CN103183212A - Method and device for preparation and transportation before warehousing of steel coil finished product - Google Patents

Method and device for preparation and transportation before warehousing of steel coil finished product Download PDF

Info

Publication number
CN103183212A
CN103183212A CN2011104531129A CN201110453112A CN103183212A CN 103183212 A CN103183212 A CN 103183212A CN 2011104531129 A CN2011104531129 A CN 2011104531129A CN 201110453112 A CN201110453112 A CN 201110453112A CN 103183212 A CN103183212 A CN 103183212A
Authority
CN
China
Prior art keywords
coil
beam type
transport plane
strip
type transport
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011104531129A
Other languages
Chinese (zh)
Other versions
CN103183212B (en
Inventor
任树忠
任涛
刘士平
李芳�
杜少欣
赵明侠
孙长飞
郑建
孔令东
涂咏梅
张泽华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ansteel Engineering Technology Corp Ltd
Original Assignee
Ansteel Engineering Technology Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ansteel Engineering Technology Corp Ltd filed Critical Ansteel Engineering Technology Corp Ltd
Priority to CN201110453112.9A priority Critical patent/CN103183212B/en
Publication of CN103183212A publication Critical patent/CN103183212A/en
Application granted granted Critical
Publication of CN103183212B publication Critical patent/CN103183212B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Replacement Of Web Rolls (AREA)

Abstract

The invention relates to the field of steel coil transportation, in particular to a method and a device for preparation and transportation before warehousing of a steel coil finished product. The device is characterized by comprising a conveying line consisting of a chain conveyer, a walking beam type conveyer and a lifting mechanism, wherein the conveying line starts from the space behind a coiler, ends at the space in front of a finished product warehouse and is vertically connected with the head of a check line; and bundling equipment, weighing equipment, printing equipment and supplementary bundling equipment are arranged along the conveying belt side. Compared with the prior art, the method and the device have the beneficial effects that the bundling, weighing, printing, surface inspection and supplementary bundling functions are finished sequentially in a transportation process of the steel coil; the steel coil is flexible in transportation direction; scattered coil placement to a plurality of finished product warehouses can be realized, the investment is low, the equipment is reliable in operation, and different requirements of rolling production lines on different annual production capacities can be met by increasing or decreasing the number of the walking beam type conveyer and the chain conveyer.

Description

Reorganize and outfit method and the device of transportation before a kind of coil of strip finished product warehouse-in
Technical field
The present invention relates to the coil of strip transport field, relate in particular to method and the device of reorganizing and outfit transportation before a kind of coil of strip finished product is put in storage.
Background technology
In the hot-rolled strip production line subsequent process, after namely reeler becomes coiled sheet to the band coil of strip, reorganize and outfit before must putting in storage coil of strip, warehouse for finished product is gone in transportation then.In this process, coil of strip will be finished bundling, weighs, spray printing, surface inspection, finished product volume roll off the production line steps such as stacking.
At present, reorganize and outfit in the process before the warehouse-in of domestic and international many manufacturing lines, chain conveyor or stepping beam type transport plane are adopted in the transportation of coil of strip fully, and the advantage that adopts chain conveyor is that weight of equipment is light, dependable performance but have single, the drawback such as buffering not of transporting direction.The advantage that adopts the stepping beam type transport plane be transporting direction flexibly, can realize the buffering of short time and can finish bundling, weigh, multiple working procedure such as spray printing, but exist weight of equipment heavy, invest high deficiency.
Summary of the invention
The purpose of this invention is to provide method and the device of reorganizing and outfit transportation before a kind of coil of strip finished product is put in storage, overcome the deficiencies in the prior art, make functions such as coil of strip order in transportation is finished bundling, weighed, spray printing, surface inspection, complement bundle, the coil of strip transporting direction is flexible, can realize disperseing last volume to a plurality of warehouse for finished products.
For solving the problems of the technologies described above, technical scheme of the present invention is:
Reorganize and outfit the method for transportation before a kind of coil of strip finished product warehouse-in, comprise the lane of traffic that fortune volume dolly, chain conveyor, stepping beam type transport plane and gig constitute, end was to warehouse for finished product after lane of traffic started from reeler, lane of traffic and inspection the end of a thread portion vertical connection, along the lane of traffic side be provided with bundling, weigh, spray printing, complement bundle equipment, specifically comprise the steps:
A) link to each other by fortune volume dolly between the outlet of an end of chain conveyor one and reeler, the coil of strip that reeler rolls off the production line is behind the bander bundling, fortune volume dolly is placed on coil of strip on the chain conveyor one, and the service direction of chain conveyor one is vertical with fortune volume trolley travelling direction;
B) chain conveyor one is transported to getting of stepping beam type transport plane one head with coil of strip and rolls up the position;
C) stepping beam type transport plane one is transported to coil of strip and is checked line fixed saddle place, when coil of strip need check, coil of strip transport trolley on the inspection line is transported to coil of strip and is checked on the line, transports back after the inspection to check line fixed saddle place, connects stepping beam type transport plane two behind the inspection line fixed saddle;
D) stepping beam type transport plane two is provided with weigher along the line, finishes coil of strip and weighs, and stepping beam type transport plane two transports coil of strip to gig one then;
E) coil of strip is raised and by stepping beam type transport plane three coil of strip is transported to gig two after machine one promotes, and the side position of stepping beam type transport plane three is provided with spray printing machine and bander, and coil of strip was finished spray printing and the complement bundle function of coil of strip before last gig two;
F) coil of strip is raised machine two and rises on the ground, respectively by forward, left, stepping beam type transport plane four, stepping beam type transport plane five or the stepping beam type transport plane six of three directions are taken away to the right;
G) coil of strip is transported on the chain conveyor two through stepping beam type transport plane five, is transported to warehouse for finished product one by crane; Coil of strip is transported on the chain conveyor three through stepping beam type transport plane six, is transported to warehouse for finished product two by crane; Coil of strip on the stepping beam type transport plane four is transported to warehouse for finished product three through crane, and steel coils packing is waited to deliver.
Reorganize and outfit the device of transportation before a kind of coil of strip finished product warehouse-in, comprise chain conveyor, chain conveyor one is located at fortune volume trolley travelling channel end, the service direction of chain conveyor one is vertical with the service direction of fortune volume dolly, chain conveyor one, stepping beam type transport plane one, check the line fixed saddle, stepping beam type transport plane two, gig one, stepping beam type transport plane three and gig two join successively, stepping beam type transport plane two is provided with weigher along the line, the side position of stepping beam type transport plane three is provided with spray printing machine and bander, gig two be provided with three outlets respectively with stepping beam type transport plane four, stepping beam type transport plane five, the head of stepping beam type transport plane six links to each other, the afterbody of stepping beam type transport plane five links to each other with chain conveyor two, and the afterbody of stepping beam type transport plane six links to each other with chain conveyor three.
Described fortune volume trolley travelling channel side is provided with bander.
Compared with prior art, the invention has the beneficial effects as follows: make functions such as coil of strip order in transportation is finished bundling, weighed, spray printing, surface inspection, complement bundle, the coil of strip transporting direction is flexible, can realize disperseing last volume to a plurality of warehouse for finished products, small investment, equipment are reliable, quantity by increase and decrease stepping beam type transport plane and chain conveyor can satisfy the different requirements of the different rolling line of yearly capacity.
Description of drawings
Fig. 1 embodiment of the invention structural representation.
In figure: 1-fortune volume dolly one 2-baler one 3-fortune volume dolly two 4-baler two 5-chain conveyor one 6-walking-beam coil conveyer one 7-check that line fixed saddle 8-checks line transport vehicle for steel coils 9-walking-beam coil conveyer two 10-weigher 11-elevator one 12-walking-beam coil conveyer three 13-jet printer 14-baler three 15-elevator two 16-walking-beam coil conveyer four 17-walking-beam coil conveyer five 18-walking-beam coil conveyer six 19-chain conveyor two 20-chain conveyor three 21-warehouse for finished product one 22-warehouse for finished product two 23-warehouse for finished products three
The specific embodiment
Be described further below in conjunction with the specific embodiment of accompanying drawing to invention:
See Fig. 1, it is the device example structure scheme drawing of reorganizing and outfit transportation before a kind of coil of strip finished product warehouse-in of the present invention, chain conveyor 1 is located at the end of fortune volume dolly 1 and fortune volume dolly 23 operation passages, the service direction of chain conveyor 1 is vertical with the service direction of fortune volume dolly 23 with fortune volume dolly 1, chain conveyor 1, stepping beam type transport plane 1, check line fixed saddle 7, stepping beam type transport plane 29, gig 1, stepping beam type transport plane 3 12 and gig 2 15 join successively, stepping beam type transport plane 29 is provided with weigher 10 along the line, the side position of stepping beam type transport plane 3 12 is provided with spray printing machine 13 and bander 3 14, gig 2 15 be provided with three outlets respectively with stepping beam type transport plane 4 16, stepping beam type transport plane 5 17, the head of stepping beam type transport plane 6 18 links to each other, the afterbody of stepping beam type transport plane 5 17 links to each other with chain conveyor 2 19, and the afterbody of stepping beam type transport plane 6 18 links to each other with chain conveyor 3 20.The operation channel side of fortune volume dolly 1 is provided with bander 1, and the operation channel side of fortune volume dolly 23 is provided with bander 24.
The present invention starts from behind the reeler eventually to warehouse for finished product, and functions such as coil of strip order in transportation is finished bundling, weighed, spray printing, surface inspection, complement bundle specifically comprise the steps:
A) rolling up dolly 23 by fortune volume dolly 1 and fortune between the outlet of an end of chain conveyor 1 and reeler links to each other, the coil of strip that reeler rolls off the production line is behind bander 1 and bander 24 bundlings, fortune volume dolly 1 and fortune volume dolly 23 are placed on coil of strip on the chain conveyor 1, and the service direction of chain conveyor 1 is vertical with fortune volume dolly 23 service directions with fortune volume dolly 1;
B) chain conveyor 1 is transported to getting of stepping beam type transport plane one 6 heads with coil of strip and rolls up the position;
C) stepping beam type transport plane 1 is transported to coil of strip and is checked line fixed saddle 7 places, when coil of strip need check, coil of strip transport trolley 8 on the inspection line is transported to coil of strip and is checked on the line, transports back after the inspection to check line fixed saddle 7 places, checks line fixed saddle 7 back connection stepping beam type transport planes 29;
D) stepping beam type transport plane 29 is provided with weigher 10 along the line, finishes coil of strip and weighs, and stepping beam type transport plane 29 transports coil of strip to gig 1 then;
E) coil of strip is raised and by stepping beam type transport plane 3 12 coil of strip is transported to gig 2 15 after machine 1 promotes, the side position of stepping beam type transport plane 3 12 is provided with spray printing machine 13 and bander 3 14, and coil of strip was finished spray printing and the complement bundle function of coil of strip before last gig 2 15;
F) coil of strip is raised machine 2 15 and rises on the ground, respectively by forward, left, stepping beam type transport plane 4 16, stepping beam type transport plane 5 17 or the stepping beam type transport plane 6 18 of three directions are taken away to the right;
G) coil of strip is transported on the chain conveyor 2 19 through stepping beam type transport plane 5 17, is transported to warehouse for finished product 1 by crane; Coil of strip is transported on the chain conveyor 3 20 through stepping beam type transport plane 6 18, is transported to warehouse for finished product 2 22 by crane; Coil of strip on the stepping beam type transport plane 4 16 is transported to warehouse for finished product 3 23 through crane, and steel coils packing is waited to deliver.

Claims (3)

1. reorganize and outfit the method for transportation before a coil of strip finished product is put in storage, it is characterized in that, comprise the lane of traffic that fortune volume dolly, chain conveyor, stepping beam type transport plane and gig constitute, end was to warehouse for finished product after lane of traffic started from reeler, lane of traffic and inspection the end of a thread portion vertical connection, along the lane of traffic side be provided with bundling, weigh, spray printing, complement bundle equipment, specifically comprise the steps:
A) link to each other by fortune volume dolly between the outlet of an end of chain conveyor one and reeler, the coil of strip that reeler rolls off the production line is behind the bander bundling, fortune volume dolly is placed on coil of strip on the chain conveyor one, and the service direction of chain conveyor one is vertical with fortune volume trolley travelling direction;
B) chain conveyor one is transported to getting of stepping beam type transport plane one head with coil of strip and rolls up the position;
C) stepping beam type transport plane one is transported to coil of strip and is checked line fixed saddle place, when coil of strip need check, coil of strip transport trolley on the inspection line is transported to coil of strip and is checked on the line, transports back after the inspection to check line fixed saddle place, connects stepping beam type transport plane two behind the inspection line fixed saddle;
D) stepping beam type transport plane two is provided with weigher along the line, finishes coil of strip and weighs, and stepping beam type transport plane two transports coil of strip to gig one then;
E) coil of strip is raised and by stepping beam type transport plane three coil of strip is transported to gig two after machine one promotes, and the side position of stepping beam type transport plane three is provided with spray printing machine and bander, and coil of strip was finished spray printing and the complement bundle function of coil of strip before last gig two;
F) coil of strip is raised machine two and rises on the ground, respectively by forward, left, stepping beam type transport plane four, stepping beam type transport plane five or the stepping beam type transport plane six of three directions are taken away to the right;
G) coil of strip is transported on the chain conveyor two through stepping beam type transport plane five, is transported to warehouse for finished product one by crane; Coil of strip is transported on the chain conveyor three through stepping beam type transport plane six, is transported to warehouse for finished product two by crane; Coil of strip on the stepping beam type transport plane four is transported to warehouse for finished product three through crane, and steel coils packing is waited to deliver.
2. reorganize and outfit the device of transportation before a coil of strip finished product is put in storage, comprise chain conveyor, it is characterized in that, chain conveyor one is located at fortune volume trolley travelling channel end, the service direction of chain conveyor one is vertical with the service direction of fortune volume dolly, chain conveyor one, stepping beam type transport plane one, check the line fixed saddle, stepping beam type transport plane two, gig one, stepping beam type transport plane three and gig two join successively, stepping beam type transport plane two is provided with weigher along the line, the side position of stepping beam type transport plane three is provided with spray printing machine and bander, gig two be provided with three outlets respectively with stepping beam type transport plane four, stepping beam type transport plane five, the head of stepping beam type transport plane six links to each other, the afterbody of stepping beam type transport plane five links to each other with chain conveyor two, and the afterbody of stepping beam type transport plane six links to each other with chain conveyor three.
3. reorganize and outfit the device of transportation before a kind of coil of strip finished product warehouse-in according to claim 2, it is characterized in that, described fortune volume trolley travelling channel side is provided with bander.
CN201110453112.9A 2011-12-29 2011-12-29 Method for preparation and transportation before warehousing of steel coil finished product Active CN103183212B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110453112.9A CN103183212B (en) 2011-12-29 2011-12-29 Method for preparation and transportation before warehousing of steel coil finished product

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110453112.9A CN103183212B (en) 2011-12-29 2011-12-29 Method for preparation and transportation before warehousing of steel coil finished product

Publications (2)

Publication Number Publication Date
CN103183212A true CN103183212A (en) 2013-07-03
CN103183212B CN103183212B (en) 2015-04-29

Family

ID=48674713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110453112.9A Active CN103183212B (en) 2011-12-29 2011-12-29 Method for preparation and transportation before warehousing of steel coil finished product

Country Status (1)

Country Link
CN (1) CN103183212B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106628979A (en) * 2016-12-20 2017-05-10 中冶南方工程技术有限公司 Steel coil overturning and striding transportation system
CN108341206A (en) * 2018-03-09 2018-07-31 上海梅山工业民用工程设计研究院有限公司 A kind of coil of strip transport system
US10035598B2 (en) 2016-10-10 2018-07-31 Jervis B. Webb Company System and method for expanding a luggage inspection area
US10279911B2 (en) 2016-10-10 2019-05-07 Jervis B. Webb Company System and method for storing and sequencing luggage items
CN110342169A (en) * 2019-08-19 2019-10-18 上海梅山工业民用工程设计研究院有限公司 A kind of efficient coil of strip conveying system
CN112026373A (en) * 2020-08-13 2020-12-04 北京首钢自动化信息技术有限公司 Label printing method, system and equipment
CN112456331A (en) * 2020-11-06 2021-03-09 河钢股份有限公司承德分公司 Method for realizing automatic control of unmanned manual packing area of reservoir area

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2362781Y (en) * 1998-07-24 2000-02-09 深圳市金达科技实业有限公司 Conveying equipment for coiled steel strip package production line
US6843358B1 (en) * 2002-04-02 2005-01-18 Arthur B. Rhodes Rotatable transfer track device
CN2835160Y (en) * 2005-10-14 2006-11-08 中国第二重型机械集团公司 Stepping transfer arrangement
US20060289271A1 (en) * 2005-06-01 2006-12-28 Nelson Jonathan M Firewood delivery apparatus
CN201660284U (en) * 2009-12-23 2010-12-01 鞍钢集团工程技术有限公司 Parallel steel coil stepping conveying device
CN201678239U (en) * 2009-12-28 2010-12-22 中冶南方工程技术有限公司 Conveying device for hot rolled or cold rolled steel coils
CN202379415U (en) * 2011-12-29 2012-08-15 鞍钢集团工程技术有限公司 Reconditioning-conveying device before warehousing of steel coil finished product

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2362781Y (en) * 1998-07-24 2000-02-09 深圳市金达科技实业有限公司 Conveying equipment for coiled steel strip package production line
US6843358B1 (en) * 2002-04-02 2005-01-18 Arthur B. Rhodes Rotatable transfer track device
US20060289271A1 (en) * 2005-06-01 2006-12-28 Nelson Jonathan M Firewood delivery apparatus
CN2835160Y (en) * 2005-10-14 2006-11-08 中国第二重型机械集团公司 Stepping transfer arrangement
CN201660284U (en) * 2009-12-23 2010-12-01 鞍钢集团工程技术有限公司 Parallel steel coil stepping conveying device
CN201678239U (en) * 2009-12-28 2010-12-22 中冶南方工程技术有限公司 Conveying device for hot rolled or cold rolled steel coils
CN202379415U (en) * 2011-12-29 2012-08-15 鞍钢集团工程技术有限公司 Reconditioning-conveying device before warehousing of steel coil finished product

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10035598B2 (en) 2016-10-10 2018-07-31 Jervis B. Webb Company System and method for expanding a luggage inspection area
US10279911B2 (en) 2016-10-10 2019-05-07 Jervis B. Webb Company System and method for storing and sequencing luggage items
CN106628979A (en) * 2016-12-20 2017-05-10 中冶南方工程技术有限公司 Steel coil overturning and striding transportation system
CN108341206A (en) * 2018-03-09 2018-07-31 上海梅山工业民用工程设计研究院有限公司 A kind of coil of strip transport system
CN110342169A (en) * 2019-08-19 2019-10-18 上海梅山工业民用工程设计研究院有限公司 A kind of efficient coil of strip conveying system
CN112026373A (en) * 2020-08-13 2020-12-04 北京首钢自动化信息技术有限公司 Label printing method, system and equipment
CN112456331A (en) * 2020-11-06 2021-03-09 河钢股份有限公司承德分公司 Method for realizing automatic control of unmanned manual packing area of reservoir area

Also Published As

Publication number Publication date
CN103183212B (en) 2015-04-29

Similar Documents

Publication Publication Date Title
CN103183212B (en) Method for preparation and transportation before warehousing of steel coil finished product
CN107902316B (en) Intelligent storage system for fabric rolls and control method
CN202379415U (en) Reconditioning-conveying device before warehousing of steel coil finished product
CN100386158C (en) Short bar separation and recovery system and method
CN201678239U (en) Conveying device for hot rolled or cold rolled steel coils
EP1317391B1 (en) Method and apparatus for sorting rolls
CN111792135A (en) Automatic production line for film roll suspension packaging in film industry
CN108840010A (en) Tobacco leaf production auxiliary material warehousing system
CN105160517A (en) Logistic system suitable for electronic commerce
CN101326103A (en) Method and apparatus for transporting rolls during packing
CN202518712U (en) Warehousing device for cigarette piece warehouse
CN104355032B (en) Flexible order sorting system
CN102152960A (en) Finished cigarette warehousing random inspection method and system
CN103318588B (en) The storage method in part tabacco barn storehouse and part cigarette loading device used
CN201485076U (en) Waterproof coiled material stacking device
CN104891158B (en) A kind of robot palletizing system
CN204341818U (en) Flexible order sorting system
CN206013634U (en) A kind of two-part bamboo clappers conveying mechanism with baffle plate
CN107934422A (en) A kind of drive method and drive mechanism of circulation conveying pallet
CN205003534U (en) Production warehousing and transportation system
CN204714025U (en) A kind of robot palletizing system
EP2920089B1 (en) Method and system for commissioning products
CN205526708U (en) Smoke box commodity circulation stack system
CN208150353U (en) Fully automatic stereo formula sorting line
CN203624537U (en) Diversion and guide weighing conveyor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant