CN103244159B - A kind of method and device applying bolt pretension - Google Patents

A kind of method and device applying bolt pretension Download PDF

Info

Publication number
CN103244159B
CN103244159B CN201310173331.0A CN201310173331A CN103244159B CN 103244159 B CN103244159 B CN 103244159B CN 201310173331 A CN201310173331 A CN 201310173331A CN 103244159 B CN103244159 B CN 103244159B
Authority
CN
China
Prior art keywords
anchor pole
nut
annular cylinder
supporter
pallet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310173331.0A
Other languages
Chinese (zh)
Other versions
CN103244159A (en
Inventor
许兴亮
张农
田素川
孙康
孙成才
周斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201310173331.0A priority Critical patent/CN103244159B/en
Publication of CN103244159A publication Critical patent/CN103244159A/en
Application granted granted Critical
Publication of CN103244159B publication Critical patent/CN103244159B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

Apply method and the device of bolt pretension, be applicable to general tunnel, supporting roadway surrounding rock engineering.When applying bolt pretension, first going out armature boring with drilling machine construction, in boring, filling in resin explosive roll and anchor pole successively, and overlap pallet and nut in the outer section of anchor pole; Air rock drill drives anchor pole to rotate with crushing stick, and waits for that powder stick solidifies generation intensity; Hydraulic stretching device is installed; Primer fluid compressing cylinder, applies stretch-draw pretightning force to anchor pole, contacts with the unsettled nut of spanner precession with pallet; Reduce hydraulic jack pressure to zero, remove hydraulic tensioner.Anchor pole pretension can not only be made to construct and to reach designing requirement easily, and the applying method changing bolt pretension is by the transfer process of traditional moment of torsion force of periphery to axle power, decrease the requirement to material quality of bolt, avoid the damage to anchor pole, improve efficiency of construction.

Description

A kind of method and device applying bolt pretension
Technical field
The present invention relates to a kind of method and the device that apply bolt pretension, be particularly useful for the bolt support technology generally used of ground, roadway, construction of tunnel.
Background technology
In the field such as underground construction and slope project, bolt support is most widely used reinforcing technique.Because different depth rock mass self-characteristic around tunnel and residing ambient stress difference easily produce Incoordinate deformation, prevent from causing supporting to be lost efficacy because surrouding rock deformation causes nut loosening so anchor pole needs to carry out pretension with nut to anchor pole in use.Anchor rod prestress, on the impact of supporting effect of roadway, mainly contains following 3 points: 1. award rock mass enough normal pressures during skyhook, stops crack and slide and the reduction of country rock.2. utilize prestressing force to the constraint of rock-mass relaxing and weakening, delay the reduction with containment Surrounding Rock Strength, control the process that country rock breaks, play country rock self-bearing capacity.3. increase rock mass confined pressure, effectively change the stress state of country rock, improve by the mechanical property of Bolted Rock Masses, increase by the intensity of Bolted Rock Masses.
Also there is no the facility of Special applying bolt pretension at present, generally rely on the moment of torsion of torque wrench or jumbolter applying and return the pretightning force calculated and apply.Its general principle realizes the conversion of the force of periphery to axle power by the angle of nut and anchor pole rolled thread section screw thread, but when anchor pole rolled thread the section coarse or nut of processing and pallet frictional force larger time, the axial tension of anchor pole effectively can not be converted into the moment of torsion of nut applying, cause the pretightning force of rockbolt installation to be had a greatly reduced quality, the pretightning force of setting cannot be reached; If apply pretightning force with jumbolter, because rig is that the pulsed moment of torsion relying on pressure wind or hydraulic-driven to produce carries out tensioning, the infringement that impact force produces anchor pole is larger.The pretightning force of anchor pole setting simultaneously can not be excessive, when the pretightning force applied exceedes design parameters, waste not only can be caused also to damage anchor pole.Therefore, in the work progress of bolt support, be badly in need of a kind of method of accurate applying pretightning force.
Summary of the invention
Technical scheme: the object of the invention is to overcome deficiency in prior art it, method and the device of the applying bolt pretension that a kind of structure is simple, easy and simple to handle, result of use is good are provided.
Technical scheme: the method for applying bolt pretension of the present invention, comprises the following steps:
The first step, boring: go out armature boring with drilling machine construction, water remaining in cleaning eye and slag, fill in Anchor Agent and anchor pole successively in boring, and in anchor pole revealed section cover top tray, nut precession anchor pole rolled thread section contacted with pallet with hand;
Second step, skyhook: air rock drill is connected with nut, rotating nut also drives anchor pole to rotate to stir Anchor Agent, after waiting for that Anchor Agent solidifies, unloads air rock drill;
3rd step, skyhook pretightning force device: the shell of bolt pretension device is leaned on pallet, in anchor pole front end, nut is puted forth effort in precession one again, fastened by the slide bar pulling claw of bolt pretension device and put forth effort nut, and pulling claw is locked by the ring that is tightened forward;
4th step, apply pretightning force: open fluid pressure drive device, annular cylinder is protruding by oil liquid pressure band moving slide-bar, by pulling claw, stretch-draw pretightning force is applied to anchor pole, observe pressure meter, after manometric pressure reaches setting value, stop solution hydraulic driver, then contacts with pallet with spanner tightening nut;
5th step, reduces the pressure to zero of annular cylinder, loosens retainer ring backward, and remove pulling claw constraint, and take off bolt pretension device, that finally unloads anchor pole outer end puts forth effort nut.
Realize the applying bolt pretension device of said method, comprise fluid pressure drive device, also comprise shell, slide bar, supporter, annular cylinder, the front end of described shell is provided with 3 supporting legs, the rear end of shell sets gradually supporter and the annular cylinder with supporter tabling, shell is provided with the slide bar that afterbody passes supporter and annular cylinder, the front end of slide bar is provided with the retainer ring of pulling claw and fixing pulling claw, the outer wall of supporter is provided with the passage being communicated with annular cylinder, passway is connecting fluid hydraulic driver by the road, the export pipeline of fluid pressure drive device is provided with pressure meter, fluid is entered in annular cylinder cavity by the pipeline in supporter.
Beneficial effect: the present invention can apply accurate pretightning force to general bolt support, change bolt pretension by the applying of traditional moment of torsion force of periphery to the transfer process of axle power, decrease the requirement to material quality of bolt, avoid the damage to anchor pole, improve efficiency of construction.Use hydraulic jack directly to apply pretightning force by slide block, the accurate applying of pretightning force can be realized, anchor pole pretension can not only be made to construct and reach designing requirement easily, but also the waste that the pretightning force that causes because artificially constructing can not be caused excessive.Oil cylinder structure of hydraulic is simple, and size is less, is adapted at down-hole small space and uses.Principle of the present invention is simple, and work progress easily operates, and the implement structure of use is simple, convenient disassembly, for ease of maintenaince, and can reuse, and cost is lower, has very strong practicality.
Accompanying drawing explanation
Fig. 1 is pretightning force loading system structural representation of the present invention,
Fig. 2 is the A-A cross-sectional view of Fig. 1.
In figure: 1-Anchor Agent, 2-anchor pole, 3-pallet, 4-nut, 5-puts forth effort nut, 6-pulling claw, 7-retainer ring, 8-slide bar, 9-shell, 10-supporter, 11-annular cylinder, 12-fluid pressure drive device, 13-pressure meter.
Detailed description of the invention
Below in conjunction with accompanying drawing, one embodiment of the present of invention are further described:
The method of applying bolt pretension of the present invention: with cleaning out water remaining in hole and slag behind the good hole of pneumatic drilling machine drill, filling in Anchor Agent 1 and anchor pole 2 in boring, and installing pallet 3, with hand, nut 4 precession anchor pole rolled thread section being contacted with pallet 3; Air rock drill is connected with nut 4, rotates anchor pole 2 with low-power and stir Anchor Agent 1, after Anchor Agent 1 solidifies, unload air rock drill; Before anchor pole, in 15mm, nut 5 is puted forth effort in precession one again, and tensioner shell 9 is withstood pallet 3, and the pulling claw 6 of slide bar 8 fastens puts forth effort nut 5, and pulling claw 6 is locked by driven forward retainer ring 7; Primer fluid hydraulic driver 12, fluid enters the cavity between annular cylinder 11 and supporter 10, and annular cylinder 11 stretches out under oil pressure effect, pushes the pedestal of slide bar 8, when closing fluid pressure drive device 12 after the pretightning force size that the registration of pressure meter 13 reaches default; Slide bar 8 bounces back, and anchor pole 2 is driven by pulling claw 6 and stretches out crag vertically, and when pulling capacity is equal with oil liquid pressure, slide bar 8 stops retraction; The nut 4 being close to pallet 3 pulls out pallet 3 with outside anchor pole 2, then contacts with pallet 3 with spanner precession nut 4; Unclamp retainer ring 7, open pulling claw 6, remove hydraulic stretching device, that finally unloads anchor pole 2 outer end puts forth effort nut 5.
Applying bolt pretension device of the present invention, comprise fluid pressure drive device 12, primarily of shell 9, slide bar 8, supporter 10, annular cylinder 11 is formed, the front end of described shell 9 is provided with 3 supporting legs, the rear end of shell 9 sets gradually supporter 10 and the annular cylinder 11 with supporter 10 tabling, shell 9 is provided with the slide bar 8 that afterbody passes supporter 10 and annular cylinder 11, the front end of slide bar 8 is provided with the retainer ring 7 of pulling claw 6 and fixing pulling claw 6, the outer wall of supporter 10 is provided with the passage being communicated with annular cylinder 11, passway is connecting fluid hydraulic driver 12 by the road, the export pipeline of fluid pressure drive device 12 is provided with pressure meter 13, fluid enters in annular cylinder 11 cavity by the pipeline in supporter 10, annular cylinder 11 is protruding by oil liquid pressure band moving slide-bar 8, thus generation axial tension.

Claims (2)

1. one kind applies the method for bolt pretension, comprise: go out armature boring with drilling machine construction, water remaining in cleaning eye and slag, Anchor Agent (1) and anchor pole (2) is filled in successively in boring, and at anchor pole (2) revealed section cover top tray (3), with hand, nut (4) precession anchor pole (2) rolled thread section is contacted with pallet (3); Be connected with nut (4) by air rock drill, rotating nut (4) also drives anchor pole (2) to rotate to stir Anchor Agent (1), after waiting for that Anchor Agent (1) solidifies, unloads air rock drill; In anchor pole (2) front end 15mm, nut (5) is puted forth effort in precession one again, the shell (9) of bolt pretension device is leaned on pallet (3), the pulling claw (6) of the slide bar (8) of bolt pretension device is fastened and puts forth effort nut (5), and pulling claw (6) is locked by the ring (7) that is tightened forward; It is characterized in that:
Pretightning force is applied by opening fluid pressure drive device (12), fluid enters the cavity between annular cylinder (11) and supporter (10), annular cylinder (11) is protruding by the zone of action moving slide-bar (8) of oil liquid pressure, by pulling claw (6), stretch-draw pretightning force is applied to anchor pole (2), observe pressure meter (13), after the pressure of pressure meter (13) reaches setting value, stop solution hydraulic driver (12), slide bar (8) bounces back, anchor pole (2) is driven by pulling claw (6) and stretches out crag vertically, when pulling capacity is equal with oil liquid pressure, slide bar (8) stops retraction, the nut (4) being close to pallet (3) pulls out pallet (3) with outside anchor pole (2), then uses spanner tightening nut (4) to contact with pallet (3), reduce the pressure to zero of annular cylinder (11), loosen retainer ring (7) backward, remove pulling claw (6) constraint, and take off bolt pretension device, that finally unloads anchor pole (2) outer end puts forth effort nut (5).
2. one kind realizes the applying bolt pretension device of method described in claim 1, comprise fluid pressure drive device (12), it is characterized in that: also comprise shell (9), slide bar (8), supporter (10), annular cylinder (11), the front end of described shell (9) is provided with 3 supporting legs, the rear end of shell (9) sets gradually supporter (10) and the annular cylinder (11) with supporter (10) tabling, shell (9) is provided with the slide bar (8) that afterbody passes supporter (10) and annular cylinder (11), the front end of slide bar (8) is provided with the retainer ring (7) of pulling claw (6) and fixing pulling claw (6), the outer wall of supporter (10) is provided with the passage being communicated with annular cylinder (11), passway is connecting fluid hydraulic driver (12) by the road, the export pipeline of fluid pressure drive device (12) is provided with pressure meter (13), fluid enters in annular cylinder (11) cavity by the pipeline in supporter (10), annular cylinder (11) is protruding by oil liquid pressure band moving slide-bar (8), thus generation axial tension.
CN201310173331.0A 2013-05-13 2013-05-13 A kind of method and device applying bolt pretension Active CN103244159B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310173331.0A CN103244159B (en) 2013-05-13 2013-05-13 A kind of method and device applying bolt pretension

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310173331.0A CN103244159B (en) 2013-05-13 2013-05-13 A kind of method and device applying bolt pretension

Publications (2)

Publication Number Publication Date
CN103244159A CN103244159A (en) 2013-08-14
CN103244159B true CN103244159B (en) 2015-08-19

Family

ID=48924000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310173331.0A Active CN103244159B (en) 2013-05-13 2013-05-13 A kind of method and device applying bolt pretension

Country Status (1)

Country Link
CN (1) CN103244159B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103573279B (en) * 2013-11-14 2016-10-05 山东科技大学 Mining telescopic energy adsorption anti-impact viscous damping anchor rod and supporting method thereof
CN103590843B (en) * 2013-11-21 2015-10-21 山东大学 A kind of full-thread bolt pretightning force bringing device and method of operating can moving back anchor fast
CN105370303B (en) * 2015-11-26 2018-01-09 湖南科技大学 Tensioning equipment and its operating method for deep tunnel high pre-stress suspension roof support
CN105548001B (en) * 2016-01-23 2018-11-27 北京航空航天大学 A kind of pipe-seam type anchor rod scene drawing force measuring device
CN107696267B (en) * 2017-10-19 2024-02-27 中铁三局集团有限公司 Tensioning reinforcing steel bar pre-tightening equipment for ballastless track plate of high-speed railway
CN108274613B (en) * 2018-03-10 2022-08-23 山东高速轨道设备材料有限公司 Tensioning combination mechanism
CN108327068B (en) * 2018-03-10 2022-03-08 山东高速铁建装备有限公司 Prestressed track slab steel bar stretching machine
CN108756966A (en) * 2018-06-07 2018-11-06 湖南科技大学 A kind of tensioning equipment suitable for underground construction defective anchor bar

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200985797Y (en) * 2006-07-28 2007-12-05 北京中煤矿山工程有限公司 Anchor rod preloader
CN101634149B (en) * 2009-08-05 2011-07-06 朱奎 Prestressed anchor foundation pit support and construction method
DE102010024352A1 (en) * 2010-06-18 2011-12-22 Firep Rebar Technology Gmbh Improved tie rod made of fiber-reinforced plastic
CN202148913U (en) * 2011-07-28 2012-02-22 湖南科技大学 Anchor rod pretightening device
CN203257441U (en) * 2013-05-13 2013-10-30 中国矿业大学 Device for accurately applying axial force on anchor rod

Also Published As

Publication number Publication date
CN103244159A (en) 2013-08-14

Similar Documents

Publication Publication Date Title
CN103244159B (en) A kind of method and device applying bolt pretension
US10794183B2 (en) Self-drilling differential grouting combined bolt and anchoring method therefor
CN105370303B (en) Tensioning equipment and its operating method for deep tunnel high pre-stress suspension roof support
AU2021271378B2 (en) Water jet technology-based anchor cable self-drilling and rapid anchoring construction method
CN103573279B (en) Mining telescopic energy adsorption anti-impact viscous damping anchor rod and supporting method thereof
CN204200253U (en) Apply the device of bolt pretension
CN103758552A (en) Hole-expanding anchor rod and construction process thereof
CN109853570B (en) Sediment cleaning device at bottom of concrete bored concrete pile
CN203230445U (en) Length-changeable self-boring type grouting anchor rod
CN207177942U (en) A kind of multi-cylinder anchor rod hydraulic tensioning equipment
CN107387140A (en) A kind of multi-cylinder anchor rod hydraulic tensioning equipment and anchor pole method for stretching
CN205135675U (en) A tension device that is used for high prestressed anchorage pole in deep tunnel to strut
CN219012666U (en) Device for fastening anchor rod and applying prestress
CN102635378A (en) New process for high-strength resin anchor construction
CN203257441U (en) Device for accurately applying axial force on anchor rod
AU2015201493A1 (en) Self-drilling injection lance and method for ground stabilization using the said self-drilling injection lance.
CN114876536A (en) Anchor high-pretightening-force anchor rod and anchor cable combined supporting device and method
CN101700649A (en) Iron tower flange and foundation bolt securing device
CN111119961B (en) High-prestress applying device for anchor rod and using method
CN201635750U (en) Novel resin anchor-rod installer
CN210660155U (en) Grouting anchoring device and groutable solid anchor rod composed of same
CN204311448U (en) Apply bolt pretension device
CN106401625A (en) Drillable anchor rod device capable of being anchored in crossed mode and construction method
CN106514542B (en) A kind of Digital-display torque multiplier of adjustable amplification factor
CN217841700U (en) Anchor high pretightning force anchor bolt support device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant