CN103139811A CN2013100461060A CN201310046106A CN103139811A CN 103139811 A CN103139811 A CN 103139811A CN 2013100461060 A CN2013100461060 A CN 2013100461060A CN 201310046106 A CN201310046106 A CN 201310046106A CN 103139811 A CN103139811 A CN 103139811A
Authority
CN
China
Prior art keywords
base station
engineering parameter
adjustment
antenna
server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100461060A
Other languages
Chinese (zh)
Inventor
艾鑫伟
游爱民
王斌
施晓斌
徐坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN2013100461060A priority Critical patent/CN103139811A/en
Publication of CN103139811A publication Critical patent/CN103139811A/en
Priority to PCT/CN2013/084115 priority patent/WO2014121617A1/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/02Arrangements for optimising operational condition

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses an adjustment method and a system of an engineering parameter. In the method, a base station receives an adjustment command from a server, wherein the adjustment command is generated by the server according to the comparison between an engineering parameter which is currently used by the base station and reported by the base station and an initial plan engineering parameter which is preset on the server and is corresponding to the base station, or, the adjustment command is obtained by the server according to statistic analysis carried out on the engineering parameter which is currently used and reported by the base station for a plurality of times within a preset cycle, and the base station carries out adjustment on the engineering parameter which is used currently according to the adjustment command. According to the technical scheme of the adjustment method and the system of the engineering parameter, a sector of the base station in a network can be enabled to have higher flexibility, a project construction cycle, a network optimization cycle and network investment cost are reduced, and network optimization efficiency and accuracy of late planning of the network are improved.

Description

The method of adjustment of engineering parameter and system
Technical field
The present invention relates to the communications field, in particular to a kind of method of adjustment and system of engineering parameter.
Background technology
At present, the deployment of the website sector in correlation technique all adopts fixture to be fixed, and by roof pole, metal fixing, fan antenna is fixed on pole.And usually need a period of time that network is optimized after network builds up, thereby this optimizing process is mainly weakly cover and cross the problem that covers by adjusting improving with the coverage that changes the sector towards, angle of declination and height of sector.Therefore, existing optimizing process need to when being optimized adjustment, be adjusted by artificial upper station; Yet the at present this mode of adjusting the sector by artificial upper station is difficult to avoid being subjected to the impact of many factors, such as: weather, property, mobile retinue, workmen's qualification and high maintenance cost, above-mentioned factor all might cause making slow progress of network optimization process and can cause the waste of a large amount of human and material resources, financial resources.
The problem that adopts fixture to be fixed to produce to the deployment of website sector below in conjunction with following three kinds of scenes is illustrated:
Scene one, in the situation that capacity increase sharply, such as: stadium hold the situations such as large-scale activity, rally can occur personnel/mobile subscriber a large amount of be gathered in zone among a small circle, because the user capacity of each residential quarter is limited, exceeds user capacity and will cause cutting off rate that the user calls to raise or without the poor phenomenon of user awareness of service.If according to the technical scheme in correlation technique as can be known, the sector all is fixedly mounted on pole, the antenna of the low user capacity residential quarter that exists for stadium periphery is towards because can't dynamically be adjusted to the crowded zone of user, so can only use at present interim equipment in the capacity expansion vehicle to carry out the interim dilatation in zone, although the problem of so can the solution capacity increasing sharply, the while has also increased the operating cost of network.
Scene two, at present in the networking process, because workmen's quality is uneven, also exists in the construction Supervision process because of artificial the participation and cause error extensively to exist, occur thereby cause large mandarin duck to connect anti-phenomenon.Large mandarin duck reverse connection of antenna refers to that two antenna feeders all connect instead, the antenna feeder that is the A residential quarter is connected to the B residential quarter, and the antenna feeder of B residential quarter is connected to the A residential quarter, if the adjacent area definition is bad, can cause this website and the switching of peripheral base station to be affected, the problem of the later stage frequency planning that also can exert an influence.
Scene three, networking process are very very long, and its reason is: all change occuring wireless network every day on the one hand, due to the problem that has urban construction, cause radio-ray path often to change; On the other hand in network optimization process, the artificial experience that participates in needing to rely on the optimization engineer, can frequently adjust the website sector that exists in network, and each adjustment all can relate to the sector towards, highly, the adjustment of angle of declination, these all can be subject to the impact of the factors such as weather, property, mobile responsible person and engineering construction personnel.For example: the engineering construction personnel need to possess the workmen of the professional qualification of card of ascending a height now, the personnel itself that possess this technical ability authentication are just few, and the technical staff can't get involved engineering construction after sale, be difficult to project quality is managed the quality of engineering construction and engineering construction personnel's quality close relation; Engineering construction meeting in optimizing process is because bad weather: such as: the weather conditions such as rainfall, snowfall, thunderstorm, strong wind, the workmen can't go up the station and delay, particularly the Northeast and southern many rainfalls are regional, and the situation that the construction meeting of engineering is postponed because of the impact of weather happens occasionally; And also can be subject to the impact of property and resident family when the equipment such as antenna that the roof terrace is installed are adjusted, and each upper station all needs fully to link up with property and resident family, and its time is uncontrollable, thereby causes the Optimizing construction time limit uncontrollable; Topmost reason is that the impact of each objective factor all can cause the prolongation of global optimization process, the increase that human and material resources, financial resources drop into.
Summary of the invention
The invention provides a kind of method of adjustment and system of engineering parameter, easily cause making slow progress and can wasting the problem of a large amount of human and material resources and financial resources of network optimization process to solve at least in correlation technique by manual type, the base station coverage sector to be adjusted.
A kind of method of adjustment of engineering parameter is provided according to an aspect of the present invention.
Comprise according to the method for adjustment of engineering parameter of the present invention: the base station receives the adjustment instruction that comes from server, wherein, the engineering parameter of adjusting instruction and be this current use in base station that server reports according to the base station with set in advance on server compare with initial plan engineering parameter corresponding to base station after generation, perhaps, to adjust instruction be server carries out statistical analysis according to the engineering parameter of the current use that in predetermined period, the base station is repeatedly reported and obtains; The base station is adjusted the engineering parameter of current use according to adjusting instruction.
Preferably, the base station comprises according to adjusting the engineering parameter adjustment of instruction to current use: the base station according to adjust instruction determine to the antenna of base station towards and/or antenna adjust with respect to the mechanical tilt angle of the pole of base station; The base station obtains the engineering parameter of current use again according to adjusting result.
Preferably, the base station is determined the antenna of base station is comprised towards adjusting according to adjusting instruction: the base station is according to adjusting that the rotation direction of antenna is determined in instruction and angle to be rotated on rotation direction; The base station is adjusted antenna according to angle on rotation direction.
Preferably, the base station is determined that antenna is adjusted with respect to the mechanical tilt angle of the pole of base station and comprised according to adjusting instruction: the base station is according to the amplitude of variation of adjusting instruction and determine the mechanical tilt angle; The base station is adjusted antenna according to amplitude of variation.
Preferably,, also comprise according to adjusting after instruction adjusts the engineering parameter of current use in the base station: the engineering parameter of the current use after the server record adjustment corresponding with the base station; Server upgrades at the engineering parameter corresponding with the base station of the engineering parameter that records through employing after presetting duration to the current preservation of server, perhaps, and with the engineering parameter deletion of record.
A kind of adjustment System of engineering parameter is provided according to a further aspect in the invention.
Comprise according to the adjustment System of engineering parameter of the present invention: one or more base stations; Each base station includes: receiver module, be used for receiving the adjustment instruction that comes from server, wherein, the engineering parameter of adjusting instruction and be this current use in base station that server reports according to the base station with set in advance on server compare with initial plan engineering parameter corresponding to base station after generation, perhaps, to adjust instruction be server carries out statistical analysis according to the engineering parameter of the current use that in predetermined period, the base station is repeatedly reported and obtains; Adjusting module is used for according to adjusting instruction, the engineering parameter of current use being adjusted.
Preferably, above-mentioned adjusting module comprises: adjustment unit, be used for according to adjust instruction determine to the antenna of base station towards and/or antenna adjust with respect to the mechanical tilt angle of the pole of base station; Acquiring unit is used for again obtaining the engineering parameter of current use according to adjusting result.
Preferably, adjustment unit comprises: first determines subelement, is used for according to adjusting that the rotation direction of antenna is determined in instruction and angle to be rotated on rotation direction; First adjusts subelement, is used for according to angle, antenna being adjusted on rotation direction.
Preferably, adjustment unit comprises: second determines subelement, is used for determining according to the adjustment instruction amplitude of variation at mechanical tilt angle; Second adjusts subelement, is used for according to amplitude of variation, antenna being adjusted.
Preferably, said system also comprises: server; Server comprises: logging modle is used for the engineering parameter of the current use after the record adjustment corresponding with the base station; Processing module is used for upgrading at the engineering parameter corresponding with the base station of the engineering parameter that records through employing after presetting duration to the current preservation of server, perhaps, and with the engineering parameter deletion of record.
By the present invention, adopt the base station to receive the adjustment instruction that comes from server, the engineering parameter of adjusting instruction and be this current use in base station that server reports according to the base station with set in advance on server compare with initial plan engineering parameter corresponding to base station after generation, perhaps, to adjust instruction be server carries out statistical analysis according to the engineering parameter of the current use that in predetermined period, the base station is repeatedly reported and obtains; The base station is adjusted the engineering parameter of current use according to adjusting instruction, solved in the correlation technique by manual type, the base station coverage sector to be adjusted and easily caused making slow progress and can wasting the problem of a large amount of human and material resources and financial resources of network optimization process, and then adjust scheme by remote auto, can make the base station section in network possess higher flexibility, reduce engineering construction cycle, network optimization cycle and network input cost, improve the accuracy of network optimization efficient and network later stage planning.
Description of drawings
Accompanying drawing described herein is used to provide a further understanding of the present invention, consists of the application's a part, and illustrative examples of the present invention and explanation thereof are used for explaining the present invention, do not consist of improper restriction of the present invention.In the accompanying drawings:
Fig. 1 is the flow chart according to the method for adjustment of the engineering parameter of the embodiment of the present invention;
Fig. 2 is the flow chart of the method for adjustment of engineering parameter according to the preferred embodiment of the invention;
Fig. 3 is the structured flowchart according to the adjustment System of the engineering parameter of the embodiment of the present invention;
Fig. 4 is the structured flowchart of the adjustment System of engineering parameter according to the preferred embodiment of the invention;
Fig. 5 is the schematic diagram according to the base station after the improvement of the embodiment of the present invention;
Fig. 6 is the schematic diagram of by hydraulic means, the antenna sector angle being adjusted according to the preferred embodiment of the invention;
Fig. 7 is the schematic diagram that coverage sector changes after on the basis of Fig. 6, aerial angle being adjusted according to the preferred embodiment of the invention;
Fig. 8 is the schematic diagram of the adjustment System of engineering parameter according to the preferred embodiment of the invention.
Embodiment
Hereinafter also describe in conjunction with the embodiments the present invention in detail with reference to accompanying drawing.Need to prove, in the situation that do not conflict, embodiment and the feature in embodiment in the application can make up mutually.
Fig. 1 is the flow chart according to the method for adjustment of the engineering parameter of the embodiment of the present invention.As shown in Figure 1, the method can comprise following treatment step:
Step S102: the base station receives the adjustment instruction that comes from server, wherein, the engineering parameter of adjusting instruction and be this current use in base station that server reports according to the base station with set in advance on server compare with initial plan engineering parameter corresponding to base station after generation, perhaps, to adjust instruction be server carries out statistical analysis according to the engineering parameter of the current use that in predetermined period, the base station is repeatedly reported and obtains;
Step S104: the base station is adjusted the engineering parameter of current use according to adjusting instruction.
In correlation technique, by manual type, the base station coverage sector is adjusted and easily caused making slow progress and can wasting a large amount of human and material resources and financial resources of network optimization process.Adopt method as shown in Figure 1, the engineering parameter of this current use in base station that network initial stage construction period server reports according to the base station with setting in advance on server compare with initial plan engineering parameter corresponding to base station after generate and adjust instruction, perhaps, carry out statistical analysis at network operation stage server according to the engineering parameter of the current use that in predetermined period, the base station repeatedly reported and obtain to adjust instruction; The base station receives the adjustment instruction that comes from server, and according to adjusting instruction, the engineering parameter of current use is adjusted, solved in the correlation technique by manual type, the base station coverage sector to be adjusted and easily caused making slow progress and can wasting the problem of a large amount of human and material resources and financial resources of network optimization process, and then adjust scheme by remote auto, can make the base station section in network possess higher flexibility, reduce engineering construction cycle, network optimization cycle and network input cost, improve the accuracy of network optimization efficient and network later stage planning.
In a preferred embodiment, originally network when building up, whole base station sections that server can issue its administration of command request report the Practical Project parameter of self, and compare with the engineering parameter of background net management planning, with confirm which or which base station abnormal (comprising: the Practical Project parameter that causes due to construction wrong and the engineering parameter difference of planning is excessive and because the engineering parameter difference of the wrong Practical Project parameter that causes of engineering parameter of planning and planning is excessive), and then avoid just introducing error at the network initial stage of building up; In the network operation stage, if the engineering parameter of indivedual base station sections is because other factors (for example: climatic factor, urban planning factor) cause occuring serious variation, server can in time provide alarm, and the engineering parameter that the base station that comprehensively changes repeatedly reports carries out statistical analysis, assign and adjust instruction the engineering parameter of the base station that changes is adjusted, thereby realize optimization to network.
Preferably, in step S104, the base station can comprise the following steps according to adjusting the engineering parameter adjustment of instruction to current use:
Step S1: the base station according to adjust instruction determine to the antenna of base station towards and/or antenna adjust with respect to the mechanical tilt angle of the pole of base station;
Step S2: the base station obtains the engineering parameter of current use again according to adjusting result.
Preferably, in step S1, the base station is determined can comprise following operation to the antenna of base station towards adjusting according to adjusting instruction:
Step S11: the base station is according to adjusting that the rotation direction of antenna is determined in instruction and angle to be rotated on rotation direction;
Step S12: the base station is adjusted antenna according to angle on rotation direction.
In a preferred embodiment, personnel/mobile subscriber that the situations such as large-scale activity, rally of holding for above-mentioned stadium occur is increasing sharply in the zone among a small circle, because the user capacity of each residential quarter is limited, exceeding user capacity will cause cutting off rate that the user calls to raise or without the poor phenomenon of user awareness of service, the antenna of low user capacity residential quarter that can be by changing that the stadium periphery exists has also reduced the operating cost of network simultaneously towards the problem of increasing sharply with the solution capacity.
Preferably, in step S1, the base station is determined that antenna is adjusted with respect to the mechanical tilt angle of the pole of base station and can be comprised following operation according to adjusting instruction:
Step S13: the amplitude of variation at mechanical tilt angle is determined in the base station according to the adjustment instruction;
Step S14: the base station is adjusted antenna according to amplitude of variation.
At present, technical scheme in correlation technique is not too paid close attention to the adjustment to the mechanical tilt angle, because some antenna is the electrical tilt antenna that can adjust antenna phase, but still consider all more feasible not as directly adjustment being controlled at the mechanical tilt angle of antenna from the angle of controlling effect from the angle of cost, and when adjusting to a certain degree, can't continue antenna phase to adjust, can adjust flexibly the mechanical tilt angle of antenna this moment, will play an important role for the distance of the network coverage and the change of scope, and very flexible.
Preferably, at step S104, the base station can also comprise following treatment step after according to the adjustment instruction, the engineering parameter of current use being adjusted:
Step S3: the engineering parameter of the current use after the server record adjustment corresponding with the base station;
Step S4: server upgrades at the engineering parameter corresponding with the base station of the engineering parameter that records through employing after presetting duration to the current preservation of server, perhaps, and with the engineering parameter deletion of record.
In a preferred embodiment, server can record the engineering parameter of the current use after the adjustment corresponding with the base station, and after the default duration (for example: 5 days) of process, if find that the base station has clear improvement after adjusting, the engineering parameter that can adopt record upgrades the engineering parameter corresponding with the base station of the current preservation of server; If finding does not only have obviously to improve through after adjusting, also descend to some extent on the contrary, the engineering parameter of record is deleted.
Below in conjunction with preferred implementation shown in Figure 2, above-mentioned preferred implementation process is further described.
Fig. 2 is the flow chart of the method for adjustment of engineering parameter according to the preferred embodiment of the invention.As shown in Figure 2, this flow process can comprise the following steps:
Step S202: the webmaster machine room is assigned the instruction that reports engineering parameter by network management platform, and the instruction that base station section response webmaster is assigned is also fed back current engineering parameter information;
Step S204: network management platform gathers the engineering parameter information of all basic station over network sector;
Step S206: network management platform can compare the engineering parameter information of the initial planning of preserving in the real-time engineering parameter information that gathers and webmaster;
Step S208: surpass the cellular engineering parameter information of predetermined threshold value for error, network management platform can provide alerting service, represents that the engineering parameter information of this base station section exists abnormal;
Step S210: network management platform is analyzed the base station section of abnormal, if because large mandarin duck connects instead, need to revise the sector number information in webmaster; If because engineering parameter information and original planning there are differences, need to assign instruction by network management platform the antenna of alarm residential quarter is carried out long-range adjustment;
Step S212: the webmaster machine room is assigned angle and Height Adjustment instruction, the instruction that base station section response webmaster is assigned and the engineering parameter information of feeding back current sector;
Step S214: network management platform confirms that the sector adjusts parameter, and system judge adjustment mode to the sector by calculatings, and angle is clockwise or counterclockwise, and the mechanical tilt angle is that hydraulic stem pushes away forward or to recovery, and long-range sector of assigning to the needs adjustment;
Step S216: after instruction was adjusted in the sector response, electricity drove or fluid pressure drive device work, and digital compass and height sensor begin and adjust the settings calibration;
Step S218: when the sector is adjusted to accordingly towards with height the time, electricity drives or fluid pressure drive device quits work, and whole adjustment process finishes;
Step S220: NM server can record this adjustment information to be put on record, and automatically returns to the front section orientation of adjustment after a period of time can be set;
Step S222: if do not carry out recovery operation, background net management can report engineering parameter information to be revised as the current network configuration information with being adjusted the sector, be consistent with the engineering parameter that reaches Practical Project parameter and server stores, if find to have inconsistent situation, background net management can carry out alarm prompt;
Step S224: by analyzing alarm cause, judge whether to exist large mandarin duck to connect anti-situation, overcome the above problems by the mode of revising the network management project parameter or the mode that continues the adjustment section orientation.
Fig. 3 is the structured flowchart according to the adjustment System of the engineering parameter of the embodiment of the present invention.As shown in Figure 3, the adjustment System of this project parameter can comprise: one or more base stations 10; Each base station 10 all can comprise: receiver module 100, be used for receiving the adjustment instruction that comes from server, wherein, the engineering parameter of adjusting instruction and be this current use in base station that server reports according to the base station with set in advance on server compare with initial plan engineering parameter corresponding to base station after generation, perhaps, to adjust instruction be server carries out statistical analysis according to the engineering parameter of the current use that in predetermined period, the base station is repeatedly reported and obtains; Adjusting module 102 is used for according to adjusting instruction, the engineering parameter of current use being adjusted.
Adopt system as shown in Figure 3, solved in the correlation technique by manual type, the base station coverage sector to be adjusted and easily caused making slow progress and can wasting the problem of a large amount of human and material resources and financial resources of network optimization process, and then adjust scheme by remote auto, can make the base station section in network possess higher flexibility, reduce engineering construction cycle, network optimization cycle and network input cost, improve the accuracy of network optimization efficient and network later stage planning.
In a preferred embodiment, can increase on the base station with lower module: global positioning system (GPS) module, mainly be responsible for providing GPS information, height above sea level and the horizontal tilt degree information of sector, see from technological angle to be arranged at antenna casing inside, provide interface to control in the feeder line junction; The digital compass module mainly is responsible for providing antenna towards, level angle calibration information, sees from technological angle to be arranged at antenna casing inside, provides interface to control in the feeder line junction; The monitoring camera-shooting module, main being responsible in time monitored the alarm website, tackle the site apparatus damage monitoring that external force artificial destruction and natural calamity cause, see from technological angle can be arranged at the antenna holding pole top and can rotate by 360 degree, the place provides interface to control at feeder line; Information passback module: the information that is used for passback GPS, digital compass, monitoring camera-shooting module, when assigning remote control command, background net management can return above-mentioned information, also can be set to automatically return task, carrying out corresponding parametric calibration task through after predetermined period, seeing in base station side from technological angle provides interface and carries out mutual obtaining information with upper module, is back to background net management server or inquiring client terminal and carries out data display, data check and correction and Real Time Monitoring.
Preferably, as shown in Figure 4, adjusting module 102 can comprise: adjustment unit 1020, be used for according to adjust instruction determine to the antenna of base station towards and/or antenna adjust with respect to the mechanical tilt angle of the pole of base station; Acquiring unit 1022 is used for again obtaining the engineering parameter of current use according to adjusting result.
In a preferred embodiment, Fig. 5 is the schematic diagram according to the base station after the improvement of the embodiment of the present invention.As shown in Figure 5, can be connected with pole by hydraulic pressure or electric driver module in the position of antenna upper middle, realize adjustment to antenna mechanical tilt angle by hydraulic means, for example: hydraulic stem is installed, is stretched to realize adjustment to antenna mechanical tilt angle by hydraulic stem on pole; Can also realize the deflection active steering of fan antenna and the adjustment of antenna height by automatically controlled steering module in antenna the latter half.
The mode of controlling by driving is adjusted the mechanical tilt angle of sector, changes the residential quarter coverage distance; Adjustment sector directions angle changes cell coverage area, processes the problem that network burst capacity increases sharply, and promotes network performance in conjunction with service feature.
Preferably, adjustment unit 1020 can comprise: first determines the subelement (not shown), is used for according to adjusting that the rotation direction of antenna is determined in instruction and angle to be rotated on rotation direction; First adjusts the subelement (not shown), is used for according to angle, antenna being adjusted on rotation direction.
In a preferred embodiment, Fig. 6 is the schematic diagram of by hydraulic means, the antenna sector angle being adjusted according to the preferred embodiment of the invention.As shown in Figure 6, realize the deflection active steering of fan antenna and the adjustment of antenna height by electro-motor, can dynamically change at any time the angle of antenna.Fig. 7 is the schematic diagram that coverage sector changes after on the basis of Fig. 6, aerial angle being adjusted according to the preferred embodiment of the invention.As shown in Figure 7, along with the change of aerial angle, the scope of antenna cover sector also changes immediately.
Preferably, adjustment unit 1020 can also comprise: second determines the subelement (not shown), is used for determining according to the adjustment instruction amplitude of variation at mechanical tilt angle; Second adjusts the subelement (not shown), is used for according to amplitude of variation, antenna being adjusted.
Preferably, as shown in Figure 4, said system can also comprise: server 20; Server 20 can comprise: logging modle 200 is used for the engineering parameter of the current use after the record adjustment corresponding with the base station; Processing module 202 is used for upgrading at the engineering parameter corresponding with the base station of the engineering parameter that records through employing after presetting duration to the current preservation of server, perhaps, and with the engineering parameter deletion of record.
Fig. 8 is the schematic diagram of the adjustment System of engineering parameter according to the preferred embodiment of the invention.As shown in Figure 8, by the transformation to the website fan antenna, increase digital compass module, GPS module, monitoring camera-shooting module, hydraulic pressure or electric driver module, by webmaster, deflection, mechanical tilt angle and the sector antenna height of website sector are carried out Long-distance Control; By the adjustment to section orientation, can adjust its overlay area; Adjustment to the sector height can extend coverage distance, equally also can reach adjustment to the overlay area to the adjustment at mechanical tilt angle; By the monitoring camera-shooting module, can grasp in real time the equipment ambient conditions and change, in time understand the terrace environmental change, the very first time proposes processing scheme; Simultaneously, background net management can report by each website sector, and self GPS information and digital compass information form the most real engineering parameter, the engineering parameter error of avoiding human factor to introduce, introduce more error in the network planning, when optimizing, cause the impact on existing network, effectively avoid large mandarin duck to connect anti-situation and occur.Adjust scheme by remote auto, can reduce to greatest extent the expense that produces when front upper station adjustment construction, shorten adjustment cycle, thereby shorten whole optimization cycle, pay the elaboration network with the fastest speed.
From above description, can find out, above-described embodiment has been realized following technique effect (need to prove that these effects are effects that some preferred embodiment can reach): by technical scheme provided by the invention, can be by proofreading and correct engineering parameter in network initial stage process of construction, for the optimization in later stage provides the most real network parameter, and eliminate large mandarin duck and connect anti-equal error problem; Can revise in real time section orientation and height in the optimizing phase in network optimization process, shorten because the time waste that nature and human factor cause shortens optimization cycle, save cost and input; For the covering that can in time afford redress of part special area, save network and drop in the network stabilization running.base station real-time report network engineering parameter, the equipment of avoiding introducing in error and work progress in planning process connects instead, the data that make background net management obtain are true and reliable, fast, accurately, Long-distance Control section orientation easily, angle of declination and height, can make the base station section in network possess higher flexibility, reduce the engineering construction cycle, network optimization cycle and network input cost, improve the accuracy of network optimization efficient and network later stage planning, thereby realize the real-time that the sector is adjusted, accuracy, convenience, flexibility and high automation degree.
obviously, those skilled in the art should be understood that, above-mentioned each module of the present invention or each step can realize with general calculation element, they can concentrate on single calculation element, perhaps be distributed on the network that a plurality of calculation elements form, alternatively, they can be realized with the executable program code of calculation element, thereby, they can be stored in storage device and be carried out by calculation element, and in some cases, can carry out step shown or that describe with the order that is different from herein, perhaps they are made into respectively each integrated circuit modules, perhaps a plurality of modules in them or step being made into the single integrated circuit module realizes.Like this, the present invention is not restricted to any specific hardware and software combination.
The above is only the preferred embodiments of the present invention, is not limited to the present invention, and for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection scope of the present invention.

Claims (10)

1. the method for adjustment of an engineering parameter, is characterized in that, comprising:
The base station receives the adjustment instruction that comes from server, wherein, the engineering parameter of described adjustment instruction this current use in base station that to be described server report according to described base station with set in advance on described server compare with initial plan engineering parameter corresponding to described base station after generate, perhaps, to be described server carry out statistical analysis according to the engineering parameter of the described current use that in predetermined period, described base station is repeatedly reported obtains in described adjustment instruction;
Described base station is adjusted the engineering parameter of described current use according to described adjustment instruction.
2. method according to claim 1, is characterized in that, described base station comprises according to the engineering parameter adjustment of described adjustment instruction to described current use:
Described base station according to described adjustment instruction determine to the antenna of described base station towards and/or described antenna adjust with respect to the mechanical tilt angle of the pole of described base station;
Described base station obtains the engineering parameter of current use again according to adjusting result.
3. method according to claim 2, is characterized in that, described base station is determined the antenna of described base station is comprised towards adjusting according to described adjustment instruction:
The rotation direction of described antenna is determined according to described adjustment instruction and angle to be rotated on described rotation direction in described base station;
Described base station is adjusted described antenna according to described angle on described rotation direction.
4. method according to claim 2, is characterized in that, described base station is determined according to described adjustment instruction that described antenna is adjusted with respect to the mechanical tilt angle of the pole of described base station and comprised:
The amplitude of variation at described mechanical tilt angle is determined in described base station according to described adjustment instruction;
Described base station is adjusted described antenna according to described amplitude of variation.
5. the described method of any one according to claim 1 to 4, is characterized in that, after described base station is adjusted the engineering parameter of described current use according to described adjustment instruction, also comprises:
The engineering parameter of the current use after the adjustment corresponding with described base station of described server record;
Described server upgrades at the engineering parameter corresponding with described base station of the engineering parameter that records through employing after presetting duration to the current preservation of described server, perhaps, and with the engineering parameter deletion of described record.
6. the adjustment System of an engineering parameter, is characterized in that, comprising: one or more base stations;
Each base station includes:
Receiver module, be used for receiving the adjustment instruction that comes from server, wherein, the engineering parameter of described adjustment instruction this current use in base station that to be described server report according to described base station with set in advance on described server compare with initial plan engineering parameter corresponding to described base station after generate, perhaps, to be described server carry out statistical analysis according to the engineering parameter of the described current use that in predetermined period, described base station is repeatedly reported obtains in described adjustment instruction;
Adjusting module is used for according to described adjustment instruction, the engineering parameter of described current use being adjusted.
7. system according to claim 6, is characterized in that, described adjusting module comprises:
Adjustment unit, be used for according to described adjustment instruction determine to the antenna of described base station towards and/or described antenna adjust with respect to the mechanical tilt angle of the pole of described base station;
Acquiring unit is used for again obtaining the engineering parameter of current use according to adjusting result.
8. system according to claim 7, is characterized in that, described adjustment unit comprises:
First determines subelement, is used for determining the rotation direction of described antenna and angle to be rotated on described rotation direction according to described adjustment instruction;
First adjusts subelement, is used for according to described angle, described antenna being adjusted on described rotation direction.
9. system according to claim 7, is characterized in that, described adjustment unit comprises:
Second determines subelement, is used for determining according to described adjustment instruction the amplitude of variation at described mechanical tilt angle;
Second adjusts subelement, is used for according to described amplitude of variation, described antenna being adjusted.
10. any one described system according to claim 6 to 9, is characterized in that, described system also comprises: described server;
Described server comprises:
Logging modle is used for the engineering parameter of the current use after the record adjustment corresponding with described base station;
Processing module is used for upgrading at the engineering parameter corresponding with described base station of the engineering parameter that records through employing after presetting duration to the current preservation of described server, perhaps, and with the engineering parameter deletion of described record.
CN2013100461060A 2013-02-05 2013-02-05 Adjustment method and system of engineering parameter Pending CN103139811A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN2013100461060A CN103139811A (en) 2013-02-05 2013-02-05 Adjustment method and system of engineering parameter
PCT/CN2013/084115 WO2014121617A1 (en) 2013-02-05 2013-09-24 Engineering parameter adjustment method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100461060A CN103139811A (en) 2013-02-05 2013-02-05 Adjustment method and system of engineering parameter

Publications (1)

Publication Number Publication Date
CN103139811A true CN103139811A (en) 2013-06-05

Family

ID=48498996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100461060A Pending CN103139811A (en) 2013-02-05 2013-02-05 Adjustment method and system of engineering parameter

Country Status (2)

Country Link
CN (1) CN103139811A (en)
WO (1) WO2014121617A1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014121617A1 (en) * 2013-02-05 2014-08-14 中兴通讯股份有限公司 Engineering parameter adjustment method and system
CN104936217A (en) * 2014-03-17 2015-09-23 ***通信集团陕西有限公司 Method and system for parameter check of foundation works of mobile communication station
CN106353607A (en) * 2016-08-31 2017-01-25 福州福光电子有限公司 Antenna working parameter test management system and method based on same
CN106991505A (en) * 2017-05-15 2017-07-28 发联(上海)网络科技有限公司 Management system for O&M electric medical treatment equipment
CN114125971A (en) * 2021-11-29 2022-03-01 新华三技术有限公司成都分公司 Automatic Neighbor Relation (ANR) updating method and device
CN114423016A (en) * 2021-12-30 2022-04-29 中国电信股份有限公司 Method and device for determining planning parameters of base station
CN115567946A (en) * 2022-08-12 2023-01-03 王赓 Communication terminal for adaptive adjustment of mountainous area

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101616021A (en) * 2008-06-27 2009-12-30 中兴通讯股份有限公司 Family base station network optimization method and family base station configuration server
CN102468536A (en) * 2010-11-17 2012-05-23 ***通信集团江苏有限公司 Base station antenna angular adjustment method and system
CN102509886A (en) * 2011-11-03 2012-06-20 长沙威佳通信科技有限公司 System for automatically monitoring state of base station antennae
US20120188919A1 (en) * 2008-05-16 2012-07-26 Redline Communications Inc. Isolation measurement and self oscillation prevention in tdd-ofdm repeater for wireless broadband distribution to shadowed areas

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103139811A (en) * 2013-02-05 2013-06-05 中兴通讯股份有限公司 Adjustment method and system of engineering parameter

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120188919A1 (en) * 2008-05-16 2012-07-26 Redline Communications Inc. Isolation measurement and self oscillation prevention in tdd-ofdm repeater for wireless broadband distribution to shadowed areas
CN101616021A (en) * 2008-06-27 2009-12-30 中兴通讯股份有限公司 Family base station network optimization method and family base station configuration server
CN102468536A (en) * 2010-11-17 2012-05-23 ***通信集团江苏有限公司 Base station antenna angular adjustment method and system
CN102509886A (en) * 2011-11-03 2012-06-20 长沙威佳通信科技有限公司 System for automatically monitoring state of base station antennae

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014121617A1 (en) * 2013-02-05 2014-08-14 中兴通讯股份有限公司 Engineering parameter adjustment method and system
CN104936217A (en) * 2014-03-17 2015-09-23 ***通信集团陕西有限公司 Method and system for parameter check of foundation works of mobile communication station
CN104936217B (en) * 2014-03-17 2018-11-23 ***通信集团陕西有限公司 A kind of method and system that mobile communication website foundation engineering parameter is verified
CN106353607A (en) * 2016-08-31 2017-01-25 福州福光电子有限公司 Antenna working parameter test management system and method based on same
CN106991505A (en) * 2017-05-15 2017-07-28 发联(上海)网络科技有限公司 Management system for O&M electric medical treatment equipment
CN114125971A (en) * 2021-11-29 2022-03-01 新华三技术有限公司成都分公司 Automatic Neighbor Relation (ANR) updating method and device
CN114423016A (en) * 2021-12-30 2022-04-29 中国电信股份有限公司 Method and device for determining planning parameters of base station
CN114423016B (en) * 2021-12-30 2024-04-30 中国电信股份有限公司 Method and device for determining planning parameters of base station
CN115567946A (en) * 2022-08-12 2023-01-03 王赓 Communication terminal for adaptive adjustment of mountainous area

Also Published As

Publication number Publication date
WO2014121617A1 (en) 2014-08-14

Similar Documents

Publication Publication Date Title
CN103139811A (en) Adjustment method and system of engineering parameter
US10957975B2 (en) System and method of adjusting antenna beam on antenna tower
US20230007760A1 (en) Failure modeling and management of an aerial light fixture
US10091673B2 (en) Management of backhaul nodes in a microwave backhaul
US20090141623A1 (en) Central Antenna Management System With Centralized Database
CN102017305A (en) Antenna line device configuration system
HRP20140320T1 (en) Method, antenna management system and program for optimization of broadcast characteristics of an antenna and method for determining physical parameters of an antenna
US20190297798A1 (en) Method and Apparatus for Networked Irrigation Controllers that Adjust Watering Schedules in Response to Rainfall
CN105823167A (en) Air conditioner control method and air conditioner
CN203300952U (en) Direction finding antenna field lightning protection system of short wave fixed station
KR102238357B1 (en) Changeable Passive Relay, Controlling Server, and Operating Method thereof
KR102346035B1 (en) Smart farm system for vineyard can block rain and generate solar power
EP3618484A1 (en) Method and device for adjusting downtilt angle of antenna
CN103116364A (en) Antenna attitude monitoring system supporting electric tuning function
CN105471640B (en) Remote antenna engineering parameter cognitive method, system and antenna
CN105547284A (en) 485 communication based indoor positioning and navigation system and monitoring method
US8224241B1 (en) System and method for antenna orientation for mobile applications
KR20160049764A (en) System and method for notifying optimum slope angle of angle adjusting type solar panel
CN106486768A (en) Electrical tilt antenna parameter value adjustment method and device
CN113573348B (en) Method for realizing automatic configuration of 5G base station parameters based on man-machine instruction
CN103019193B (en) Monitoring control method of multi-type steering supports in photovoltaic power station
US11616570B2 (en) Visual impairment detector for free-space optical communication systems
US20220277646A1 (en) System and method for managing data of an irrigation system
CN112153795B (en) Control method and system for execution equipment
KR102057051B1 (en) Method And Apparatus for Wireless Network Optimization

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130605

WD01 Invention patent application deemed withdrawn after publication