CN103195291A - Multilevel tent framework for dome type tent - Google Patents

Multilevel tent framework for dome type tent Download PDF

Info

Publication number
CN103195291A
CN103195291A CN2012104144239A CN201210414423A CN103195291A CN 103195291 A CN103195291 A CN 103195291A CN 2012104144239 A CN2012104144239 A CN 2012104144239A CN 201210414423 A CN201210414423 A CN 201210414423A CN 103195291 A CN103195291 A CN 103195291A
Authority
CN
China
Prior art keywords
tent
hub member
pole
side hub
tent frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012104144239A
Other languages
Chinese (zh)
Other versions
CN103195291B (en
Inventor
朱垌守
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baejin Corp
Original Assignee
Baejin Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from KR20120082504A external-priority patent/KR101479966B1/en
Application filed by Baejin Corp filed Critical Baejin Corp
Publication of CN103195291A publication Critical patent/CN103195291A/en
Application granted granted Critical
Publication of CN103195291B publication Critical patent/CN103195291B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The invention provides a multilevel tent framework for a dome type tent. The invention relates to a dome type tent framework integrally connected with tent cloth, and the framework can be configured to a tent framework with two to three levels in order to expand the size of a tent. The tent framework comprises a top end hub member; a plurality of side hub members; a plurality of vertical struts which can be connected between the top end hub member and the side hub members, each vertical strut having a foldable connecting member in the midway of the vertical strut; a plurality of horizontal struts which can be connected between the side hub members, each horizontal strut having a foldable connecting member in the midway of the horizontal strut; and a plurality of lower part struts connected between side hub members at the lowest part and the ground, each lower part strut having a foldable connecting member in the midway of the lower part strut.

Description

The multistage Tent frame that is used for the dome tent
Technical field
The present invention relates to the dome Tent frame, more particularly, relate to and make by the multistage framework of using two to three grades and can amplify the dome Tent frame of tent size that in this dome Tent frame, Tent frame and tent cloth are linked together integratedly.
Background technology
Generally speaking, be used for being constituted by a plurality of interconnective poles at the Tent frame of three dimensions structure tents.Usually, although according to size or the shape of tent different classification is arranged, with regard to system of bars, tent can mainly be divided into two types.A kind of is common tent, in this kind tent, at first a plurality of poles is assembled into predetermined shape, then tent cloth is connected with the Tent frame that has assembled.Another kind is the foldable tent with foldable tent framework, and this foldable tent framework connects with tent cloth in advance.This tent is built by launching framework, dismantles by folded frame.
In these two types, aspect structure and dismounting, folding tent has advantage easily than common tent.For this reason, folding tent is popularized.Below listed the known prior art of folding tent.
1. the owner of a patent is applicant of the present invention, registration number is 20-0149956, name is called the Korean Utility Model of " the large scale Tent frame that cloth connects with the framework one (A Large-Size Tent Frame in which the Cloth and the Frame Are Integrally Coupled) ", its application of the same clan is that U.S. Patent number is 5,884,646, authorizing day is on March 23rd, 1999, name is called " for the foldable tent framework (Foldable Tent Frame for Coupling Tent Cloth with Tent Frame in Integral Form) that tent cloth is connected with Tent frame with the one form ", hub device at the tent apical position is disclosed, wherein, the upper end of a plurality of tent poles radially is connected with the hub device, wherein, each pole is connected with another pole by collapsible connector, described collapsible connector is made of straight shape articulated element and crooked shape articulated element, wherein, the end that contacts with ground pole is provided with the supporting device that contacts to earth, and, wherein when pitching a tent, upper rack posts and lower fulcrum bar play rafter and column respectively.The favourable part of such Tent frame is: tent is built or is dismantled in simple operations folding by the connector that is made of straight shape articulated element and crooked shape articulated element or expansion tent pole.
2. registration number is 20-0276094, the Korean Utility Model that name is called " the collapsible framework of portable tent (Foldable Structure of a Portable Tent) " discloses the hub device in the apical position of tent, this hub device heart portion therein has the pedestal that is provided with a plurality of holes, and wherein: a plurality of maintenance grooves are formed on the described pedestal at certain intervals in the pedestal periphery; A pair of stop part is set in that a side of described pedestal is outstanding, inserts the movable distance of the rotatable bar of described maintenance groove with restriction; And be provided with and cover shape spare, this lid shape spare is connected to the top of pedestal and keeps by the maintenance bolt, to prevent departing from of described swingle.The favourable part of such tent is: owing to tent cloth connects integratedly with tent pole, so can build and dismantle tent rapidly.
3. registration number is 10-0643157, and the Korean Patent that name is called " touch namely with Tent frame and utilize one of this Tent frame to touch and namely use tent (One-touch Tent Frame and One-touch Tent Using Thereof) " discloses a plurality of lid connecting holes that form on last plane, between described lid connecting hole, be formed with U-shaped patchhole and be arranged on coupling member on the helical spring plate plane, be fixed on the symmetrical conveyor screw on the helical spring plate plane, connect described spirochetal horizontal curvature part, helical spring with the vertical curve that inserts in the hole part of inserting described helical spring plate plane, the upper connecting rod that is rotatably connected and keep by the horizontal curvature part by described helical spring described horizontal curvature part, and the covering of upper end to prevent that described helical spring from departing from that is connected to coupling member.Such tent so that double pointed nail engages with engaging groove, and easily assembles Tent frame by framework being inserted in each channel opening.
4. the owner of a patent is applicant of the present invention, publication No. is 1990-0002935, name is called the Korean Utility Model of " coupling apparatus of Tent frame (Binding Device ofa Tent Framework) ", its application of the same clan is that U.S. Patent number is 4,750, authorizing day is on June 14th, 1988, name is called " folding device of Tent frame (Folding Device of a Tent-Framework) ", the hub plate is disclosed, this hub plate is provided with a plurality of conjugate foramens, these conjugate foramens become radial spaced apart in the periphery of described hub plate, and wherein, each conjugate foramen has link slot, these link slots are formed on each inside wall of two inside walls of the conjugate foramen that is provided with carriage, wherein, form a pair of connecting pin in the end of described tent pole, be used for engaging with described link slot.By above-mentioned pole is inserted conjugate foramen, then insert in the described link slot, can assemble this Tent frame easily.
Summary of the invention
Above-mentioned every kind of conventional foldable Tent frame all is made of a plurality of tent poles with the collapsible connector that is connected with each bar.Because tent cloth connects with Tent frame with being integral, so only need a small amount of people just can build or dismantle tent rapidly and simply.Yet, because above-mentioned pole made by synthetic resin, glass fiber for example, therefore, the size that is difficult to increase tent makes it greater than a certain size.
In other words, so long as be applied to the small size tent, the conventional foldable Tent frame does not just have problems.Yet, want by connecting extra pole or increase the size of tent by the length of extending pole, the volume of the tent that increases because of the size that increases tent and weight can make can not use diameter is little comparatively speaking common pole commonly used to support the weight of tent cloth.
Therefore, in order to increase the size of foldable tent, must make the pole of tent have diameter with the proportional increase of size of tent, thereby make it more solid.Yet the cumulative volume that the pole that diameter increases causes tent and weight is heaviness and can't carry and build tent too.Therefore, can not produce the bigger tent of ratio stock size with conventional foldable Tent frame structure.
Simultaneously, solid and have certain flexible Metallic rod as the substitute of above-mentioned synthetic resin pull bar, the bar of being made by duralumin for example.Yet with regard to elasticity and restoring force, Metallic rod is inferior to synthetic bar.In addition, cost of production becomes three times of synthetic bar, and compares with the synthetic resin bar of making by injection, is difficult to handle and the assembling tent.
The multistage assembling device that the purpose of this invention is to provide Tent frame, this device have two to three grades of frameworks, use a plurality of hub members and have folding vertical struts and the horizontal strut of certain-length, thereby can build large-sized tent.By adopting this multistage frame construction, the size of tent increases to large-sized tent, is applied to the Tent frame that large-sized tent provides the tent cloth that can bear expansion thereby permission will be applicable to the synthetic resin bar of the common minor diameter of little foldable tent.
For achieving the above object, shown in the embodiment, the invention provides the multistage framework for the dome tent as will be described below, this multistage framework comprises: the hub member that is combined in the top of Tent frame; Be positioned at a plurality of side hub members on the side of Tent frame; A plurality of vertical struts, described vertical struts connects top hub member and described side hub member, has folding connector midway in each described vertical struts; The a plurality of horizontal struts that connect described side hub member have folding connector midway each described horizontal strut; And the bottom pole that connects of a plurality of and described side hub member, have folding connector midway each described bottom pole.
Described top hub member and described side hub member have five separately with the U-shaped patchhole of regular spaces radial arrangement, and such five poles can join to and insert in the hole.Each top hub member and described side hub member also have hinged groove in two inside walls of patchhole, the jointed shaft of pole end inserts in this hinged groove after inserting U-shaped patchhole, described hinged groove is provided with outstanding pawl in the entrance of described hinged groove, and in a single day the jointed shaft that is arranged in the pole end like this inserts described hinged groove and just can not come off easily.
The folding connector that midway arranges each described vertical struts, described horizontal strut and described bottom pole comprises: be fixed on the articulated element on the coupling part of each half bar; Articulate the swivel pin of these two articulated elements; A locking piece that articulated element forms in these two articulated elements; And the slide block slot that forms at another articulated element, described slide block slot stops the pivotal action of articulated element, or removes the prevention to pivotal action.
The invention effect
Multistage Tent frame for the dome tent of the present invention uses a plurality of hub members, vertical struts, horizontal strut and bottom pole, thereby makes the multistage tent can assemble two-stage to three grade.Multilevel hierarchy by this Tent frame, can bear the weight of tent cloth by its elastic force along the interconnective vertical struts of different directions, horizontal strut and bottom pole, thereby make it possible to these poles that used thickness and diameter are applicable to the small size tent.
In other words, in general large scale tent, the pole of tent must with the size that tent increases proportional make bigger, yet the present invention need not increase the size of bar and builds the large scale tent by using multistage Tent frame structure, making.
In addition, a small amount of people just can build and dismantle the large scale tent easily.Simultaneously, use common smaller diameter rods advantageously to help to reduce production costs.
Description of drawings
Fig. 1 is the stereogram of dome tent of the present invention, and this dome tent is equipped with the two-stage Tent frame of being combined with tent cloth.
Fig. 2 is the stereogram of an embodiment of the invention, at this embodiment, is equipped with three grades of Tent frames.
Fig. 3 is hub member among the present invention and the stereogram of vertical struts and horizontal strut.
Fig. 4 is the stereogram of the bottom pole among the present invention.
Fig. 5 a is the plan view of a part that the sectional view of collapsible connector is shown, and described collapsible connector is arranged on each pole midway, and wherein said pole is in deployed condition.
Fig. 5 b is the figure that is in the pole of folded state.
Fig. 6 is the vertical view of the dome tent of two-stage assembling.
Fig. 7 is the vertical view of the dome tent of three grades of assemblings.
The drawing reference numeral explanation of critical piece
10: top hub member; 11:U type patchhole; 12: hinged groove;
13: outstanding pawl; 20: side hub member; 30: vertical struts;
31: jointed shaft; 40: horizontal strut; 50: bottom pole;
60: tent cloth; 70: connector (or folding connector);
71: articulated element; 72: articulated element; 73: locking piece;
74: swivel pin; 75: slide block slot; 76: spring.
The specific embodiment
Can describe the embodiment of embodiments of the present invention by the following drawings in detail.
Fig. 1 is the stereogram of dome tent of the present invention, and this dome tent is equipped with the two-stage Tent frame that connects with tent cloth.Fig. 2 is the stereogram of an embodiment of the invention, in this embodiment, is equipped with three grades of Tent frames.Fig. 3 is hub member among the present invention and the stereogram of vertical struts and horizontal strut.Fig. 4 is the stereogram of the bottom pole among the present invention.Fig. 5 a is the plan view of a part that the sectional view of collapsible connector is shown, and this collapsible connector is arranged on each pole midway, and wherein said pole is in deployed condition.Fig. 5 b is the plan view of a part that the sectional view of collapsible connector is shown, and this collapsible connector is arranged on each pole midway, and wherein said pole is in folded state.
As shown in drawings, dome tent of the present invention comprises: the top hub member 10 that is arranged on the Tent frame top; Be arranged on a plurality of side hub members 20 on the side of Tent frame; A plurality of vertical struts 30, described vertical struts is connected between top hub member 10 and side hub member 20; The a plurality of horizontal struts 40 that connect side hub member 20; And a plurality of bottoms pole 50, these bottom poles are connected between the part with contacting to earth of tent cloth 60 at side hub member 20.
Top hub member 10 and side hub member 20 are identical shape and structure, as shown in Figure 3, the hub member has the overhead pedestal of disc-shaped in the middle, and this pedestal has a plurality of U-shaped bar patchholes 11, these U-shaped patchholes with rule be arranged on radially at interval described pedestal around; Hinged groove 12 is arranged on two inside walls of U-shaped patchhole 11, for making the jointed shaft 31 that is arranged on the pole end insert hinged groove 12 and engaging with hinged groove 12; And outstanding pawl 13 is arranged on the entrance of each hinged groove 12, in a single day in order to jointed shaft 31 is set in the hinged groove 12, outstanding pawl 13 can prevent that jointed shaft 31 from coming off from described hinged groove easily.
Jointed shaft 31 is arranged on the both ends of vertical struts 30 and horizontal strut 40, is used for passing U-shaped patchhole 11 and inserts and be engaged to hinged groove 12.In addition, jointed shaft 31 is arranged on the upper end of bottom pole 50.
Therefore, if with vertical struts 30, horizontal strut 40 and bottom pole 50 are inserted hub member 10, in 20 the U-shaped patchhole 11, and be pulled upwardly so that jointed shaft 31 is engaged in the hinged groove 12, pole 30,40,50 just integratedly with hub member 10,20 connect, wherein, owing to be arranged on the outstanding pawl 13 of the entrance of hinged groove 12, these poles can not come off from the hub member, wherein, pole 30,40,50 are in rotatable state by jointed shaft 31, rotatable 90 degree are up to stoping it to be further rotated by what be adjacent to be arranged on groove on the outer rim of each hub member and U-shaped patchhole 11 with U-shaped patchhole as the internal edge of chin, and the top of pole is attached to the below of described chin and is firmly held whereby.
In other words, with in vertical struts 30, horizontal strut 40 and bottom pole 50 and the process that hub member 10,20 connects, each pole 30,40,50 is inserted through hub member 10,20 U-shaped patchhole 11, be arranged on the jointed shaft 31 of pole 30,40,50 end towards the long diameter of U-shaped patchhole 11, then by making described pole rotate 90 degree and with the mandatory pull-up of described pole, jointed shaft 31 passes the outstanding pawl 13 of the entrance that is arranged on hinged groove 12 and is inserted in the hinged groove 12.Jointed shaft 31 is configured to its cross section and is the D type.Therefore, if pass the narrow outstanding pawl of the entrance that is arranged on hinged groove 12 and narrow by the D type forcibly inserts jointed shaft 31 in the hinged groove 12, jointed shaft 31 will rotatably be set in the described hinged groove so, and can not come off from hinged groove 12 easily.
In the present invention, in order to make a rod folding, shown in Fig. 5 a, at the folding connector 70 of arranging of each vertical struts 30, horizontal strut 40 and bottom pole 50 midway.
More particularly, the described folding connector that is arranged on halfway on the described pole comprises: articulated element 71,72, this articulated element are fixed on each coupling part of half and half bar; Swivel pin 74, this swivel pin articulates two articulated elements 71,72; Locking piece 73 in 71 formation of an articulated element; And slide block slot 75, this slide block slot 75 is formed on another articulated element 72 with utilizing spring, thereby can make described pole become straight or folding.
Therefore, shown in Fig. 5 a, if slide block slot 75 is moved towards locking piece 73, that is: move along locking direction, then make locking piece 73 enter the inside of slide block slot 75, thereby stop the pivotal action of articulated element 72, cause described pole to become straight.Do not operate further, will keep becoming straight state.Yet shown in Fig. 5 b, if slide block slot 75 is mobile along the direction (that is: unlocking direction) opposite with locking piece 73, locking piece 73 was removed the stopping of slide block slot 75, thereby made described rod folding.
At this moment, spring 76 promotes slide block slot 75 towards locking piece 73 constantly, thereby locking piece 73 can insert in the slide block slot 75, can make the pole of expansion maintain stretching position whereby.When moving slider groove 75 during with folding half bar, half bar via connect two articulated elements 71,72 swivel pin 74 pivots.
Vertical struts 30 all has jointed shaft 31 with horizontal strut 40 at two ends; Whereby, vertical struts 30 connects with top hub member 10 on the one hand, and connects with side hub member 20 on the other hand; And horizontal strut 40 connects with adjacent side hub member 20 on its both sides.Bottom pole 50 has jointed shaft 31 separately in an end of this pole, be used for connecting with side hub member 20, and have claw in another end of this pole, be used for connecting with the lower edge of tent cloth, therefore, bottom pole 50 is assembled between side hub member 20 and the ground.
The following process that further specifies assembling dome Tent frame of the present invention.
At first, a plurality of vertical struts 30 all are inserted through the U-shaped patchhole 11 of top hub member 10, be arranged on the jointed shaft 31 of pole 30,40,50 end towards the long diameter of U-shaped patchhole 11, then make described pole rotate 90 degree and with the mandatory pull-up of described pole, jointed shaft 31 passes outstanding pawl 13 and is inserted in the hinged groove 12 whereby; Then, the jointed shaft 31 that will be positioned at the other end place of vertical struts 30 connects with side hub member 20 in the same way.In other words, when inserting pole 30,40,50 in the U-shaped patchhole 11, an end that makes jointed shaft 31 is the most inboard towards U-shaped patchhole 11, the other end of jointed shaft 31 is towards the middle part of the outer end of the opening of U-shaped patchhole 11, this is that pole 30,40,50 only can be inserted in this way because of the total length owing to jointed shaft 31.Pass U-shaped patchhole 11 in case will have pole 30,40,50 insertions of jointed shaft 31, just pole 30,40,50 should be revolved and turn 90 degrees, like this jointed shaft 31 just can pull-up pole 30,40,50 so that jointed shaft 31 align with hinged groove 12 before inserting in the hinged groove 12.
Then, by as described above, engage with the hinged groove 12 of side hub member 20 by the jointed shaft 31 that makes horizontal strut 40, horizontal strut 40 is connected with side hub member, each horizontal strut 40 flatly is connected between two adjacent side hub members 20 whereby.Then, engage with the hinged groove 12 of corresponding side hub member by the jointed shaft 31 that makes the upper end that is positioned at bottom pole 50, bottom pole 50 is connected with side hub member 20.By bottom pole 50 is connected like this with side hub member 20, finished the two-stage Tent frame configuration that is used for the dome tent.
If the belfry of described tent is become three grades, side hub member 20 in the two-stage structure is connected with the additional vertical struts 30 that replaces bottom pole 50, additional side hub member 20 is connected with the lower end of described additional vertical struts 30, horizontal strut 40 is connected with described additional side hub member 20.By bottom pole 50 is connected with lowermost side hub member 20, finish three grades of Tent frame configurations for the dome tent.
After with two-stage or three grades assembling Tent frame, tent cloth 60 is connected with each pole 30,40,50.Then, connect with the root edge portion of described tent cloth by the claw that makes the lower end that is positioned at bottom pole 50, finish the assembling of tent.
So the tent that constitutes connects each pole 30,40,50 with hub member 10,20 under collapsible state.And, because each pole 30,40,50 connects with tent cloth 60 with being integral, when the user launches pole 30,40,50 the connector of folding up 70, will build tent as umbrella.
Because above-mentioned Tent frame, a small amount of people just can easily build described tent.Also can be by the folding pole 30,40,50 and easily dismantle described tent at connector 70 places.
Fig. 6 is the vertical view of the dome tent of two-stage assembling, and Fig. 7 is the vertical view of the dome tent of three grades of assemblings.
Hub member 10,20 in the present embodiment has five U-shaped patchholes 11 that arrange at interval with rule, and pole 30,40,50 can connect with U-shaped patchhole 11 in radial mode like this.
If assemble described Tent frame with two-stage as shown in Figure 6, the quantity of so required hub member and pole is as follows.
A top hub member 10; Five side hub members 20; Five vertical struts 30; Five horizontal struts 40; Ten bottom poles 50.In this two-stage Tent frame, between top hub member 10 and side hub member 20, connect described vertical struts; Horizontal strut 40 connects with side hub member 20; And bottom pole 50 connects with side hub member 20.
In the present embodiment, the length of the length of vertical struts 30 and bottom pole 50 is 180 centimetres, and the length of horizontal strut 40 is 220 centimetres.Because the length of these bars, when building the tent with two-stage Tent frame, the height of described tent is about 3 meters, and the diameter of the interior floor of described tent is near 6 meters, and this tent is sizable tent.With regard to pole 30,40,50 thickness, use the general smaller diameter rods that is used for small-sized tent.Yet described Tent frame is very solid, is enough to bear the weight of described tent cloth.
If with three grades of described Tent frames of assembling, the quantity of so required hub member and pole is as follows as shown in Figure 7.
A top hub member 10; 15 side hub members 20; 15 vertical struts 30; 15 horizontal struts 40; 20 bottom poles 50.In these three grades of Tent frames, between top hub member 10 and side hub member 20, connect described vertical struts; Horizontal strut 40 connects with side hub member 20; And, the process that repeated vertical pole 30 connects with horizontal strut 40, bottom pole 50 connects with side hub member 20.
In the present embodiment, the length of the length of vertical struts 30 and bottom pole 50 is 180 centimetres, and the length of horizontal strut 40 is 220 centimetres.Because the length of these bars, when building the tent with three grades of Tent frames, the height of described tent is about 5.5 meters, and the diameter of the interior floor of described tent is near 11 meters, and this tent is especially big tent.With regard to pole 30,40,50 thickness, use the general smaller diameter rods that is used for small-sized tent.Yet described Tent frame is very solid, is enough to bear the weight of described tent cloth.
In the above-described embodiment, hub member 10,20 has five patchholes 11 that connect with it for for pole 30,40,50.Yet hub member 10,20 can have six or eight patchholes 11 that are used for the assembling Tent frame.
Yet test shows: pole is connected with the hub member with five patchholes can make the Tent frame structure the most solid, the outward appearance of the tent of building is the most beautiful.
Do not recommend to be difficult to assemble tent more than three grades of assembling Tent frames because level Four or Pyatyi framework make, and the additional weight of the tent that exceptionally enlarges becomes unrealistic and must weigh.
In above-mentioned preferred embodiment, described the present invention in detail.Yet those skilled in the art still can make numerous variations example and modified example in the technical scope of claim of the present invention.Therefore, this shows that these modifications and modified example should be considered as in the scope of claim of the present invention.

Claims (5)

1. multistage Tent frame that is used for the dome tent, this multistage Tent frame comprises:
A) be positioned at the top hub member of the top end of this Tent frame;
B) be positioned at a plurality of side hub members on the side of described Tent frame;
C) a plurality of vertical struts, these vertical struts are connected between described top hub member and the described side hub member, perhaps be connected between described a plurality of side hub member, and each described vertical struts has folding connector midway between the two ends of this vertical struts;
D) a plurality of horizontal struts that connect between described a plurality of side hub members, and each described horizontal strut have folding connector midway between the two ends of this horizontal strut;
E) extension that faces down towards ground of a plurality of bottoms pole that connects with described a plurality of side hub members, described bottom pole, and between the two ends of described bottom pole, have folding connector midway,
Wherein, in the vertical direction and horizontal direction these poles are connected with described top hub member and described side hub member, then described bottom pole is connected between the side hub member and ground of foot, described whereby Tent frame can be configured to vertical two-stage to three grade.
2. the multistage Tent frame for the dome tent according to claim 1, wherein: described top hub member has for a plurality of U-shaped patchhole and a plurality of hinged groove of inserting and connect these poles separately with described side hub member; Be formed with jointed shaft at the both ends of each vertical struts and horizontal strut and the place, an end of each bottom pole, make described jointed shaft can insert in the described hinged groove and with described hinged groove and connect, these poles are connected with these hub members.
3. the multistage Tent frame for the dome tent according to claim 2, wherein, each the described hinged groove that forms in described top hub member and described side hub member is provided with outstanding pawl (13) in the entrance of this hinged groove, thereby in case described jointed shaft insert and will prevent in the described hinged groove that described jointed shaft from coming off from described hinged groove easily.
4. the multistage Tent frame for the dome tent according to claim 2, wherein, described top hub member and described side hub member have five U-shaped patchholes that arrange with regular spaces separately, make these poles to connect with these hub members in radial mode.
5. the multistage Tent frame for the dome tent according to claim 1, wherein, the described folding connector midway that is arranged between the two ends of each described vertical struts, described horizontal strut and described bottom pole comprises: the articulated element that is used for connecting this two and half bar at each half bar; Articulate the swivel pin of these two articulated elements; Be formed on the locking piece on the articulated element in these two articulated elements; And being formed on slide block slot on another articulated element, described slide block slot stops the pivotal action of described articulated element, perhaps removes the prevention to pivotal action.
CN201210414423.9A 2012-01-05 2012-10-25 For the multilevel tent framework for dome type of tent Active CN103195291B (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
KR20120001455 2012-01-05
KR10-2012-0001455 2012-01-05
KR20120082504A KR101479966B1 (en) 2012-01-05 2012-07-27 Multi-step tent frame of a dome-shaped tent
KR10-2012-0082504 2012-07-27

Publications (2)

Publication Number Publication Date
CN103195291A true CN103195291A (en) 2013-07-10
CN103195291B CN103195291B (en) 2015-09-23

Family

ID=48718091

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210414423.9A Active CN103195291B (en) 2012-01-05 2012-10-25 For the multilevel tent framework for dome type of tent

Country Status (1)

Country Link
CN (1) CN103195291B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111058679A (en) * 2018-10-17 2020-04-24 戴卡特隆有限公司 Collapsible tent comprising two umbrella structures
CN111550113A (en) * 2020-04-29 2020-08-18 广州被动屋科技有限公司 Military protection house
CN111549908A (en) * 2020-04-29 2020-08-18 广州被动屋科技有限公司 Military protection house and framework structure thereof
CN112399947A (en) * 2018-07-09 2021-02-23 古斯塔沃.加科梅尔库天斯基 Awning for protecting goods in severe weather
RU2816720C1 (en) * 2023-05-19 2024-04-03 Борис Григорьевич Мухин Spatial covering of tent type on polygonal plane

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4750509A (en) * 1985-11-25 1988-06-14 Kim Soon Tae Folding device of a tent-framework
US4998552A (en) * 1989-09-12 1991-03-12 T. A. Pelsue Company Geodetic tent structure
GB2412925A (en) * 2004-04-06 2005-10-12 Lien-Chuan Yang Collapsible tent support framework
CN201169956Y (en) * 2008-01-22 2008-12-24 李成熙 Automatic folding tent rack
CN102224310A (en) * 2008-12-01 2011-10-19 徐正佑 Canopy tent

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4750509A (en) * 1985-11-25 1988-06-14 Kim Soon Tae Folding device of a tent-framework
US4998552A (en) * 1989-09-12 1991-03-12 T. A. Pelsue Company Geodetic tent structure
GB2412925A (en) * 2004-04-06 2005-10-12 Lien-Chuan Yang Collapsible tent support framework
CN201169956Y (en) * 2008-01-22 2008-12-24 李成熙 Automatic folding tent rack
CN102224310A (en) * 2008-12-01 2011-10-19 徐正佑 Canopy tent

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112399947A (en) * 2018-07-09 2021-02-23 古斯塔沃.加科梅尔库天斯基 Awning for protecting goods in severe weather
CN111058679A (en) * 2018-10-17 2020-04-24 戴卡特隆有限公司 Collapsible tent comprising two umbrella structures
CN111058679B (en) * 2018-10-17 2022-05-31 戴卡特隆有限公司 Collapsible tent comprising two umbrella structures
CN111550113A (en) * 2020-04-29 2020-08-18 广州被动屋科技有限公司 Military protection house
CN111549908A (en) * 2020-04-29 2020-08-18 广州被动屋科技有限公司 Military protection house and framework structure thereof
RU2816720C1 (en) * 2023-05-19 2024-04-03 Борис Григорьевич Мухин Spatial covering of tent type on polygonal plane

Also Published As

Publication number Publication date
CN103195291B (en) 2015-09-23

Similar Documents

Publication Publication Date Title
US8851956B2 (en) Playhouse
US20080087313A1 (en) Collapsible canopy framework
CN102224310B (en) Canopy tent
US9140030B2 (en) Foldable tent
KR101285129B1 (en) A solidly canopy
US9856673B2 (en) Tent
CN103195291A (en) Multilevel tent framework for dome type tent
US20110297201A1 (en) Pivot knuckle joint and tent using the same
CN201016237Y (en) Tent roof bracing-folding structure
WO2006080750A1 (en) The tent and frame for one touch type tent
US20220356727A1 (en) Combination-type large tent frame assembly
KR200482801Y1 (en) Folding tent frame
KR101479966B1 (en) Multi-step tent frame of a dome-shaped tent
KR200398147Y1 (en) Canopy tent
KR101285130B1 (en) A solidly large-sized canopy
KR20200000596U (en) Car Tent
KR100874593B1 (en) Automatic folding cabin tent
CN113863775A (en) Tent seat joint and tent framework
KR101153274B1 (en) Folding tent
CN106150185A (en) A kind of Tent frame opening up receipts connects unit and a kind of Tent frame
KR200338116Y1 (en) Connecting system of foldable supporting frame of fold-up tent
CN102691353B (en) Simple and movable house supporting structure with mutually-supported folding rod support
KR101266906B1 (en) Fastener for fences
KR101090348B1 (en) Folding frame of pavilion
US20230183999A1 (en) Methods and systems for a foldable tent

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant