CN103233520A - Self-waterproof system of building external wall structure and construction method of self-waterproof system - Google Patents

Self-waterproof system of building external wall structure and construction method of self-waterproof system Download PDF

Info

Publication number
CN103233520A
CN103233520A CN2013101706008A CN201310170600A CN103233520A CN 103233520 A CN103233520 A CN 103233520A CN 2013101706008 A CN2013101706008 A CN 2013101706008A CN 201310170600 A CN201310170600 A CN 201310170600A CN 103233520 A CN103233520 A CN 103233520A
Authority
CN
China
Prior art keywords
wall
bank
blocks water
template
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101706008A
Other languages
Chinese (zh)
Other versions
CN103233520B (en
Inventor
高行友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suqian Mingyuan Construction And Installation Engineering Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310170600.8A priority Critical patent/CN103233520B/en
Publication of CN103233520A publication Critical patent/CN103233520A/en
Application granted granted Critical
Publication of CN103233520B publication Critical patent/CN103233520B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Building Environments (AREA)

Abstract

The invention provides a self-waterproof system of a building external wall structure and a construction method of the self-waterproof system. The construction method comprises the technological processes of preparation works before construction, design, preparation and installation of a template, removal of the template, building of an infilled wall and antiseep processing, plugging of holes of a concrete wall, pillars and the infilled wall and acceptance of related departments. By means of the self-waterproof system and the construction method, the sale-waterproof capacity of the external wall structure is improved, and common quality problems of the external wall surface leakage caused by waterproof failure of an external wall decorative surface layer are effectively solved.

Description

A kind of outer wall structure of building is from waterproofing system and job practices thereof
Technical field
The present invention relates to a kind of outer wall structure of building from waterproofing system and job practices thereof, belong to building engineering field.This system is applicable to that outer wall structure of building is from waterproof construction.
Background technology
The external wall waterproof is made up of architectural surface waterproof and deck waterproof two parts.The waterproof effect of architectural surface is subjected to the influence of factors such as amblent air temperature, material property, construction quality, service life, waterproof failure phenomenon ubiquity, and along with the growth of service life, waterproof effect can reduce gradually, and wall leakage can be serious day by day.Improving the waterproof ability of external wall structure layer self, is the effective way of avoiding wall face seepage behind the architectural surface waterproof failure.
Summary of the invention
In order to overcome the deficiency in the background technology, the invention discloses a kind of outer wall structure of building from waterproofing system and job practices thereof, can effectively solve the quality problems that cause the wall face seepage because of decoration of exterior wall surface layer waterproof failure.
A kind of outer wall structure of building is characterized in that from waterproofing system and job practices thereof concrete steps are:
Step 1, offer the bank groove that blocks water in wall, the beam bottom board panel edges at exterior wall position, edge offers the bank groove that blocks water at distance post outboard template;
Step 2, the steel concrete template of bearing down on one in exterior wall door and window hole base is installed, the template top gradient downstream is not less than 10%; Design exterior wall bridging piece template, bed die is laid by design elevation, and side form is looked for slope downstream by 3%-5%; Exterior wall design has insulation layer, and at the door and window hole both sides constructional column arranged outside bank that blocks water, the bank height that blocks water is identical with insulation layer thickness according to insulation layer thickness;
Step 3, when building infilled wall by laying bricks or stones, the control of perps width is at 10-12mm between infilled wall and the concrete column, before the polymer mortar initial set, wall outside perps mortar is rejected to the bank that blocks water, wait then to finish building after 24 days under the body of wall dry condition, with fluid sealant shutoff perps;
Keep somewhere the 50-60mm height gap between step 4, infilled wall and the reinforced concrete beam, after body of wall finishes building 7 days, closely knit with the filling of C20 compensation pea gravel concreten;
Before step 5, the external rendering, with 1:2 cement mortar finishing exterior wall interface male and female face, paste with cement gel mud and be not less than the wide double-deck alkali-resistant glass fiber mesh of 200mm earlier, every square of weight of the glass fiber net of use is not less than 160 grams.
Described step 1 is offered the bank groove that blocks water at 8-10mm place, distance post outboard template edge, and the template thickness of the bank groove that blocks water is not less than 20mm, and the bank groove width that blocks water is 20-25mm, and the degree of depth is 8-10mm.
Before the filling of described step 4 earlier with the moistening brick face of clear water and then from indoor to outdoor filling.
Beneficial effect of the present invention:
The present invention has improved external wall structure self waterproof ability, has effectively avoided causing because of decoration of exterior wall surface layer waterproof failure the common quality defect of wall face seepage.
Description of drawings:
Fig. 1: structural wall, beam forms schematic diagram.
Fig. 2: structural column template schematic diagram.
Fig. 3: door or window hole structure post and insulation and decoration layer structural representation.
Fig. 4: infilled wall and post schematic diagram.
Fig. 5: infilled wall and beam schematic diagram.
As Fig. 1 to shown in Figure 5,1, wall, beam concrete structure, 2, wall, beam exterior sheathing, 3, bank blocks water, 4, wall, beam bottom board plate, 5, the post concrete structure, 6, the post exterior sheathing, 7, the post side template, 8, insulation layer, 9, the external rendering surface layer, 10, constructional column, 11, infilled wall, 12, inner wall render surface layer, 13, fluid sealant, 14, blowing agent, 15, jamb, 16, alkali-resistant glass fiber mesh, 17, reinforced concrete beam, 18, pea gravel concreten, 19, concrete column, 20, polymer mortar.
The specific embodiment:
Specify the present invention below in conjunction with embodiment.
Technological process is: preparation of construction work → stencil design and preparation, installation → form removable → infilled wall are built by laying bricks or stones with antiseep processing → concrete wall, post, infilled wall duct shutoff → main body branch and are checked and accepted.
Embodiment 1:
(1), carries out stencil design, the establishment construction technology according to contents such as the concrete component form in the drawing design, load size, construction equipments.The mould material of selecting for use answers shape, size accurate, and seam is tight, and enough intensity, rigidity are arranged, and improves the component forming accuracy of gauge, and honeycombing appears in prevention template spillage.
(2), as shown in Figure 1, the outside of wall, beam concrete structure 1 and bottom are respectively arranged with wall, beam exterior sheathing 2 and 4, wall, beam bottom board plate.As shown in Figure 2, the outside of post concrete structure 5 is respectively arranged with post exterior sheathing 6 and post side template 7.The bank groove that blocks water is offered at wall, beam bottom board plate 4 edges at the exterior wall position, and the 8mm place offers the bank groove that blocks water at distance post outboard template edge, and the template thickness of offering the bank groove that blocks water should be less than 20mm, the bank groove width 20mm that blocks water, degree of depth 8mm.
When exterior wall door and window hole base steel concrete being installed bearing down on one template, the template top gradient downstream should be less than 10%, and outdoor section concrete thinnest part is not less than design thickness.During design exterior wall bridging piece template, bed die is laid by design elevation, and side form is looked for slope downstream by 3%, and the minimal thickness in end is not less than design thickness.
The exterior wall design has insulation layer, according to insulation layer 8 thickness at door and window hole both sides constructional column 10 or the concrete wall arranged outside bank 3 that blocks water, the same insulation layer thickness of bank height that blocks water can effectively prevent rain leakage, has also guaranteed the consistency of thickness of doorframe and window frame inner wall render surface layer 12 and external rendering surface layer 9.As shown in Figure 3, be provided with blowing agent 14 between door jamb 15 and the constructional column.
(3), the concrete column surface side form that is provided with the Kan Tai that blocks water should reach 50% when above of design strength in the bank intensity that blocks water, and outwards removes from the post mould is inboard, crowbar damages the bank that blocks water when preventing from removing; Other side forms should can be removed when concrete strength can guarantee that its surface and corner angle are not damaged because of form removal.Bed die should be removed from beam form is inboard when reaching the job specfication regulation and require with the intensity of test block of condition maintenance with structure, should note the protection bank that blocks water during dismounting, prevents from damaging.The bank of finding during form removal to block water damages, and uses the 1:2 cement mortar and repairs.Indivedual surface of concrete structure have than the honeycomb of small size or reveal stone mass defect, and available 1:2 cement mortar is floating.Larger area honeycomb, dew stone and dew muscle cutter earlier go the layer of concrete that becomes flexible and the particles of aggregates of giving prominence to individually, cleaning concrete surface then, improve one-level with pea gravel concreten 18(than former strength grade of concrete again) filling, and careful tamping, prevent that the seepage phenomenon from appearring in exterior wall.
(4), as shown in Figure 4, the perps width should be controlled at 10mm between infilled wall 11 and the concrete column, before polymer mortar 20 initial sets wall outside perps mortar is rejected to the bank that blocks water, wait then to finish building and use fluid sealant 19 shutoff perps after 24 days when the body of wall dry condition, the glue cream of perps should be full.As shown in Figure 5, keep somewhere the 50mm height gap between infilled wall and the reinforced concrete beam 17, body of wall finishes building after 7 days closely knit with the filling of C20 compensation pea gravel concreten again, before the filling earlier with the moistening brick face of clear water and then from indoor to outdoor filling.
(5), whitewash before, earlier be not less than the wide double-deck alkali-resistant glass fiber mesh 16 of 200mm with pasting with cement gel mud again behind the 1:2 cement mortar finishing exterior wall interface male and female face, every square of weight of the glass fiber net of use is not less than 160 and restrains.
(6), after construction finishes, should in time put construction information in order, submit a report asking for relevant department's tissue and check and accept.
Embodiment 2:
(1), carries out stencil design, the establishment construction technology according to contents such as the concrete component form in the drawing design, load size, construction equipments.The mould material of selecting for use answers shape, size accurate, and seam is tight, and enough intensity, rigidity are arranged, and improves the component forming accuracy of gauge, and honeycombing appears in prevention template spillage.
(2), as shown in Figure 1, the outside of wall, beam concrete structure 1 and bottom are respectively arranged with wall, beam exterior sheathing 2 and 4, wall, beam bottom board plate.As shown in Figure 2, the outside of post concrete structure 5 is respectively arranged with post exterior sheathing 6 and post side template 7.The bank groove that blocks water is offered at wall, beam bottom board plate 4 edges at the exterior wall position, and the 10mm place offers the bank groove that blocks water at distance post outboard template edge, and the template thickness of offering the bank groove that blocks water should be less than 20mm, the bank groove width 25mm that blocks water, degree of depth 10mm.
When exterior wall door and window hole base steel concrete being installed bearing down on one template, the template top gradient downstream should be less than 10%, and outdoor section concrete thinnest part is not less than design thickness.During design exterior wall bridging piece template, bed die is laid by design elevation, and side form is looked for slope downstream by 5%, and the minimal thickness in end is not less than design thickness.
The exterior wall design has insulation layer, according to insulation layer 8 thickness at door and window hole both sides constructional column 10 or the concrete wall arranged outside bank 3 that blocks water, the same insulation layer thickness of bank height that blocks water can effectively prevent rain leakage, has also guaranteed the consistency of thickness of doorframe and window frame inner wall render surface layer 12 and external rendering surface layer 9.As shown in Figure 3, be provided with blowing agent 14 between door jamb 15 and the constructional column.
(3), the concrete column surface side form that is provided with the Kan Tai that blocks water should reach 50% when above of design strength in the bank intensity that blocks water, and outwards removes from the post mould is inboard, crowbar damages the bank that blocks water when preventing from removing; Other side forms should can be removed when concrete strength can guarantee that its surface and corner angle are not damaged because of form removal.Bed die should be removed from beam form is inboard when reaching the job specfication regulation and require with the intensity of test block of condition maintenance with structure, should note the protection bank that blocks water during dismounting, prevents from damaging.The bank of finding during form removal to block water damages, and uses the 1:2 cement mortar and repairs.Indivedual surface of concrete structure have than the honeycomb of small size or reveal stone mass defect, and available 1:2 cement mortar is floating.Larger area honeycomb, dew stone and dew muscle cutter earlier go the layer of concrete that becomes flexible and the particles of aggregates of giving prominence to individually, cleaning concrete surface then, improve one-level with pea gravel concreten 18(than former strength grade of concrete again) filling, and careful tamping, prevent that the seepage phenomenon from appearring in exterior wall.
(4), as shown in Figure 4, the perps width should be controlled at 12mm between infilled wall 11 and the concrete column, before polymer mortar 20 initial sets wall outside perps mortar is rejected to the bank that blocks water, wait then to finish building and use fluid sealant 19 shutoff perps after 24 days when the body of wall dry condition, the glue cream of perps should be full.As shown in Figure 5, keep somewhere the 60mm height gap between infilled wall and the reinforced concrete beam 17, body of wall finishes building after 7 days closely knit with the filling of C20 compensation pea gravel concreten again, before the filling earlier with the moistening brick face of clear water and then from indoor to outdoor filling.
(5), whitewash before, earlier be not less than the wide double-deck alkali-resistant glass fiber mesh 16 of 200mm with pasting with cement gel mud again behind the 1:2 cement mortar finishing exterior wall interface male and female face, every square of weight of the glass fiber net of use is not less than 160 and restrains.
(6), after construction finishes, should in time put construction information in order, submit a report asking for relevant department's tissue and check and accept.

Claims (3)

1. an outer wall structure of building is characterized in that from waterproofing system and job practices thereof, and concrete steps are:
Step 1, offer the bank groove that blocks water in wall, the beam bottom board panel edges at exterior wall position, edge offers the bank groove that blocks water at distance post outboard template;
Step 2, the steel concrete template of bearing down on one in exterior wall door and window hole base is installed, the template top gradient downstream is not less than 10%; Design exterior wall bridging piece template, bed die is laid by design elevation, and side form is looked for slope downstream by 3%-5%; Exterior wall design has insulation layer, and at the door and window hole both sides constructional column arranged outside bank that blocks water, the bank height that blocks water is identical with insulation layer thickness according to insulation layer thickness;
Step 3, when building infilled wall by laying bricks or stones, the control of perps width is at 10-12mm between infilled wall and the concrete column, before the polymer mortar initial set, wall outside perps mortar is rejected to the bank that blocks water, wait then to finish building after 24 days under the body of wall dry condition, with fluid sealant shutoff perps;
Keep somewhere the 50-60mm height gap between step 4, infilled wall and the reinforced concrete beam, after body of wall finishes building 7 days, closely knit with the filling of C20 compensation pea gravel concreten;
Before step 5, the external rendering, with 1:2 cement mortar finishing exterior wall interface male and female face, paste with cement gel mud and be not less than the wide double-deck alkali-resistant glass fiber mesh of 200mm earlier, every square of weight of the glass fiber net of use is not less than 160 grams.
2. a kind of outer wall structure of building according to claim 1 is from waterproofing system and job practices thereof, it is characterized in that: described step 1 is offered the bank groove that blocks water at 8-10mm place, distance post outboard template edge, the template thickness of bank groove of blocking water is not less than 20mm, the bank groove width that blocks water is 20-25mm, and the degree of depth is 8-10mm.
3. a kind of outer wall structure of building according to claim 1 is characterized in that from waterproofing system and job practices thereof: before the filling of described step 4 earlier with the moistening brick face of clear water and then from indoor to outdoor filling.
CN201310170600.8A 2013-01-21 2013-05-10 Self-waterproof construction method of building external wall structure Expired - Fee Related CN103233520B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310170600.8A CN103233520B (en) 2013-01-21 2013-05-10 Self-waterproof construction method of building external wall structure

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN201310021087.6 2013-01-21
CN2013100210876 2013-01-21
CN201310021087 2013-01-21
CN201310170600.8A CN103233520B (en) 2013-01-21 2013-05-10 Self-waterproof construction method of building external wall structure

Publications (2)

Publication Number Publication Date
CN103233520A true CN103233520A (en) 2013-08-07
CN103233520B CN103233520B (en) 2017-03-22

Family

ID=48881584

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201310170600.8A Expired - Fee Related CN103233520B (en) 2013-01-21 2013-05-10 Self-waterproof construction method of building external wall structure
CN201310591273.3A Expired - Fee Related CN103938864B (en) 2013-01-21 2013-11-22 Infilled wall Constructional Col-umn Construction engineering method
CN201310590494.9A Expired - Fee Related CN103938796B (en) 2013-01-21 2013-11-22 Cast-in-situ reinforced concrete column construction

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201310591273.3A Expired - Fee Related CN103938864B (en) 2013-01-21 2013-11-22 Infilled wall Constructional Col-umn Construction engineering method
CN201310590494.9A Expired - Fee Related CN103938796B (en) 2013-01-21 2013-11-22 Cast-in-situ reinforced concrete column construction

Country Status (1)

Country Link
CN (3) CN103233520B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103835361A (en) * 2014-02-28 2014-06-04 中天建设集团有限公司 '7'-shaped structure self-waterproof apron design and construction method
CN106760892A (en) * 2016-12-31 2017-05-31 中国能源建设集团山西省电力勘测设计院有限公司 A kind of concrete flue movement joint and its apply method
CN107605159A (en) * 2017-10-26 2018-01-19 山东三箭建设工程管理有限公司 Secondary structure vertical member concrete construction pours device and construction method
CN114837407A (en) * 2022-03-26 2022-08-02 惠州市建筑工程有限公司 Concrete beam column joint integrated construction template and construction method thereof

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105525753A (en) * 2015-06-05 2016-04-27 中建四局第一建筑工程有限公司 Method and structure for simultaneously constructing constructional column and main body structure
CN105040864A (en) * 2015-06-30 2015-11-11 中国二十冶集团有限公司 Formwork supporting method for constructional column in limited space
CN105155843A (en) * 2015-08-05 2015-12-16 中国华冶科工集团有限公司 Construction method and construction device of constructional columns
CN106121220B (en) * 2016-07-05 2018-08-17 中国十七冶集团有限公司 Face the template of side reinforced column, the construction method of reinforcing bar
CN106968334A (en) * 2017-04-25 2017-07-21 天津市建工工程总承包有限公司 A kind of construction method of cast-in-place concrete framework secondary structure constructional column
CN107338762B (en) * 2017-08-24 2022-11-01 上海市水利工程集团有限公司 Omega-type full-locking positioning method and positioner for accurately shaping steel bars of flood prevention wall
CN107882272B (en) * 2017-10-31 2020-06-02 启迪设计集团股份有限公司 Constructional column of filling wall
CN107724669A (en) * 2017-11-23 2018-02-23 邹建军 A kind of aluminum alloy frame formwork structure of fast assembling-disassembling
CN110145120A (en) * 2019-05-23 2019-08-20 广西建工集团第五建筑工程有限责任公司 A kind of constructional column cover die and the construction method with its pre-buried concrete-constituted pile reinforcing bar
CN110485634A (en) * 2019-08-16 2019-11-22 广西建工集团第五建筑工程有限责任公司 Constructional column top rebars pre-buried structure component and its method for constructional column top rebars installation
CN110451890B (en) * 2019-08-27 2021-09-07 广东粤腾建设有限公司 Secondary structure anti-seepage and anti-leakage construction method
CN111550054B (en) * 2020-04-03 2021-10-29 中交二航局市政建设有限公司 Construction method for ensuring quality of concrete around embedded large-diameter steel sleeve
CN113356408A (en) * 2021-06-15 2021-09-07 浙江德为建材科技股份有限公司 Constructional column structure and pouring method
CN113565263A (en) * 2021-07-23 2021-10-29 华北冶建工程建设有限公司 Construction method of constructional column
CN113775116B (en) * 2021-08-27 2022-08-09 重庆新洲建筑工程有限公司 Building masonry construction method based on BIM technology
CN113718999A (en) * 2021-09-02 2021-11-30 上海建工七建集团有限公司 Construction device and method for external filler wall end constructional column without peripheral protection
CN114135054B (en) * 2021-11-23 2023-11-03 福建左海科技有限公司 Full-package type fireproof support column, pouring mold and pouring method
CN114517588B (en) * 2022-03-26 2024-03-19 惠州市建筑工程有限公司 Accurate pre-buried pouring device for steel column pier embedded part and construction method of accurate pre-buried pouring device
CN114592690B (en) * 2022-04-07 2024-05-07 深圳大学 Construction device and construction method for compression pouring reinforced concrete beam and column

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1246571A (en) * 1998-08-30 2000-03-08 胡小平 Water-blocking wall board
JP3758038B2 (en) * 2002-02-28 2006-03-22 株式会社デンソー Enclosure seal structure
CN101307647A (en) * 2008-06-06 2008-11-19 邹新建 Injection moulding cup-shaped concrete mould and methods for using them
CN201232309Y (en) * 2008-06-20 2009-05-06 朱波 Waterproof thermal insulation plate
CN201265162Y (en) * 2008-09-25 2009-07-01 伍毅敏 Back sticking type water stop capable of draining water
CN101532311A (en) * 2009-04-08 2009-09-16 东莞市彩丽建筑维护技术有限公司 A method of installing a penetration crystal waterproof layer in the concrete construction
CN101532324A (en) * 2008-03-10 2009-09-16 杨增忠 Waterproof and insulation integrated construction method
KR100986300B1 (en) * 2010-01-25 2010-10-07 준이앤씨(주) Water-proofing plate unit for concrete and construction method of concrete structure using that
CN201778402U (en) * 2010-03-12 2011-03-30 南通建筑工程总承包有限公司 Waterproof node of horizontal seam of outer wall
CN102235052A (en) * 2010-04-26 2011-11-09 王逸骁 Construction method for anti-seepage external wall
CN102535683A (en) * 2012-02-20 2012-07-04 王睿敏 External wall self-insulation slat system, and building structure and construction method thereof

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4454702A (en) * 1981-03-24 1984-06-19 Bonilla Lugo Juan Building construction and method of constructing same
US5033248A (en) * 1990-01-05 1991-07-23 Phillips Charles N Reinforced concrete building and method of construction
TW352398B (en) * 1995-09-08 1999-02-11 Tien Chiu Prefabricated concrete wall panels, and their process and their use on building
CN1068923C (en) * 1997-08-22 2001-07-25 高启伦 Method for storey building construction and its device
JP2004092274A (en) * 2002-09-03 2004-03-25 Tma:Kk Block for supporting/fixing reinforcing steel bar
CN201133034Y (en) * 2007-11-15 2008-10-15 中铁十二局集团有限公司 Reinforced bar anchoring structural piece of reinforced concrete structure
JP4279339B1 (en) * 2008-04-21 2009-06-17 株式會社 村上工務店 Column formwork unit, horizontal fastening frame for column formwork unit, and cast-in-place reinforced concrete pillar construction method
CN102003069B (en) * 2010-11-24 2012-07-11 温州中城建设集团有限公司 Construction method and pouring device for framework masonry infill wall structure
CN102127966B (en) * 2011-02-14 2012-07-04 宿迁华夏建设(集团)工程有限公司 Fixing device for template of cast-in-place reinforced concrete column
CN102444209A (en) * 2011-09-30 2012-05-09 中国二十二冶集团有限公司 Building steel-column foundation lengthening bolt and lengthening method thereof
CN102363994A (en) * 2011-11-11 2012-02-29 宿迁华夏建设(集团)工程有限公司 Annular cushion block
CN102535849B (en) * 2012-02-15 2014-06-25 中建三局第二建设工程有限责任公司 Constructional column top concreting method
CN102561681B (en) * 2012-03-15 2013-12-11 陕西建工集团总公司 Casting molding template and casting molding process for constructional columns of infilled walls

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1246571A (en) * 1998-08-30 2000-03-08 胡小平 Water-blocking wall board
JP3758038B2 (en) * 2002-02-28 2006-03-22 株式会社デンソー Enclosure seal structure
CN101532324A (en) * 2008-03-10 2009-09-16 杨增忠 Waterproof and insulation integrated construction method
CN101307647A (en) * 2008-06-06 2008-11-19 邹新建 Injection moulding cup-shaped concrete mould and methods for using them
CN201232309Y (en) * 2008-06-20 2009-05-06 朱波 Waterproof thermal insulation plate
CN201265162Y (en) * 2008-09-25 2009-07-01 伍毅敏 Back sticking type water stop capable of draining water
CN101532311A (en) * 2009-04-08 2009-09-16 东莞市彩丽建筑维护技术有限公司 A method of installing a penetration crystal waterproof layer in the concrete construction
KR100986300B1 (en) * 2010-01-25 2010-10-07 준이앤씨(주) Water-proofing plate unit for concrete and construction method of concrete structure using that
CN201778402U (en) * 2010-03-12 2011-03-30 南通建筑工程总承包有限公司 Waterproof node of horizontal seam of outer wall
CN102235052A (en) * 2010-04-26 2011-11-09 王逸骁 Construction method for anti-seepage external wall
CN102535683A (en) * 2012-02-20 2012-07-04 王睿敏 External wall self-insulation slat system, and building structure and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103835361A (en) * 2014-02-28 2014-06-04 中天建设集团有限公司 '7'-shaped structure self-waterproof apron design and construction method
CN106760892A (en) * 2016-12-31 2017-05-31 中国能源建设集团山西省电力勘测设计院有限公司 A kind of concrete flue movement joint and its apply method
CN107605159A (en) * 2017-10-26 2018-01-19 山东三箭建设工程管理有限公司 Secondary structure vertical member concrete construction pours device and construction method
CN114837407A (en) * 2022-03-26 2022-08-02 惠州市建筑工程有限公司 Concrete beam column joint integrated construction template and construction method thereof
CN114837407B (en) * 2022-03-26 2024-05-28 惠州市建筑工程有限公司 Concrete beam column joint integrated construction template and construction method thereof

Also Published As

Publication number Publication date
CN103233520B (en) 2017-03-22
CN103938796A (en) 2014-07-23
CN103938796B (en) 2016-05-18
CN103938864A (en) 2014-07-23
CN103938864B (en) 2016-03-16

Similar Documents

Publication Publication Date Title
CN103233520A (en) Self-waterproof system of building external wall structure and construction method of self-waterproof system
CN106801517B (en) External reinforcing and reinforcing method for school shed with prefabricated porous plate brick mixed structure
CN100572710C (en) The non-net polyphenyl plate cast-in-place concrete exterior wall heat-preserving job practices
CN103866885B (en) Construction method of energy-saving heat-insulating structure of lighting window
CN103266767A (en) Construction method for preventing and treating cracks between concrete structure and filler wall
CN104594387A (en) Improved post-pouring strip advanced water-stopping construction method
CN105484391A (en) Construction method for manufacturing heat-preservation waterproof wall through light heat-preservation GRC disassembling-free formworks
CN103883026A (en) Green energy-saving cast-in-place heat-insulation composite external wall system and construction method thereof
CN104358341A (en) Building brickwork and masonry construction method of building brickwork
CN114109030A (en) Construction method of special-shaped structure of bare concrete diaphragm wall
CN108612233B (en) Construction method of cast-in-situ facing clear concrete wall
CN109138227A (en) Without exterior sheathing exterior-wall heat insulation and structure-integrated pouring molding construction technology
CN114482135A (en) Advanced water stop structure of basement exterior wall post-cast strip and construction method
CN203856099U (en) Green energy-saving cast-in-situ heat-insulating composite external wall system with windows
CN103883022A (en) Earthquake-resistant, sound-insulating and crack-resistant integrated structure for inner wall and outer wall of enclosure structure and construction method thereof
CN205954707U (en) Leading enclosed construction in basement outer wall post -cast strip
CN116104224A (en) External wall heat insulation integrated gap spliced construction node and construction method
CN113323314A (en) External wall paving construction method for sintered ceramic tiles in freeze-thaw environment
CN113323396A (en) Integrated construction method for external wall of fabricated building
CN112127752A (en) Construction process for installing and preventing leakage of outer flush type outer window
CN113338335B (en) Waterproof construction method for external corner of bottom plate of urban underground comprehensive pipe gallery
CN219690530U (en) Waterproof construction structure of foundation pit structure die construction
CN110984437A (en) Construction method of verna plate light composite grouting wall system
CN104343137A (en) Construction method of underground waterproof engineering
CN104712147A (en) Construction method of inorganic insulation board

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20170221

Address after: 223800 Jiangsu Province Economic and Technological Development Zone Suqian Jinji Lake Road No. 188

Applicant after: Suqian Mingyuan construction and Installation Engineering Co., Ltd.

Address before: 223800 Jiangsu city of Suqian Province Huang Wan Road, No. 190

Applicant before: Gao Xingyou

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170322

Termination date: 20190510