CN103243731B - Mould supporting method for trapezoid cross section base of shear wall - Google Patents
Mould supporting method for trapezoid cross section base of shear wall Download PDFInfo
- Publication number
- CN103243731B CN103243731B CN201310174368.5A CN201310174368A CN103243731B CN 103243731 B CN103243731 B CN 103243731B CN 201310174368 A CN201310174368 A CN 201310174368A CN 103243731 B CN103243731 B CN 103243731B
- Authority
- CN
- China
- Prior art keywords
- section
- trapezoid cross
- basis
- split bolt
- muscle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The invention discloses a mould supporting method for a trapezoid cross section base of a shear wall. The method adopts a mode that split bolts are fixed with wall plate ribs, support bolts are fixed with base plate ribs and limit short ribs are arranged on the split bolts and the support bolts to determine support mould points of two waist mould plates of the trapezoid cross section base and ensure that the geometrical size of the trapezoid section is controlled. Lateral pressure bearing capability of the waist mould plates is improved by means of reinforcing square columns to prevent deformation and mould expansion. Double-frame pipes, butterfly fasteners and wedge gaskets are adopted to fix the mould plates, the wall plate ribs and the base plate ribs to ensure that the axis of the trapezoid cross section base is not offset in the concrete pouring process.
Description
Technical field
The present invention relates to the formwork erection technology of technical field of building construction, the mold method on basis, especially a kind of shear wall trapezoid cross section.
Background technology
In building structure, the application of shear wall is very general.The cross section on conventional shear wall basis is notch cuttype cross section, because its cross section is smooth vertical and horizontal, is easy to support, fixed form, and the quality of pouring concrete is easy to control.Problems existing is, under equal carrying condition, its cross-sectional area is large, high material consumption, when ground foundation is weak, when key dimension is larger, easily produces the uneven and stress concentration phenomenon of carrying.For overcoming above-mentioned engineering defect, save construction costs, the Cross section Design on shear wall basis is trapezoid cross section by prior art, for ensureing the construction quality in concrete foundation construction, the construction technology that usual employing sole plate and wall base concrete are poured into a mould simultaneously, for meeting this construction technology, general employing " is hung modulus method " and is supported, fixed ladder tee section foundation forms, Problems existing is, when adopting " hanging modulus method " to construct, the waist Template Location difficulty of both sides, basis, trapezoid cross section, without fixing bearing surface, when pouring concrete, easily cause distortion, run mould, rise the quality problems such as mould, cause basis, concrete trapezoid cross section axis shift, and once there is above-mentioned defect, follow-up reprocess very difficult, especially poor for ground, when basis is comparatively dark or plank thickness is thicker, the probability producing above-mentioned quality problems in construction sharply increases, according to statistics, adopt the trapezoid cross section foundation forms that " hanging modulus method " installs, due to the race mould of template, the mould reason that rises and cause the quality problems on basis, trapezoid cross section countless.
Summary of the invention
The mold method on the basis, a kind of shear wall trapezoid cross section provided for the deficiencies in the prior art is provided, the present invention adopts that split bolt and wallboard muscle are fixed, support bracket bolt and base plate muscle are fixed and on split bolt and support bracket bolt, arrange the mode of spacing short muscle, determine the formwork point of basis, trapezoid cross section two waist templates, guarantee that the physical dimension of trapezoid cross section is controlled; Strengthening by arranging the ability that wooden a tree, used in making timber for boats raising waist template bears side pressure, preventing distortion and rising by mould; Adopt and with two frame pipe, butterfly fastener and wedge pad, template and wallboard muscle and base plate muscle are implemented to fix, guarantee not offseting of the basic axis in trapezoid cross section in concrete placement.
The concrete technical scheme realizing the object of the invention is:
The mold method on basis, shear wall trapezoid cross section, its feature comprises the steps:
A), foundation excavation
According to working drawing, put foundation line, implement foundation dredging;
B), base plate muscle and wallboard muscle is pricked
According to working drawing, roll the base plate muscle of horizontal direction, roll the wallboard muscle of vertical direction, the height of wallboard muscle must exceed basis, trapezoid cross section;
C), the upper formwork point on basis, trapezoid cross section is set
Select several split bolt, by several split bolt along the contour distribution successively of the longitudinal direction of wallboard muscle and level penetrates wallboard muscle welds with it, according to wallboard thickness, the two ends of split bolt welding to drawing spacing short muscle, split bolt with to the upper formwork point drawing the intersection point of spacing short muscle to be basis, trapezoid cross section;
D), formwork point under basis, trapezoid cross section is set
Select several support bracket bolt, longitudinal direction wide successively distribute also vertical the insert base plate muscle of several support bracket bolt along wallboard muscle both sides is welded with it, according to the absolute altitude of base plate, the spacing short muscle of welding support on support bracket bolt, the intersection point of support bracket bolt and the spacing short muscle of support is the lower formwork point on basis, trapezoid cross section;
E), the first template leg on basis, trapezoid cross section is installed
Two the first template legs are placed in the first split bolt two ends respectively, with two frame pipe, butterfly fastener the first template leg is fixed on the first split bolt to drawing spacing short muscle place, the first template leg installation of basis, trapezoid cross section upper base;
F), the second template leg on basis, trapezoid cross section is installed
Two the second template legs are placed on support bracket bolt respectively, with two frame pipe, butterfly fastener, the second template leg are fixed on the spacing short muscle place of support of support bracket bolt, the second template leg installation gone to the bottom in basis, trapezoid cross section;
G), the formwork point of basis, trapezoid cross section two waists is set
Select several second split bolt, the 3rd split bolt, by several second split bolt, the 3rd split bolt along the longitudinally layer distributed horizontal welding is connected on wallboard muscle successively of wallboard muscle, to the line be called between the first template leg and the second template leg, find the second split bolt, the two ends of the 3rd split bolt and the intersection point of this line, at the second split bolt, the 3rd split bolt two ends point of intersection welding to drawing spacing short muscle, the second split bolt, the 3rd split bolt with to draw the intersection point of spacing short muscle be trapezoid cross section basis two waists formwork point;
H), the waist template of both sides, basis, trapezoid cross section is installed
Two panels waist template is placed in respectively the second split bolt, the 3rd split bolt two ends, with two frame pipe, butterfly fastener two panels waist template is fixed on the second split bolt, the 3rd split bolt to drawing spacing short muscle place, the waist model sheetinstallat of both sides, basis, trapezoid cross section completes;
I), the examination of trapezoid cross section foundation forms and pouring concrete
According to working drawing, implement to check and accept to trapezoid cross section foundation forms, after acceptance(check), adopt delivery pump to implement pouring concrete to basis, trapezoid cross section.
First, second and third described split bolt is double threaded screw; Described support bracket bolt is single-head screw, and the shaft of support bracket bolt is provided with diagonal brace; Described waist template is provided with strengthens wooden a tree, used in making timber for boats and wedge pad.
The present invention adopts that split bolt and wallboard muscle are fixed, support bracket bolt and base plate muscle are fixed and on split bolt and support bracket bolt, arrange the mode of spacing short muscle, determine the formwork point of basis, trapezoid cross section two waist templates, guarantee that the physical dimension of trapezoid cross section is controlled; Strengthening by arranging the ability that wooden a tree, used in making timber for boats raising waist template bears side pressure, preventing distortion and rising by mould; Adopt and with two frame pipe, butterfly fastener and wedge pad, template and wallboard muscle and base plate muscle are implemented to fix, guarantee not offseting of the basic axis in trapezoid cross section in concrete placement.
Accompanying drawing explanation
Fig. 1 is the formwork schematic diagram of the embodiment of the present invention;
Fig. 2 is the structural representation of support bracket bolt of the present invention;
Fig. 3 is the structural representation of split bolt of the present invention;
Fig. 4 is the present invention's two frame pipe, butterfly fastener and bolted structural representation.
Detailed description of the invention
Embodiment
Shear Walls plate thickness is 600mm, basis, a shear wall trapezoid cross section die process, and concrete steps are as follows:
A), foundation excavation
According to working drawing, put foundation line, implement foundation dredging;
B), base plate muscle and wallboard muscle is pricked
According to working drawing, roll the base plate muscle 1 of horizontal direction, roll the wallboard muscle 2 of vertical direction, the height of wallboard muscle 2 must exceed basis, trapezoid cross section more than 500mm;
C), the upper formwork point on basis, trapezoid cross section is set
Select several split bolt 31, longitudinal direction contour successively the press@400 ~ 500mm of several split bolt 31 along wallboard muscle 2 is distributed, and level penetrates wallboard muscle 2 welds with it, respectively 300mm is intercepted to the two ends of split bolt 31 with the mid point of wallboard muscle 2, in the welding of the 300mm position, two ends of split bolt 31 to drawing spacing short muscle 36, split bolt 31 with to the upper formwork point drawing the intersection point of spacing short muscle 36 to be basis, trapezoid cross section;
D), formwork point under basis, trapezoid cross section is set
Select several support bracket bolt 4, longitudinal direction wide successively the press@400 ~ 500mm of several support bracket bolt 4 along wallboard muscle 2 both sides is distributed, and the vertical base plate muscle 1 that inserts welds with it, according to the spacing short muscle 41 of absolute altitude ± 0.0 welding support on support bracket bolt 4 of base plate, support bracket bolt 4 is the lower formwork point on basis, trapezoid cross section with the intersection point of the spacing short muscle 41 of support;
E), the first template leg on basis, trapezoid cross section is installed
Two the first template legs 51 are placed in the first split bolt 31 two ends respectively, with two frame pipe 7, butterfly fastener 6 first template leg 51 is fixed on the first split bolt 31 to drawing spacing short muscle 36 place, the first template leg 51 installation of basis, trapezoid cross section upper base;
F), the second template leg on basis, trapezoid cross section is installed
Two the second template legs 52 are placed on support bracket bolt 4 respectively, with two frame pipe 7, butterfly fastener 6, second template leg 52 are fixed on spacing short muscle 41 place of support of support bracket bolt 4, the second template leg 52 installation gone to the bottom in basis, trapezoid cross section;
G), the formwork point of basis, trapezoid cross section two waists is set
Select several second split bolt 32, 3rd split bolt 33, by several second split bolt 32, 3rd split bolt 33 is along longitudinal layer distributed successively of wallboard muscle 2, and horizontal welding is connected on wallboard muscle 2, to the line be called between the first template leg 51 and the second template leg 52, find the second split bolt 32, the two ends of the 3rd split bolt 33 and the intersection point of this line, at the second split bolt 32, the line direction welding of the point of intersection at the 3rd split bolt 33 two ends is to drawing spacing short muscle 36, second split bolt 32, 3rd split bolt 33 with to the formwork point drawing the intersection point of spacing short muscle 36 to be basis, trapezoid cross section two waists,
H), the waist template of both sides, basis, trapezoid cross section is installed
Two panels waist template 53 is placed in respectively the second split bolt 32, the 3rd split bolt 33 two ends, with two frame pipe 7, butterfly fastener 6 two panels waist template 53 is fixed on the second split bolt 32, the 3rd split bolt 33 to drawing spacing short muscle 36 place, waist template 53 installation of both sides, basis, trapezoid cross section;
I), the examination of trapezoid cross section foundation forms and pouring concrete
According to working drawing, implement to check and accept to trapezoid cross section foundation forms, after acceptance(check), adopt delivery pump to implement pouring concrete to basis, trapezoid cross section.
First, second and third split bolt of the present invention is double threaded screw, and described first, second and third split bolt is that length does not wait, arranges different bolts to what draw spacing short muscle 36.
Support bracket bolt 4 of the present invention is single-head screw, and the shaft of support bracket bolt 4 is provided with diagonal brace 42, and diagonal brace 42 and support bracket bolt 4 are together welded on base plate muscle 1.
Owing to having an angle between the waist template 53 of both sides and the second split bolt 32 or the 3rd split bolt 33, for ensureing that two frame pipe 7, butterfly fastener 6 are by uniform force when the second split bolt 32 or the 3rd split bolt 33 fastening waist template 53, the present invention arranges wedge pad 55 to eliminate the impact of angle between two frame pipe 7 and waist template 53.
Claims (3)
1. the mold method on basis, shear wall trapezoid cross section, is characterized in that it comprises the steps:
A), foundation excavation
According to working drawing, put foundation line, implement foundation dredging;
B), base plate muscle and wallboard muscle is pricked
According to working drawing, roll the base plate muscle of horizontal direction, roll the wallboard muscle of vertical direction, the height of wallboard muscle must exceed basis, trapezoid cross section;
C), the upper formwork point on basis, trapezoid cross section is set
Select several split bolt, by several split bolt along the contour distribution successively of the longitudinal direction of wallboard muscle and level penetrates wallboard muscle welds with it, according to wallboard thickness, the two ends of split bolt welding to drawing spacing short muscle, split bolt with to the upper formwork point drawing the intersection point of spacing short muscle to be basis, trapezoid cross section;
D), formwork point under basis, trapezoid cross section is set
Select several support bracket bolt, longitudinal direction wide successively distribute also vertical the insert base plate muscle of several support bracket bolt along wallboard muscle both sides is welded with it, according to the absolute altitude of base plate, the spacing short muscle of welding support on support bracket bolt, the intersection point of support bracket bolt and the spacing short muscle of support is the lower formwork point on basis, trapezoid cross section;
E), the first template leg on basis, trapezoid cross section is installed
Two the first template legs are placed in the first split bolt two ends respectively, with two frame pipe, butterfly fastener the first template leg is fixed on the first split bolt to drawing spacing short muscle place, the first template leg installation of basis, trapezoid cross section upper base;
F), the second template leg on basis, trapezoid cross section is installed
Two the second template legs are placed on support bracket bolt respectively, with two frame pipe, butterfly fastener, the second template leg are fixed on the spacing short muscle place of support of support bracket bolt, the second template leg installation gone to the bottom in basis, trapezoid cross section;
G), the formwork point of basis, trapezoid cross section two waists is set
Select several second split bolt, the 3rd split bolt, by several second split bolt, the 3rd split bolt along the longitudinally layer distributed horizontal welding is connected on wallboard muscle successively of wallboard muscle, to the line be called between the first template leg and the second template leg, find the second split bolt, the two ends of the 3rd split bolt and the intersection point of this line, at the second split bolt, the 3rd split bolt two ends point of intersection welding to drawing spacing short muscle, the second split bolt, the 3rd split bolt with to draw the intersection point of spacing short muscle be trapezoid cross section basis two waists formwork point;
H), the waist template of both sides, basis, trapezoid cross section is installed
Two panels waist template is placed in respectively the second split bolt, the 3rd split bolt two ends, with two frame pipe, butterfly fastener two panels waist template is fixed on the second split bolt, the 3rd split bolt to drawing spacing short muscle place, the waist model sheetinstallat of both sides, basis, trapezoid cross section completes;
I), the examination of trapezoid cross section foundation forms and pouring concrete
According to working drawing, implement to check and accept to trapezoid cross section foundation forms, after acceptance(check), adopt delivery pump to implement pouring concrete to basis, trapezoid cross section.
2. the mold method on basis, shear wall trapezoid cross section according to claim 1, is characterized in that first, second and third split bolt is double threaded screw.
3. the mold method on basis, shear wall trapezoid cross section according to claim 1, it is characterized in that support bracket bolt is single-head screw, the shaft of support bracket bolt is provided with diagonal brace.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310174368.5A CN103243731B (en) | 2013-05-13 | 2013-05-13 | Mould supporting method for trapezoid cross section base of shear wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310174368.5A CN103243731B (en) | 2013-05-13 | 2013-05-13 | Mould supporting method for trapezoid cross section base of shear wall |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103243731A CN103243731A (en) | 2013-08-14 |
CN103243731B true CN103243731B (en) | 2015-03-11 |
Family
ID=48923583
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310174368.5A Expired - Fee Related CN103243731B (en) | 2013-05-13 | 2013-05-13 | Mould supporting method for trapezoid cross section base of shear wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103243731B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105442897B (en) * | 2015-11-09 | 2018-06-26 | 深圳市市政工程总公司 | Double-deck secondary settling tank abnormity wall construction method |
CN109308363B (en) * | 2017-07-28 | 2023-04-07 | 广联达科技股份有限公司 | Raft board slope-releasing construction method and system and computer device |
CN108661066B (en) * | 2018-06-20 | 2020-05-08 | 郑州市第一建筑工程集团有限公司 | Independent foundation closed type formwork structure and process |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202005011851U1 (en) * | 2005-07-28 | 2005-10-20 | Goldbeck Bau Gmbh | Prefabricated base and pillar arrangement for buildings, has fishplates for connection of pillar with base at upper side of base and at lower end of pillar and bolts for connecting fishplates by driving them into aligned boreholes |
CN2873941Y (en) * | 2005-12-30 | 2007-02-28 | 徐捷 | Positioning fastening device for building formwork |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050252107A1 (en) * | 2004-04-12 | 2005-11-17 | Linse Robert P | Footing for factory built structure support system |
-
2013
- 2013-05-13 CN CN201310174368.5A patent/CN103243731B/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202005011851U1 (en) * | 2005-07-28 | 2005-10-20 | Goldbeck Bau Gmbh | Prefabricated base and pillar arrangement for buildings, has fishplates for connection of pillar with base at upper side of base and at lower end of pillar and bolts for connecting fishplates by driving them into aligned boreholes |
CN2873941Y (en) * | 2005-12-30 | 2007-02-28 | 徐捷 | Positioning fastening device for building formwork |
Non-Patent Citations (1)
Title |
---|
水利电力部水利水电建设总局.第九章模板工程.《水利水电工程施工组织设计手册》.水利电力出版社,1987,第3卷第241-243页. * |
Also Published As
Publication number | Publication date |
---|---|
CN103243731A (en) | 2013-08-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631512B (en) | Hang modulus method after-pouring band beam-slab construction method | |
CN206722404U (en) | A kind of narrow end wall single side formwork horizontal reinforcing device | |
CN103422667B (en) | A kind of two prefabricated superimposed body of wall support system of plate | |
CN207513157U (en) | A kind of expansion joint shear wall formwork | |
CN104929148B (en) | The upside-down mounting hardened system of generation power foundation of wind power ring group plinth and reinforcement means thereof | |
CN108951840B (en) | Method for constructing arc-shaped outer wall of basement based on single-side formwork support of shaped support | |
CN103243731B (en) | Mould supporting method for trapezoid cross section base of shear wall | |
CN213682129U (en) | Deep foundation pit unilateral die carrier | |
CN203238950U (en) | Concrete beam formwork supported by trusses suspended in air | |
CN211396591U (en) | Concrete shear wall root reinforcing apparatus | |
CN219080981U (en) | Non-support fixing device for post-pouring strip of superimposed sheet | |
CN108035544A (en) | A kind of expansion joint position shear wall side form bracing means and construction method | |
CN204898612U (en) | Mould with adjustable be used for pouring ditch | |
CN203022761U (en) | Novel vertical shaft formwork | |
CN212743352U (en) | Reinforcing apparatus of unilateral formwork template and fossil fragments | |
CN212249192U (en) | Reinforced structure of board side form is encorbelmented to super thick | |
CN211369523U (en) | Template system of expansion joint shear force wall | |
CN104481142B (en) | The construction method of the chain support system of coupled columns template synchronous | |
CN204040457U (en) | Wooden frame plastic formwork system | |
CN113445739A (en) | Adjustable unilateral template supporting device | |
CN207347943U (en) | A kind of template of continuous rigid frame bridge closure section | |
CN112746628A (en) | Cast-in-place comprehensive pipe gallery formwork supporting structure and cast-in-place comprehensive pipe gallery construction method | |
CN207582971U (en) | Pump line bearing | |
CN102162224B (en) | Top reaching one-time casting process of concrete check gate seam pier | |
CN105569070B (en) | The method for pouring large-size concrete beam column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150311 Termination date: 20210513 |
|
CF01 | Termination of patent right due to non-payment of annual fee |