CN103255924B - 钢筋砼剪力墙或柱立筋安装限位装置及其安装方法 - Google Patents

钢筋砼剪力墙或柱立筋安装限位装置及其安装方法 Download PDF

Info

Publication number
CN103255924B
CN103255924B CN201310134984.8A CN201310134984A CN103255924B CN 103255924 B CN103255924 B CN 103255924B CN 201310134984 A CN201310134984 A CN 201310134984A CN 103255924 B CN103255924 B CN 103255924B
Authority
CN
China
Prior art keywords
stud
wall
gag lever
lever post
limiting rods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310134984.8A
Other languages
English (en)
Other versions
CN103255924A (zh
Inventor
谢利平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry 22 Construction Co Ltd
Original Assignee
China Nuclear Industry 22 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry 22 Construction Co Ltd filed Critical China Nuclear Industry 22 Construction Co Ltd
Priority to CN201310134984.8A priority Critical patent/CN103255924B/zh
Publication of CN103255924A publication Critical patent/CN103255924A/zh
Application granted granted Critical
Publication of CN103255924B publication Critical patent/CN103255924B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

一种钢筋砼剪力墙或柱立筋安装限位装置及方法,它包括立筋保护层限位杆和墙体厚度限位杆,立筋保护层限位杆焊接于墙体厚度限位杆内侧,两者形成墙体立筋限位装置骨架,立筋保护层限位杆内侧位于墙体厚度限位杆之间设有限位杆连接件,立筋保护层限位杆和限位杆连接件之间间隔设有多对立筋纵向间距限位杆,每对立筋纵向间距限位杆之间垂直设有一对立筋横向间距限位杆。本发明施工方便,操作灵活,能够大幅提高混凝土浇筑完成之后立筋的定位精度,能同时控制立筋的纵向和横向两个方向的定位。

Description

钢筋砼剪力墙或柱立筋安装限位装置及其安装方法
技术领域
本发明属于钢筋砼剪力墙或柱立筋安装限位装置及其安装方法。
背景技术
现有的钢筋混凝土剪力墙或柱子立筋的设置如图1-2所示,图中附图标记6、7分别指代墙体水平筋和墙体立筋,其限位一般是通过立筋外侧的水平钢筋的保护层来控制,其缺点是:该方法只能控制墙体或柱子立筋横向位置,立筋纵向位置无法控制。现有的水平钢筋保护层一般是采用混凝土垫块或是塑料垫块来控制,在墙体模板安装过程,容易出现垫块损坏,导致墙体钢筋保护层不够,或是立筋往墙体中心方向偏移,导致墙体钢筋保护层过大,均不满足设计要求,影响下一道工序施工,需要通过钢筋矫正来进行处理,花费大量的人力物力。
发明内容
本发明要解决的技术问题是提供一种钢筋砼剪力墙或柱立筋安装限位装置及其安装方法,其根据钢筋混凝土墙体的厚度或柱子的宽度,墙体或柱子立筋的间距,钢筋直径以及保护层的大小,设置一种定型的“模板”来控制墙体或柱子立筋的位置,以提高墙体或柱子立筋的定位精度和工程的施工质量。
本发明采用的技术方案:
一种钢筋砼剪力墙或柱立筋安装限位装置,它包括立筋保护层限位杆和墙体厚度限位杆,立筋保护层限位杆焊接于墙体厚度限位杆内侧,两者形成墙体立筋限位装置骨架,立筋保护层限位杆内侧位于墙体厚度限位杆之间设有限位杆连接件,立筋保护层限位杆和限位杆连接件之间间隔设有多对立筋纵向间距限位杆,每对立筋纵向间距限位杆之间垂直设有一对立筋横向间距限位杆。
上述述立筋纵向间距限位杆在纵向方向上的对数为4对。
一种钢筋砼剪力墙或柱立筋安装限位装置的安装方法,在每一次墙体模板安装之前,将该限位装置安装于该层墙体水平施工缝之上,夹在墙体两侧模板之间,墙体立筋从限位装置中指定的位置***,控制混凝土顶部即墙体水平施工缝处立筋根部的位置,从而能够提高墙体立筋的定位精度。
本发明取得的技术效果:
1、本发明施工方便,操作灵活,能够大幅提高混凝土浇筑完成之后立筋的定位精度,能同时控制立筋的纵向和横向两个方向的定位,并且每根立筋的安装精度能控制在5mm以内,确保墙体钢筋的保护层满足设计要求,从根本上避免了立筋施工后不再需要进行矫正的问题,节约施工成本;并且该定限位装置能作周转工具,重复使用;
2、  本发明中的两根立筋保护层限位杆1的外包尺寸即为立筋的保护层,通过控制立
筋的保护层进而控制立筋外侧水平筋的保护层,能避免钢筋保护层过大或过小问题。
附图说明
图1为现有技术中墙体钢筋平面布置图;
图2为现有技术中墙体钢筋平面布置图;
图3为本发明的结构示意图。
具体实施方式
下面结合附图对本发明的实施方式做进一步的说明。
参见图3,一种钢筋砼剪力墙或柱立筋安装限位装置,它包括立筋保护层限位杆1和墙体厚度限位杆5,立筋保护层限位杆焊接于墙体厚度限位杆内侧,两者形成墙体立筋限位装置骨架,立筋保护层限位杆内侧位于墙体厚度限位杆之间设有限位杆连接件4,立筋保护层限位杆和限位杆连接件之间间隔设有多对(优选4对)立筋纵向间距限位杆2,每对立筋纵向间距限位杆之间垂直设有一对立筋横向间距限位杆3。
钢筋砼剪力墙立筋安装限位装置的安装方法,在每一次墙体模板安装之前,将该限位装置安装于该层墙体的水平施工缝之上,夹在墙体两侧模板之间,墙体立筋从限位装置中指定的位置(比如位于立筋纵向间距限位杆2和立筋横向间距限位杆3之间形成的小方格内)***,控制混凝土顶部即墙体水平施工缝处立筋根部的位置,从而能够提高墙体立筋的定位精度。每一个钢筋混凝土剪力墙立筋限位装置,最短需要进行两根纵向立筋的分隔,最长不限,可根据墙体或柱子的钢筋数量和钢筋直径进行确定,方便现场施工即可。同样的方法也适用于柱体的施工。
根据钢筋混凝土剪力墙立筋最容易出现的定位问题,如混凝土浇筑完成之后,立筋最容易出现保护层不够或是偏位问题,该立筋安装限位装置能有针对性地进行预防。
该发明的工作原理:根据钢筋混凝土墙体的厚度、墙体立筋的间距、钢筋直径以及保护层的大小,设置一种限位装置来控制墙体立筋的位置。限位装置的长度可根据需要确定,一般情况下,对于墙体可按四根立筋的纵向长度考虑。在每一次墙体模板安装之前,将该限位装置安装于该层墙体水平施工缝之上,夹在墙体两侧模板之间,墙体立筋从定型“模板”中指定的位置***,控制混凝土顶部即墙体水平施工缝处立筋根部的位置,能够提高墙体立筋的定位精度。

Claims (3)

1.一种钢筋砼剪力墙或柱立筋安装限位装置,其特征在于:它包括立筋保护层限位杆(1)和墙体厚度限位杆(5),立筋保护层限位杆焊接于墙体厚度限位杆内侧,两者形成墙体立筋限位装置骨架,立筋保护层限位杆内侧位于墙体厚度限位杆之间设有限位杆连接件(4),立筋保护层限位杆和限位杆连接件之间间隔设有多对立筋纵向间距限位杆(2),每对立筋纵向间距限位杆之间垂直设有一对立筋横向间距限位杆(3)。
2.如权利要求1所述的钢筋砼剪力墙或柱立筋安装限位装置,其特征在于:所述立筋纵向间距限位杆在纵向方向上的对数为4对。
3.权利要求1或2所述的钢筋砼剪力墙或柱立筋安装限位装置的安装方法,其特征在于:在每一次墙体模板安装之前,将该限位装置安装于该层墙体水平施工缝之上,夹在墙体两侧模板之间,墙体立筋从限位装置中指定的位置***,控制混凝土顶部即墙体水平施工缝处立筋根部的位置,从而能够提高墙体立筋的定位精度。
CN201310134984.8A 2013-04-18 2013-04-18 钢筋砼剪力墙或柱立筋安装限位装置及其安装方法 Active CN103255924B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310134984.8A CN103255924B (zh) 2013-04-18 2013-04-18 钢筋砼剪力墙或柱立筋安装限位装置及其安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310134984.8A CN103255924B (zh) 2013-04-18 2013-04-18 钢筋砼剪力墙或柱立筋安装限位装置及其安装方法

Publications (2)

Publication Number Publication Date
CN103255924A CN103255924A (zh) 2013-08-21
CN103255924B true CN103255924B (zh) 2015-06-10

Family

ID=48960107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310134984.8A Active CN103255924B (zh) 2013-04-18 2013-04-18 钢筋砼剪力墙或柱立筋安装限位装置及其安装方法

Country Status (1)

Country Link
CN (1) CN103255924B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447982B (zh) * 2016-05-30 2019-06-14 五冶集团上海有限公司 一种钢筋混凝土标准层水平方向施工缝衔接方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0791064A (ja) * 1993-09-28 1995-04-04 Tokyo Tekko Co Ltd 鉄筋篭の組立方法および組立装置
JP2001220858A (ja) * 2000-02-08 2001-08-17 Oji Steel Co Ltd コンクリート補強体及びその組立方法
CN201649666U (zh) * 2010-01-04 2010-11-24 江苏江中集团有限公司 一种制作柱体钢筋框架的定位支架
CN202578006U (zh) * 2012-05-30 2012-12-05 陕西建工集团第一建筑工程有限公司 绑扎钢筋用定位结构
CN202689345U (zh) * 2012-05-25 2013-01-23 中国华冶科工集团有限公司 剪力墙竖向钢筋限位件
CN203222999U (zh) * 2013-04-18 2013-10-02 中国核工业第二二建设有限公司 钢筋砼剪力墙或柱立筋安装限位装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0791064A (ja) * 1993-09-28 1995-04-04 Tokyo Tekko Co Ltd 鉄筋篭の組立方法および組立装置
JP2001220858A (ja) * 2000-02-08 2001-08-17 Oji Steel Co Ltd コンクリート補強体及びその組立方法
CN201649666U (zh) * 2010-01-04 2010-11-24 江苏江中集团有限公司 一种制作柱体钢筋框架的定位支架
CN202689345U (zh) * 2012-05-25 2013-01-23 中国华冶科工集团有限公司 剪力墙竖向钢筋限位件
CN202578006U (zh) * 2012-05-30 2012-12-05 陕西建工集团第一建筑工程有限公司 绑扎钢筋用定位结构
CN203222999U (zh) * 2013-04-18 2013-10-02 中国核工业第二二建设有限公司 钢筋砼剪力墙或柱立筋安装限位装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
控制剪力墙钢筋位移的技术措施;李学军;《山西建筑》;20060731;第32卷(第13期);第125~126页 *

Also Published As

Publication number Publication date
CN103255924A (zh) 2013-08-21

Similar Documents

Publication Publication Date Title
CN105888108B (zh) 内置定位预制件钢筋混凝土剪力墙及施工方法
CN103669655B (zh) 变形缝两侧墙体混凝土浇筑施工工艺
CN104002377B (zh) 一种预制箱梁钢筋绑扎及波纹管定位装置
CN204920990U (zh) 一种隧道二衬钢筋定位卡具
CN203888030U (zh) 一种定位装置
CN203257105U (zh) 组装式钢筋***
CN106592867B (zh) 一种钢筋混凝土梁的建造方法
CN202706332U (zh) 一种型钢混凝土组合结构柱脚
CN204459477U (zh) 一种预埋管道固定支架
CN207277691U (zh) 一种混凝土柱模板定位装置
CN203613727U (zh) 一种墙体钢筋控制器
CN103255924B (zh) 钢筋砼剪力墙或柱立筋安装限位装置及其安装方法
CN206397137U (zh) 一种框架柱模板加固装置
CN204385921U (zh) 清水混凝土墙柱插筋固定装置
CN203222999U (zh) 钢筋砼剪力墙或柱立筋安装限位装置
CN103921347B (zh) 预制t梁肋板钢筋、预应力管道固定抽插式安装模架
CN203613729U (zh) 一种波纹管精确定位装置
CN106400687B (zh) 一种墩柱钢筋定位辅助胎架
CN205444915U (zh) 一种现浇混凝土结构电子测温计保护装置
CN211846865U (zh) 吊装波纹管的装置
CN202644563U (zh) 小型设施预埋地脚螺栓安装装置
CN203270950U (zh) 一种控制剪力墙两侧水平分布筋位置的装置
CN109322446A (zh) 梁中预应力筋的定位装置及定位方法
CN104131631B (zh) 一种抗震框架顶层端节点构造的施工方法
CN206143641U (zh) 一种连续刚构桥竖向预应力定位装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant