CN103255836B - Bamboo cable structure unit - Google Patents

Bamboo cable structure unit Download PDF

Info

Publication number
CN103255836B
CN103255836B CN201310161674.5A CN201310161674A CN103255836B CN 103255836 B CN103255836 B CN 103255836B CN 201310161674 A CN201310161674 A CN 201310161674A CN 103255836 B CN103255836 B CN 103255836B
Authority
CN
China
Prior art keywords
bamboo
beam column
steel beam
steel
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310161674.5A
Other languages
Chinese (zh)
Other versions
CN103255836A (en
Inventor
傅宇光
邵本顺
符申超
陈世鸣
王鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201310161674.5A priority Critical patent/CN103255836B/en
Publication of CN103255836A publication Critical patent/CN103255836A/en
Application granted granted Critical
Publication of CN103255836B publication Critical patent/CN103255836B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention belongs to Structural Engineering field, relate to a kind of newly can form of structure---the bamboo Cable Structure unit of extensive use.This element of construction comprises bamboo bar, cable wire, requires to be connected to arch between described bamboo bar by the first steel beam column, pin, cement mortar according to span.Bamboo is encircleed two pin o'clock and is connected with cable wire with cement mortar by the second steel beam column.Cable wire is anchored on steel beam column by ground tackle.Form of structure proposed by the invention can be used in and manyly need in the middle of large span component, utilizes bamboo to encircle and imposed load is changed into axial force and provides counter-force by the drawknot of cable wire, form a kind of structural system of self-balancing.

Description

Bamboo Cable Structure unit
Technical field
The invention belongs to Structural Engineering field in the middle of civil engineering, relate to a kind of novel bamboo Cable Structure unit.
Background technology
Bamboo structure is applied more and more wider in the middle of present building, and many small-sized buildings are built by bamboo structure.Bamboo structure has environmental protection, and lightweight has stronger axial push-pull mechanical property simultaneously, so in some provisional buildings, or in the middle of more small-sized building, Application comparison is extensive.Simultaneously the mode of construction of Bamboo structural building is also fairly simple, and the concrete that node processing is relatively common and steel work are also easily a lot, and this construction speed making bamboo structure small building is also than comparatively fast.
Apply more widely although Bamboo structural building has had, but its application is still limited in the middle of more small-sized temporary building at present, seldom have the Bamboo structural building that span is larger, very large reason is that can be applied in the middle of the larger structure of span large across supporting member because the feature of bamboo wood itself is difficult to make.The dome in the India shop in the middle of World Expo makes of bamboo wood, and its establishment utilizing bamboo wood mutual defines large across bamboo structure, but way is cumbersome, does not have applicability widely.So it is very important to design a kind of bamboo structure bearing carrier that the range of application of bamboo structure can be made to be extended in the middle of the larger building of span newly.
Summary of the invention
The object of the invention is to the defect for overcoming prior art and provide a kind of novel bamboo Cable Structure unit, this element can be used in larger load-bearing place of Bamboo structural building span, and bamboo wood can be applied in relatively large building.
For achieving the above object, the present invention is by the following technical solutions:
In order to meet the requirement of large span, and give full play to the rift grain Anti-pull-press performance of bamboo wood, bamboo wood is curved arcuation, if span is excessive, can connector be utilized to couple together according to the curved good bamboo bar of curvature on multistage bamboo bar, form a complete arch.Wherein the connection of two sections of bamboo bars inserts bending steel beam column in the middle of adopting, and stamps pin in bamboo bar junction symmetry, through steel beam column, is used for fixing steel beam column at junction joints cement mortar simultaneously.In order to resist the horizontal thrust at bamboo arch bipod place, in the middle of bipod, use cable wire drawknot.Steel bushing part is enclosed within the pin of bamboo arch, and inner joints cement mortar, cable wire is anchored on steel beam column.The present invention mainly utilizes the Anti-pull-press ability of former bamboo, utilizes connector to make the arch structure of large span former bamboo, and utilizes cable wire drawknot to make it form the bamboo cable elements of self-balancing at bipod place.This element can much use by Pin, jointly as the skeleton of large span architecture dome.
A kind of bamboo Cable Structure unit that the present invention proposes, comprises bamboo bar, cable wire, cement mortar, the first steel beam column, the second steel beam column, steel pin nail and ground tackle, wherein: described multistage bamboo bar span as requested, curves suitable curvature; The junction, end of two sections of adjacent bamboo bars is inserted at the two ends of the first steel beam column respectively, and the junction, end of two sections of bamboo bars and the first steel beam column are followed closely fixing by steel pin, and the junction of the junction inwall of two sections of bamboo bars and the first steel beam column is fixed by cement mortar; Multistage bamboo bar connects and composes arch bamboo bar successively; On the bamboo arch springing of arch bamboo bar, cover has the second steel beam column, and the bamboo arch springing of arch bamboo bar and the second steel beam column junction are fixed by cement mortar, and connected by cable wire between two bamboo arch springings of arch bamboo bar, described cable wire is fixed on bamboo arch springing by ground tackle.
In the present invention, described first steel beam column is two sections of adjacent bamboo bars curve suitable curvature steel pipe in the flexibility of junction.
In the present invention, the junction, end of described first steel beam column and bamboo bar is reserved with pin hole.
In the present invention, described steel pin nail is from top to bottom successively through the reserved pin hole on the pin hole of the junction, end of bamboo bar and the first steel beam column, the reserved pin hole of the opposite side connected everywhere from the end of bamboo bar again passes, and described steel pin nail is arranged vertically with bamboo bar and the first steel beam column.
In the present invention, described second steel beam column is steel bushing part.
According to span needs, determine the shape that bamboo is encircleed and concrete size.Bamboo bar is curved required shape, and the first steel beam column diameter being less than bamboo bar stretches into bamboo bar depths, avoids contacting with ring place, and plugs steel pin nail and fixed by the first steel beam column, two sections of bamboo bars is connected.In order to fix the first steel beam column better, by joints cement mortar in the bamboo bar of junction.Thus form intactly bamboo arch.
Second steel beam column and steel bushing are enclosed within two arch springing places, then utilize ground tackle to fix cable wire, finally joints cement mortar in the second steel beam column is used for fixing bamboo arch, thus forms intactly bamboo Cable Structure unit.
The present invention has following beneficial effect:
As the dome frame member of large-span structure, roof truss members can be similar to and be applied in the middle of the larger Bamboo structural building of span, expanded the range of application of Bamboo structural building.
Accompanying drawing explanation
Fig. 1 is overall schematic of the present invention.
Fig. 2 is bamboo arch connected node schematic diagram in the present invention.
Fig. 3 is this use Novel bamboo arch arch springing schematic diagram.
Fig. 4 is the application schematic diagram of the present invention at long-span roof.
Fig. 5 be the present invention large across the application schematic diagram on dome.
Fig. 6 is the application schematic diagram of the present invention in large-span structure top cover.
Fig. 7 is the application schematic diagram of the present invention in cantilevered structure.
Number in the figure: 1 is bamboo bar, 2 is cable wire, and 3 is the first steel beam column, and 4 is pin, and 5 is cement mortar, and 6 is the second steel beam column, and 7 is ground tackle.
Detailed description of the invention
Below in conjunction with accompanying drawing illustrated embodiment, the present invention is further illustrated.
Embodiment 1: a kind of bamboo Cable Structure unit, comprises bamboo bar 1, cable wire 2, first steel beam column 3, pin 4, cement mortar 5, second steel beam column 6, ground tackle 7 as shown in Figure 1.Be illustrated in figure 1 a complete bamboo Cable Structure unit.Fig. 2 is the connected node between bamboo bar.First steel beam column 3 and reserved pin hole on bamboo bar 1, pin 4 is through pin hole reserved on bamboo bar 1, again through the first steel beam column 3, pass from the pin hole of bamboo bar 1 opposite side again, its direction of insertion is vertical with bamboo bar 1 with the first steel beam column 3, pin 4 by upper under be inserted in the first steel beam column 3 and bamboo bar 1 successively, as shown in Figure 2.Fig. 3 is the node schematic diagram of bamboo arch springing.Second steel beam column 6 is enclosed within bamboo arch springing, and utilizes ground tackle 7 to be anchored on the second steel beam column 6 by cable wire before clearance position joints cement mortar 5 fixes bamboo arch joints cement mortar 5.
As shown in Figure 4, by placed side by side for a few Pin of bamboo Cable Structure unit, and it is overall every Pin to be connected and fixed formation, and the skeleton that can be used as long-span roof uses.As shown in Figure 5, each Pin bamboo Cable Structure unit is rotated placement centered by summit, and edge ring bars connects into an entirety, and summit colligation, thus is formed greatly across the skeleton of dome together.As shown in Figure 6, this is the application of super-span structure top cover.First by some Pin bamboo Cable Structure unit at end winding support on steel loop, and with annular connecting rod, each Pin bamboo Cable Structure unit to be fixed, forms an entirety.As shown in Figure 7, by vertically placed side by side for a few Pin bamboo Cable Structure unit, upper end utilizes rod member to connect together, and bottom anchoring forms canopy formula structure of encorbelmenting on the ground.
Above-mentioned is can understand and apply the invention product for ease of those skilled in the art to the description of embodiment.Person skilled in the art obviously easily can make various amendment to these embodiments, and General Principle described herein is applied in other embodiments and need not through performing creative labour.Therefore, the invention is not restricted to embodiment here, those skilled in the art, according to announcement of the present invention, do not depart from improvement that scope makes and amendment all should within protection scope of the present invention.

Claims (5)

1. a bamboo Cable Structure unit, comprise bamboo bar, cable wire, cement mortar, the first steel beam column, the second steel beam column, steel pin nail and ground tackle, it is characterized in that: 1) bamboo component consists of arch bamboo component by multistage bamboo bar, in order to realize the building requirements compared with large span, according to the span of design, every section of bamboo bar curves suitable curvature; Adjacent two sections of bamboo bars adopt the first steel beam column to link together, the junction, end of two sections of adjacent bamboo bars is inserted at the two ends of the first steel beam column respectively, two sections of bamboo bars and the first steel beam column are followed closely fixing by steel pin, and the junction inwall of two sections of bamboo bars and the first steel beam column are fixed by cement mortar; Multistage bamboo bar connects and composes arch bamboo bar successively;
2) described cable wire and bamboo component adopt two the second steel beam column to link together, second steel beam column two ends connect bamboo component arch springing and cable wire end respectively, and the bamboo arch springing of arch bamboo bar and the second steel beam column junction are fixed by cement mortar, cable wire component is connected and fixed by ground tackle and the second steel beam column;
3) cable wire is adopted to be the horizontal thrust of encircleing bipod place in order to resist bamboo between two bamboo arch springings, the bending resistance utilizing bamboo bar to have and Anti-pull-press ability, utilize connector to make the arch structure of large span on bamboo bar, and utilize at bipod place cable wire drawknot to make it form the bamboo cable elements of self-balancing.
2. bamboo Cable Structure unit according to claim 1, is characterized in that described first steel beam column is the steel pipe curving suitable curvature according to two sections of adjacent bamboo bars in the flexibility of junction.
3. bamboo Cable Structure unit according to claim 1, is characterized in that the junction, end of described first steel beam column and bamboo bar is reserved with pin hole.
4. bamboo Cable Structure unit according to claim 3, it is characterized in that described steel pin nail from top to bottom successively through the reserved pin hole on the reserved pin hole of junction, end of bamboo bar and the first steel beam column, pass from the reserved pin hole of the opposite side of bamboo bar again, and described steel pin nail is arranged vertically with bamboo bar and the first steel beam column.
5. bamboo Cable Structure unit according to claim 1, is characterized in that described second steel beam column is steel bushing part.
CN201310161674.5A 2013-05-06 2013-05-06 Bamboo cable structure unit Expired - Fee Related CN103255836B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310161674.5A CN103255836B (en) 2013-05-06 2013-05-06 Bamboo cable structure unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310161674.5A CN103255836B (en) 2013-05-06 2013-05-06 Bamboo cable structure unit

Publications (2)

Publication Number Publication Date
CN103255836A CN103255836A (en) 2013-08-21
CN103255836B true CN103255836B (en) 2015-07-29

Family

ID=48960019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310161674.5A Expired - Fee Related CN103255836B (en) 2013-05-06 2013-05-06 Bamboo cable structure unit

Country Status (1)

Country Link
CN (1) CN103255836B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469890B (en) * 2013-09-26 2016-03-30 南京林业大学 A kind of bamboo structure Reticulated Domes and assemble method
CN108331199B (en) * 2018-04-09 2023-09-22 南京林业大学 Assembled raw bamboo wall body and combined wall and preparation method thereof
CN111926678B (en) * 2020-07-15 2021-11-16 四川绿建西宜建设工程有限公司 Outdoor bamboo arch device and installation method
CN113622524B (en) * 2021-08-17 2022-11-25 山东华亿钢机股份有限公司 Large-span arc-shaped steel structure without support in middle and construction method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4143502A (en) * 1975-07-14 1979-03-13 Wyche Cyril T Method of erecting a structural arch support
CN85200602U (en) * 1985-04-11 1987-05-27 郑锡宝 Light bamboo truss for tile roof
JPH1162110A (en) * 1997-08-07 1999-03-05 Fujita Corp Reinforced structure of bamboo structure
JP3356729B2 (en) * 1999-09-13 2002-12-16 三重県 Composite bamboo members
CN201221154Y (en) * 2008-06-26 2009-04-15 李维成 Bending type bamboo structure building module
CN201292592Y (en) * 2008-11-05 2009-08-19 中国京冶工程技术有限公司 Radial cable arch structure
CN201785943U (en) * 2010-07-30 2011-04-06 邓维成 Greenhouse arched beam
CN202577602U (en) * 2012-03-14 2012-12-05 同济大学 Steel bushing cement type bamboo joint

Also Published As

Publication number Publication date
CN103255836A (en) 2013-08-21

Similar Documents

Publication Publication Date Title
CN103074938B (en) Annular cross cable truss structure
CN107268791B (en) Combined tension dome structure of rigidity roofing
CN103255836B (en) Bamboo cable structure unit
CN202108115U (en) Bamboo truss string structure
CN102653965B (en) High-redundancy beam-string truss structure and implementation method
CN106978850B (en) A kind of closure shape of a saddle space structure of part self-balancing
CN103967125B (en) Big opening rung formula Suo Cheng network
CN105926850A (en) Circular cross cable truss structure
WO2010124679A3 (en) Shelter
CN105952049A (en) Dual-strut cable dome structure
CN112523358A (en) Bidirectional oblique crossing combined spoke type tension cable truss system and application
CN111945541A (en) Half-through tied arch bridge
CN201648942U (en) Combined cable-truss stretch-draw integral structure for mast stayed-cables and suspension cables
CN201292592Y (en) Radial cable arch structure
CN107201779B (en) A kind of batter post couples the structure of stress with wide span house cap
CN203200904U (en) Radiation type prestress stay cable purlin hanging structure
KR101431974B1 (en) Vinyl house structuring system
CN201660964U (en) Mast stayed cable truss stretching integral structure
CN102995747B (en) Truss system with pneumatic membrane compression bar
CN105908838A (en) Roundabout stretching structure
CN201660966U (en) Mast suspension cable joist tensile integral structure
CN203361471U (en) Cable-stay device applied to large-span cantilever floor structure
CN216713538U (en) Large-span steel structure roof system
CN201321674Y (en) Square plane ribbed-annual-shaped cable dome structure
CN215519428U (en) Bidirectional oblique crossing combined spoke type tension cable truss system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150729

Termination date: 20180506