CN103194959A - Floating bridge adaptable to changing of riverway water level and capable of meeting requirements of riverway navigation - Google Patents

Floating bridge adaptable to changing of riverway water level and capable of meeting requirements of riverway navigation Download PDF

Info

Publication number
CN103194959A
CN103194959A CN2013101248175A CN201310124817A CN103194959A CN 103194959 A CN103194959 A CN 103194959A CN 2013101248175 A CN2013101248175 A CN 2013101248175A CN 201310124817 A CN201310124817 A CN 201310124817A CN 103194959 A CN103194959 A CN 103194959A
Authority
CN
China
Prior art keywords
bridge section
bridge
active segment
segment
river course
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101248175A
Other languages
Chinese (zh)
Other versions
CN103194959B (en
Inventor
余葵
周家俞
缪吉伦
舒荣龙
王召兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwestern Hydro Engineering Research Institute For Water Way Of Chongqing Jiaotong University
Original Assignee
Southwestern Hydro Engineering Research Institute For Water Way Of Chongqing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwestern Hydro Engineering Research Institute For Water Way Of Chongqing Jiaotong University filed Critical Southwestern Hydro Engineering Research Institute For Water Way Of Chongqing Jiaotong University
Priority to CN201310124817.5A priority Critical patent/CN103194959B/en
Publication of CN103194959A publication Critical patent/CN103194959A/en
Application granted granted Critical
Publication of CN103194959B publication Critical patent/CN103194959B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a floating bridge adaptable to changing of riverway water level and capable of meeting requirements of riverway navigation. The floating bridge comprises a left bridge segment, a right bridge segment and a middle movable segment. The left bridge segment and the right bridge segment are fixedly arranged in the riverway. The left bridge segment, the right bridge segment and the middle movable segment are respectively formed by a plurality of monomer boats connecting head to tail. At least a part of the monomer boats are detachably connected with the adjacent monomer boats in the left bridge segment and the right bridge segment, and can be detached or connected according to the requirements of the changes of the water level of the riverway. A navigation breach is formed between the left bridge segment and the right bridge segment. Two ends of the middle movable segment are detachably connected with the left bridge segment and the right bridge segment respectively. The navigation breach is formed after the middle movable segment between the left bridge segment and the right bridge segment is moved away, and two ends of the middle movable segment are respectively connected to the left bridge segment and the right bridge segment to form a continuous river crossing channel after the floating bridge is closed. A power device is mounted on the movable segment. The floating bridge is adaptable to large changes of water level differences of the riverway and is capable of meeting the requirements of riverway navigation.

Description

A kind of pontoon bridge that can adapt to the river course SEA LEVEL VARIATION and satisfy river course navigation demand
Technical field
The present invention relates to a kind of pontoon bridge, particularly relate to a kind of pontoon bridge that can adapt to the river course SEA LEVEL VARIATION and satisfy river course navigation demand, belong to the marine traffic engineering technical field.
 
Background technology
For alleviating steamer transport power deficiency, improve the water transport traffic has positive effect to pontoon bridge as a kind of marine traffic engineering facility, and pontoon bridge has obtained using more widely in fields such as river course, harbour for this reason.But the pontoon bridge main body of pontoon bridge is generally an affixed and inseparable integral body in the prior art, for example CN 201120064267.9 discloses a kind of pontoon bridge, the some planks on comprising buoyancy tank and being arranged on combined type buoyancy tank (being connected a plurality of buoyancy tanks as a whole by the binding mode).The pontoon bridge that this pontoon bridge main body is inseparable integral body mainly exists following defective: (1) is when the SEA LEVEL VARIATION of navigation channel, because the pontoon bridge main body is an inseparable integral body, the length of pontoon bridge main body immobilizes, thereby can not adapt to SEA LEVEL VARIATION, be difficult to satisfy large water-head and change the actual needs of using in the river.(2) after pontoon bridge set up and finishes, the pontoon bridge main body was across the river course and be inseparable integral body, and the river course has lost the navigation function.
 
Summary of the invention
At the prior art above shortcomings, the purpose of this invention is to provide a kind of pontoon bridge principal length can make corresponding adjustment with SEA LEVEL VARIATION, and does not block the pontoon bridge of navigation channel navigation.
For achieving the above object, the present invention adopts following technological means:
A kind of pontoon bridge that can adapt to the river course SEA LEVEL VARIATION and satisfy river course navigation demand, comprise the pontoon bridge main body, the two ends of pontoon bridge main body are installed in the two sides, river course by the disembarkation facility respectively, it is characterized in that: described pontoon bridge main body is made up of left bridge section, right bridge section and middle part active segment, and left bridge section and right bridge section rely on casts anchor or draw means such as cable is fixing to be fixedly installed in the river course with the bank.
Described left bridge section, right bridge section and active segment are formed by connecting from beginning to end by a plurality of monomer boats respectively, wherein have at least partial monosomy boat and adjacent monomer boat with it to change needs according to river water level between the monomer boat that removably connects and select dismounting or connection for removably connecting in left bridge section and the right bridge section.
Form the navigation breach between left side bridge section and the right bridge section, the two ends of active segment removably connect with left bridge section and right bridge section respectively, the middle part active segment is removed the back and is formed the navigation hole between left side bridge section and the right bridge section, and the two ends after the active segment closure of middle part are connected to form the continuous passage that crosses the river with left bridge section respectively with right bridge section; Be provided with power set at active segment.
 
Described active segment mainly contains two kinds of set-up modes:
One, active segment is positioned at left bridge section and right bridge section downstream, the two ends of active segment are overlapped on respectively on left bridge section and the right bridge section and by linkage and link together, power set are located at active segment one end, are provided with the linkage that prevents that active segment from throwing off between the active segment other end and corresponding left bridge section or the right bridge section.
Two, active segment is positioned at left bridge section and right bridge section middle, the two ends of active segment are docked at respectively on left bridge section and the right bridge section and by bolt and removably connect, power set are two covers and are divided into the active segment two ends, are provided with the linkage that prevents the active segment disengagement between active segment one end and corresponding left bridge section or the right bridge section.
Described monomer boat is made up of bridgepile boat and the bridge deck of being located on the bridgepile boat, and the bridge deck of all monomer boats connect by the vertical screw rod that connects successively.Described left bridge section and right bridge section by anchor cable be fixedly arranged on the river course in anchorage or with the bank regularly warping appliances such as ox be connected.
Described linkage can be the insurance wirerope; Described power set are the machine outside that is installed on the bridgepile boat stern trimming flag.
Compared to existing technology, the present invention has following beneficial effect:
1, among the present invention, the monomer boat in left bridge section and the right bridge section and adjacent monomer boat are the absolute construction that removably connects; Can be according to the quantity of the height increase and decrease monomer boat of the fluctuation of river water level, realize that the pontoon bridge principal length changes the purpose of adjusting with the river water level difference, be that inseparable structure is compared with pontoon bridge main body in the prior art, overcome river course (particularly river course, reservoir area) SEA LEVEL VARIATION greatly to the adverse effect of goods and materials such as pedestrian or vehicle by pontoon bridge.
2, the present invention's left side bridge section and right bridge section are fixedly installed on the river course, and between them She Catching-rabbits navigation hole, and the two ends Bian of active segment is connected to form the passage that crosses the river of goods and materials such as pedestrian or vehicle with removably connecting with left bridge section and right bridge section.When needs were opened the navigation or air flight, active segment can be opened, and abdicated the navigation channel navigation; After navigation finished, active segment can be closed, and guaranteed the normal use of pontoon bridge.Be provided with power set at active segment, when opening and closing, active segment is similar to a ship, under the thruster power set drive, near or away from the fixedly pontoon bridge section that connects it.
If power set occur unexpected or other accidents take place because active segment fixedly is connected with the insurance wirerope with two sides between the pontoon bridge section, can avoid active segment and fixedly the pontoon bridge section throw off fully, thereby assurance safety.
In sum, the present invention can play and adapt to the effect that the river course large water-head changes and can satisfy river course navigation demand.
?
Description of drawings
Fig. 1 is structural representation of the present invention;
Fig. 2 is monomer boat structural representation among the present invention.
 
The specific embodiment
Below in conjunction with drawings and Examples, the present invention is described in further details.
As shown in Figure 1, a kind of pontoon bridge that can adapt to the river course SEA LEVEL VARIATION and satisfy river course navigation demand is made up of shore facilities such as the slope ladder access of pontoon bridge main body and two sides or ramps.The two ends of pontoon bridge main body connect the two sides, river course by the springboard lifting appliance, and the pontoon bridge main body is made up of left bridge section, right bridge section (left bridge section and right bridge section constitute main bridge section 1) and intermediate active section 2 among the figure.Described left bridge section, right bridge section and active segment 2 interconnect by a plurality of monomer boats 6 and form.Particularly, as shown in Figure 2, described monomer boat 6 is made up of bridgepile boat 7 and the bridge deck of being located on the bridgepile boat 78, connects by the vertical screw rod that connects successively between the bridge deck 8 of all monomer boats 6.
Just can make its structure that becomes a detachable dismounting by the pontoon bridge main body being carried out above design, to adapt to the fluctuation of river water level.Below to how to do to discuss in detail according to the detailed process of river water level fluctuation adjustment pontoon bridge principal length:
When river water level changes by the main bridge section 1(of increase and decrease left side bridge section or right bridge section) each monomer boat 6 quantity realize adjustment to the pontoon bridge principal length, to adapt to the river course SEA LEVEL VARIATION.Detailed process is as follows: when river water level descends, need to reduce the quantity of monomer boat.Can untie connection screw rods all on the bridge deck 8 of the monomer boat 6 that need dismantle this moment, make this monomer boat 6 be in free movement state, the monomer boat 6 that will be in free state then moves to the appointed place, thereby break away from the pontoon bridge main body, and then the two monomer boats 6 that will disconnect because of dismounting get final product by the vertical screw rod bolt that connects, the pontoon bridge principal length just reduces like this, has adapted to the needs of river width constriction after river water level descends.When river water level raises, can adopt similar method (process is opposite) that the monomer boat 6 that shifts out is joined in the pontoon bridge main body, detailed process no longer is described in detail.
The weight of considering each monomer boat is bigger, and only controlling its disengagement or connect by manpower relatively wastes time and energy, so the present invention has additional the power set that increase and decrease monomer boat is used; These power set are arranged on the monomer boat adjacent with the monomer boat of needs dismounting.During dismounting, with two monomer boats (namely itself needing the monomer boat of dismounting and the monomer boat of drive) as under the integral demounting, sail out of the appointed area by the power set driving, and then two monomer boats are taken apart, dynamic monomer boat is sailed go back to the bridge section place after taking apart, the monomer boat two ends that are connected to this drive then at the two ends that pontic is disconnected get final product again.Power set sail out of or drive towards the pontic except driving the monomer boat, and are also helpful when the dismounting screw rod, if there are not power set, pontoon bridge is under the water impact effect, the dismounting of screw rod is very difficult, and the use of power set can overcome flow action, makes the dismounting of screw rod become relatively easy.
In view of the bourn acting force at offshore place less relatively, left bridge canned paragraph or right bridge canned paragraph near the korneforos part by anchorage or with the bank regularly warping appliances such as ox be connected and fixed, the present invention when increase and decrease monomer boat, mobile two ends monomer boat near the bank often.
In order to satisfy the navigation demand, the present invention left side bridge canned paragraph and right bridge canned paragraph are arranged on the river course left and right banks, and left bridge canned paragraph is connected with the anchorage 3 that is fixedly arranged on upstream, river course or downstream by anchor cable 4 with partial monosomy boat in the right bridge canned paragraph also can be selected to be connected with the bank mooring facilities as the case may be.Form the navigation hole in the middle of left side bridge canned paragraph and the right bridge canned paragraph, the two ends of active segment 2 adopt the mode of removably connecting to form the continuous passage that crosses the river with left bridge canned paragraph and right bridge canned paragraph respectively, are provided with power set at active segment 2.Under the daily state, active segment 2 and left bridge canned paragraph and right bridge canned paragraph link together to constitute and can supply current integral body, namely as the pontoon bridge main body under the common pontoon bridge use state.After the connection between active segment 2 and the left bridge section/right bridge section was removed, active segment 2 just was in active state, can open and abdicate the navigation navigation channel, and this moment, the pontoon bridge main body can realize the function of opening the navigation or air flight.Navigation is closed active segment the pontoon bridge main body that namely is returned under the use state after finishing again.
Particularly, active segment has but is not limited to following two kinds of set-up modes (in these two kinds of set-up modes, its detail can be selected according to actual needs and flexibly):
One, downstream overlapping mode.This moment, active segment was positioned at the downstream of left bridge canned paragraph and right bridge canned paragraph, and the active segment two ends are overlapped on left bridge canned paragraph and the right bridge canned paragraph respectively and are connected by isolated plant (embodiment is wirerope 5).Join power set one cover, be located at active segment one end.Following to be located at the active segment left end with power set be how example explanation active segment opens and closes when navigation needs, and is located at the process all fours of the other end.When needing navigation, earlier open special-purpose linkage by the operating personnel on left bridge section and the right bridge section, put auxiliary constraint wirerope, the constraint wirerope of active segment left end need unclamp gradually with the movement of left active segment, after the active segment right-hand member is opened special-purpose linkage, the constraint wirerope suitably unclamp need behind the certain-length (this length enough makes active segment open when rotating not to interfere with right bridge canned paragraph as the rotating shaft end in generation and gets final product) fixed; The active segment left end is that the rotating shaft end is to a side shifting with the active segment right-hand member under power set and drag force effect, this moment, active segment was opened gradually, for prevent boats and ships by the time and active segment come in contact, the active segment left end of opening need move to right bridge canned paragraph place and adopt isolated plant affixed, guarantees the boats and ships safety of passing through.After boats and ships pass through, open the special-purpose linkage of active segment left end and right bridge canned paragraph, the active segment left end is back closed gradually under power set promote, and until the pontoon bridge main body that returns under the use state, whole navigation process is finished.
Two, center docking mode.This moment, active segment was positioned at left bridge canned paragraph and right bridge canned paragraph middle, and the two ends of active segment are docked at respectively on left bridge canned paragraph and the right bridge canned paragraph and by hinged bolt and are connected.Power set are two covers and are divided into the active segment two ends.It is the same to catch up with the situation of stating, in order to prevent unexpected the generation, be provided with the insurance wirerope that prevents that active segment is out of control between end and corresponding left bridge section or the right bridge section about active segment, the places different with the downstream overlapping mode are, open the bolt that active segment and left bridge section are connected with right bridge section, under two power set cooperation and under the drag force effect, the insurance wirerope can bear corresponding pulling force when opening, the active segment that is about to open is retrained.The active segment Parallel to the flow direction moves a certain distance, and active segment is opened when rotating not with interfering as the left side of rotating shaft end or right bridge canned paragraph in generation got final product.And then under the power drive of left side, the left end active segment is that the rotating shaft end carries out axial rotation with the right-hand member active segment, opens ship navigation fully until active segment with above-mentioned overlapping mode is the same.When closing, started the power set of left end by the operator, active segment is reached basic when parallel with canned paragraph, restart the right-hand member power set, under the cooperation of two power set, active segment is slowly started to left bridge canned paragraph and right bridge canned paragraph middle, will connect set bolt then, recover the pontoon bridge main body under the use state, vehicle and pedestrian can normally pass a bridge.
Center docking mode pontoon bridge does not intersect section, and good integrity makes things convenient for vehicles and pedestrians, but cost is higher, and it is longer that mobile active segment opens and closes the time that spends.The downstream overlapping mode, because active segment is overlapped on the downstream, the traffick difficulty crosses the river and does not have problems but be used for the pedestrian, and advantage is that cost is low, and it is shorter relatively that active segment is opened the shut-in time.
Described power set are the ship on-hook, are installed on bridgepile boat 7 stern trimming flags.
Explanation is at last, above embodiment is only unrestricted in order to technical scheme of the present invention to be described, although with reference to preferred embodiment the present invention is had been described in detail, those of ordinary skill in the art is to be understood that, can make amendment or be equal to replacement technical scheme of the present invention, and not breaking away from aim and the scope of technical solution of the present invention, it all should be encompassed in the middle of the claim scope of the present invention.

Claims (5)

1. pontoon bridge that can adapt to the river course SEA LEVEL VARIATION and satisfy river course navigation demand, comprise the pontoon bridge main body, the two ends of pontoon bridge main body are installed in the two sides, river course by the disembarkation facility respectively, it is characterized in that: described pontoon bridge main body is made up of left bridge section, right bridge section and middle part active segment, and left bridge section and right bridge section are fixedly installed in the river course; Described left bridge section, right bridge section and active segment are formed by connecting from beginning to end by a plurality of monomer boats respectively, wherein have partial monosomy boat and adjacent monomer boat with it in left bridge section and the right bridge section at least for removably connecting; Form navigation between left side bridge section and the right bridge section and use breach, the two ends of active segment removably connect to form the continuous passage that crosses the river with left bridge section and right bridge section respectively, are provided with power set at active segment.
2. a kind of pontoon bridge that can adapt to the river course SEA LEVEL VARIATION and satisfy river course navigation demand according to claim 1, it is characterized in that: described active segment is positioned at left bridge section and right bridge section downstream, the two ends of active segment are overlapped on left bridge section and the right bridge section respectively and link together, power set are located at active segment one end, are provided with the linkage that prevents that active segment from throwing off between the active segment other end and corresponding left bridge section or the right bridge section.
3. a kind of pontoon bridge that can adapt to the river course SEA LEVEL VARIATION and satisfy river course navigation demand according to claim 1, it is characterized in that: described active segment is positioned at left bridge section and right bridge section middle, the two ends of active segment are docked at respectively on left bridge section and the right bridge section and by bolt and removably connect, power set are two covers and are divided into the active segment two ends, are provided with the linkage that prevents the active segment disengagement between active segment one end and corresponding left bridge section or the right bridge section.
4. according to claim 1 or 2 or 3 described a kind of pontoon bridges that can adapt to the river course SEA LEVEL VARIATION and satisfy river course navigation demand, it is characterized in that: described monomer boat is made up of bridgepile boat and the bridge deck of being located on the bridgepile boat, and the bridge deck of left bridge section, right bridge section and each self-corresponding all monomer boat of middle part active segment connect by the vertical screw rod that connects successively.
5. a kind of pontoon bridge that can adapt to the river course SEA LEVEL VARIATION and satisfy river course navigation demand according to claim 4, it is characterized in that: described power set are the machine outside that is installed on the bridgepile boat stern trimming flag.
CN201310124817.5A 2013-04-11 2013-04-11 A kind of can adapt to river course SEA LEVEL VARIATION and meet river course navigation demand pontoon bridge Expired - Fee Related CN103194959B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310124817.5A CN103194959B (en) 2013-04-11 2013-04-11 A kind of can adapt to river course SEA LEVEL VARIATION and meet river course navigation demand pontoon bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310124817.5A CN103194959B (en) 2013-04-11 2013-04-11 A kind of can adapt to river course SEA LEVEL VARIATION and meet river course navigation demand pontoon bridge

Publications (2)

Publication Number Publication Date
CN103194959A true CN103194959A (en) 2013-07-10
CN103194959B CN103194959B (en) 2015-11-18

Family

ID=48717765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310124817.5A Expired - Fee Related CN103194959B (en) 2013-04-11 2013-04-11 A kind of can adapt to river course SEA LEVEL VARIATION and meet river course navigation demand pontoon bridge

Country Status (1)

Country Link
CN (1) CN103194959B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106978778A (en) * 2017-05-18 2017-07-25 中铁第五勘察设计院集团有限公司 A kind of navigable overhead railway bridge of boats
CN107829421A (en) * 2017-12-01 2018-03-23 大连汇洋船务工程配套有限公司 A kind of port security door with propulsion plant
CN113981802A (en) * 2021-11-03 2022-01-28 黄河勘测规划设计研究院有限公司 Construction method and use method capable of quickly opening and closing floating bridge
CN113981801A (en) * 2021-11-03 2022-01-28 黄河勘测规划设计研究院有限公司 Floating bridge capable of being opened and closed quickly
CN113981803A (en) * 2021-11-09 2022-01-28 浙江二十冶建设有限公司 Floating bridge and floating bridge construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1852338A (en) * 1927-09-17 1932-04-05 Cleve F Shaffer Bridge construction
CN86200249U (en) * 1986-01-21 1987-06-24 浙江省湖州市人民政府湖州市军分区交通战备领导小组办公室 Jointing unit for float bridge with boats
JP2001220710A (en) * 2000-02-08 2001-08-17 Kajima Corp Floating type bridge
CN2721696Y (en) * 2004-08-04 2005-08-31 杨晶 Simple floating bridge of river
CN201151869Y (en) * 2007-12-29 2008-11-19 湖北华舟有限责任公司 Assembled and apart placed type bateau bridge
US20090038088A1 (en) * 2007-06-05 2009-02-12 Richard Steven Adler Rapid deployment floating bridges
CN201756677U (en) * 2009-11-26 2011-03-09 周鹏 Multipurpose pontoon bridge
CN201873939U (en) * 2010-09-08 2011-06-22 李顺堂 Hidden floating bridge device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1852338A (en) * 1927-09-17 1932-04-05 Cleve F Shaffer Bridge construction
CN86200249U (en) * 1986-01-21 1987-06-24 浙江省湖州市人民政府湖州市军分区交通战备领导小组办公室 Jointing unit for float bridge with boats
JP2001220710A (en) * 2000-02-08 2001-08-17 Kajima Corp Floating type bridge
CN2721696Y (en) * 2004-08-04 2005-08-31 杨晶 Simple floating bridge of river
US20090038088A1 (en) * 2007-06-05 2009-02-12 Richard Steven Adler Rapid deployment floating bridges
CN201151869Y (en) * 2007-12-29 2008-11-19 湖北华舟有限责任公司 Assembled and apart placed type bateau bridge
CN201756677U (en) * 2009-11-26 2011-03-09 周鹏 Multipurpose pontoon bridge
CN201873939U (en) * 2010-09-08 2011-06-22 李顺堂 Hidden floating bridge device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106978778A (en) * 2017-05-18 2017-07-25 中铁第五勘察设计院集团有限公司 A kind of navigable overhead railway bridge of boats
CN107829421A (en) * 2017-12-01 2018-03-23 大连汇洋船务工程配套有限公司 A kind of port security door with propulsion plant
CN113981802A (en) * 2021-11-03 2022-01-28 黄河勘测规划设计研究院有限公司 Construction method and use method capable of quickly opening and closing floating bridge
CN113981801A (en) * 2021-11-03 2022-01-28 黄河勘测规划设计研究院有限公司 Floating bridge capable of being opened and closed quickly
CN113981803A (en) * 2021-11-09 2022-01-28 浙江二十冶建设有限公司 Floating bridge and floating bridge construction method

Also Published As

Publication number Publication date
CN103194959B (en) 2015-11-18

Similar Documents

Publication Publication Date Title
CN103194959B (en) A kind of can adapt to river course SEA LEVEL VARIATION and meet river course navigation demand pontoon bridge
CN202923839U (en) Anchoring and mooring system of yacht and yacht comprising same
DE102015104089A1 (en) DRIVING AND STEERING DEVICE INSTALLED UNDER THE SEA MIRROR EXTERIOR TO THE RIGHT AND LEFT SIDE WALL OF A SHIP
CN107245937B (en) Across the waters pontoon bridge of one kind-tunnel composite structure
CN108385626A (en) Ultra-large type water-power plant
CN201321147Y (en) Automatic mast lowering mechanism
CN204979194U (en) Lifeboat
CN204056234U (en) A kind of self propelled barge floating holder for jacket chunk
PL210192B1 (en) Rescue ship for disabled vessels, vessel rescue method, and use of a rescue ship
CN103979083B (en) A kind of self propelled barge and operational method thereof of floating holder for jacket chunk
WO2022122562A1 (en) Catamaran-type houseboat
CN206307237U (en) A kind of pushing tow sideband device for being applied to motorboat
CN201245810Y (en) Open-close type waterborne civil boat float bridge
CN203864931U (en) Large-opening closing device used for ship and provided with opening protecting supporting rod
CN103842245A (en) Submersible apparatus and methods of installing anchoring equipment
CN107187554A (en) The binary partly latent barge defeated for the dry haul of semisubmersible drilling platform and operational method
Gao et al. Study on the safety guarantee of ship mooring from frequent cable accidents
CN203567913U (en) Constant-resistance anti-collision anchor chain
CN211167294U (en) Operating system for opening and closing moon pool bottom cover
CN206297700U (en) Track combination ship
CN205396468U (en) Special buoyancy formula lash of lockage
CN102392437B (en) Semi-floating type pre-navigation lock
CN205676840U (en) Ramp type passenger wharf structure
CN203958565U (en) A kind of large ship is moored safely and is repaiied, manufacturing installation
CN208530806U (en) It is a kind of to launch a ship system according to the large ship shifting of embankment construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151118