of whole assembling according to claim 6 is characterized in that: also be provided with expansion bolt (232) between described compound partition wall (1) and structure metope, cylinder (23) and reinforce.
8. the seamless mounting structure of the compound partition wall of whole assembling according to claim 7, it is characterized in that: described structure metope, cylinder side arrange a L shaped steel plate every 1m, described expansion bolt is arranged between the two neighbouring L shaped steel plates, and the specification of described expansion bolt is 10mm * 160mm.
9. the seamless mounting structure of the compound partition wall of whole assembling according to claim 1, it is characterized in that: the described joint both sides, partition board top of going up respectively are provided with a L shaped steel plate, perhaps L shaped steel plate is arranged on joint partition board top middle portion, and is fixing by nailing (202) between L shaped steel plate and concrete roof.
10. the seamless mounting structure of the compound partition wall of whole assembling according to claim 9, it is characterized in that: the described 90 degree corners of going up between joint both sides, partition board top and concrete roof add and are pasted with grid band (204), and are fixing by nailing (202) between described L shaped steel plate and structure metope, cylinder.
CN201310130103.5A 2013-04-15 2013-04-15 Integral assembly type composite partition wall seamless mounting structure Active CN103266693B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310130103.5A CN103266693B (en) 2013-04-15 2013-04-15 Integral assembly type composite partition wall seamless mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310130103.5A CN103266693B (en) 2013-04-15 2013-04-15 Integral assembly type composite partition wall seamless mounting structure

Publications (2)

Publication Number Publication Date
CN103266693A true CN103266693A (en) 2013-08-28
CN103266693B CN103266693B (en) 2015-02-25

Family

ID=49010347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310130103.5A Active CN103266693B (en) 2013-04-15 2013-04-15 Integral assembly type composite partition wall seamless mounting structure

Country Status (1)

Country Link
CN (1) CN103266693B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104746772A (en) * 2015-04-16 2015-07-01 重庆建工第三建设有限责任公司 Ash concrete hollow partition board anti-cracking construction method
CN107178162A (en) * 2017-05-23 2017-09-19 山东佳德泓实业有限公司 One kind exempts from paint energy-saving wall board and its mounting process

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2415073Y (en) * 2000-03-15 2001-01-17 林保财 Partition panel without need of scarf strip
JP2001107496A (en) * 1999-10-12 2001-04-17 Sekisui Chem Co Ltd Partition panel mounting structure and method
CN1970914A (en) * 2006-12-13 2007-05-30 北京城建集团有限责任公司 Steel structure assisted layered installation and construction method for superhigh PRC partition plate
CN201778419U (en) * 2010-06-24 2011-03-30 成都建筑工程集团总公司 Fixing and mounting structure for partition board and wall cylindrical surface
CN201785904U (en) * 2010-09-28 2011-04-06 江苏崇佑新型建材有限公司(外商独资) Connecting device for partition wall
CN102797309A (en) * 2012-09-11 2012-11-28 朱孝元 Building partition wall with easy disassembly and assembly
CN102251606B (en) * 2011-04-26 2013-03-20 北京城建五建设工程有限公司 Outer partition wall built by adopting light concrete partition wall boards and construction method thereof
CN203145250U (en) * 2013-04-15 2013-08-21 浙江海天建设集团有限公司 Integrally assembled composite partition wall seamless mounting structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001107496A (en) * 1999-10-12 2001-04-17 Sekisui Chem Co Ltd Partition panel mounting structure and method
CN2415073Y (en) * 2000-03-15 2001-01-17 林保财 Partition panel without need of scarf strip
CN1970914A (en) * 2006-12-13 2007-05-30 北京城建集团有限责任公司 Steel structure assisted layered installation and construction method for superhigh PRC partition plate
CN201778419U (en) * 2010-06-24 2011-03-30 成都建筑工程集团总公司 Fixing and mounting structure for partition board and wall cylindrical surface
CN201785904U (en) * 2010-09-28 2011-04-06 江苏崇佑新型建材有限公司(外商独资) Connecting device for partition wall
CN102251606B (en) * 2011-04-26 2013-03-20 北京城建五建设工程有限公司 Outer partition wall built by adopting light concrete partition wall boards and construction method thereof
CN102797309A (en) * 2012-09-11 2012-11-28 朱孝元 Building partition wall with easy disassembly and assembly
CN203145250U (en) * 2013-04-15 2013-08-21 浙江海天建设集团有限公司 Integrally assembled composite partition wall seamless mounting structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104746772A (en) * 2015-04-16 2015-07-01 重庆建工第三建设有限责任公司 Ash concrete hollow partition board anti-cracking construction method
CN107178162A (en) * 2017-05-23 2017-09-19 山东佳德泓实业有限公司 One kind exempts from paint energy-saving wall board and its mounting process

Also Published As

Publication number Publication date
CN103266693B (en) 2015-02-25

Similar Documents

Publication Publication Date Title
EP3865631B1 (en) Assembled floor slab-type steel/wood combination joint and assembly method therefor
CN203145250U (en) Integrally assembled composite partition wall seamless mounting structure
CN104763085B (en) The double T floor frames structures of assembled integral prestressing force and its construction method
CN102444224A (en) Concrete composite shear wall
CN202831295U (en) Prefabricated concrete shear wall provided with unbounded built-in steel plate eccentric supports
CN203145249U (en) Integrally assembled composite partition wall
CN103015572A (en) Connecting method for wall body and floor slab and special connecting structure as well as quick-assembled house
CN103912133B (en) Vierendeel girder transverse stretching pre-stressed carbon fiber sheet material reinforcement means
CN103266692B (en) Top and bottom mounting structure for composite partition
CN211690922U (en) High-performance autoclaved aerated concrete integrated plate outer wall structure for prefabricated building
CN103266693B (en) Integral assembly type composite partition wall seamless mounting structure
CN201526105U (en) Novel chamber ''#''-shaped grid combination floor
CN103266699B (en) Seamless mounting method for integral assembled composite partition walls
CN203145244U (en) Widening and heighten structure of composite partition wall
CN204983396U (en) Bamboo - aerated concrete combination beam
CN103266691B (en) Widened and heightened structure for compound partition wall
CN107355027B (en) Section steel concrete shear wall assembly type space modularized structural system and construction method
CN108487549B (en) Assembled function-recoverable steel skeleton concrete combined column and mounting method
CN103266696B (en) Connecting process for composite partition, steel column and crossbeam
CN104989010A (en) Connecting method for bamboo wood prefabricated wallboards
CN203145251U (en) Connecting structure of composite partition wall and structural wall face and post face
CN103266695B (en) Connecting structure for composite partition and steel column
CN103266694B (en) Connecting structure for composite partition and structural wall and cylinder
CN213013896U (en) Expansion joint device for bridge construction
CN203145252U (en) Composite partition wall-steel post connecting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 55, Wu Ning Xi Road, Dongyang City, Jinhua, Zhejiang

Patentee after: HAITIAN CONSTRUCTION GROUP Co.,Ltd.

Address before: No. 55, Wu Ning Xi Road, Dongyang City, Jinhua, Zhejiang

Patentee before: ZHEJIANG HAITIAN CONSTRUCTION GROUP Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Seamless installation structure of integral assembly composite partition wall

Granted publication date: 20150225

Pledgee: Dongyang Branch of China Construction Bank Co.,Ltd.

Pledgor: HAITIAN CONSTRUCTION GROUP Co.,Ltd.

Registration number: Y2024980019617