CN103233566A - Construction method of joint trimming agent - Google Patents

Construction method of joint trimming agent Download PDF

Info

Publication number
CN103233566A
CN103233566A CN 201310162744 CN201310162744A CN103233566A CN 103233566 A CN103233566 A CN 103233566A CN 201310162744 CN201310162744 CN 201310162744 CN 201310162744 A CN201310162744 A CN 201310162744A CN 103233566 A CN103233566 A CN 103233566A
Authority
CN
China
Prior art keywords
seam
agent
ceramic tile
plastic pipe
trimming agent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201310162744
Other languages
Chinese (zh)
Inventor
张云春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201310162744 priority Critical patent/CN103233566A/en
Publication of CN103233566A publication Critical patent/CN103233566A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention discloses a construction method of a joint trimming agent. The construction method of the joint trimming agent solves the problem that the construction cannot be completed for one time in an existing method. The construction method of the joint trimming agent includes the following steps of cleaning tile joints; filling the tile joints with plastic tubes; adding the joint trimming agent to the tile joints; trowelling the joint trimming agent in the tile joints; wiping away overflowed joint trimming agent with a wet sponge; and flatting the tile joints with less joint trimming agent. Compared with the prior art, when the construction method of the joint trimming agent is used, the entire construction process can be completed for one time in different temperature conditions time, the joint filling unevenness and irregularity due to the gravity cannot occur, and the joint defect modifying is not needed. The construction method of the joint trimming agent is rapid in construction, simple in method, low in cost and obvious in the effect.

Description

The job practices of a kind of U.S. seam agent
Technical field
The present invention relates to the job practices of a kind of U.S. seam agent, under the situation to the good ceramic tile of paving when mainly being building decoration and fitment, the ceramic tile slit is injected the job practices of U.S. seam agent.
Background technology
In the building decoration and fitment field, need sometimes the slit of ceramic tile is filled, in the hope of reaching attractive in appearance and good waterproof effect.Usually, after the ceramic tile paving is intact, adopt white cement dry powder to carry out jointing, but time one length will turn black, be difficult to clean out.Simultaneously, because the leakiness that the slit is filled out forms the straight joint that runs through easily and causes the post-processed of leaking pretty troublesome.
In construction, handle in the ceramic tile slit that also has the agent of the U.S. seam of employing ceramic tile that paving is finished, and generally is to adopt following steps: the first step: clear up brickwork joint.Earlier the both sides of brickwork joint are cleaned out the edge with paper knife, and then the part of intermediate projections is shoveled, with hairbrush that the lime-ash cleaning that clears is clean again.Second step: agent is stitched by U.S.A be contained on the glue rifle.There is a pressing plate rear end of glue rifle, earlier pressing plate is pressed down, and can pull out the pushing ram of glue rifle, and then the agent of U.S. seam is installed.The 3rd step: squeeze into the agent of U.S. seam to brickwork joint.U.S.A is stitched after agent squeezes into the ceramic tile slit, smear with finger.The 4th step: use the sponge brush clean edge.The 5th step: to the seam agent of the ceramic tile squeezed into seam Sino-U.S. fewer carry out levelling, make it more attractive in appearance.
This job practices is more effective much than adopting the white cement powder jointing.Can improve waterproof effect to a certain extent, increase the aesthetics of joint filling.But, adopt the agent of U.S. seam to urge tile pointing often can not once finish.Because after finishing jointing for the first time, because the influence of gravity is stitched the depths that the agent meeting falls into the ceramic tile slit with U.S. that the glue rifle is squeezed into, cause joint filling inhomogeneous, even can form the through hole that runs through, have a strong impact on attractive in appearance.So need carry out the jointing second time to the ceramic tile seam, though can improve the effect of joint filling greatly, but still it is undesirable to have indivedual local joint filling effects.Especially construction when it is cold, U.S. seam agent sclerosis is slower, and effect can be poorer.
Summary of the invention
For overcoming above-mentioned defective, the technical issues that need to address of the present invention are: a kind of simple and reliable job practices of U.S. seam agent easily again is provided, makes that the ceramic tile slit after this method construction of employing is more attractive in appearance.
For solving the problems of the technologies described above, technical scheme of the present invention is: the job practices of a kind of U.S. seam agent comprises the steps:
The first step: the slit of cleaning ceramic tile.Earlier the both sides of brickwork joint are cleaned out the edge with paper knife, and then the part of intermediate projections is shoveled, remove the lime-ash that clears clean with hairbrush or vehicle-washing device again.
Second step: plastic pipe filling ceramic tile seam.Get length suitably, external diameter of pipe is slightly larger than the wide plastic pipe of ceramic tile seam, and plastic pipe is filled in the ceramic tile slit, guarantees that simultaneously plastic pipe do not fill in deeply, the gap depth control that the plastic pipe top is reserved is at 1mm-3mm.
The 3rd step: squeeze into the agent of U.S. seam to the ceramic tile seam.U.S.'s seam agent of pipe dress is contained on the glue rifle, squeezes into the agent of U.S. seam to brickwork joint.
The 4th step: U.S.A is stitched after agent squeezes into the ceramic tile slit, and floating with finger or other instruments, the agent of U.S. seam is unlikely to parallel with ground, can reduce wear.
The 5th step: wipe U.S.'s seam agent of overflowing with wet sponge.
The 6th step: levelling.Levelling is carried out in the ceramic tile seam Sino-U.S. fewer place of squeezing into of seam agent, made it more attractive in appearance.
As a kind of improvement: during with the plastic pipe joint filling, the gap depth control that the plastic pipe top is reserved is at 2mm.
Improve as another kind: fill with elastomeric material the hollow part of plastic pipe.
Improve as another kind:: the external surface of plastic pipe is provided with rule or irregular projection.
Compared with prior art, adopt this method that U.S.'s seam construction is carried out in the ceramic tile slit, can different temperature conditions next time property finish the whole construction operation, can not gap because there being gravity and fill not inhomogeneous and irregular situation and take place, also need not to stitch agent with U.S. and make up a deficiency.Construction is rapid, and method is simple, and is with low cost, and effect is obvious.
Description of drawings
Fig. 1 carries out the beautiful section of structure that stitches after agent is constructed for the ceramic tile slit.
The specific embodiment
Be further described below in conjunction with the job practices of accompanying drawing to U.S. seam of the present invention agent.
Job practices of the present invention is at reserve apertured situation at the paving ceramic tile time, by the processing to the ceramic tile slit, can use the ceramic tile slit after the agent of U.S. seam is handled more beautiful so that ceramic tile can stand the flexible of different temperatures, and water-fastness, nondiscolouring.The job practices of U.S. seam of the present invention agent comprises the steps:
The first step: the slit 5 of cleaning ceramic tile 1.Earlier the both sides of brickwork joint are cleaned out the edge with paper knife, and then the part of intermediate projections is shoveled, remove the lime-ash that clears clean with hairbrush or vehicle-washing device again.
Second step: plastic pipe filling ceramic tile seam.Get length suitably, external diameter of pipe is slightly larger than the wide plastic pipe 2 of ceramic tile seam, and plastic pipe 2 is filled in ceramic tile slit 5, plastic pipe 2 was not filled in dark, the gap depth control that guarantees simultaneously to reserve the plastic pipe top is at 1mm-3mm.
The 3rd step: squeeze into the agent of U.S. seam to the ceramic tile seam.U.S.'s seam agent of pipe dress is contained on the glue rifle, injects the agent 3 of U.S. seam to the ceramic tile seam;
The 4th step: U.S.A is stitched after agent squeezes into the ceramic tile slit, and floating with finger or other instruments, the agent of U.S. seam is unlikely to parallel with ground, can reduce wear.
The 5th step: wipe U.S.'s seam agent of overflowing with wet sponge.
The 6th step: levelling.To the seam agent of the ceramic tile squeezed into seam Sino-U.S. fewer carry out levelling, make it more attractive in appearance.
As a kind of improvement, during with the plastic pipe joint filling, the gap depth control that the plastic pipe top is reserved is at 2mm.
Improve as another kind, fill with elastomeric material 4 hollow part of plastic pipe.
Improve as another kind, the external surface of plastic pipe is provided with rule or irregular projection.
After adopting such job practices, owing to there is elasticity, under the elastic force effect, increased the frictional force in plastic pipe and ceramic tile slit, plastic pipe can be stuck in the ceramic tile seam firmly, U.S.'s seam agent of injecting the ceramic tile slit can the slump because of gravity, makes that the upper surface of U.S.'s seam agent in the slit is smooth, smooth, beautiful, and is easy to construct.Owing to need not to make up a deficiency with the agent of U.S. seam again, saved the time of construction, improved efficient, effect is obvious in actual use.

Claims (4)

1. the job practices of U.S. seam agent is characterized in that: comprise the steps:
The first step: the slit (5) of cleaning ceramic tile (1)
Earlier the both sides of brickwork joint are cleaned out the edge with paper knife, and then the part of intermediate projections is shoveled, remove the lime-ash that clears clean with hairbrush or vehicle-washing device again;
Second step: plastic pipe filling ceramic tile seam
Get length suitably, external diameter of pipe is slightly larger than the wide plastic pipe (2) of ceramic tile seam, and plastic pipe (2) is filled in ceramic tile slit (5), plastic pipe (2) was not filled in dark, the gap depth control that guarantees simultaneously to reserve the plastic pipe top is at 1mm-3mm;
The 3rd step: squeeze into the agent of U.S. seam to the ceramic tile seam
U.S.'s seam agent of pipe dress is contained on the glue rifle, injects the agent (3) of U.S. seam to the ceramic tile seam;
The 4th step:
U.S.A is stitched after agent squeezes into the ceramic tile slit, and floating with finger or other instruments, the agent of U.S. seam is unlikely to parallel with ground, can reduce wear;
The 5th step: wipe U.S.'s seam agent of overflowing with wet sponge;
The 6th step: levelling
To the seam agent of the ceramic tile squeezed into seam Sino-U.S. fewer carry out levelling, make it more attractive in appearance.
2. job practices according to claim 1 is characterized in that: during with plastic pipe filling ceramic tile slit, the gap depth control that the plastic pipe top is reserved is at 2mm.
3. job practices according to claim 1 is characterized in that: elastomeric material (4) filling of the hollow part of plastic pipe.
4. job practices according to claim 1 is characterized in that: the external surface of plastic pipe is provided with rule or irregular projection.
CN 201310162744 2013-05-07 2013-05-07 Construction method of joint trimming agent Pending CN103233566A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201310162744 CN103233566A (en) 2013-05-07 2013-05-07 Construction method of joint trimming agent

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201310162744 CN103233566A (en) 2013-05-07 2013-05-07 Construction method of joint trimming agent

Publications (1)

Publication Number Publication Date
CN103233566A true CN103233566A (en) 2013-08-07

Family

ID=48881630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201310162744 Pending CN103233566A (en) 2013-05-07 2013-05-07 Construction method of joint trimming agent

Country Status (1)

Country Link
CN (1) CN103233566A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104624446A (en) * 2014-12-31 2015-05-20 李东雷 Anti-sticking liquid coating device of cement types of seam beautifying agent, glass cement, sealant, true porcelain cement and the like
CN104775589A (en) * 2015-01-19 2015-07-15 广州鸿力复合材料有限公司 Tile surface material composite plate and novel construction method thereof
CN109025203A (en) * 2017-06-08 2018-12-18 苏三六 The green pure seam construction method of U.S. by hand in mountain

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104624446A (en) * 2014-12-31 2015-05-20 李东雷 Anti-sticking liquid coating device of cement types of seam beautifying agent, glass cement, sealant, true porcelain cement and the like
CN104775589A (en) * 2015-01-19 2015-07-15 广州鸿力复合材料有限公司 Tile surface material composite plate and novel construction method thereof
CN104775589B (en) * 2015-01-19 2016-05-04 广州鸿力复合材料有限公司 A kind of ceramic tile plane materiel composite plate and novel construction method thereof
CN109025203A (en) * 2017-06-08 2018-12-18 苏三六 The green pure seam construction method of U.S. by hand in mountain

Similar Documents

Publication Publication Date Title
CN203383409U (en) Caulking construction structure for surface layer dividing joints of building roof
CN204265094U (en) A kind of U.S. seam device of taping
CN204238532U (en) Scraping board type U.S. for building seam glue rifle head
CN108930292A (en) The method that a kind of pair of new-old concrete interface carries out water-proofing treatment
CN103233566A (en) Construction method of joint trimming agent
CN211815463U (en) Road crack repairing device
CN104120855A (en) Construction method for paving ground tile floor
CN104481034A (en) Waterproofing construction method
CN104612332A (en) Fine aggregate concrete roof double-glass strip dividing joint construction method
CN106760381A (en) A kind of composite plate of mating formation on free grafting ground
CN103306383A (en) Infiltration prevention method for bolt hole in outer wall of reinforced concrete shear wall
CN206233607U (en) For the mortar joint control device of masonry panel
CN107780627A (en) A kind of exterior wall heat-insulating paint construction method
CN207755217U (en) A kind of intelligent robot
CN103806664A (en) Construction technology of external thermal insulation mortar
CN204533836U (en) Pipeline through-flooring leakage-resistant device
CN109736539A (en) Ceramic tile close joint paving ground structure and laying method
CN104480828B (en) Permeable terrace expanded joint structure and construction method thereof
CN210067247U (en) Rigid-flexible composite waterproof structure
CN109025203A (en) The green pure seam construction method of U.S. by hand in mountain
CN207526073U (en) A kind of ceramic tile positioning and gap control device
CN104453190B (en) The processing method of ghost after a kind of tile laying
CN110130643B (en) Construction process for plastic and flax ground
CN209011307U (en) A kind of wall is equipped with the node structure of deformation joint with floorboard junction
CN206346441U (en) A kind of composite plate of mating formation on free grafting ground

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130807