CN103234405A - Deep hole crack control blasting method for grouting reinforced surrounding rock - Google Patents

Deep hole crack control blasting method for grouting reinforced surrounding rock Download PDF

Info

Publication number
CN103234405A
CN103234405A CN2013101597265A CN201310159726A CN103234405A CN 103234405 A CN103234405 A CN 103234405A CN 2013101597265 A CN2013101597265 A CN 2013101597265A CN 201310159726 A CN201310159726 A CN 201310159726A CN 103234405 A CN103234405 A CN 103234405A
Authority
CN
China
Prior art keywords
explosive
grouting
boring
crack
drilled holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101597265A
Other languages
Chinese (zh)
Inventor
赵明生
池恩安
成旭
魏兴
谢春明
明悦
沈晓松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Xinlian Blasting Engineering Group Co Ltd
Original Assignee
Guizhou Xinlian Blasting Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Xinlian Blasting Engineering Group Co Ltd filed Critical Guizhou Xinlian Blasting Engineering Group Co Ltd
Priority to CN2013101597265A priority Critical patent/CN103234405A/en
Publication of CN103234405A publication Critical patent/CN103234405A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a deep hole crack control blasting method for a grouting reinforced surrounding rock. The deep hole crack control blasting method comprises the following steps: (1) drilling holes on a rock body needing grouting, wherein the diameter of the drilled holes is 50-120mm, the depth of the drilled holes is 6-9m, and the distance between two drilled holes is 3-9m; (2) placing explosive containing tubes in the drilled holes, and filling stick explosive into the explosive containing tubes, wherein each explosive containing tube is formed by welding two arc-shaped plates in an overlapping mode, the decoupling coefficient of the stick explosive is 1.5-2.5, and the density of linear explosive is 1.1-1.7kg/l; and (3) performing presplitting blasting on the explosive in the drilled holes after explosion, and then filling grouting materials into cracks of the drilled holes. A plurality of cracks can be formed in a stratum, blast holes can be reserved and cannot collapse, grouting dispersing range is expanded, accordingly effective grouting curtains can be formed, the effect of grouting and water plugging can be achieved, and the surrounding rock can be reinforced.

Description

A kind of deep hole Crack Control blasting method of grouting reinforcement rock
Technical field
The present invention relates to a kind of deep hole Crack Control blasting method of grouting reinforcement rock, belong to Geotechnical Engineering and explosion field.
Background technology
At present, have to some results qualitatively in the research aspect the grouting and reinforcing rock mass strength both at home and abroad, but also be not applied to practice; The factor that influences the grouting and reinforcing rock mass strength is a lot, can not improve with slip casting intensity simply and how much weigh.
The crack of rock mass is the irregular plane of fracture that forms under the natural endowment, its atypical characteristic influences the flow event of slurries consumingly, and the distribution in crack, surface characteristics, has randomness, rock mass hole or crack are the passages that slurries flow, because the difference of rock mass structure causes the mode of slurry stream warp different with approach, thereby produce different slip casting effects, also do not have the deep hole Crack Control blasting method of effective grouting reinforcement rock at present.
Summary of the invention
At the deficiencies in the prior art part, the present invention aims to provide a kind of deep hole Crack Control blasting method of grouting reinforcement rock, can effectively improve the effect of grouting reinforcement rock at the distribution atypical characteristic of rock cranny.
For solving the problems of the technologies described above the technical solution used in the present invention: a kind of deep hole Crack Control blasting method of grouting reinforcement rock may further comprise the steps:
(1) to the rock mass that the needs slip casting hole of drilling, bore diameter is 50-120 millimeters, and drilling depth is 6-9 meters, and the spacing of wells is 3-9 meters;
(2) in described boring, put into the powder charge pipe, the explosive cartridge of in the powder charge pipe, packing into, this powder charge pipe is formed by the joint welding of two arc sheet material, and the not coupling coefficient value of explosive cartridge is 1.5-2.5, and traditional thread binding explosive density is 1.1-1.7 kgm -1, detonator in colligation on the explosive that installs is inserted in the explosive detonator as apparatus to cause bursting, and detonator is caused outside the boring, with the good big gun of yellow mud shutoff hole, detonates by compound electric explosion network, detonator system;
(3) detonate that explosive carries out presplit blasting in the back boring, under the burst pressure effect, make the rock mass between the described boring produce the crack of running through; The length of the through crack that produces between the boring is injected injecting paste material in the crack of described boring then greater than 150~120 times boring radius.
Principle of the present invention is: the method that adopts blast generation through crack between a kind of boring, after blast, the wall of a borehole is formed the blast pressure pulse, thereby reach the purpose that in rock mass, generates through crack, increase the distance of crack growth and do not cause hole wall seriously broken. prolonged action time simultaneously and made blast generate the easy injection of gas in the crack, drive the farther of crack propagation, enlarged the scope of fracturing, the most direct exercising result of deep hole Crack Control explosion is exactly to impel the crack that the rock mass generation runs through between the boring and the crack is expanded, crack in the rock mass increases considerably and expands, and has formed interconnected fracture net in a big way between injected hole.
The invention has the beneficial effects as follows: adopt patented technology of the present invention, after the explosion, can in the rock stratum, form a lot of cracks, and the big gun hole still can keep, not subside, enlarged the range of scatter of slip casting, thereby form effective grouting curtain, reach the grouting for water blocking effect and play the effect of reinforcing country rock, and can reduce the quantity of injected hole.
Description of drawings
Fig. 1 is powder charge tubular construction schematic diagram;
Fig. 2 is powder charge scheme of installation in the powder charge pipe;
In the accompanying drawing: 1 powder charge pipe, 2 paddings, 3 explosive cartridges, 4 detonators, 5 lead-in wires.
The specific embodiment
The invention will be further described below in conjunction with specific embodiment.
Example one,
As shown in Figure 1 and Figure 2, certain rock mass slope engineering, rock mass is based on limestone, wherein, firmness of rock coefficient f=6-7 is about formation dip 75 degree, water content is bigger, and there is water on the top layer for following 2 meters, behind the slope toe excavation, side slope rock stratum instability, reserve domatic beyond the side slope, with the rig hole of drilling, 70 millimeters of bore diameters, drilling depth is 6 meters, and adjacent distance between borehole is 6 meters.In described boring, put into powder charge pipe 1, the explosive cartridge 3 of in powder charge pipe 1, packing into, this powder charge pipe 1 is formed by the joint welding of two arc sheet material, and the not coupling coefficient value of explosive cartridge 3 is 1.5, and linear charging density is 1.1 kgm -1Primacord in colligation on the explosive cartridge 3 that installs, after reaching the requirement of engineering design Deng the explosive length that installs primacord, detonator 4 is inserted in the explosive as apparatus to cause bursting, and detonator lead-in wire 5 caused outside the boring,, detonate by custom-designed compound electric explosion network, detonator system as padding 1 shutoff big gun hole with yellow mud, then injecting paste material is injected after the explosion and reinforce the back excavation construction in the crack of described boring.Injecting paste material is selected fine sand, cement, waterglass for use, plasticity index 10-20, Portland cement, modulus of water glass is 2.8-3.3, and concentration 38-42Be, Be are Baume concentration, namely immerse the concentration of numeric representation solution measured in the solution with Baume hydrometer, in work progress, at tomography and crushed zone taked on a small quantity, repeatedly, technological means such as repetition, intermittence, guarantee ejection for water plugging and surrounding rock consolidation effect.Grouting mode is taked the segmentation downward grouting according to the actual conditions of injected hole, and the grouting for water blocking effect is fine, and actual grouting for water blocking rate surpasses 91%, and the massif slope rock mass is very stable always.

Claims (1)

1. the deep hole Crack Control blasting method of a grouting reinforcement rock is characterized in that may further comprise the steps:
(1) to the rock mass that the needs slip casting hole of drilling, bore diameter is 50-120 millimeters, and drilling depth is 6-9 meters, 3-9 meters of the spacings of wells;
(2) in described boring, put into powder charge pipe (1), the explosive cartridge (3) of in powder charge pipe (1), packing into, this powder charge pipe (1) is formed by the joint welding of two arc sheet material, and the not coupling coefficient value of explosive cartridge (3) is 1.5-2.5, and traditional thread binding explosive density is 1.1-1.7 kgm -1, detonator in colligation on the explosive that installs is inserted in the explosive detonator (4) as apparatus to cause bursting, and detonator lead-in wire (5) is caused outside the boring, with the stifled good big gun hole of padding (2), detonates by compound electric explosion network, detonator system;
(3) detonate that explosive carries out presplit blasting in the back boring, under quick-fried living pressure effect, make the rock mass between the described boring produce the crack of running through; The length of the through crack that produces between the boring is injected injecting paste material in the crack of described boring then greater than 150~120 times boring radius.
CN2013101597265A 2013-05-03 2013-05-03 Deep hole crack control blasting method for grouting reinforced surrounding rock Pending CN103234405A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101597265A CN103234405A (en) 2013-05-03 2013-05-03 Deep hole crack control blasting method for grouting reinforced surrounding rock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101597265A CN103234405A (en) 2013-05-03 2013-05-03 Deep hole crack control blasting method for grouting reinforced surrounding rock

Publications (1)

Publication Number Publication Date
CN103234405A true CN103234405A (en) 2013-08-07

Family

ID=48882457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101597265A Pending CN103234405A (en) 2013-05-03 2013-05-03 Deep hole crack control blasting method for grouting reinforced surrounding rock

Country Status (1)

Country Link
CN (1) CN103234405A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113375515A (en) * 2021-07-21 2021-09-10 中国十五冶金建设集团有限公司 Blasting compaction device and method for blasting compaction of soil slope by using same
CN113432500A (en) * 2021-08-06 2021-09-24 安徽理工大学 Blasting method for fracture-containing dangerous rock mass

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040075612A (en) * 2003-02-22 2004-08-30 김일환 Liner for blasting and method for blasting in use of the same
CN102109304A (en) * 2010-11-30 2011-06-29 中国矿业大学(北京) Directional rock blasting crack propagation method and device
CN102878874A (en) * 2012-10-09 2013-01-16 北京科技大学 Deep-hole pre-splitting blasting grouting method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040075612A (en) * 2003-02-22 2004-08-30 김일환 Liner for blasting and method for blasting in use of the same
CN102109304A (en) * 2010-11-30 2011-06-29 中国矿业大学(北京) Directional rock blasting crack propagation method and device
CN102878874A (en) * 2012-10-09 2013-01-16 北京科技大学 Deep-hole pre-splitting blasting grouting method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113375515A (en) * 2021-07-21 2021-09-10 中国十五冶金建设集团有限公司 Blasting compaction device and method for blasting compaction of soil slope by using same
CN113375515B (en) * 2021-07-21 2023-01-17 中国十五冶金建设集团有限公司 Blasting compaction device and method for blasting compaction of soil slope by using same
CN113432500A (en) * 2021-08-06 2021-09-24 安徽理工大学 Blasting method for fracture-containing dangerous rock mass

Similar Documents

Publication Publication Date Title
Huang et al. Hydraulic fracturing after water pressure control blasting for increased fracturing
CN106194244B (en) Lower permeability seam liquid phase CO2Phase transformation fracturing is anti-reflection grid type gas pumping method
CN102878874A (en) Deep-hole pre-splitting blasting grouting method
CN105201448B (en) Block water slip casting method for blocking in a kind of high-pressure high-flow water gushing channelway
CN104005415B (en) The efficient forming construction method thereof of diaphram wall in light weathered granite
CN107355229B (en) The construction method of deep hole smooth surface Tunnel Blasting system and the tunnel
CN107060834A (en) Grout injection control technique is oozed in drainage slowly under back rich water broken condition
CN104482815A (en) Tunnel smooth blasting method
CN100434653C (en) Blasting type cave well completion technological method of coal layer gas well
CN111365002B (en) Ground pre-grouting method for small-section high wellbore in complex stratum
CN105737697B (en) A kind of outlining blasting method suitable for joints development rock mass
CN104295309B (en) A kind of jet perforating hollow grouting anchor and its construction method with framework of steel reinforcement
CN103362117A (en) Full-section grouting method for grouting section
CN204718510U (en) A kind of novel joint-cutting quick-burning charge monoblock type photoface exploision device
CN107130988A (en) A kind of anti-reflection slip casting Composite Bolt of liquid carbon dioxide explosion
Huang et al. Field investigation into directional hydraulic fracturing for hard roof in Tashan Coal Mine
CN102817633B (en) The device drawing out methane and the pre-splitting method of the controlled blasting of deep hole crack
CN103233738A (en) Comprehensive weakening method of top coal of heavy-pitch super high seam
CN109737840B (en) Multi-tunnel construction method based on soft interlayer
CN104596375A (en) Fully mechanized excavation construction method for rock roadway
WO2022247258A1 (en) Extra-thick coal seam upper layer old goaf roof reconstruction method and construction method
CN103835723A (en) Comprehensive pretreatment method for shaft penetration in mined-out area stratum
CN108222882A (en) Inwash individual well multi-section multi-layer slip casting new casing and construction method
CN115749713A (en) Rock stratum frequency conversion pulse fracture network fracturing method and equipment
CN107288606B (en) Method for artificially building hot dry rock thermal reservoir

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130807