CN103243678B - Mole - Google Patents

Mole Download PDF

Info

Publication number
CN103243678B
CN103243678B CN201310196958.8A CN201310196958A CN103243678B CN 103243678 B CN103243678 B CN 103243678B CN 201310196958 A CN201310196958 A CN 201310196958A CN 103243678 B CN103243678 B CN 103243678B
Authority
CN
China
Prior art keywords
precast concrete
mole
pile
preformed
concrete framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310196958.8A
Other languages
Chinese (zh)
Other versions
CN103243678A (en
Inventor
李伟
张佩良
别社安
李增军
李勋
刘欣
刘富强
刘凤松
丁文智
陈强
米刘芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Port & Channel Engineering Co Ltd
Original Assignee
Tianjin Port & Channel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Port & Channel Engineering Co Ltd filed Critical Tianjin Port & Channel Engineering Co Ltd
Priority to CN201310196958.8A priority Critical patent/CN103243678B/en
Publication of CN103243678A publication Critical patent/CN103243678A/en
Application granted granted Critical
Publication of CN103243678B publication Critical patent/CN103243678B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Revetment (AREA)

Abstract

The present invention relates to a kind of mole, comprise mole levee body, it is characterized in that: described mole levee body forms continuous print levee body by wall pile frame construction, described wall pile frame construction is formed primarily of precast concrete framework and some preformed piles, described precast concrete framework comprises nose girder, linking beam and column, described nose girder and linking beam form square frame, integral prefabricated concrete frame is formed by column by upper and lower two described square frames, before and after described precast concrete framework, nose girder is axially arranged with some reserved stake holes, some preformed piles are run through in described reserved stake holes, described precast concrete framework is placed in preformed pile top, described precast concrete framework and some preformed piles entirety form breakwater wall pile foundation.Beneficial effect: wall pile frame construction mole adopts precast concrete framework as mole levee body, and its rigidity, stability, durability are higher, and lower portion fills backfill, increases levee body deadweight, can resist larger wave load.

Description

Mole
Technical field
The invention belongs to hydraulic structure, particularly relate to a kind of mole adopting wall pile frame construction.
Background technology
Mole be block wave impact force, go along with sb. to guard him basin, maintain the water surface steadily protect harbour to affect so that building in the water that safety of ship berths and operation is built from bad weather.Its traditional structure forms mainly can be divided into ramp type, vertical type.
Sloping breakwater is a kind of widely used structural shape, lower to the requirement of bearing capacity of foundation soil, is applicable to weaker ground.Wave is broken domatic, and dike front-reflection ripple is less, wave absorption better performances, has higher resistance to overturning.Structure is simple, and easy construction, does not need large lifting equipment, is easy to repair after damage.Because sloping breakwater structure section is comparatively large, its material usage has larger growth with the increase of the depth of water, and thus sloping breakwater is applicable to the relatively shallow and marine site of building stones abundance of the depth of water.
Vertical breakwater generally can be divided into gravity and stake formula, and wherein gravity is the most conventional.Type breakwater keeps stable by the weight of building own, and can double as harbour inside it, common form has ordinary concrete square-shaped, huge concrete blocks formula, reinforced concrete caisson formula and large-diameter circular cartridge type etc.Square-shaped upright embankment wall body is firm durable, and easy construction can resist larger wave, but it is from great, and foundation stress is large, and concrete amount is many, and install under water and dive under water workload greatly, construction speed is slow, and levee body overall performance is poor.Caisson type upstanding bank levee body good integrity, installation workload waterborne is little, and construction speed is fast, fill out in case and can reduce cost with gravel, but the water transportation of caisson will have the navigation channel of the enough depth of water, its tank wall is thinner, be subject to sea water intrusion in fluctuation of water table district and damage, higher to ground requirement for bearing capacity.Large-diameter circular cartridge type upstanding bank structure is simple, material usage is comparatively economized, be can be used for soft foundation, but its soil body and structure function complicated mechanism, for soft foundation, driving depth is shallow, can not reach bearing stratum, uses and is subject to a definite limitation.
The common type of stake formula upstanding bank is lattice steel sheet pile formula, and be made up of the serial lattice structure closed the steel sheet pile squeezed in ground, heap sand or building stones in space, to resist wave.Cellular steel sheet pile mole resistance to overturning is better, is applicable to the situation that the depth of water is large, wave is strong.Its shortcoming be steel sheet pile at fluctuation of water table district easy-to-rust, structure durability is poor.
Current hydraulic structure is gradually to maximization, deep waterization development, site condition becomes increasingly complex, difficulty of construction strengthens, and traditional structure pattern has many restrictions on the use amount of sandstone material, ground applicability and structure durability, can not engineering demands.The developmental research that therefore can adapt to the novel water conservancy project fabric structure of more complex conditions just becomes very urgent.
Summary of the invention
The present invention is to overcome deficiency of the prior art, a kind of mole adopting wall pile frame construction is provided, have that element precast, sandstone material consumption are few, ground strong adaptability, the feature that structure durability is strong, can bear larger wave load, is particularly useful for the waters that foundation capability is poor, sandstone material is few.
The present invention for achieving the above object, be achieved through the following technical solutions, a kind of mole, comprise mole levee body, it is characterized in that: described mole levee body forms continuous print levee body by wall pile frame construction, described wall pile frame construction is formed primarily of precast concrete framework and some preformed piles, described precast concrete framework comprises nose girder, linking beam and column, described nose girder and linking beam form square frame, integral prefabricated concrete frame is formed by column by upper and lower two described square frames, before and after described precast concrete framework, nose girder is axially arranged with some reserved stake holes, some preformed piles are run through in described reserved stake holes, described precast concrete framework is placed in preformed pile top, described precast concrete framework and some preformed piles entirety form breakwater wall pile foundation.
Described breakwater wall pile foundation top cast-in-situ concrete cap and breastwork, make some preformed piles and precast concrete framework form the breakwater wall pile foundation of overall hydraulic structure structure.
Described preformed pile adopts concrete pile, prestressed concrete pile or steel pipe pile, and its cross sectional shape is circular, square or other profiled-cross-section.
Described linking beam adopts plain bars or presstressed reinforcing steel structure.
The scope of described precast concrete lengths of frame and width is 5m ~ 40m.
Beneficial effect: wall pile frame construction mole adopts precast concrete framework as mole levee body, and its rigidity, stability, durability are higher, and lower portion fills backfill, increases levee body deadweight, can resist larger wave load.This form mole has that sandstone consumption is few, the adaptable advantage of ground, is applicable to soft foundation seashore and lacks sand material area, is especially applicable to China coast muddy foundation seashore.
Accompanying drawing explanation
Fig. 1 is the structural profile schematic diagram of mole;
Fig. 2 is the structural representation of wall pile frame construction;
Fig. 3 is the structural representation of precast concrete framework;
In figure: 1, precast concrete framework, 2, preformed pile, 3, cap, 4, breastwork, 5, reserved stake holes, 6, nose girder, 7, linking beam, 8, column, 9, backfill.
Detailed description of the invention
Below in conjunction with preferred embodiment, to according to detailed description of the invention provided by the invention, details are as follows:
Embodiment
Refer to accompanying drawing 1-3, the invention provides a kind of mole, comprise mole levee body, mole levee body forms continuous print levee body by wall pile frame construction, wall pile frame construction is formed primarily of precast concrete framework 1 and some preformed piles 2, precast concrete framework comprises nose girder 6, linking beam 7 and column 8, nose girder and linking beam form square frame, integral prefabricated concrete frame is formed by column by upper and lower two square frames, nose girder is axially arranged with some reserved stake holes 5 before and after precast concrete framework, some preformed piles 2 are run through in reserved stake holes, precast concrete framework is placed in preformed pile top, precast concrete framework and some preformed piles entirety form mole prefabricated pile basis.Mole prefabricated pile basis top cast-in-situ concrete cap 3 and breastwork 4, make some preformed piles and precast concrete framework form the mole prefabricated pile basis of overall hydraulic structure structure.Preformed pile adopts concrete pile, prestressed concrete pile or steel pipe pile, and its cross sectional shape is circular, square or other profiled-cross-section.Linking beam adopts plain bars or presstressed reinforcing steel structure.Precast concrete lower portion is filled with backfill 9.
Concrete frame has water permeability, can reduce the effect of construction period wave load.
Reserved stake holes, when construction of prefabricated piles, plays and carries out effect that is spacing, guiding to preformed pile injection.
Preferred version of the present invention is, reserved stake holes is in advance on nose girder.The quantity of linking beam is 2-4 root, forms " mouth " word or " day " font or " order " font square frame with nose girder.Linking beam plays the effect of drawknot front and rear row preformed pile.
Described precast concrete lengths of frame and width range are 5m-40m, and height is determined according to former mud face, design water level and requirement of engineering.
Concrete frame has multiple action, and one is connect with preformed pile, makes whole preformed pile frame construction harbour form an entirety; Two is in framework after backfill or sand material, overall structure from great, rigidity large, can bear larger level and vertical load, increases the stability of structure; Three is that framework is provided with reserved stake holes, carries out spacing, improve the construction precision of preformed pile to the injection of preformed pile.
The above is only preferred embodiment of the present invention, not does any pro forma restriction to structure of the present invention.Every above embodiment is done according to technical spirit of the present invention any simple modification, equivalent variations and modification, all still belong in the scope of technical scheme of the present invention.

Claims (4)

1. a mole, comprise mole levee body, it is characterized in that: described mole levee body forms continuous print levee body by wall pile frame construction, described wall pile frame construction is formed primarily of precast concrete framework and some preformed piles, described precast concrete framework comprises nose girder, linking beam and column, described nose girder and linking beam form square frame, integral prefabricated concrete frame is formed by column by upper and lower two described square frames, before and after described precast concrete framework, nose girder is axially arranged with some reserved stake holes, some preformed piles are run through in described reserved stake holes, described precast concrete framework is placed in preformed pile top, described precast concrete framework and some preformed piles entirety form breakwater wall pile foundation, described breakwater wall pile foundation top cast-in-situ concrete cap and breastwork, make some preformed piles and precast concrete framework form the breakwater wall pile foundation of overall hydraulic structure structure.
2. mole according to claim 1, is characterized in that: described preformed pile adopts concrete pile, prestressed concrete pile or steel pipe pile, and its cross sectional shape is circular, square.
3. mole according to claim 1, is characterized in that: described linking beam adopts plain bars or prestressed reinforcement structure.
4. mole according to claim 1, is characterized in that: the scope of described precast concrete lengths of frame and width is 5m ~ 40m.
CN201310196958.8A 2013-05-23 2013-05-23 Mole Active CN103243678B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310196958.8A CN103243678B (en) 2013-05-23 2013-05-23 Mole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310196958.8A CN103243678B (en) 2013-05-23 2013-05-23 Mole

Publications (2)

Publication Number Publication Date
CN103243678A CN103243678A (en) 2013-08-14
CN103243678B true CN103243678B (en) 2015-07-29

Family

ID=48923530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310196958.8A Active CN103243678B (en) 2013-05-23 2013-05-23 Mole

Country Status (1)

Country Link
CN (1) CN103243678B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105460173B (en) * 2014-09-09 2018-06-29 上海海郑海洋建设工程技术有限公司 Floating body wave resistance dam
CN106049350A (en) * 2016-07-26 2016-10-26 浙江省水利水电勘测设计院 Anti-seepage seawall with pile foundation framework rib plate structures
CN106351171B (en) * 2016-08-05 2018-04-20 钦州学院 Transmission arranges silt breakwater
CN106351173A (en) * 2016-10-31 2017-01-25 天津港航工程有限公司 Water-permeable breakwater structure
CN106522155A (en) * 2016-10-31 2017-03-22 天津港航工程有限公司 Wave-dissipating water-permeable breakwater
CN107130561B (en) * 2017-06-29 2019-08-23 中国路桥工程有限责任公司 A kind of harbour hydro-structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201686963U (en) * 2010-05-07 2010-12-29 王锦文 Riprap slope-type breakwater with supporting frame inside
CN102359087A (en) * 2011-07-29 2012-02-22 中国海洋大学 Hollow submerged dike
CN202865797U (en) * 2012-09-28 2013-04-10 长沙理工大学 Pile foundation precast slab assembly type seawall
CN203256680U (en) * 2013-05-23 2013-10-30 天津港航工程有限公司 Jetty

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2549752B2 (en) * 1990-07-09 1996-10-30 戸田建設株式会社 Breakwater structure
JPH1150426A (en) * 1997-08-04 1999-02-23 Toda Constr Co Ltd Wave absorbing structure breakwater using the same, and construction method of wave absorbing structure
JP2005264514A (en) * 2004-03-17 2005-09-29 Nishimatsu Constr Co Ltd Foundation slab structure of sea berth structure, and its construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201686963U (en) * 2010-05-07 2010-12-29 王锦文 Riprap slope-type breakwater with supporting frame inside
CN102359087A (en) * 2011-07-29 2012-02-22 中国海洋大学 Hollow submerged dike
CN202865797U (en) * 2012-09-28 2013-04-10 长沙理工大学 Pile foundation precast slab assembly type seawall
CN203256680U (en) * 2013-05-23 2013-10-30 天津港航工程有限公司 Jetty

Also Published As

Publication number Publication date
CN103243678A (en) 2013-08-14

Similar Documents

Publication Publication Date Title
CN103243678B (en) Mole
CN1837511B (en) Double-rowed cofferdam and method for manufacturing the same
CN103015367B (en) High-efficiency economical construction method for revetment
CN203795372U (en) Box body and inserted plate combined type ecological bank protection structure
CN103255742B (en) Frame wall pile type wharf
CN201040840Y (en) Hydrophilic wave-eliminating breakwater with grid-type structure
CN203834422U (en) Novel high-pile wharf
CN201506969U (en) Large-diameter dyke tubular pile and dyke or wharf structure thereof
CN102912762B (en) Dam with pile groups and permeable frame and construction method of dam
CN101144264A (en) Assembly type gravity-porous marine engineering structure
CN203256680U (en) Jetty
CN201686963U (en) Riprap slope-type breakwater with supporting frame inside
CN101994303A (en) Large diameter grain tubular pile embanking construction process and embanking or wharf structure thereof
CN101892650A (en) Combined type seawall and construction method thereof
CN102234995A (en) Ecological overtopping dam and construction method thereof
CN109356186B (en) Bridge tower composite foundation applicable to deep water soft soil areas and construction method
CN114382048B (en) Shellfish-algae reef type ecological seawall structure
CN203256675U (en) Wall pile framework structure
CN203034418U (en) Ecological riverway embankment by filing dimension stones in reinforced concrete frames
CN205954573U (en) Basalt fiber system unrestrained type hydraulic reclamation island reef bank protection that fixes sand to disappear
CN202989858U (en) Pile group water permeating frame dam
CN213328885U (en) Permeable breakwater
CN214993512U (en) Check dam adopting box-type net mold stacking
CN103276691B (en) wall pile frame construction
CN113047215A (en) Middle plate pile high pile wharf structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant