CN1031755C - Dry coke-quenching chamber - Google Patents

Dry coke-quenching chamber Download PDF

Info

Publication number
CN1031755C
CN1031755C CN 92110697 CN92110697A CN1031755C CN 1031755 C CN1031755 C CN 1031755C CN 92110697 CN92110697 CN 92110697 CN 92110697 A CN92110697 A CN 92110697A CN 1031755 C CN1031755 C CN 1031755C
Authority
CN
China
Prior art keywords
coke
cooling section
quenching
cooling
dry coke
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 92110697
Other languages
Chinese (zh)
Other versions
CN1084545A (en
Inventor
阿·格·斯塔拉沃依特
瓦·阿·阿尼西莫夫
智联瑞
鲁彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shougang Corp
Original Assignee
Shougang Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shougang Corp filed Critical Shougang Corp
Priority to CN 92110697 priority Critical patent/CN1031755C/en
Publication of CN1084545A publication Critical patent/CN1084545A/en
Application granted granted Critical
Publication of CN1031755C publication Critical patent/CN1031755C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Coke Industry (AREA)

Abstract

The present invention relates to a coke quenching chamber of a dry coke quenching device, which is characterized in that the manufacture cost of the dry coke quenching device is reduced by the methods of decreasing height and a diameter ratio. The dry coke quenching device designed by the present invention has the advantages of good cooling effect, high coke quality and low operation cost.

Description

Dry coke-quenching chamber
The invention belongs to the device of stove outdoor dry-type cooling coke, claim dry coke quenching auxiliary again, be mainly used in hot coke cooling, also can be used for other device of rare gas element refrigerative is also carried out in the carbonaceous material calcination subsequently.
A whole set of dry coke quenching auxiliary comprises several most of compositions of vertical coke quencher, feeder, gas distributing device and delivery device, and the structure of vertical coke quencher mainly is divided into the section of prestoring, cooling section, and blast cap and discharging awl section be several parts of flue tiltedly.The about 1050 ℃ red coke of temperature is by the feeder section of prestoring of packing into, the cooling section that enters in service.Cooled coke is drawn off by delivery device through discharging awl section.The gas of cooling usefulness enters cooling section cooling heat coke through gas distributing device and blast cap, then through tiltedly flue discharge.Cooling gas can be CO 2, N 2Etc. inert gas.
" the characteristic comparison of the Soviet Union and French dry coke quenching auxiliary " literary composition that Soviet Union's " coke with chemistry " 1975 the 1st phases of magazine deliver discloses the structural parameter of the dry coke quenching auxiliary of USSR (Union of Soviet Socialist Republics).As the quenching processing power is 56 tons/hour device, and the segment body that prestores is long-pending to be the 83-120 cubic meter; The cooling section volume is 250 cubic metres; Quenching specific volume (putting out one ton of volume that coke is required) is 4.46 cubic metres of/ton Jiao; The cooling section height is 0.75 with diameter than (H/D); The quenching time is 2.2 hours.The specific volume of this device cooling section is big, the cost height, and the red burnt residence time is long, coke briquette cracky, shortcomings such as production run expense height.
Japan's " Kawasaki Steel skill newspaper " 1981 the 13rd volumes the 4th phase article of 11-16 pages discloses the dry coke quenching auxiliary similar techniques scheme with the Soviet Union.Its quenching processing power is 100 tons/hour, and the segment body that prestores is long-pending to be 270 cubic metres, and the cooling section volume is 480 cubic metres, and the cooling section specific volume is 4.8 cubic metres of/ton Jiao, and height is 0.91 with diameter than (H/D).Though this scheme has reduced the specific volume of cooling section, H/D has brought up to 0.91 by 0.75, thereby causes cost to raise, and does not also overcome other shortcomings of Soviet Union's device.Mandatory declaration, increases quenching throughput with improving the H/D value in the world, is commonplace method.
In order to overcome above-mentioned the deficiencies in the prior art, the object of the present invention is to provide a kind of new dry coke-quenching chamber technical solution, thereby reduce the cost of dry coke quenching auxiliary, in production run, the reduction expense.
In order to achieve the above object, the present inventor had once carried out the temperature distribution state measurement to the industrial dry coke quenching auxiliary of the various different throughput of USSR (Union of Soviet Socialist Republics).Details is seen the 28th page of the 21st page of Soviet Union's " coke with chemistry " magazine 1987 the 4th phase and the third phase, and the 9-10 page of the 3rd phase of nineteen ninety.Measuring result shows, is positioned at 1 meter on the blast cap, and coke temperature is 900 ℃, and cooling section periphery coke temperature is no more than 350 ℃.This explanation, the process of cooling of dry coke quenching mainly concentrates on the bottom and the periphery thereof of coke quencher's cooling section and finishes, rather than carries out in whole cooling section.Therefore, be effective cooling zone of coke from the cooling section bottom to the zone that exceeds 1 meter on blast cap summit.Red burnt through effective cooling zone, temperature drops to about 200 ℃.According to this conclusion, the main points of technical scheme of the present invention are to reduce the cooling section height, reduce the ratio of cooling section specific volume and H/D.Thereby reduce the cost of dry coke quenching auxiliary, reduce working cost aborning, save the operating time.And it is low to reach the coke burn out rate, and coke size is big, i.e. the good effect of coke quality.
In general, the long-pending design of the segment body that prestores is by beautiful fixed with the coking processing condition (circulation repair time, single coking chamber is the amount of the discharging of the coke once) of the supporting coke oven of dry coke quenching auxiliary.And the volume of cooling section then drops to 200 ℃ of required quenching times according to coke from 1050 ℃ and determines.The theoretical quenching time calculates with heat balance equation.The calculation formula that proposes is gone in invention in Soviet Union's " coke and chemistry " the 3rd phase of nineteen ninety the 9th~10 page of article τ = ( c 1 t 1 - c 2 t 2 ) γ k 1.1 Δt α v
Under general working condition, thermal conductivity α in the cooling section different zones vValue is different, and generally in 7867~83234 kilojoule that/cubic meters hour degree scope, its quenching time is between 0.22~1.0 hour.For the coke temperature that guarantees to draw off all is not higher than 200 ℃, the quenching time that the present invention adopts is 1 hour.The volume V=τ Q/ γ of cooling section k, the processing power that designs for dry coke-quenching chamber of Q wherein, ton/hour; γ kBe the bulk density of coke, ton/cubic meter is generally 0.5~0.6 ton/cubic metre.Therefore, the specific volume (V of cooling section Ratio=V/Q) be 1.7~2.0, promptly the volume V of cooling section be processing capacity Q 1.7~2.1) doubly.
The best interior diameter D of coke quencher can be by the sectional area F of coke quencher kCalculate F k=π D 2/ 4; On the other hand, the sectional area of coke quencher will satisfy the throughput of cooling gas, then F k=QG/3600Wr, wherein, G is 1500 cubic metres/ton for putting out one ton of needed gas volume of coke; Wr during for no coke gas by the speed of cooling section.It is 0.1~0.9 meter per second.Then calculate D=0.77~0.87
Figure C9211069700052
Further can be regarded as the ratio H/D=(2.577~4.410) of cooling section height H and diameter D
Figure C9211069700061
For the coke quencher of processing capacity Q>50 ton/hour, H/D is within 0.2~0.6 scope
Effect of the present invention is the technical economic benefit height.The dry coke quenching auxiliary of building by technical scheme of the present invention compared with prior art, every can be reduced cost 16%.For example, the coke-oven plant that needs are built six dry coke quenching auxiliaries only with regard to one in the used refractory materials of coke quencher, can save out a suitable dried refractory materials that puts out groove.Saved electrisity consumption owing to highly reduce, so working cost is few, coke has reduced the probability and the red incipient scorch damage amount of lumpiness corrupted in the time decreased of dry coke-quenching chamber.
As embodiment, it is 5b, 70,120,170 tons/hour the design variable of dry coke-quenching chamber that following table has been listed processing power.
Q (t/h) r (t/m 3) Vyg VakT (m 3) D (m) H (m) H/D
56 0.5~ 0.6 1.7 2.0 95.2 112 6.51 2.86 3.36 0.44 0.52
70 0.5~ 0.6 1.7 2.0 119 140 7.28 2.86 3.36 0.39 0.46
120 0.5~ 0.6 1.7 2.0 204 240 9.53 2.86 3.36 0.30 0.35
170 0.5~ 0.6 1.7 2.0 289 340 11.35 2.86 3.36 0.25 0.30
Data W r=0.7 meter per second calculates in this table.
Description of drawings:
Fig. 1 is coke quencher's diagrammatic cross-section,
Wherein 1---charging bole, 2---the section of prestoring,
3---cooling section, 4---gas distributing device and blast cap,
5---discharging awl sections 6---are flue tiltedly

Claims (1)

1, a kind of coke quencher of stove outdoor dry-type cooling coke, form by the section of prestoring, cooling section, blast cap, oblique flue and discharging awl section, it is characterized in that coke quencher's cooling section volume is 1.7~2.0 times of quenching processing power, the cooling section interior diameter is subduplicate 0.77~0.87 times of a quenching processing power, and the height of coke quencher's cooling section and its diameter ratio are 0.20~0.60.
CN 92110697 1992-09-21 1992-09-21 Dry coke-quenching chamber Expired - Fee Related CN1031755C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 92110697 CN1031755C (en) 1992-09-21 1992-09-21 Dry coke-quenching chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 92110697 CN1031755C (en) 1992-09-21 1992-09-21 Dry coke-quenching chamber

Publications (2)

Publication Number Publication Date
CN1084545A CN1084545A (en) 1994-03-30
CN1031755C true CN1031755C (en) 1996-05-08

Family

ID=4944931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 92110697 Expired - Fee Related CN1031755C (en) 1992-09-21 1992-09-21 Dry coke-quenching chamber

Country Status (1)

Country Link
CN (1) CN1031755C (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101760207A (en) * 2008-11-25 2010-06-30 中冶成工上海五冶建设有限公司 Method of installing coke dry quenching disks, coke dry quenching boxes and coke dry quenching cabinets
CN102786960B (en) * 2012-08-06 2014-04-30 山西鑫立能源科技有限公司 Dry quenching device for coal pyrolyzing furnace
CN102786961B (en) * 2012-08-06 2014-04-30 山西鑫立能源科技有限公司 Coke quenching bridge arch of coal pyrolyzing furnace

Also Published As

Publication number Publication date
CN1084545A (en) 1994-03-30

Similar Documents

Publication Publication Date Title
CN110157846B (en) Method for adding scrap steel into blast furnace in large proportion
CN100519768C (en) Shaft furnace for production of ferrochromium and smelting method thereof
CN1031755C (en) Dry coke-quenching chamber
CN106636508A (en) Iron smelting process achieving effective and cyclic utilization of stock gas of blast furnace
CN104630407A (en) Whole-body type external-heating muffle type rotary kiln
CN110305999A (en) A kind of metallized charge and its application method of the accumulation of processing blast furnace crucibe
GB2121442A (en) Increasing blast temperature in melting or reduction furnaces
FR2452520A1 (en) PROCESS FOR THE CONTINUOUS INJECTION OF FINE GRAIN LIGNITE INTO THE CRUCIBLE OF A BLAST FURNACE
Higashi Energy balance of steel mills and the utilization of by-product gases
CN204455171U (en) A kind of entire body external heat flame-insulating type rotary kiln
CN1142541A (en) Direct reduction process of sponge iron coal base
US3105757A (en) Method and apparatus for the preparation of ferrous oxide
CN1041944C (en) Iron-bath molten reduction method
CN1092601C (en) Method and equipment for producing blast-furnace phosphoric acid
RU2058394C1 (en) Method for blast furnace smelting of zinc-containing burdens
Liubov UDC 669.162. 261.3 ANALYSIS OF THE VARIATION IN RADIAL DISTRIBUTION OF FEED MATERIALS WITH AN INCREASE OF ORE LOAD TO COKE RATIO IN A BLAST FURNACE
SU459501A1 (en) The method of measuring the parameters of the charge materials in the blast furnace working space
CN105177211B (en) The production method and device of a kind of high purity iron
NAKANE et al. Fluidizing and Flooding Phenomena in the Blast Furnace
Lyakishev et al. Technological progress and energy conservation in the iron and steel industry of the USSR
JPS5757782A (en) Quenching furnace of dry-process quenching apparatus for coke
JPS5628286A (en) Control of end of coking period in coke oven
TERPÁK et al. Mathematical model of the theoretical temperature of the blast furnace
Cherneta et al. The Use of Coke Oven Gas in the Blast Furnaces at the Makeevka Iron and Steel Works
RU1801120C (en) Method for controlling operation of group of blast furnaces

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C15 Extension of patent right duration from 15 to 20 years for appl. with date before 31.12.1992 and still valid on 11.12.2001 (patent law change 1993)
OR01 Other related matters
EE01 Entry into force of recordation of patent licensing contract

Assignee: Beijing Shougang Co., Ltd.

Assignor: Capital Iron & Steel General Company

Contract fulfillment period: In September 12, 2012, 10 years, the patent expires

Contract record no.: 200210042

Denomination of invention: CDQ room

Granted publication date: 19960508

License type: Exclusive

Record date: 20020603

LIC Patent licence contract for exploitation submitted for record

Free format text: LICENCE; TIME LIMIT OF IMPLEMENTING CONTACT: 2012.9.12, 10 YEARS, EXPIRATION OF PATENT RIGHT

Name of requester: BEIJING SHOUDU STEEL CO., LTD.

Effective date: 20020603

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee