CN103195365A - Rotary drilling rig hard rock stratum step drilling construction process - Google Patents

Rotary drilling rig hard rock stratum step drilling construction process Download PDF

Info

Publication number
CN103195365A
CN103195365A CN2013101079514A CN201310107951A CN103195365A CN 103195365 A CN103195365 A CN 103195365A CN 2013101079514 A CN2013101079514 A CN 2013101079514A CN 201310107951 A CN201310107951 A CN 201310107951A CN 103195365 A CN103195365 A CN 103195365A
Authority
CN
China
Prior art keywords
reaming
diameter
drilling
depth
rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101079514A
Other languages
Chinese (zh)
Other versions
CN103195365B (en
Inventor
刘永光
常仁齐
罗菊
常通
丁洪亮
唐桂军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou XCMG Foundation Construction Machinery Co Ltd
Original Assignee
Xuzhou XCMG Foundation Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou XCMG Foundation Construction Machinery Co Ltd filed Critical Xuzhou XCMG Foundation Construction Machinery Co Ltd
Priority to CN201310107951.4A priority Critical patent/CN103195365B/en
Publication of CN103195365A publication Critical patent/CN103195365A/en
Application granted granted Critical
Publication of CN103195365B publication Critical patent/CN103195365B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses rotary drilling rig hard rock stratum step drilling construction process. The process includes that a, stratum drilling is conducted by using a small-diameter rock tubular drill with the diameter ranging from 800-1000 mm, then slag removing is conducted through a small-diameter sand fishing hopper, and the required pile hole depth h is drilled through repeated and combined drilling; b, according to the diameter of a required pile hole and the diameter of the rock tubular drill drilling for the first time, the number of levels of step drilling is determined, and the diameter difference between adjacent holes is within 400-500mm; and c, a chambering rock tubular drill with drilling diameter one-level larger than that in step a is used for conducting chambering, detritus cut in a chambering process fall into holes drilled by the small-diameter drill, and according to cubic meter of earth and stones and cubic meter of detritus cut during chambering in holes, the chambering depth H of large holes when small hole space is full is calculated. When the chambering depth H is met, chambering is stopped. By means of reasonable grading, a plurality of times of step drilling is conducted, and working efficiency can be improved effectively.

Description

A kind of rotary drilling rig ground consisting of hard rock classification drilling construction technology
Technical field
The present invention relates to a kind of drilling construction technology, specifically is a kind of rotary drilling rig ground consisting of hard rock classification drilling construction technology.
Background technology
Rotary drilling rig uses traditional drilling assembly construction technology mostly when ground consisting of hard rock creeps at present, namely uses tube to creep into earlier, uses the augers fragmentation then, uses the Double bottom plate to drag for slag at last; This kind construction technology, drilling efficiency is lower, and the pick consumption is bigger.The part building site is also arranged at present, adopt classification drilling construction technology to creep into, but there is the hierarchical approaches confusion mostly, can not rationally uses drill bit, do not have the problems such as operating process of standard, cause drill bit unreasonable allocation in early stage, frequently in creeping into change working procedure confusion in drill bit, the construction, effectively drilling time can't guarantee etc. problem to cause the advantage of classification drilling construction technology to bring into play.
Summary of the invention
Problem at above-mentioned prior art exists the invention provides a kind of rotary drilling rig ground consisting of hard rock classification drilling construction technology, by rational classification, carries out the multiple fractionation reaming and creeps into, and can increase work efficiency effectively.
To achieve these goals, the technical solution used in the present invention is: a kind of rotary drilling rig ground consisting of hard rock classification drilling construction technology, and concrete steps are:
A. use bore diameter to creep into capable rock stratum at the small-bore of 800mm-1000mm rock tube earlier and creep into, drag for sand hopper by bore diameter in the small-bore of 800mm-1000mm then and carry out scarfing cinder, cooperate so repeatedly and creep into required stake hole depth h;
B. according to the diameter of the rock tube brill of the diameter in required stake hole and boring first, determine the progression of classification reaming, make diameter difference between the adjacent holes in the 400mm-500mm scope;
C. use bore diameter to creep into capable ream operation than the reaming rock tube of the big one-level of step a, the many rubbles that cut in the reaming process can be fallen in the hole that aperture creeps into, rubble earthwork according to earthwork in the aperture and reaming cutting, calculate macropore reaming depth H when the aperture space is filled up, concrete design formulas is:
H = π ( d / 2 ) 2 h π ( ( D / 2 ) 2 - ( d / 2 ) 2 )
H in the formula is the reaming degree of depth; D is counter bore diameter; H is the stake hole depth; D is the small-bore diameter; When arriving the reaming depth H, stop reaming;
D. after stopping reaming, use the small-bore to drag for sand hopper and carry out scarfing cinder, and then use the large aperture rock tube among the step c to bore the continuation reaming, scarfing cinder again circulates repeatedly until creeping into required stake hole depth h;
E. use the reaming rock tube of the big one-level of using than previous step of bore diameter to bore and drag for sand hopper repeating step c, d, to hole reaming, scarfing cinder that previous step forms, the diameter, the drilling depth that reach required stake hole until counter bore diameter reach required stake hole depth h;
F. equal two-stage as the progression that needs the classification reaming, then need not step e; As the progression of need classification reaming greater than three grades, corresponding repeating step e then.
Compared with prior art, the method that the present invention adopts classification to creep into guarantees the smoothness of working procedure, efficient operation, improves drilling efficiency, efficiency of construction can be improved 1.5 times; When creeping into, reaming use the rock tube to bore, when having avoided the reaming of use Double bottom plate to creep into, heel teeth is stressed, the center is unsettled, the problem of drill bit rapid wear, and use the reaming of rock tube brill to creep into than using the reaming of Double bottom plate to creep into efficiency of construction and improved 2 times, rig is when creeping in addition, more little more being easy in aperture crept into, the advantage of this technology performance rig in slim-hole drilling, and by reasonable classification number of times, thereby rationally use the rock tube to bore counter bore diameter, rock can be broken easily when making the rock tube bore reaming, and fall among the aperture, use is dragged for sand hopper and is picked up, thereby gives full play to the rig advantage, avoid the repetition fragmentation, improved drilling efficiency.
Description of drawings
Fig. 1 is workflow diagram of the present invention.
The specific embodiment
The invention will be further described below in conjunction with accompanying drawing.
Embodiment 1: required stake hole is Ф 1500mm, creeps into rock stratum degree of depth 15m; Use secondary hierarchical approaches (as shown in Figure 1);
A: use Ф 1000mm rock tube to creep into earlier, take tube to drill through the preferential operator scheme of core, core is unsuccessful can to cooperate Ф 1000mm to drag for the sand hopper scarfing cinder if get, and creeps into the 15m place;
B: use Ф 1500mm rock tube to creep into capable reaming, when creeping into 6.7m by design formulas in the rock stratum, the rubble that gets off is cut in reaming, Ф 1000mm aperture space can be filled up;
C: after Ф 1000mm aperture space is filled, use Ф 1000mm to drag for sand hopper and carry out scarfing cinder, and then use Ф 1500mm rock tube to bore and continue reaming, when creeping into 3.7m again, Ф 1000mm aperture space fills up again, re-use Ф 1000mm and drag for sand hopper and carry out scarfing cinder this moment, and so repeatable operation is crept into projected depth 15m.
Embodiment 2: required stake bore dia is Ф 1800mm, creeps into rock stratum degree of depth 20m, by using three grades of classification modes;
A: use Ф 1000mm rock tube to creep into earlier, take tube to drill through the preferential operator scheme of core, core is unsuccessful can to cooperate Ф 1000mm to drag for the sand hopper scarfing cinder if get, and creeping into the degree of depth is the 20m place;
B: use Ф 1400mm rock tube to creep into capable reaming, when creeping into 10.2m in the rock stratum, the rubble that gets off is cut in reaming, Ф 1000mm aperture space can be filled up;
C: after little Ф 1000mm aperture space is filled, use Ф 1000mm to drag for sand hopper and carry out scarfing cinder, and then use Ф 1400mm rock tube to bore and continue reaming, when creeping into 5.0m again, Ф 1000mm fills up in the aperture again, re-use Ф 1000mm and drag for sand hopper and carry out scarfing cinder this moment, and so repeatable operation is crept into projected depth 20m;
D: use Ф 1800mm rock tube to creep into capable reaming, when creeping into 12.0m in the rock stratum, the rubble that gets off is cut in reaming, Ф 1400mm aperture space can be filled up.
E: after little Ф 1400mm aperture space is filled, use Ф 1400mm to drag for sand hopper and carry out scarfing cinder, and then use Ф 1800mm rock tube to bore and continue reaming, when creeping into 4.8m again, Ф 1400mm fills up in the aperture again, re-use Ф 1400mm and drag for sand hopper and carry out scarfing cinder this moment, and so repeatable operation is crept into projected depth 20m.
Be the rock stratum that the saturated uniaxial compressive strength in stratum surpasses 30Mpa in the rock stratum, adopt grading technology of the present invention to compare with traditional construction technology in this rock stratum, can increase work efficiency significantly.

Claims (1)

1. rotary drilling rig ground consisting of hard rock classification drilling construction technology is characterized in that concrete steps are:
A. use bore diameter to creep into capable rock stratum at the small-bore of 800mm-1000mm rock tube earlier and creep into, drag for sand hopper by bore diameter in the small-bore of 800mm-1000mm then and carry out scarfing cinder, cooperate so repeatedly and creep into required stake hole depth h;
B. according to the diameter of the rock tube brill of the diameter in required stake hole and boring first, determine the progression of classification reaming, make diameter difference between the adjacent holes in the 400mm-500mm scope;
C. use bore diameter to creep into capable ream operation than the reaming rock tube of the big one-level of step a, the many rubbles that cut in the reaming process can be fallen in the hole that aperture creeps into, rubble earthwork according to earthwork in the aperture and reaming cutting, calculate macropore reaming depth H when the aperture space is filled up, concrete design formulas is:
H = π ( d / 2 ) 2 h π ( ( D / 2 ) 2 - ( d / 2 ) 2 )
H in the formula is the reaming degree of depth; D is counter bore diameter; H is the stake hole depth; D is the small-bore diameter; When arriving the reaming depth H, stop reaming;
D. after stopping reaming, use the small-bore to drag for sand hopper and carry out scarfing cinder, and then use the large aperture rock tube among the step c to bore the continuation reaming, scarfing cinder again circulates repeatedly until creeping into required degree of depth h;
E. use the reaming rock tube of the big one-level of using than previous step of bore diameter to bore and drag for sand hopper repeating step c, d, to hole reaming, scarfing cinder that previous step forms, the diameter, the drilling depth that reach required stake hole until counter bore diameter reach required stake hole depth h;
F. equal two-stage as the progression that needs the classification reaming, then need not step e; As the progression of need classification reaming greater than three grades, corresponding repeating step e then.
CN201310107951.4A 2013-03-29 2013-03-29 A kind of rotary drilling rig ground consisting of hard rock classification drilling construction technique Active CN103195365B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310107951.4A CN103195365B (en) 2013-03-29 2013-03-29 A kind of rotary drilling rig ground consisting of hard rock classification drilling construction technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310107951.4A CN103195365B (en) 2013-03-29 2013-03-29 A kind of rotary drilling rig ground consisting of hard rock classification drilling construction technique

Publications (2)

Publication Number Publication Date
CN103195365A true CN103195365A (en) 2013-07-10
CN103195365B CN103195365B (en) 2015-08-05

Family

ID=48718164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310107951.4A Active CN103195365B (en) 2013-03-29 2013-03-29 A kind of rotary drilling rig ground consisting of hard rock classification drilling construction technique

Country Status (1)

Country Link
CN (1) CN103195365B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074458A (en) * 2014-06-25 2014-10-01 中铁上海工程局集团有限公司 Drilled pile graded casing drilling perforating method
CN104295239A (en) * 2014-09-29 2015-01-21 中铁建设投资集团有限公司 Method for using rotary drilling rig to drill into hard rock stratum
CN105649012A (en) * 2015-12-30 2016-06-08 中铁局集团有限公司 Construction method for bored pile of subway station enclosure structure of upper-soft lower-hard ground
CN107237323A (en) * 2017-05-23 2017-10-10 中铁建大桥工程局集团第工程有限公司 Major diameter super thick boulder bed forming hole method
CN107339069A (en) * 2017-06-22 2017-11-10 中铁十五局集团有限公司 Drilling method for mechanical drilling pile
CN109184564A (en) * 2018-08-17 2019-01-11 上海二十冶建设有限公司 Method for correcting error when oblique rock stratum is met in a kind of rotary drilling rig pore-forming
CN109322301A (en) * 2018-11-08 2019-02-12 上海市基础工程集团有限公司 Major diameter ultra-deep super thick rock stratum rotary digging bored concrete pile plum blossom drilling construction method
CN110107301A (en) * 2019-04-09 2019-08-09 北京中煤矿山工程有限公司 A kind of mechanical rock breaking sinking method of positive-reversed-positive three-level drilling
CN112709529A (en) * 2020-12-28 2021-04-27 中铁十局集团第七工程有限公司 Radial grading pore-forming construction method and application of hard rock layer drilled pile
CN113738266A (en) * 2021-08-27 2021-12-03 中交第二航务工程局有限公司 Multi-stage drill bit fractional drilling pore-forming method of combined rotary drilling rig
CN113931572A (en) * 2021-09-22 2022-01-14 中交路桥华南工程有限公司 Construction method of large-diameter pile foundation of composite stratum and drill bit system
CN114108611A (en) * 2021-11-15 2022-03-01 中铁大桥局集团有限公司 Construction method of large-diameter steel pipe concrete reducing pile foundation

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4671367A (en) * 1985-12-05 1987-06-09 Electric Power Research Institute, Inc. Pole hole digger with percussive core drilling
CN1584222A (en) * 2004-05-28 2005-02-23 程天森 Pile core constructing method
CN101270577A (en) * 2008-03-04 2008-09-24 中国建筑第六工程局有限公司 Construction method for large-diameter ultra-deep rock borehole bottom-expanding filling pile
CN101343983A (en) * 2008-08-22 2009-01-14 北京市三一重机有限公司 Barrel type drilling tool
CN201738814U (en) * 2010-06-25 2011-02-09 北京探矿工程研究所 Inner spiral cylinder type combined rock drilling tool
CN201810207U (en) * 2010-09-29 2011-04-27 北京市三一重机有限公司 Rotary excavation drilling machine and rotary excavation drilling tool thereof
CN202125269U (en) * 2011-05-10 2012-01-25 北京市三一重机有限公司 Rotary drilling rig and drilling tool of rotary drilling rig

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4671367A (en) * 1985-12-05 1987-06-09 Electric Power Research Institute, Inc. Pole hole digger with percussive core drilling
CN1584222A (en) * 2004-05-28 2005-02-23 程天森 Pile core constructing method
CN101270577A (en) * 2008-03-04 2008-09-24 中国建筑第六工程局有限公司 Construction method for large-diameter ultra-deep rock borehole bottom-expanding filling pile
CN101343983A (en) * 2008-08-22 2009-01-14 北京市三一重机有限公司 Barrel type drilling tool
CN201738814U (en) * 2010-06-25 2011-02-09 北京探矿工程研究所 Inner spiral cylinder type combined rock drilling tool
CN201810207U (en) * 2010-09-29 2011-04-27 北京市三一重机有限公司 Rotary excavation drilling machine and rotary excavation drilling tool thereof
CN202125269U (en) * 2011-05-10 2012-01-25 北京市三一重机有限公司 Rotary drilling rig and drilling tool of rotary drilling rig

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074458A (en) * 2014-06-25 2014-10-01 中铁上海工程局集团有限公司 Drilled pile graded casing drilling perforating method
CN104295239A (en) * 2014-09-29 2015-01-21 中铁建设投资集团有限公司 Method for using rotary drilling rig to drill into hard rock stratum
CN105649012A (en) * 2015-12-30 2016-06-08 中铁局集团有限公司 Construction method for bored pile of subway station enclosure structure of upper-soft lower-hard ground
CN107237323A (en) * 2017-05-23 2017-10-10 中铁建大桥工程局集团第工程有限公司 Major diameter super thick boulder bed forming hole method
CN107339069A (en) * 2017-06-22 2017-11-10 中铁十五局集团有限公司 Drilling method for mechanical drilling pile
CN109184564A (en) * 2018-08-17 2019-01-11 上海二十冶建设有限公司 Method for correcting error when oblique rock stratum is met in a kind of rotary drilling rig pore-forming
CN109322301A (en) * 2018-11-08 2019-02-12 上海市基础工程集团有限公司 Major diameter ultra-deep super thick rock stratum rotary digging bored concrete pile plum blossom drilling construction method
CN109322301B (en) * 2018-11-08 2020-09-01 上海市基础工程集团有限公司 Quincuncial pore-forming construction method for rotary excavating bored concrete pile of large-diameter ultra-deep and ultra-thick rock stratum
CN110107301A (en) * 2019-04-09 2019-08-09 北京中煤矿山工程有限公司 A kind of mechanical rock breaking sinking method of positive-reversed-positive three-level drilling
CN112709529A (en) * 2020-12-28 2021-04-27 中铁十局集团第七工程有限公司 Radial grading pore-forming construction method and application of hard rock layer drilled pile
CN113738266A (en) * 2021-08-27 2021-12-03 中交第二航务工程局有限公司 Multi-stage drill bit fractional drilling pore-forming method of combined rotary drilling rig
CN113931572A (en) * 2021-09-22 2022-01-14 中交路桥华南工程有限公司 Construction method of large-diameter pile foundation of composite stratum and drill bit system
CN113931572B (en) * 2021-09-22 2024-01-19 中交路桥华南工程有限公司 Construction method of large-diameter pile foundation of composite stratum and drill bit system
CN114108611A (en) * 2021-11-15 2022-03-01 中铁大桥局集团有限公司 Construction method of large-diameter steel pipe concrete reducing pile foundation

Also Published As

Publication number Publication date
CN103195365B (en) 2015-08-05

Similar Documents

Publication Publication Date Title
CN103195365A (en) Rotary drilling rig hard rock stratum step drilling construction process
CN103244051B (en) A kind of combined down-hole hammer drilling tool and pile forming method thereof
CN111379516A (en) Hole forming method of cast-in-situ bored pile
CN103277037B (en) Pipe pile leading-hole construction method under boulder cluster geological condition
CN104047543B (en) A kind of construction method of large diameter drill hole pile pore-forming in high intensity lithostratigraphy
CN104763345A (en) Construction device and method for building foundation
CN104947690A (en) Grooving construction method for embedding underground continuous wall into rock
CN109322301B (en) Quincuncial pore-forming construction method for rotary excavating bored concrete pile of large-diameter ultra-deep and ultra-thick rock stratum
CN102409978B (en) Rotary drilling hole forming method by using multi-stage alloy pilot roller bit in complex stratum cast-in-place pile construction
CN106761422A (en) A kind of staged Percusion spiral drill head
CN113738266A (en) Multi-stage drill bit fractional drilling pore-forming method of combined rotary drilling rig
CN103510850B (en) A kind of piling drilling rig
CN202559338U (en) Screwing pile using air
CN110130321A (en) The processing method of rock in a kind of manual digging pile construction
CN102628268A (en) Cyclone pile
CN205713982U (en) A kind of pile foundation construction drilling equipment being applicable to karst area
CN106168115B (en) A kind of hard-rock boring drill bit of cooperation rotary drilling rig
CN106014262B (en) A kind of expanding method of the non-circular impact Counterboring apparatus of drilled pile
CN109610494A (en) A kind of embedding rock construction technology of large-diameter pile foundation
CN214033711U (en) Rotary drilling bit for removing waste pile
CN205100226U (en) Underground continuous wall goes into rock grooving construction equipment
CN203559771U (en) Piling drilling tool
CN206468296U (en) A kind of staged Percusion spiral drill head
CN203769664U (en) Coring bit suitable for soft and hard drilled objects
KR101962341B1 (en) Construction method of cast-in-place concrete pile with semi-spherical end

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant