CN103239863A - Five-ring roller coaster - Google Patents

Five-ring roller coaster Download PDF

Info

Publication number
CN103239863A
CN103239863A CN201310171569XA CN201310171569A CN103239863A CN 103239863 A CN103239863 A CN 103239863A CN 201310171569X A CN201310171569X A CN 201310171569XA CN 201310171569 A CN201310171569 A CN 201310171569A CN 103239863 A CN103239863 A CN 103239863A
Authority
CN
China
Prior art keywords
track
rail
train
rings
coaster
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310171569XA
Other languages
Chinese (zh)
Inventor
李军
李宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Huaye Metallurgy Equipment Manufacturing Co Ltd
Original Assignee
Shandong Huaye Metallurgy Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Huaye Metallurgy Equipment Manufacturing Co Ltd filed Critical Shandong Huaye Metallurgy Equipment Manufacturing Co Ltd
Priority to CN201310171569XA priority Critical patent/CN103239863A/en
Publication of CN103239863A publication Critical patent/CN103239863A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

A five-ring roller coaster comprises a platform, a train, a rail and vertical columns. The front end and the rear end of the platform are connected with the rail respectively, the rail is made of two rail steels with constantly parallel central lines, and the trajectory of the rail is a closed curve; the vertical columns support the rail to enable the rail to form two vertical rings and two spiral rings, the train runs on the rail, a traction system and a braking apparatus are mounted on the train, the vertical columns support the rail to enable the rail to form a rail vertex, and a floating ring is arranged on the rail in the rear of the spiral rings; a lightening shielding apparatus is mounted at the rail vertex; and anemographs are mounted on the vertical columns. Compared with existing three-ring and four-ring roller coasters, the five-ring roller coaster has the advantages that the number of rings of the train running rail is increased, the total length of the rail is lengthened, the running time is increased, and rings of the rail are increased with the occupied area unchanged, so that moving postures of the train are abundant and varied, tourists can enjoy the adventure, and the roller coaster is popular with tourists of an amusement park.

Description

The five rings roller-coaster
 
Technical field
The present invention relates to the roller-coaster of the frame for movement in a kind of industry field of travelling, relate in particular to a kind of five rings roller-coaster.
Background technology
Existing roller-coaster is that row slide the recreation facility that dolly slides at aerial conveyor, roller-coaster is one of equipment most popular in each big amusement park, it is by track, column, draw-gear, brake apparatus, takes advantage of people's train, and major parts such as control appliance are formed; After dolly at first is drawn to peak along track, break away from power, rely on it to have potential energy, dive downwards with inertia, in the growth and decline of kinetic energy and potential energy change, after overhead track enters two vertical upright rings continuously, after sliding, excessive horizontal loops track enters two helical orbits more continuously, steadily get back to the station at last, omnidistance Fourth Ring altogether, the rise on track and ground be from about 30 meters, about 600 meters of route track length, omnidistance about 120 seconds of trolley travelling, the visitor can experience instantaneous acceleration in 120 seconds time, slow down, very dizzy, rapidly slide, approach weightless pleasant sensation and stimulation.But along with development of science and technology, irritating recreation is more and more, and people have not satisfied the stimulation that the Fourth Ring roller-coaster brings, and needs a kind of time longer, highly higher, and the more roller-coaster of number of rings satisfies people's pleasant sensation and stimulation.
Summary of the invention
The purpose of this invention is to provide a kind ofly under the constant situation of floor space, running time is longer, highly higher, the running number of rings is more, more can bring the five rings roller-coaster of pleasant sensation and stimulation to people.
For achieving the above object, the technical solution adopted in the present invention is:
A kind of five rings roller-coaster, comprising: platform, train, track, column; The platform front and back end connects track respectively, track be by two center lines all the time parallel track steel form, the track of track is closed curve; The upright supports track makes track form two upright rings and two helical rings, train turns round in orbit, trailer system and brake apparatus are installed on the train, its characteristics are: described upright supports track makes track form a track peak, and the track design at described helical ring rear has the ring that wafts.
According to above-mentioned five rings roller-coaster, its characteristics are: described track peak is 33-34 rice.
According to above-mentioned five rings roller-coaster, its characteristics are: described track total length is 720-725 rice.
According to above-mentioned five rings roller-coaster, its characteristics are: described train operation F-Zero is: 80 kms/hour; The train week age that orbits is 136-138 second.
According to above-mentioned five rings roller-coaster, its characteristics are: on the described track peak lightning arrester is installed.
According to above-mentioned five rings roller-coaster, its characteristics are: on the described column anemobiagraph is installed.
Advantage of the present invention is: five rings of the present invention roller-coaster is compared with existing three rings, Fourth Ring roller-coaster, increased the number of rings of train operation track, the total length of track has lengthened, increased running time, under the constant situation of floor space, increased the number of rings of track, make the athletic posture of train more rich and varied, the more happy more stimulation that the visitor is played is welcome by the visitor of amusement park more.
Description of drawings
Fig. 1 is structural representation of the present invention.
Fig. 2 is the schematic, simplified diagram of overlooking of Fig. 1.
In the accompanying drawing
1, platform 2, train 3, upright ring 4, helical ring 5, ring 6, track peak 7, track 8, column 9, anemobiagraph 10, lightning arrester waft.
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment the present invention is further described:
A kind of five rings roller-coaster, as shown in Figure 1, 2, comprising: platform 1, train 2, track 7, column 8; Platform 1 front and back end connects track respectively, track 7 be by two center lines all the time parallel track steel form, the track of track 7 is closed curves; Column 8 supporting tracks 7 make track form 3 and two helical rings 4 of two upright rings, train 2 is in track 7 runnings, trailer system and brake apparatus are installed on the train 2, and column 8 supporting tracks 7 make track form a track peak 6, and track 7 designs at described helical ring 4 rears have the ring 5 that wafts.
In the present embodiment, track peak 6 is 33-34 rice.
In the present embodiment, track 7 total lengths are 720-725 rice.
In the present embodiment, train 2 operation F-Zeros are: 80 kms/hour; Train 2 is 136-138 second at track 7 operation week ages.
In the present embodiment, on the track peak 6 lightning arrester 10 is installed.
In the present embodiment, on the column 8 anemobiagraph 9 is installed.
Operation principle of the present invention is: dispatch a car before the operation, train is clamped by brake apparatus, rests on to wait on the platform that the visitor is upper and lower.After operating personnel send the instruction (pressing start button) of driving, the drive motors of train traction system starts, drive fluid coupling, the reductor running, thereby driving the lifting chain gets into smooth earlier, brake in the station of train several groups of brake apparatus opens thereupon, train relies on self gravitation and track slope to slide along the departures track downwards, and rushes at the lifting orbital segment of track, the draw hook of train and operating conduction chain automatic coupling, drive train along the lifting section orbital motion of the 20 degree gradients, to track peak place, train and chain are automatically-unhooked, and travel switch sends signal, the drive motors of traction enhancement shuts down, after breaking away from traction, train just relies on the potential energy of self fully, overcomes frictional resistance, with various attitudes, various speed slide along track and get back to starting point.
The train that has just broken away from conduction chain, have maximum potential, from the acceleration of diving of straight slope track, slip over two in succession vertically behind the upright ring downwards, carry out the transition to two helical rings again, after slipping over helical ring, the ring that wafts that climbs to, slide 360 the degree circular traces after, just enter back the station track, through stopping brake in the outer retarding braking of platform and the platform, train is parked in the platform, has finished the operation of a circulation.
Technical parameter of the present invention is:
1, column center line linearity is installed less than 1:1000, and is not more than 5 millimeters, total length is no more than 5:1000.
2, equipment installs the solid and reliable operation of each moving component installation requirement of back freely, does not allow different strength phenomenon, and the securing member of screw-down torque requirement is arranged, and should adopt torque spanner, and screw-down torque in accordance with regulations is fastening.
3, each safety locking motion requires and can reliably use.
4, each revolution, lubricating component require to beat sufficient lubricating oil.
Ban use of equipment when 5, wind speed is 15m/s.
6, according to the landform self manufacture, the form of fence and installation meet the pertinent regulations of GB8408-2008 to the equipment outer fence by the user.
7, application: used needs carry out the metallic article surface of application and rust, oxide skin, grease, dust etc. must be removed before application.
Embodiment recited above is described preferred embodiment of the present invention; be not that design of the present invention and protection domain are limited; under the prerequisite that does not break away from design concept of the present invention; common engineers and technicians make technical scheme of the present invention in this area various modification and improvement all should fall into protection scope of the present invention.

Claims (6)

1. five rings roller-coaster, comprising: platform (1), train (2), track (7), column (8); Platform (1) front and back end connects track (7) respectively, track (7) be by two center lines all the time parallel track steel form, the track of track (7) is closed curve; Column (8) supporting track makes track form two upright ring (3) and two helical rings (4), train (2) turns round at track (7), train is equipped with trailer system and brake apparatus on (2), it is characterized in that: described column (8) supporting track makes track form a track peak (6), and track (7) design at described helical ring (4) rear has the ring (5) that wafts.
2. five rings according to claim 1 roller-coaster, it is characterized in that: described track peak (6) is 33-34 rice.
3. five rings according to claim 1 roller-coaster, it is characterized in that: described track (7) total length is 720-725 rice.
4. five rings according to claim 1 roller-coaster, it is characterized in that: described train (2) operation F-Zero is: 80 kms/hour; Train (2) week age that orbits is 136-138 second.
5. five rings according to claim 1 roller-coaster is characterized in that: lightning arrester (10) is installed on the described track peak (6).
6. five rings according to claim 1 roller-coaster is characterized in that: anemobiagraph (9) is installed on the described column (8).
CN201310171569XA 2013-05-11 2013-05-11 Five-ring roller coaster Pending CN103239863A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310171569XA CN103239863A (en) 2013-05-11 2013-05-11 Five-ring roller coaster

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310171569XA CN103239863A (en) 2013-05-11 2013-05-11 Five-ring roller coaster

Publications (1)

Publication Number Publication Date
CN103239863A true CN103239863A (en) 2013-08-14

Family

ID=48919957

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310171569XA Pending CN103239863A (en) 2013-05-11 2013-05-11 Five-ring roller coaster

Country Status (1)

Country Link
CN (1) CN103239863A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104906794A (en) * 2015-05-13 2015-09-16 朱成风 Overhead rail vehicle

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201055685Y (en) * 2007-06-28 2008-05-07 中冶集团北京冶金设备研究设计总院 Four-loop switchback
CN203315729U (en) * 2013-05-11 2013-12-04 山东华冶冶金设备制造有限公司 Five-ring roller coaster

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201055685Y (en) * 2007-06-28 2008-05-07 中冶集团北京冶金设备研究设计总院 Four-loop switchback
CN203315729U (en) * 2013-05-11 2013-12-04 山东华冶冶金设备制造有限公司 Five-ring roller coaster

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104906794A (en) * 2015-05-13 2015-09-16 朱成风 Overhead rail vehicle

Similar Documents

Publication Publication Date Title
CN202185151U (en) Track structure forming riding car travelling route during entertainment riding
AU2017206253B2 (en) Zip track and system
CN201445737U (en) Circular body-building bicycle
CN204601603U (en) The dynamic rail system of a kind of suspension roller-coaster
CN105251208A (en) Vertical falling type roller coaster track and application method thereof
CN204745629U (en) Interactive type dark rider equipment of suspension type roller -coaster
CN203315729U (en) Five-ring roller coaster
CN111035939A (en) Seesaw type roller coaster
CN103239863A (en) Five-ring roller coaster
CN104906794A (en) Overhead rail vehicle
CN207898966U (en) A kind of Dan Lihuan indoor high-speeds roller-coaster
CN204996111U (en) Perpendicular drop -out roller coaster track
CN203255187U (en) Cableway ambulance
CN105031926A (en) Moving rail system for suspended roller coasters and method for improving user experience of moving rail system
CN201085917Y (en) Noise eliminating device of scenic railway for play
CN102895784B (en) Jumping recreation facility
CN207913205U (en) A kind of double vertical ring indoor high-speed roller-coasters
CN203436812U (en) Roller coaster entertaining device
CN204001902U (en) Coaxial asynchronous full-automatic Traverse Displacement Unit
CN203954658U (en) A kind of six ring roller-coasters
CN207101869U (en) A kind of indoor high-speed roller coaster track
CN202147683U (en) Turning device of movable rope clip
CN106422335A (en) Overhead cable sliding component and overhead cable sliding system
CN106669155B (en) Spiral of travelling Durchgangshohle system
CN206228927U (en) Overhead cable pulley arrangement and overhead cable gliding system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130814