CN103233686A - Manual pipe bit - Google Patents
Manual pipe bit Download PDFInfo
- Publication number
- CN103233686A CN103233686A CN2013101483118A CN201310148311A CN103233686A CN 103233686 A CN103233686 A CN 103233686A CN 2013101483118 A CN2013101483118 A CN 2013101483118A CN 201310148311 A CN201310148311 A CN 201310148311A CN 103233686 A CN103233686 A CN 103233686A
- Authority
- CN
- China
- Prior art keywords
- shovel head
- drill bit
- shovel
- soil
- extension bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
- Sampling And Sample Adjustment (AREA)
- Earth Drilling (AREA)
Abstract
The invention discloses a manual pipe bit which is mainly composed of a shovel head, a balance weight lever and a lengthening bar. The front end of the balance weight lever is connected with the shovel head, the rear end of the balance weight lever is connected with the lengthening bar, the shovel head is a barrel with a rear port sealed, the balance weight lever is fixed on the rear end face of the shovel head, and a side wall of the shovel head is provided with a sample taking port for taking out soil mass samples. The shovel head is the barrel and is simple in structure. Compared with a shovel head of an existing Luoyang shovel, due to the fact that area of the shovel head contacted with soil is increased and friction force between the soil and an inner wall of the shovel head is increased, underground soil mass can be taken up as much as possible, and the problem that the soil cannot be taken out easily once the Luoyang shovel is met with underground water is solved. The manual pipe bit is light and convenient to carry and use. After tunneled into the shovel head, the soil mass can be taken out through the sample taking port, and the manual pipe bit is simple to operate, large in tunneling depth and favorable for smooth development of engineering geologic investigation.
Description
Technical field
The present invention relates to the simple and easy exploring equipment of a kind of engineering geologic investigation shallow-layer cohesive soil, sand, particularly a kind of artificial pipe bit.
Background technology
In recent years, along with the fast development of mountain area engineering construction (as mountainous area highway), the prospecting task also increases gradually.Usually, intermountain depression, simple stratum can adopt simple and easy exploring equipment to find out engineering geological conditions.
At present, the most frequently used simple and easy exploring equipment is luoyang spade, luoyang spade is made up of shovel head, weight linear meter and extension bar, the shovel head is half cylindrical shell shape, be mainly used to dig underground soil layer and it is carried upper ground surface, the effect of weight linear meter is just as the front of javelin, shovel is added accurately first watch, effectively dig into to the soil layer deep, the front end of weight linear meter is connected with the shovel head with welding manner, extension bar is connected in the screw thread mode with the rear end of weight linear meter, and extension bar constantly spreading lengthens entire length to adapt to the soil layer of different depth.In use, luoyang spade stabs vertically downward and hits ground, utilizes the shovel head underground soil zone can be gone out, and digs out a deep hole that diameter is about tens centimetres gradually, analyzes the character of the underground soil layer of shallow-layer according to the structure of taking soil out of, color, density and various inclusion.Luoyang spade possesses plurality of advantages such as light, simple to operate in the engineering investigation process.
Yet, luoyang spade also has the following disadvantages in the engineering investigation use: when tunneling in cohesive soil, if run into underground water, owing to the frictional force that has reduced between soil and the shovel inwall, the phenomenon that can be difficult to fetch earth, in addition, if run into loose layer of sand, also it can't be taken to ground, therefore, limit the degree of depth of exploration, be unfavorable for carrying out smoothly of engineering geologic investigation.
Summary of the invention
The object of the present invention is to provide the artificial pipe bit of carrying out smoothly that a kind of simple in structure, light, simple to operate, tunnelling footage is big, be conducive to engineering geologic investigation.
Above-mentioned purpose of the present invention realizes by following technical measures: a kind of artificial pipe bit, mainly formed by shovel head, weight linear meter and extension bar, the front end of described weight linear meter is connected with the shovel head, its rear end is connected with extension bar, it is characterized in that: described shovel head is the cylindrical shell of rear port sealing, described weight linear meter is fixed on the rear end face of described shovel head, has for the sample tap that takes out soil body sample at the described sidewall that shovels head.
Shovel head of the present invention is cylindrical shell, simple in structure, compare with the shovel head of existing luoyang spade, owing to increased the area that contacts with soil, and then soil and the frictional force of shoveling between the inwall have been increased, therefore the underground soil body can be brought up as much as possible, avoided luoyang spade one to meet underground water, just be difficult to the situation that soil is taken out; The present invention carries and uses lightly, after the soil body is tunneled shovel head, can the soil body be taken out by sample tap, and simple to operate, tunnelling footage is big, is conducive to carrying out smoothly of engineering geologic investigation.
As one embodiment of the present invention, at a described drill bit that has additional tubular that shovels, described drill bit links to each other with the front port of described shovel head by the structure that removably connects.
As another embodiment of the invention, have additional the drill bit of tubular at described shovel head, described drill bit links to each other with the front port of described shovel head by the structure that removably connects, be provided with cover plate for this front port of shutoff at the front port of described drill bit, described cover plate is hinged on the inwall of described drill bit, mouth along described front port is provided with the flanging that bends inwards along circumference, described passings is realized shutoff at described flanging so that in sand when driving cover plate open make sand enter in the shovel head or when mentioning in the shovel head sand push the cover plate pass and close.Can be applicable to the driving of loose sand well and fetch earth, loose sand can be taken to ground smoothly.
As optimal way of the present invention, the described structure that removably connects adopts screw connection structure.
The present invention also has following embodiment:
Described shovel head and described weight linear meter are for being welded to connect.
Described weight linear meter and described extension bar are for being threaded.
Described extension bar is several, and the rod end of several extension bars is connected extension bar by the joint screw thread connection respectively.
Compared with prior art, the present invention has following significant effect:
⑴ shovel head of the present invention is cylindrical shell, simple in structure, compare with the shovel head of existing luoyang spade, owing to increased the area that contacts with soil, and then soil and the frictional force of shoveling between the inwall have been increased, therefore the underground soil body can be brought up as much as possible, avoided luoyang spade one to meet underground water, just be difficult to the situation that soil is taken out.
⑵ on the shovel head drill bit is installed, can changes according to the soil property situation and use two kinds of different drill bits, both can when cohesive soil is met water, the soil body can be taken out smoothly, be applicable to the driving of loose sand again and fetch earth.
⑶ can take out the soil body by sample tap after the soil body is tunneled the shovel head, and simple to operate, tunnelling footage is big, is conducive to carrying out smoothly of engineering geologic investigation.
Of the present invention simple in structure, carry and use light, practical, but wide popularization and application is in the engineering investigation field.
Description of drawings
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.
Fig. 1 is the structural representation of the embodiment of the invention 1;
Fig. 2 is the structural representation of the embodiment of the invention 2;
Fig. 3 is the structural representation of drill bit among the embodiment 2.
The specific embodiment
Embodiment 1
As shown in Figure 1, it is a kind of artificial pipe bit of the present invention, mainly formed with extension bar 3 by shovel 1, weight linear meter 2, weight linear meter 2 adopts high-density metal material bar to make, and diameter is 6cm, and extension bar 3 employing diameters are that the iron pipe of 4cm is made, the front end of weight linear meter 2 is welded to connect with shovel 1, and the rear end of weight linear meter 2 is threaded with extension bar 3, and extension bar 3 is several, and the rod end of several extension bars 3 is threaded by joint 5 respectively extension bar is connected.Shovel 1 is the cylinder of rear port sealing, adopts the core barrel cutting of probing usefulness to form, and weight linear meter 2 is fixed on the rear end face of shovel 1, sidewall at shovel 1 has for the sample tap 11 that takes out soil body sample, sample tap is rectangular opening, and bore is bigger, with convenient therefrom sampling.
Present embodiment is applicable to the situation of tunneling and run into water in viscous soil horizon, compare with existing luoyang spade, owing to increased the frictional force between soil and the shovel inwall, therefore the underground soil body can be brought up as much as possible, in soil body driving shovel head, mention the shovel head to ground, can use iron rod by sample tap the soil body to be disclosed.
Shown in Fig. 2,3, the difference of present embodiment and embodiment 1 is: have additional columnar drill bit 4 at shovel 1, drill bit 4 links to each other with the front port of shovel 1 by the structure that removably connects, in the present embodiment, this structure that removably connects adopts screw connection structure, specifically links to each other with the external screw thread that is arranged on shovel 1 front port by the internal thread 41 that is arranged on drill bit 4 rear ports.
Present embodiment (figure does not draw) is with the difference of embodiment 1: the structure of drill bit is different among the drill bit in the present embodiment and the embodiment 1, based on the drill bit among the embodiment 1, be provided with cover plate for this front port of shutoff at the front port of drill bit, cover plate is hinged on the inwall of drill bit, mouth along the chisel edge mouth is provided with the flanging that bends inwards along circumference, and passings is realized shutoff at flanging.
The course of work of present embodiment is: present embodiment is applicable to the driving of loose sand and fetches earth, when in sand, tunneling, thereby cover plate is subjected to the thrust of the soil body and rotates and open the front port of drill bit, make sand enter in the drill bit and enter and shovel in the head, when upwards mentioning shovel, sand can make Qi Guanhe for the extruding cover plate in the shovel head under the self gravitation effect, therefore, sand in the shovel head can be kept somewhere to get off, thereby loose sand is taken to ground smoothly.
When the soil body is cohesive soil, use the drill bit of embodiment 1, when the soil body is sand, use the drill bit of embodiment 2, therefore, two kinds of drill bits can selectively be suitable for and change mutually according to soil mass property.In addition, can determine the entire length of extension bar according to the exploration soil depth, to select the quantity of extension bar.
Embodiments of the present invention are not limited thereto; according to foregoing of the present invention; ordinary skill knowledge and customary means according to this area; syndeton between each building block of the present invention also has other embodiment; therefore the present invention can also make modification, replacement or the change of other various ways, all drops within the rights protection scope of the present invention.
Claims (7)
1. artificial pipe bit, mainly formed by shovel head, weight linear meter and extension bar, the front end of described weight linear meter is connected with the shovel head, its rear end is connected with extension bar, it is characterized in that: described shovel head is the cylindrical shell of rear port sealing, described weight linear meter is fixed on the rear end face of described shovel head, has for the sample tap that takes out soil body sample at the described sidewall that shovels head.
2. artificial pipe bit according to claim 1 is characterized in that: have additional the drill bit of tubular at described shovel head, described drill bit links to each other with the front port of described shovel head by the structure that removably connects.
3. artificial pipe bit according to claim 1, it is characterized in that: the drill bit that has additional tubular at described shovel head, described drill bit links to each other with the front port of described shovel head by the structure that removably connects, be provided with cover plate for this front port of shutoff at the front port of described drill bit, described cover plate is hinged on the inwall of described drill bit, mouth along described front port is provided with the flanging that bends inwards along circumference, described passings is realized shutoff at described flanging so that in sand when driving cover plate open make sand enter in the shovel head or when mentioning in the shovel head sand push the cover plate pass and close.
4. according to claim 2 or 3 described artificial pipe bits, it is characterized in that: the described structure that removably connects adopts screw connection structure.
5. artificial pipe bit according to claim 4 is characterized in that: described shovel head and described weight linear meter are for being welded to connect.
6. artificial pipe bit according to claim 5 is characterized in that: weight linear meter of the present invention and described extension bar are for being threaded.
7. artificial pipe bit according to claim 6 is characterized in that: described extension bar is several, and the rod end of several extension bars connects by joint screw thread respectively extension bar is connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101483118A CN103233686A (en) | 2013-04-25 | 2013-04-25 | Manual pipe bit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101483118A CN103233686A (en) | 2013-04-25 | 2013-04-25 | Manual pipe bit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103233686A true CN103233686A (en) | 2013-08-07 |
Family
ID=48881749
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013101483118A Pending CN103233686A (en) | 2013-04-25 | 2013-04-25 | Manual pipe bit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103233686A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103867200A (en) * | 2014-02-17 | 2014-06-18 | 河海大学 | Hole forming device in cohesionless soil and application method |
CN103966994A (en) * | 2014-05-05 | 2014-08-06 | 深圳市工勘岩土集团有限公司 | Feeler inspection type underground pipeline probing shovel |
CN104314117A (en) * | 2014-08-28 | 2015-01-28 | 江西稀有金属钨业控股集团有限公司 | Simple prospecting equipment |
CN104759662A (en) * | 2015-03-18 | 2015-07-08 | 广东省公路勘察规划设计院股份有限公司 | Engineering geological investigation hand drill jig |
CN112761130A (en) * | 2019-10-21 | 2021-05-07 | 山东科技大学 | Drilling equipment is used in geotechnical engineering reconnaissance |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2157979Y (en) * | 1993-03-25 | 1994-03-02 | 童春耕 | Drill bit |
US5606139A (en) * | 1995-05-02 | 1997-02-25 | Kejr Engineering, Inc. | Soil sample probe with retaining ring for holding core-catching structure within the probe |
CN1614382A (en) * | 2004-11-30 | 2005-05-11 | 南开大学 | Wet soil sampler |
CN2786602Y (en) * | 2005-02-06 | 2006-06-07 | 沈阳农业大学 | Improved soil collecting drill |
CN201060110Y (en) * | 2006-12-29 | 2008-05-14 | 中国科学院武汉岩土力学研究所 | Group connecting type rotary earth borrowing apparatus |
CN201373812Y (en) * | 2009-04-01 | 2009-12-30 | 长安大学 | Portable deep soil sampler |
CN202073084U (en) * | 2011-03-25 | 2011-12-14 | 牛志祥 | Novel luoyang shovel |
CN102818714A (en) * | 2012-08-13 | 2012-12-12 | 长江勘测规划设计研究有限责任公司 | Covering layer sampling device |
CN203229940U (en) * | 2013-04-25 | 2013-10-09 | 广东省公路勘察规划设计院股份有限公司 | Manual tubular drill |
-
2013
- 2013-04-25 CN CN2013101483118A patent/CN103233686A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2157979Y (en) * | 1993-03-25 | 1994-03-02 | 童春耕 | Drill bit |
US5606139A (en) * | 1995-05-02 | 1997-02-25 | Kejr Engineering, Inc. | Soil sample probe with retaining ring for holding core-catching structure within the probe |
CN1614382A (en) * | 2004-11-30 | 2005-05-11 | 南开大学 | Wet soil sampler |
CN2786602Y (en) * | 2005-02-06 | 2006-06-07 | 沈阳农业大学 | Improved soil collecting drill |
CN201060110Y (en) * | 2006-12-29 | 2008-05-14 | 中国科学院武汉岩土力学研究所 | Group connecting type rotary earth borrowing apparatus |
CN201373812Y (en) * | 2009-04-01 | 2009-12-30 | 长安大学 | Portable deep soil sampler |
CN202073084U (en) * | 2011-03-25 | 2011-12-14 | 牛志祥 | Novel luoyang shovel |
CN102818714A (en) * | 2012-08-13 | 2012-12-12 | 长江勘测规划设计研究有限责任公司 | Covering layer sampling device |
CN203229940U (en) * | 2013-04-25 | 2013-10-09 | 广东省公路勘察规划设计院股份有限公司 | Manual tubular drill |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103867200A (en) * | 2014-02-17 | 2014-06-18 | 河海大学 | Hole forming device in cohesionless soil and application method |
CN103867200B (en) * | 2014-02-17 | 2016-06-15 | 河海大学 | Hole-forming device and using method in a kind of cohesiveless soil |
CN103966994A (en) * | 2014-05-05 | 2014-08-06 | 深圳市工勘岩土集团有限公司 | Feeler inspection type underground pipeline probing shovel |
CN103966994B (en) * | 2014-05-05 | 2016-02-10 | 深圳市工勘岩土集团有限公司 | Feeler inspection formula underground utilities visit shovel |
CN104314117A (en) * | 2014-08-28 | 2015-01-28 | 江西稀有金属钨业控股集团有限公司 | Simple prospecting equipment |
CN104759662A (en) * | 2015-03-18 | 2015-07-08 | 广东省公路勘察规划设计院股份有限公司 | Engineering geological investigation hand drill jig |
CN104759662B (en) * | 2015-03-18 | 2018-05-15 | 广东省交通规划设计研究院股份有限公司 | A kind of engineering geological investigation hand drill drilling machine |
CN112761130A (en) * | 2019-10-21 | 2021-05-07 | 山东科技大学 | Drilling equipment is used in geotechnical engineering reconnaissance |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105927211B (en) | A kind of the rock mass mechanics characteristic original position drilling test method and device of deep underground engineering | |
CN104694746B (en) | A kind of method of ion adsorption type re in_situ leaching and leaching ore deposit system thereof | |
CN103233686A (en) | Manual pipe bit | |
CN109238161A (en) | A kind of observation device and observation method of tunnel surface absolute convergence amount | |
CN106285776A (en) | A kind of unrestrained method of roof water based on Technology of Directional Drilling | |
CN203229940U (en) | Manual tubular drill | |
CN204782999U (en) | Uncovered thin -wall sampler of formula of creeping into | |
CN103835647A (en) | Method for drilling floating pebble bed | |
CN202659146U (en) | Double-drilling combined drill structure suitable for drilling operation of oil well and horizontal well | |
CN210374907U (en) | Portable measuring scale for coal mine measurement engineering | |
CN210564401U (en) | Novel probe tube lower righting device for reducing drilling well logging | |
Spagnoli et al. | First deployment of the underwater drill rig MeBo200 in the North Sea and its applications for the geotechnical exploration | |
CN104631418A (en) | Method for checking underground pipeline through simple manpower device in urban geology exploration | |
CN103362473A (en) | Graded variable density well cementation technology | |
CN206919965U (en) | A kind of level of ground water remote auto observation device | |
CN206769812U (en) | A kind of coalfield prospecting probing guiding mechanism | |
CN208780495U (en) | A kind of soil sampler used for geological prospecting | |
CN201526309U (en) | Underground hydrological observation hole | |
CN107764585A (en) | A kind of charges sampler based on the gangue Reclamation by filling sinking land in coalmining areas | |
CN203022620U (en) | Drilling equipment used in petroleum exploitation process | |
CN206530298U (en) | Water conservancy project ring aluminum alloy drill stem for geological drilling | |
CN103469779B (en) | A kind of standard penetration test device dividing degree of rock weathering | |
CN205981762U (en) | Sampling drill bit is surveyed in water conservancy project | |
CN205910025U (en) | Ground reconnaissance sampling device | |
CN204920826U (en) | A drilling tool for drilling geology soil layer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 510507 Guangdong city of Guangzhou province Shahe tianpingjia Xinghua Road No. 22 Applicant after: GUANGDONG PROVINCE COMMUNICATIONS PLANNING & DESIGN INSTITUTE CO., LTD. Address before: 510507 Guangdong city of Guangzhou province Shahe tianpingjia Xinghua Road No. 22 Applicant before: Guangdong Highway Design Institute Co., Ltd. |
|
COR | Change of bibliographic data | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130807 |