CN103216263B - A kind of control method adopting the emptying underground filling of shutoff valve to found inner air tube - Google Patents

A kind of control method adopting the emptying underground filling of shutoff valve to found inner air tube Download PDF

Info

Publication number
CN103216263B
CN103216263B CN201210019462.9A CN201210019462A CN103216263B CN 103216263 B CN103216263 B CN 103216263B CN 201210019462 A CN201210019462 A CN 201210019462A CN 103216263 B CN103216263 B CN 103216263B
Authority
CN
China
Prior art keywords
shutoff valve
bgreatt
gre
control system
underground filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210019462.9A
Other languages
Chinese (zh)
Other versions
CN103216263A (en
Inventor
张泽武
李书生
黄士兵
姜寄
蔡颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Feny Co Ltd
Original Assignee
Feny Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Feny Co Ltd filed Critical Feny Co Ltd
Priority to CN201210019462.9A priority Critical patent/CN103216263B/en
Publication of CN103216263A publication Critical patent/CN103216263A/en
Application granted granted Critical
Publication of CN103216263B publication Critical patent/CN103216263B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipe Accessories (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

<b> the present invention relates to a kind of </b><bGreatT.Gre aT.GT and adopts the emptying underground filling of shutoff valve to found the control method of inner air tube, include hydraulic pressure </b><bGreatT.Gre aT.GT pumping plant, shutoff valve, displacement transducer, </b><bGreatT.Gre aT.GTPLC</b><bGr eatT.GreaT.GT control system, be characterized in </b><bGreatT.Gre aT.GTPLC</b><bGr eatT.GreaT.GT control system by control cables respectively with hydraulic power unit, shutoff valve is connected, hydraulic power unit is connected with shutoff valve by oil pipe, real time value is delivered in </b><bGreatT.Gre aT.GTPLC</b><bGr eatT.GreaT.GT control system by analog module by the displacement transducer be placed on shutoff valve, </b><bGreatT.Gre aT.GTPLC</b><bGr eatT.GreaT.GT control system controls the size of shutoff valve aperture according to the real time value that displacement transducer transmits, emptying underground filling founds inner air tube.The present invention adopts hydraulic control throttle valve and by the size </b><bGreatT.Gre aT.GT of displacement transducer Measurement accuracy valve opening, again by the concrete aperture of </b><bGreatT.Gre aT.GTPLC</b><bGr eatT.GreaT.GT control system control valve, so that the air </b><bGreatT.Gre aT.GT in the emptying underground filling standpipe of </b><bGreatT.Gre aT.GT.</b>

Description

A kind of control method adopting the emptying underground filling of shutoff valve to found inner air tube
Technical field
the present invention relates to the control method that a kind of emptying underground filling founds inner air tube, particularly relate to a kind of control method adopting the emptying underground filling of shutoff valve to found inner air tube, belong to mining filling technique field.
Background technology
at present, because the exploitation under some specific conditions can bring very serious impact to surface buildings, highway, dam etc., therefore underground filling more and more comes into one's own, and paste body filling mode is because intensity after filling is high, down-hole is not easy the advantages such as dehydration and is widely used, but the material that paste body filling mode is carried is heterogeneous body, easily produce gas at pipeline riser place and cause plugging, once plugging will cause tremendous influence to whole filling system, therefore, the operation of air to whole filling system at emptying standpipe place is significant.
therefore, along with improving constantly of filling in mine technology, timely emptying underground filling founds inner air tube to ensure the operation conditions of filling pipeline, finds and handling failure point, has become the task of top priority of filling in mine System Development from now on.
Summary of the invention
object of the present invention is just to overcome prior art above shortcomings, provides a kind of control method adopting the emptying underground filling of shutoff valve to found inner air tube.The present invention adopts hydraulic control throttle valve, the having stable behavior of valve; The size of valve opening can be measured accurately by displacement transducer; Can the concrete aperture of control valve accurately by PLC control system.
the technical solution adopted in the present invention is: the emptying underground filling of this employing shutoff valve founds the control method of inner air tube, include hydraulic power unit, shutoff valve, displacement transducer, PLC control system, be characterized in PLC control system by control cables respectively with hydraulic power unit, shutoff valve is connected, hydraulic power unit is connected with shutoff valve by oil pipe, being placed in the displacement transducer on shutoff valve is delivered in PLC control system by the analog module of PLC by real time value, PLC control system controls the size of shutoff valve aperture according to the real time value that displacement transducer transmits, emptying underground filling founds inner air tube.
for completing object of the present invention better, the size of described control shutoff valve aperture, founding inner air tube with emptying underground filling is: first rinse underground filling pipeline with water, in the process of rinsing, shutoff valve aperture is transferred to maximum, then to pump cement slurry in pipeline, pipeline is lubricated, again to pipeline pumping material after lubrication, before pumping material, shutoff valve is adjusted to low discharge, flow after making the flow before shutoff valve be greater than shutoff valve, so that make the material in pipeline slowly be full of underground filling standpipe, the outlet valve that air in pipeline is arranged from underground filling standpipe is discharged.
compared with prior art, the invention has the beneficial effects as follows: adopt hydraulic control throttle valve, the having stable behavior of shutoff valve; The size of shutoff valve aperture can be measured accurately by displacement transducer; The concrete aperture of shutoff valve can be controlled accurately by PLC control system.
Accompanying drawing explanation
fig. 1 is control system of the present invention composition schematic diagram.
fig. 2 is the schematic layout pattern of shutoff valve of the present invention.
fig. 3 is control flow schematic diagram of the present invention.
Detailed description of the invention
below in conjunction with drawings and Examples, the present invention is further described.
embodiment 1.
as shown in FIG. 1 to 3, the emptying underground filling of this employing shutoff valve founds the control method of inner air tube, include hydraulic power unit, shutoff valve, displacement transducer, PLC control system, wherein PLC control system by control cables respectively with hydraulic power unit, shutoff valve is connected, hydraulic power unit is connected with shutoff valve by oil pipe, real time value is delivered in PLC control system by PLC analog module by the displacement transducer be placed on shutoff valve, PLC control system controls the size of shutoff valve aperture according to the real time value that displacement transducer transmits, emptying underground filling founds inner air tube.
implementation step is as follows.
set up control system by accompanying drawing 1, the valve position illustrated by accompanying drawing 2 carries out layout, and the control flow illustrated by accompanying drawing 3 controls.
start hydraulic power unit by PLC control system, the self-sustaining that hydraulic power unit itself can carry out pressure controls, for shutoff valve (2) regulates aperture ready.First stowing operation rinses pipeline with water, in the process of rinsing, shutoff valve (2) aperture is transferred to maximum, then to pump cement slurry in pipeline, pipeline is lubricated, just can to pipeline pumping material after lubrication, before pumping material, shutoff valve (2) is adjusted to low discharge, flow after making the front flow of shutoff valve (2) be greater than shutoff valve (2), material in such pipeline slowly will be full of standpipe, and air will be discharged from the outlet valve (1) above standpipe.
detailed process is: first shutoff valve (2) can be adjusted to 1/3 or 1/2 open position according to concrete rate of pumping, open outlet valve (1), start pumping, whether observe outlet valve (1) has material to flow out, if there is material to flow out, shutoff valve (3) is adjusted to maximum opening, whether have material flow out, if now still had, prove that vertical inner air tube is emptying if observing outlet valve (1).Now keep shutoff valve (2) aperture constant, outlet valve (1) is closed.The requirement of filling process can be met in addition according to the aperture of the size adjustment shutoff valve (2) of pump output in the process of carrying out pipeline pack.

Claims (1)

1. the control method adopting the emptying underground filling of shutoff valve to found inner air tube, include hydraulic power unit, shutoff valve, displacement transducer, PLC control system, it is characterized in that PLC control system by control cables respectively with hydraulic power unit, shutoff valve is connected, hydraulic power unit is connected with shutoff valve by oil pipe, real time value is delivered in PLC control system by analog module by the displacement transducer be placed on shutoff valve, PLC control system controls the aperture of shutoff valve according to the real time value that displacement transducer transmits, emptying underground filling founds inner air tube, the step that the aperture of described control shutoff valve founds inner air tube with emptying underground filling is: first rinse underground filling pipeline with water, in the process of rinsing, shutoff valve aperture is transferred to maximum, then to pump cement slurry in pipeline, pipeline is lubricated, again to pipeline pumping material after lubrication, before pumping material, shutoff valve is adjusted to low discharge, flow after making the flow before shutoff valve be greater than shutoff valve, so that make the material in pipeline slowly be full of underground filling standpipe, the outlet valve that air in pipeline is arranged from underground filling standpipe is discharged.
CN201210019462.9A 2012-01-21 2012-01-21 A kind of control method adopting the emptying underground filling of shutoff valve to found inner air tube Active CN103216263B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210019462.9A CN103216263B (en) 2012-01-21 2012-01-21 A kind of control method adopting the emptying underground filling of shutoff valve to found inner air tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210019462.9A CN103216263B (en) 2012-01-21 2012-01-21 A kind of control method adopting the emptying underground filling of shutoff valve to found inner air tube

Publications (2)

Publication Number Publication Date
CN103216263A CN103216263A (en) 2013-07-24
CN103216263B true CN103216263B (en) 2016-01-20

Family

ID=48814378

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210019462.9A Active CN103216263B (en) 2012-01-21 2012-01-21 A kind of control method adopting the emptying underground filling of shutoff valve to found inner air tube

Country Status (1)

Country Link
CN (1) CN103216263B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106555606B (en) * 2016-11-30 2018-11-30 长沙矿山研究院有限责任公司 The automatic outlet device and method of flushing water in a kind of filling pipeline
CN107725105A (en) * 2017-11-20 2018-02-23 长沙矿山研究院有限责任公司 It is a kind of to be used to eliminate under filling slurry to the device of pumping line vapour lock

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4461318A (en) * 1981-02-21 1984-07-24 Holstein Und Kappert Gmbh Double seat valve
CN1827920A (en) * 2005-03-02 2006-09-06 李勇 Method for reducing steel pipe concrete pumping resistance
CN101598232A (en) * 2009-07-20 2009-12-09 山东大学 The control valve electro-hydraulic driver
CN201649664U (en) * 2010-01-14 2010-11-24 飞翼股份有限公司 Conveying pipe structure for pumping concrete downwards with large gradient
CN201963360U (en) * 2010-12-27 2011-09-07 淄博矿业集团有限责任公司岱庄煤矿 Pressure online monitoring system for paste-filling pipeline
CN201964145U (en) * 2010-12-31 2011-09-07 浙江师范大学 Detecting device for pipeline blocking

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4461318A (en) * 1981-02-21 1984-07-24 Holstein Und Kappert Gmbh Double seat valve
CN1827920A (en) * 2005-03-02 2006-09-06 李勇 Method for reducing steel pipe concrete pumping resistance
CN101598232A (en) * 2009-07-20 2009-12-09 山东大学 The control valve electro-hydraulic driver
CN201649664U (en) * 2010-01-14 2010-11-24 飞翼股份有限公司 Conveying pipe structure for pumping concrete downwards with large gradient
CN201963360U (en) * 2010-12-27 2011-09-07 淄博矿业集团有限责任公司岱庄煤矿 Pressure online monitoring system for paste-filling pipeline
CN201964145U (en) * 2010-12-31 2011-09-07 浙江师范大学 Detecting device for pipeline blocking

Also Published As

Publication number Publication date
CN103216263A (en) 2013-07-24

Similar Documents

Publication Publication Date Title
CN201464456U (en) High-pressure crack grouting simulation test bed
CN104550142A (en) Wind and water linkage flushing device and wind and water linkage flushing method for mortar conveying pipeline
CN104264677B (en) A kind of Novel constant-pressure grouting device and method of operating
CN104674784A (en) Control device of slope tide level under super gravity
CN202900256U (en) Draining device for measuring elevation angel hole coal bed gas pressure
CN105507886A (en) Overflow and well leakage monitoring system and monitoring method thereof
CN103279142A (en) Load test intelligent control water tank loading method
CN103216263B (en) A kind of control method adopting the emptying underground filling of shutoff valve to found inner air tube
CN102928327A (en) Circulating water pressure regulating device for seepage deformation test
CN203324088U (en) Adjustable multifunctional water tank loading device
CN205797931U (en) A kind of deep-well filling pipe automatic block clearing device
CN101982747A (en) Method for calibrating synchronous grouting quantity and grouting pressure of shield
CN202228060U (en) Pressure-relief liquid injection device for producing well
CN203925506U (en) Slurry balance pipe-jacking tunneling machine excavation face automatic pressure-balancing device
CN107387105B (en) Soil pressure shield bentonite pressure maintaining equipment and method
CN207406342U (en) A kind of filling system for the post processing of caisson wall wall
CN104110036A (en) Grouting plug for two-fluid process
CN103114838B (en) High-pressure automatic sand discharge device
CN205297646U (en) Automatic water discharging device of gas drainage pipe remote control
CN204435330U (en) The interim ecological bleeder pipe plugging system of a kind of water power hydraulic engineering
CN104234133B (en) Intelligent groundwater mining and backflow device
CN209400383U (en) A kind of compressed water generation apparatus measuring Rockmass Permeabuity Coefficient
CN202850860U (en) Grouting air exhausting device
CN203701079U (en) Pneumatic anti-settling circulating system for drilled pile slurry
CN208444219U (en) A kind of temperature change hydraulic pressure water filling device for indoor gushing water simulation test

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Li Shusheng

Inventor after: Jiang Ji

Inventor after: Cui Ming

Inventor after: Wang Yumin

Inventor before: Cai Ying

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: CAI YING TO: LI SHUSHENG JIANG JI CUI MING WANG YUMIN

C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhang Zewu

Inventor after: Li Shusheng

Inventor after: Huang Shibing

Inventor after: Jiang Ji

Inventor after: Cai Ying

Inventor before: Li Shusheng

Inventor before: Jiang Ji

Inventor before: Cui Ming

Inventor before: Wang Yumin

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LI SHUSHENG JIANG JI CUI MING WANG YUMIN TO: ZHANG ZEWU LI SHUSHENG HUANG SHIBING JIANG JI CAI YING

C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Control method for emptying air in underground filling riser by using cut-off valve

Effective date of registration: 20200703

Granted publication date: 20160120

Pledgee: Bank of Changsha Limited by Share Ltd. science and Technology Branch

Pledgor: FENY Corp.,Ltd.

Registration number: Y2020980003781

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20210722

Granted publication date: 20160120

Pledgee: Bank of Changsha Limited by Share Ltd. science and Technology Branch

Pledgor: FENY Corp.,Ltd.

Registration number: Y2020980003781

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A control method of emptying air in downhole filling riser by using shut-off valve

Effective date of registration: 20210811

Granted publication date: 20160120

Pledgee: Bank of Changsha Limited by Share Ltd. science and Technology Branch

Pledgor: FENY Corp.,Ltd.

Registration number: Y2021980007550

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20160120

Pledgee: Bank of Changsha Limited by Share Ltd. science and Technology Branch

Pledgor: FENY Corp.,Ltd.

Registration number: Y2021980007550