CN103174410B - Method for achieving time and depth conversion through weight change of downhole instrument tool - Google Patents

Method for achieving time and depth conversion through weight change of downhole instrument tool Download PDF

Info

Publication number
CN103174410B
CN103174410B CN201310073845.9A CN201310073845A CN103174410B CN 103174410 B CN103174410 B CN 103174410B CN 201310073845 A CN201310073845 A CN 201310073845A CN 103174410 B CN103174410 B CN 103174410B
Authority
CN
China
Prior art keywords
instrument
depth
time
bypass
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310073845.9A
Other languages
Chinese (zh)
Other versions
CN103174410A (en
Inventor
黄文帜
高怀雪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jichen Intelligent Equipment Group Co ltd
Original Assignee
Gi Technologies Beijing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gi Technologies Beijing Co ltd filed Critical Gi Technologies Beijing Co ltd
Priority to CN201310073845.9A priority Critical patent/CN103174410B/en
Publication of CN103174410A publication Critical patent/CN103174410A/en
Application granted granted Critical
Publication of CN103174410B publication Critical patent/CN103174410B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to a method for realizing time and depth conversion through weight change of an underground instrument, which comprises the steps of connecting a mud pressure sensor to a mud vertical pipe, connecting a depth sensor to a roller of a well team, connecting a hook load tension sensor to a dead rope of a crown block roller, and carrying out data acquisition by utilizing a winch coding sensor and the hook load tension sensor, wherein the winch coding sensor is connected to the winch roller of the well team, when in work, the winch coding sensor senses the rotation of a winch wheel in the whole well logging process, an output signal is coded to calculate the rotating angular speed, the hook load tension sensor is arranged on the dead rope connected to the crown block roller, the motion condition of the instrument is judged by measuring and acquiring a change signal of the tension of the sensor in the process that an acquisition sleeve and the instrument are placed, stopped and lifted in a well, effective motion time is acquired through an acquisition circuit and stored in a chip, and completing the conversion relation between time and depth by utilizing the relation among the angular speed, the radius and the time. The method has the advantages of simple used instrument and equipment, convenient operation, and high measurement and data acquisition efficiency and accuracy.

Description

The method changing the time that realizes and degree of depth conversion by the weight of downhole instrument instrument
Technical field
The present invention relates to logging technique field, be specifically related to a kind of weight change by downhole instrument and instrument The method realizing time and degree of depth conversion.
Background technology
In the operation process such as drilling well, well logging and mistake drill bit well logging, it is required for more accurate depth survey, Depth data the most accurately, the measurement of downhole instrument is just not much meaning.Especially after drilling well completes In the well logging that each instrument is gone into the well, send under instrument, discharge, and instrument in the well after having logged well The time carried on being installed, it is required for being sent to aboveground data storage processing equipment accurately in real time, to these numbers According to measurement, transmit and process the time quantum being accomplished by being gone into the well by instrument and be converted to depth of falling well data, existing Go into the well time and depth survey conversion method of instrument need the data volume measured and obtain big and loaded down with trivial details, institute The equipment and the personnel that need are the most more, and efficiency is low, cost is high in measurement, it is therefore desirable to during to conveying downhole instrument, Carry out the go into the well conversion method of time and depth data of instrument to improve.
Summary of the invention
It is an object of the invention to propose a kind of by the weight of downhole instrument and instrument change the time that realizes with The method of degree of depth conversion, solves in existing well logging go into the well instrument time and depth data measurement conversion Method efficiency and accuracy rate are low, and equipment needed thereby and personnel are more, and the problem that data volume is loaded down with trivial details.
For reaching this purpose, the present invention by the following technical solutions:
The method changing the time that realizes and degree of depth conversion by the weight of downhole instrument instrument, first carries out ground Instrument is arranged, and is instrument down-hole operation afterwards, and described ground instrument arranges and comprises the steps:
First, instrument inspection and parameter are arranged: be respectively provided with respectively by digital independent case with portable computer Prop up go into the well parameter and the unlatching log-time of instrument, and start the clock of downhole instrument;
Second, mud pressure sensor is connected on mud standpipe, depth transducer is connected to the rolling of drilling team On cylinder, hook carries tension pick-up and is installed to connect on the dead line of overhead traveling crane cylinder;
3rd, carry out depth transducer and mud pressure sensor scale;
Described instrument down-hole operation comprises the steps:
4th, lower drilling rod, to shaft bottom, connects and bores under drilling tool, bore in strict accordance with under the built-up sequence on drilling tool table Tool, well head arranges special messenger to sit hilllock, requires to carry out mud grouting operation according to drilling team;
5th, connect instrument, with chuck, instrument is connected in drilling pipe by root, after cable torpedo is passed bypass Connecting instrument, cable depth is to zero;
6th, connect bypass, first bypass is sling, then play cable, remove chuck, transfer about 2 meters Cable, tightens bypass with pipe wrench or chain wrench, is compressed by bypass clamping plate, loosens cable, enter with hydraulic tongs One step tightens bypass, plays cable pine bypass clamping plate afterwards, connects 1 cylindrical drill bar in bypass above, and payout is by instrument Vertical depth shaft bottom delivered to by device, until instrument is motionless;
7th, suppress and send instrument, suppress and instrument is delivered to shaft bottom;
8th, discharge instrument;
9th, propose drilling rod well logging;
Tenth, successively instrument is proposed well head, dismounting, puts down raised platform around a well;
11st, unload and fall down hanger
12nd, the time after well logging is completed, curve merging, degree of depth matching treatment, depth correction etc., Ultimately produce rdr file, instrument data is read.
On the basis of abovementioned steps, further preferred version is: the described first step carry out instrument inspection and When parameter is arranged, when arranging parameter, instrument will be under " test pattern " state, when keeping each instrument when arranging Between synchronize.
On the basis of abovementioned steps, further preferred version is: described 3rd step carries out depth transducer During scale, well head draws personnel and 3 synchronizations of ground handling operator at ruler personnel, overhead traveling crane wire rope drum to join Close;Carrying out mud pressure sensor scale when having pressurized equipment in base, if taking advantage of the factor 1, adding the factor 0;Logical Crossing after pressue device adds a fixation pressure, on parameter panel, display is just now magnitude of voltage.
On the basis of abovementioned steps, further preferred version is: described 4th step, and lower drilling rod is to shaft bottom Time, check drilling rod internal diameter with 74mm drift size gauge tool, it is ensured that minimum hydrophthalmia size is more than 75mm, every lower 1 post (root) Drilling tool, well logging team must be recorded relative recording by special messenger, it is provided that time the protocol data deeply mated, by drilling rod Under on behind shaft bottom, carry 4 drilling rods, and take off 4 drilling rods.
On the basis of abovementioned steps, further preferred version is: described 7th step is suppressed when sending instrument, Stress control is within 5 MPas, and the lowering velocity of control winch, within 3m/ minute, shifts instrument onto shaft bottom, Slowly rise afterwards and be pumped to the pump pressure that the side of well logging requires, after stable pump pressure, with in the speed of about 6 ms/min Carry drilling tool, above carry a cylindrical drill tool, when cable stretch value diminishes or explanation instrument has pumped out during negative value, outstanding Block at extension.
On the basis of abovementioned steps, further preferred version is: during described 8th step release instrument, add 110V unidirectional current, panel current limliting 200mA of powering, upper portable cable is at bypass 150 meters, and checking and approving instrument is No release, pressure release successively after confirmation release is errorless, stops winch, unloads bypass, and release and cable are taken out.
On the basis of abovementioned steps, further preferred version is: when proposing drilling rod well logging in described 9th step, On put forward drilling rod speed controlling at 6 ms/min.
Beneficial effects of the present invention: be connected to by mud pressure sensor on mud standpipe, depth transducer is even Receive on the cylinder of drilling team, hook is carried tension pick-up and is connected on the dead line of overhead traveling crane roller, utilize winch to compile Code sensor and hook carry tension pick-up and carry out data acquisition, and wherein winch code sensor is connected to drilling team On winch drum, sensing the rotation of winch wheel in whole well logging during work, output signal is encoded permissible Calculating the angular velocity of rotation, hook carries tension pick-up and is arranged on the dead line being connected to overhead traveling crane roller, passes through Measure gather sleeve pipe and instrument transfer in well, stop, on carry during the variable signal of sensor tension force, Judge the motion conditions of instrument, gather out by effective movement time by Acquisition Circuit, be stored in core In sheet, finally utilize the relation of angular velocity, radius and time, it is possible to deadline and the conversion of the degree of depth Relation, the instrument and equipment that the method uses is simple, simple operation, and use manpower and material resources sparingly resource, and measures The highest with data acquisition efficiency and accuracy rate.
Accompanying drawing explanation
Fig. 1 is well logging apparatus structural representation;
In figure:
1, overhead traveling crane;2, steel wire rope;3, winch;4, dead line;5, travelling block;6, hook;7, solid Fixed rack;8, ground roller;9, hook carries tension pick-up.
Detailed description of the invention
Further illustrate technical scheme below in conjunction with the accompanying drawings and by detailed description of the invention.
The method changing the time that realizes and degree of depth conversion by the weight of downhole instrument instrument, first carries out ground Instrument is arranged, and is instrument down-hole operation afterwards, is illustrated in figure 1 well logging apparatus structural representation, on well head Overhead traveling crane 1 on roller under be hung with travelling block 5, hook 6 is installed below travelling block 5, ground Winch 3 by steel wire rope 2 be connected on overhead traveling crane 1 roller, the roller opposite side of overhead traveling crane 1 connect have dead Rope 4, dead line 4 lower end is connected to ground roller 8, and is provided with for hold-down hook load tension force at dead line 4 hypomere The fixed support 7 of sensor 9, hook carries tension pick-up 9 lower end and is fixedly connected on ground, and upper end is by fixing Support 7 is connected on the dead line 4 that is connected with overhead traveling crane roller.
Described ground instrument arranges and comprises the steps:
First, instrument inspection and parameter are arranged: be respectively provided with respectively by digital independent case with portable computer Prop up go into the well parameter and the unlatching log-time of instrument, and start the clock of downhole instrument;
Second, mud pressure sensor is connected on mud standpipe, depth transducer is connected to the rolling of drilling team On cylinder, hook carries tension pick-up 9 and is installed to connect on the dead line of overhead traveling crane cylinder;
3rd, carry out depth transducer and mud pressure sensor scale;
Described instrument down-hole operation comprises the steps:
4th, lower drilling rod, to shaft bottom, connects and bores under drilling tool, bore in strict accordance with under the built-up sequence on drilling tool table Tool, well head arranges special messenger to sit hilllock, requires to carry out mud grouting operation according to drilling team;
5th, connect instrument, with chuck, instrument is connected in drilling pipe by root, after cable torpedo is passed bypass Connecting instrument, cable depth is to zero;
6th, connect bypass, first bypass is sling, then play cable, remove chuck, transfer about 2 meters Cable, tightens bypass with pipe wrench or chain wrench, is compressed by bypass clamping plate, loosens cable, enter with hydraulic tongs One step tightens bypass, plays cable pine bypass clamping plate afterwards, connects 1 cylindrical drill bar in bypass above, and payout is by instrument Vertical depth shaft bottom delivered to by device, until instrument is motionless;
7th, suppress and send instrument, suppress and instrument is delivered to shaft bottom;
8th, discharge instrument;
9th, propose drilling rod well logging;
Tenth, successively instrument is proposed well head, dismounting, puts down raised platform around a well;
11st, unload and fall down hanger
12nd, the time after well logging is completed, curve merging, degree of depth matching treatment, depth correction etc., Ultimately produce rdr file, instrument data is read.
On the basis of abovementioned steps, further preferred version is: the described first step carry out instrument inspection and When parameter is arranged, when arranging parameter, instrument will be under " test pattern " state, when keeping each instrument when arranging Between synchronize.
On the basis of abovementioned steps, further preferred version is: described 3rd step carries out depth transducer During scale, well head draws personnel and 3 synchronizations of ground handling operator at ruler personnel, overhead traveling crane wire rope drum to join Close;Carrying out mud pressure sensor scale when having pressurized equipment in base, if taking advantage of the factor 1, adding the factor 0;Logical Crossing after pressue device adds a fixation pressure, on parameter panel, display is just now magnitude of voltage.
On the basis of abovementioned steps, further preferred version is: described 4th step, and lower drilling rod is to shaft bottom Time, check drilling rod internal diameter with 74mm drift size gauge tool, it is ensured that minimum hydrophthalmia size is more than 75mm, every lower 1 post (root) Drilling tool, well logging team must be recorded relative recording by special messenger, it is provided that time the protocol data deeply mated, by drilling rod Under on behind shaft bottom, carry 4 drilling rods, and take off 4 drilling rods.
On the basis of abovementioned steps, further preferred version is: described 7th step is suppressed when sending instrument, Stress control is within 5 MPas, and the lowering velocity of control winch, within 3m/ minute, shifts instrument onto shaft bottom, Slowly rise afterwards and be pumped to the pump pressure that the side of well logging requires, after stable pump pressure, with in the speed of about 6 ms/min Carry drilling tool, above carry a cylindrical drill tool, when cable stretch value diminishes or explanation instrument has pumped out during negative value, outstanding Block at extension.
On the basis of abovementioned steps, further preferred version is: during described 8th step release instrument, add 110V unidirectional current, panel current limliting 200mA of powering, upper portable cable is at bypass 150 meters, and checking and approving instrument is No release, pressure release successively after confirmation release is errorless, stops winch, unloads bypass, and release and cable are taken out.
On the basis of abovementioned steps, further preferred version is: when proposing drilling rod well logging in described 9th step, On put forward drilling rod speed controlling at 6 ms/min.
Beneficial effects of the present invention: be connected to by mud pressure sensor on mud standpipe, depth transducer is even Receive on the cylinder of drilling team, hook is carried pressure transducer and is connected on the dead line of overhead traveling crane roller, utilize winch to compile Code sensor and hook carry tension pick-up and carry out data acquisition, and wherein winch code sensor is connected to drilling team On winch drum, sensing the rotation of winch wheel in whole well logging during work, output signal is encoded permissible Calculating the angular velocity of rotation, hook carries tension pick-up and is arranged on the dead line connecting overhead traveling crane roller, by surveying Amount gather sleeve pipe and instrument transfer in well, stop, on carry during the variable signal of sensor tension force, come Judge the motion conditions of instrument, gather out by effective movement time by Acquisition Circuit, be stored in chip In, finally utilize the relation of angular velocity, radius and time, it is possible to the conversion of deadline and the degree of depth is closed System, the instrument and equipment that the method uses is simple, simple operation, and use manpower and material resources sparingly resource, and measure and Data acquisition efficiency and accuracy rate are the highest.

Claims (6)

1. the method realizing time and degree of depth conversion by the weight change of downhole instrument instrument, first carries out ground Face instrument is arranged, and is instrument down-hole operation afterwards, it is characterised in that:
Described ground instrument arranges and comprises the steps:
First, instrument inspection and parameter are arranged: be respectively provided with respectively by digital independent case with portable computer Prop up going into the well parameter and opening log-time of instrument, and start the clock of downhole instrument, instrument when parameter is set Each appliance time is kept to synchronize when arranging under " test pattern " state;
Second, mud pressure sensor is connected on mud standpipe, depth transducer is connected to the rolling of drilling team On cylinder, hook carries tension pick-up and is installed to connect on the dead line of overhead traveling crane cylinder;
3rd, carry out depth transducer and mud pressure sensor scale;
Described instrument down-hole operation comprises the steps:
4th, lower drilling rod, to shaft bottom, connects and bores under drilling tool, bore in strict accordance with under the built-up sequence on drilling tool table Tool, well head arranges special messenger to sit hilllock, requires to carry out mud grouting operation according to drilling team;
5th, connect instrument, with chuck, instrument is connected in drilling pipe by root, after cable torpedo is passed bypass Connecting instrument, cable depth is to zero;
6th, connect bypass, first bypass is sling, then play cable, remove chuck, transfer about 2 meters Cable, tightens bypass with pipe wrench or chain wrench, is compressed by bypass clamping plate, loosens cable, enter with hydraulic tongs One step tightens bypass, plays cable pine bypass clamping plate afterwards, connects 1 cylindrical drill bar in bypass above, and payout is by instrument Vertical depth shaft bottom delivered to by device, until instrument is motionless;
7th, suppress and send instrument, suppress and instrument is delivered to shaft bottom;
8th, discharge instrument;
9th, propose drilling rod well logging;
Tenth, successively instrument is proposed well head, dismounting, puts down raised platform around a well;
11st, unload and fall down hanger;
12nd, the time graph after well logging being completed merges, carries out degree of depth matching treatment and depth correction, Ultimately produce rdr file, instrument data is read.
Weight by downhole instrument instrument the most according to claim 1 changes the time that realizes and turns with the degree of depth The method changed, it is characterised in that: when described 3rd step carries out depth transducer scale, well head draw ruler personnel, Personnel and 3 synchronous matching of ground handling operator at overhead traveling crane wire rope drum;Enter when having pressurized equipment in base Row mud pressure sensor scale, if taking advantage of the factor 1, adds the factor 0;A fixation pressure is added by pressue device After, on parameter panel, display is just now magnitude of voltage.
Weight by downhole instrument instrument the most according to claim 1 changes the time that realizes and turns with the degree of depth The method changed, it is characterised in that: described 4th step, when lower drilling rod is to shaft bottom, bore with 74mm drift size gauge tool inspection Bar internal diameter, it is ensured that minimum hydrophthalmia size is more than 75mm, and every lower 1 cylindrical drill tool, well logging team must be recorded phase by special messenger Close record, it is provided that time the protocol data deeply mated, 4 drilling rods will be carried on behind shaft bottom under drilling rod, and Take off 4 drilling rods.
Weight by downhole instrument instrument the most according to claim 1 changes the time that realizes and turns with the degree of depth The method changed, it is characterised in that: described 7th step is suppressed when sending instrument, Stress control within 5 MPas, The lowering velocity of control winch, within 3m/ minute, shifts instrument onto shaft bottom, slowly rises afterwards and is pumped to survey The pump pressure that well side requires, after stable pump pressure, to carry drilling tool in the speed of about 6 ms/min, above carries a cylindrical drill Tool, when cable stretch value diminishes or explanation instrument has pumped out during negative value, blocks at suspension.
Weight by downhole instrument instrument the most according to claim 1 changes the time that realizes and turns with the degree of depth The method changed, it is characterised in that: during described 8th step release instrument, add 110V unidirectional current, power supply panel limit Stream 200mA, upper portable cable, at bypass 150 meters, checks and approves whether instrument discharges, after confirming that release is errorless Pressure release successively, stops winch, unloads bypass, and release and cable is taken out.
Weight by downhole instrument instrument the most according to claim 1 changes the time that realizes and turns with the degree of depth The method changed, it is characterised in that: when proposing drilling rod well logging in described 9th step, above put forward drilling rod speed controlling 6 M/min.
CN201310073845.9A 2013-03-08 2013-03-08 Method for achieving time and depth conversion through weight change of downhole instrument tool Active CN103174410B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310073845.9A CN103174410B (en) 2013-03-08 2013-03-08 Method for achieving time and depth conversion through weight change of downhole instrument tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310073845.9A CN103174410B (en) 2013-03-08 2013-03-08 Method for achieving time and depth conversion through weight change of downhole instrument tool

Publications (2)

Publication Number Publication Date
CN103174410A CN103174410A (en) 2013-06-26
CN103174410B true CN103174410B (en) 2016-12-28

Family

ID=48634544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310073845.9A Active CN103174410B (en) 2013-03-08 2013-03-08 Method for achieving time and depth conversion through weight change of downhole instrument tool

Country Status (1)

Country Link
CN (1) CN103174410B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437751B (en) * 2013-08-23 2016-03-16 中国石油集团川庆钻探工程有限公司 Real-time automatic correction system for drill bit position
CN104295288B (en) * 2014-10-14 2017-02-01 四川航天电液控制有限公司 petroleum drilling well depth measuring system and method
CN106326513B (en) * 2015-07-02 2020-02-21 中石化石油工程技术服务有限公司 Cable tension calculation and control method in logging system
CN105221135A (en) * 2015-09-17 2016-01-06 航天科工惯性技术有限公司 For well depth survey device and the measuring method of wireless drilling system
CN105350954B (en) * 2015-11-05 2019-01-08 中国电子科技集团公司第二十二研究所 When depth acquisition methods and device based on drill string conveying well measuring instrument
CN105735972A (en) * 2016-03-11 2016-07-06 中国石油天然气集团公司 System for measuring, recording and processing depth of downhole tool for resource exploration and development
CN106948807A (en) * 2017-03-23 2017-07-14 连云港杰瑞自动化有限公司 A kind of method to crossing acquisition and the correction of drilling rod logger depth
CN111075431B (en) * 2020-01-09 2024-04-19 西安电子科技大学 Oil gas testing parameter recorder, operation state mode identification method and system

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU491115A1 (en) * 1972-11-27 1975-11-05 Раменское отделение Всесоюзного научно-исследовательского института геофизических методов разведки The method of stationary marking logging cable
US4117600A (en) * 1975-07-22 1978-10-03 Schlumberger Technology Corporation Method and apparatus for providing repeatable wireline depth measurements
US4459752A (en) * 1982-09-27 1984-07-17 Babcock Consultants, Inc. Precision tubular length measuring system
CN1657739A (en) * 2004-02-16 2005-08-24 中国石油勘探开发研究院钻井工艺研究所 Automatic tracking method and device for bottom depth of well and borehole trace
CN1888383A (en) * 2006-07-24 2007-01-03 北京华油先锋石油装备技术有限公司 Deepwell depth and cable pulling winch metering device
CN101975058A (en) * 2010-10-13 2011-02-16 中国石油天然气股份有限公司 Method and device for retrieving logging curve data
CN102364047A (en) * 2011-01-20 2012-02-29 中国人民解放军63653部队 Geometric parameter measuring method for vertical shaft
CN102758615A (en) * 2012-07-20 2012-10-31 长江勘测规划设计研究有限责任公司 High-accuracy smart dual-core well depth measuring device
CN202731891U (en) * 2012-08-23 2013-02-13 上海科油石油仪器制造有限公司 Device for measuring well depth while drilling

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU491115A1 (en) * 1972-11-27 1975-11-05 Раменское отделение Всесоюзного научно-исследовательского института геофизических методов разведки The method of stationary marking logging cable
US4117600A (en) * 1975-07-22 1978-10-03 Schlumberger Technology Corporation Method and apparatus for providing repeatable wireline depth measurements
US4459752A (en) * 1982-09-27 1984-07-17 Babcock Consultants, Inc. Precision tubular length measuring system
CN1657739A (en) * 2004-02-16 2005-08-24 中国石油勘探开发研究院钻井工艺研究所 Automatic tracking method and device for bottom depth of well and borehole trace
CN1888383A (en) * 2006-07-24 2007-01-03 北京华油先锋石油装备技术有限公司 Deepwell depth and cable pulling winch metering device
CN101975058A (en) * 2010-10-13 2011-02-16 中国石油天然气股份有限公司 Method and device for retrieving logging curve data
CN102364047A (en) * 2011-01-20 2012-02-29 中国人民解放军63653部队 Geometric parameter measuring method for vertical shaft
CN102758615A (en) * 2012-07-20 2012-10-31 长江勘测规划设计研究有限责任公司 High-accuracy smart dual-core well depth measuring device
CN202731891U (en) * 2012-08-23 2013-02-13 上海科油石油仪器制造有限公司 Device for measuring well depth while drilling

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
石油测井车井上监测***的设计与实现;丁伟;《石油天然气学报》;20120630;100-103 *

Also Published As

Publication number Publication date
CN103174410A (en) 2013-06-26

Similar Documents

Publication Publication Date Title
CN103174410B (en) Method for achieving time and depth conversion through weight change of downhole instrument tool
CN104499485B (en) One pile for one column fully automatic hydraulic verticality-regulating system and vertical adjustment method
CN101377412B (en) Cage conductor shape laser detector based on double-steel wire rope orientation and detecting method thereof
CN104406568B (en) Device and method for monitoring settlement of ground surface in deep water area
CN104627762A (en) Detection system and detection method of friction elevator rope groove wear loss
CN105369836A (en) Novel pile foundation detection method
CN106698163A (en) Rail detection system for mine vertical shaft hoist
CN101798923A (en) System and method for remote control coal mine evacuation working face advance detection and forecasting
CN101894454A (en) Oil derrick stress measurement and data acquisition system based on wireless sensor network
CN102535527A (en) Testing device and method of breast wall slurry pressure during pore-forming construction of cast-in-situ bored pile
CN201206463Y (en) Depth measurement apparatus for rotary drill rig
CN2727395Y (en) High temperature high pressure optical waveguide well logging system
CN204214437U (en) Profundal zone surface subsidence monitoring device
CN206504694U (en) It is a kind of to implement the multi-functional laryard that blasthole is measured and explosive is lifted
CN103233472B (en) The ram machine construction monitoring method of ram machine construction monitoring device
CN110106924A (en) Pile driving process tubular pole soil plug height monitoring device and monitoring method
CN202903164U (en) Hook height measurement system used for petroleum drilling machine
CN102561941A (en) Rotary drilling rig and pore-forming state detection device thereof
CN207079641U (en) Pile bearing capacity automatic checkout system based on self-balancing approach
CN102758608B (en) Ball-throwing type releasing method and drilling tool used for same
CN205532655U (en) Anchor rope tool to lock volume of shrinking back measuring device
CN104149792B (en) Aerial Conveyance for Human in Coal Mine Fast Installation construction technology
CN111101928A (en) Well depth measuring system and method
CN102606094B (en) Drill pipe positioning, assembling and disassembling calipers
CN102758607B (en) Cable backward releasing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180122

Address after: 300356 24, Tianjin Industrial Park, eight Li Town, Jinnan District, Jianshe Road

Patentee after: (Tianjin) Petroleum Engineering Technology Service Co., Ltd.

Address before: 100070 Beijing city Fengtai District Haiying Road No. 1 Building No. 4 Hospital East first floor

Patentee before: Jiai Technology (Beijing) Co., Ltd.

CP01 Change in the name or title of a patent holder

Address after: 300356 Tianjin Jinnan District eight Li Tai town Industrial Park No. 24 Jianshe Road.

Patentee after: Ji AI (Tianjin) Petroleum Engineering Co., Ltd.

Address before: 300356 Tianjin Jinnan District eight Li Tai town Industrial Park No. 24 Jianshe Road.

Patentee before: (Tianjin) Petroleum Engineering Technology Service Co., Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 300356 Tianjin Jinnan District eight Li Tai town Industrial Park No. 24 Jianshe Road.

Patentee after: Jiai (Tianjin) automatic control intelligent equipment Co.,Ltd.

Address before: 300356 Tianjin Jinnan District eight Li Tai town Industrial Park No. 24 Jianshe Road.

Patentee before: JIAI (TIANJIN) PETROLEUM ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 300356 Tianjin Jinnan District eight Li Tai town Industrial Park No. 24 Jianshe Road.

Patentee after: Jichen Intelligent Equipment Group Co.,Ltd.

Address before: 300356 Tianjin Jinnan District eight Li Tai town Industrial Park No. 24 Jianshe Road.

Patentee before: Jiai (Tianjin) automatic control intelligent equipment Co.,Ltd.

CP01 Change in the name or title of a patent holder