CN103130126A - Method for lead screw rope arrangement of well drilling winch - Google Patents

Method for lead screw rope arrangement of well drilling winch Download PDF

Info

Publication number
CN103130126A
CN103130126A CN 201110405056 CN201110405056A CN103130126A CN 103130126 A CN103130126 A CN 103130126A CN 201110405056 CN201110405056 CN 201110405056 CN 201110405056 A CN201110405056 A CN 201110405056A CN 103130126 A CN103130126 A CN 103130126A
Authority
CN
China
Prior art keywords
winch
leading screw
rope
rope arrangement
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110405056
Other languages
Chinese (zh)
Inventor
晋兆建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201110405056 priority Critical patent/CN103130126A/en
Publication of CN103130126A publication Critical patent/CN103130126A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses a method for lead screw rope arrangement of a well drilling winch. The method comprises the steps: (a), firstly, starting a driving device (1), wherein the driving device (1) drives a lead screw (4) rotate; (b) driving a nut (5) to move by rotation of a polish screw (1), thereby generating linear motion of the rope arrangement; (c) after the nut (5) moves to a limiting position and crashes with a limiting block (6), changing a rotation direction of the polish screw (1); (d) the nut (5) moves towards an opposite direction so as to finish a reciprocating rope arrangement process. Through the method for the lead screw rope arrangement, the rope arrangement is relatively even, dense, simple and direct, used devices are compact in structure, machining is easy, a transmission ratio of the lead screw rope arrangement is standard, and installing is convenient.

Description

The leading screw rope-discharging method of well drilling hoist
Technical field
The present invention relates to a kind of leading screw rope-discharging method of well drilling hoist.
Background technology
Although of all kinds on various winch structure, generally all consist of the following components in essence:
(1) cylinder, drum shaft assembly, this is the core work parts of winch.Cylinder should have enough Rong Shengliang, guarantees that rope woolding is in good condition to extend rope service-life;
(2) winch has sensitive failure-free main brake mechanism and well behaved assist brake, can regulate exactly the pressure of the drill, evenly sends drilling tool to, arbitrarily controls running speed and effortlessly the heaviest drill string load is checked in going down process;
(3) cat head and cat shaft assembly are in order to satisfy the needs with shackle on tong and other auxiliary lifting.Bailing drum also is housed, in order to extract core barrel on some cat shafts;
(4) transmission gear shift system introduces and distributed power and transmit motion, and enough shelves speed is provided;
(5) control system comprises dental inlay, tooth-like, pneumatic clutch.Their general subordinates are in the component part of control system of rig;
(6) lubricating system comprises that butter is lubricated, drip feed lubrication and sealing, splashes or positive lubrication;
(7) support system has frame bracket or the closed box shell-type mounting of welding.Medium-sized winch integral transportation, its weight is in 10 tons; Heavy and superduty winch will be broken into shipped, and the unit of transportation should be in 15 tons, so that movement.
In the middle of Process of Oil Well Drilling, the radical function of winch shows:
(1) drilling tool (comprise grief joint, drilling rod, brill very, drill bit etc.) is lowered to hundreds of rice to several kms, even surpasses the shaft bottom of myriametre.
(2) with drilling tool from hundreds of rice to several kms, the shaft bottom of even going up myriametre trips out.
(3) in drilling well, foil portion drilling tool weight, be pressed in pressure on drill bit with control.
(4) in drilling well, as down-hole accident occurs, need to be lowered to or to trip out the various downhole tools of processing the down-hole fault in pit shaft.
(5) install at rig, when dismantling, need derrick integral body is stood up or transferred.
(6) in cement job, need to be lowered to sleeve pipe etc. in well.
According to function and the characteristics of winch, in general, the well borer does that winch is had following requirement:
(1) in order to guarantee the heaviest drilling tool that hoists, require each parts of winch to satisfy in intensity, rigidity under the prerequisite of its in-use performance, winch will have enough power.
(2) variation and the raising effect in order to adapt to hoisting capacity, winch should have enough hoist gear number or speed change scope of compromise.
(3) winch drum should have enough sizes and Rong Shengliang.
(4) winch should have sensitive failure-free brake system, in order to check maximum load, accurately regulates the pressure of the drill, evenly sends drilling tool to.
(5) the winch control part is answered convenient operation, and is safe and reliable.
The transmission scheme of winch has determined its structure type, can be divided into single shaft, twin shaft, three axles, multiaxis and major-minor winch by the winch number of axle.The first two is planted winch and generally all needs change speed gear box in addition
1. single drum shaft winch
The characteristics of this class winch are that cat head directly is contained in drum shaft two ends, and cylinder is contained on drum shaft.For different lifting velocities is provided, change speed gear box transmission winch and rotating disk respectively are set outside winch.This winch structure is simple, and power is little, and is lightweight, and movement is convenient, is exactly this type as C-1500 type boring winch.Its shortcoming is that the cat head rotating speed is higher, and the position is too low, operation inconvenience, and cylinder shelves speed can not independently arrange, the impact speed that makes a trip.
2. twin-roll axle winch
Double shaft drawworks is comprised of cat shaft and drum shaft, due to cat head and cylinder split axle, the speed of cat head and position is all improved, and has solved the operation inconvenience problem of cat head.It still takes outer speed change scheme.Adopt this scheme as ZJ15D and ZJ20-2 ton type rig, lightweight so that winch structure is simple, be convenient to movement.
3. three drum shaft winches
The characteristics of this class winch are to have increased the transmission shaft of introducing power on the basis of double shaft drawworks, and cat shaft is also participated in gear.The JC1-14.5 winch that grand celebration 130 rigs and ZJ130-1 adopt namely belongs to this type of, and it can realize separate three low gears and a high speed gear.Because space between three axles is larger, reverse gear can not be set, this type rig is provided with reverse gift gearing box at machine room.Because speed-changing mechanism is also taken into account rotating disk, cancelled outer change speed gear box, but winch itself is complicated.Weigh 20 tons, be converted into four shipped of three axles during movement, movement and installation are all inconvenient.
4. multiple-roll axle winch
Winch more than four axles is called multiaxial drawworks, is characterized in that cat shaft do not participate in gear, the position that is available in the middle of cat head can install auxiliary bailing drum additional, and separately establishes the requirement that tween drive shaft solves speed change and transmission.Generally can realize 6 positive 2 drum speeds that fall, the domestic drillings such as ZJ32J, ZJ45, ZJ45J, ZJ60D all adopt this scheme.
5. major-minor winch
Multiaxial drawworks has solved many-sided contradictions such as variable speed operation, shipment preferably on organization plan.But the climbing of long winch, chain has become the weakest link in the rig transmission.Modern deep-well, superdeep well drill floor get up higher (9m as high in the ZJ60L rig floor), the winch of 20 tons of left and right of weighing on the one hand hangs to rise and becomes difficulty, long-chain is climbed up rig floor and will do not increased not 1~2 tween drive shaft and center base on the other hand, makes its transmission complicated, and efficient is low.So independent cat shaft-main winch organization plan occurred.
The main winch power demand is large, is contained on the machine room base, and cat shaft and rotary table transmission device consist of separate unit and be placed on rig floor.Greatly improved the service conditions of climbing chain (or versatile spindle) because Rotary Table Power is less, facilitated and install and movement.
Make a general survey of the developing history of rig, rig has experienced one from simple to complex, and low to the high development and change process of automatization level by automatization level, the evolution of drilling well whim is like this too.Along with making rapid progress of the up-to-date technologys such as Eltec, hydraulic technique, petroleum drilling winch will develop towards the following aspects.
(1) further to electric driving direction development.Reason is that direct current SCR controls and AC frequency conversion is controlled rig and winch, and the incomparable preceence of other many drill outfits is arranged.Except a handful of countries such as the U.S., other country is still relatively backward aspect the development electric drilling machine at present, is still the megatrend of following rig research and development, general orientation.
(2) further to automation, intelligent direction effort.For safety, efficient, scientific and rational drilling well, developed hydraulic drive rig, full automatic drilling rig etc. abroad, this can produce great impact to China's Future Development automation, product that intelligent level is higher.
(3) continue to the maximization future development.Present has been developed the drill outfit of upper myriametre, ConUS one Ai Musike company developed 5000 horsepowers of winches of the first in the world platform in 1997, be described as the 5th generation electric lifting device, so, for further improving domestic drilling tech, the trend of development high-power winch is inevitable.
(4) to split type, single axle future development.At present, main winch and the catworks of many rigs have adopted Split type structure, are placed in respectively on drill floor face and background base, by independently actuating unit driving.The single axle winch is popular in the west in recent years, and the common feature of these two kinds of winches is simple in structure, and volume is little, and is lightweight, is convenient to transportation installation etc.
(5) to seriation, normalisation, the effort of modularization direction.Along with the further normalization of world market, drill outfit is inevitable to the trend of the future developments such as seriation, normalisation, universalization, and this is conducive to increase the interchangeability of equipment and the stability of properties of product, and can save a large amount of productive costss.
(6) to the high-adaptability future development.Restriction owing to being subjected to the drilling conditions such as desert, ocean, polar region wants to expand the oil production market segment, and the drill outfit that adapts to these harsies environment and weather just must be arranged, therefore, the drill outfit of exploitation high-adaptability be from now on the inevitable requirement in future.
When the fast line of petroleum drilling machine winch is wrapped in end on cylinder, there is angle between fast line and plumb bob vertical, the fast line leaning angle must be controlled in certain scope, if leaning angle is excessive, the drift angle that steel rope is entangled to cylinder will increase, thereby cause strengthening along the cylinder axial force between fast line and adjacent fake, must impact the normal winding of steel rope at cylinder.In addition, along with the increase of leaning angle, the race of steel rope and crown sheave just might wear and tear, and along with the increase of leaning angle, it is serious all the more that wearing and tearing can become, and causes great impact this service life on steel rope.
Boring winch is one of core component of oil-well rig.Used well drilling hoist system does not generally have rope guide, cause many rig cylinder steel ropes the sequence disorder to occur, cause disorder cable, steel cable to push mutually, make steel rope produce gross distortion, distortion, bending, knotting, have to scrap in advance, not only cause significant wastage, more seriously may bury thus serious potential safety hazard, especially in the use of deep-well, superdeep well winch, this phenomenon is very general especially.At present, although have the guiding steamboat on winch, this guiding steamboat also just plays the effect that prevents that steel rope from swinging, and is difficult to tackle the problem at its root.
Summary of the invention
The object of the invention is to overcome the shortcoming and defect of above-mentioned prior art, a kind of leading screw rope-discharging method of well drilling hoist is provided, the leading screw rope-discharging method row rope of this well drilling hoist is relatively even, closely knit directly simple, the equipment therefor compact conformation, processing is simple, and leading screw row rope drive is than standard, and is easy for installation.
Purpose of the present invention is achieved through the following technical solutions: the leading screw rope-discharging method of well drilling hoist comprises the following steps:
(a) at first, open actuating device, actuating device drives the leading screw rotation;
(b) feed rod rotation drive nut moves, thus the straight-line motion of the row's of generation rope;
(c) after nut moves to end position and limiting stopper collision, change turning to of feed rod;
(d) nut moves round about, thereby completes the reciprocating rope-arranging process.
Described feed rod turns to the change process to be: pull from the commutation slide block by reverse lever, be meshed with the left and right bevel gear, thereby change turning to of leading screw.
Described actuating device is for dragging Pulley.
The present invention's leading screw used row rope system mainly is made of leading screw, the actuating device that is connected with leading screw and the nut that is sleeved on leading screw, also is set with reversing arrangement on described leading screw.
The two ends of described leading screw are respectively arranged with limiting stopper.
Described reversing arrangement mainly is made of the bevel gear and the commutation slide block that are arranged on leading screw, and described bevel gear and commutation slide block are meshed.
Described commutation slide block is connected with reverse lever.
In sum, the invention has the beneficial effects as follows: row's rope is relatively even, and is closely knit directly simple, the equipment therefor compact conformation, and processing is simple, and leading screw row rope drive is than standard, and is easy for installation.
Description of drawings
Fig. 1 is the structural representation of equipment therefor of the present invention.
The specific embodiment
Below in conjunction with embodiment, the present invention is described in further detail, but embodiments of the present invention are not limited only to this.
Embodiment:
The leading screw rope-discharging method of the well drilling hoist that the present invention relates to comprises the following steps:
(a) at first, open actuating device 1, actuating device 1 drives leading screw 4 rotations;
(b) feed rod 1 rotation drive nut 5 moves, thus the straight-line motion of the row's of generation rope;
(c) after nut 5 moves to end position and limiting stopper 6 collisions, change turning to of feed rod 1;
(d) nut 5 moves round about, thereby completes the reciprocating rope-arranging process.
Described feed rod 1 turns to the change process to be: pull from commutation slide block 3 by reverse lever 7, be meshed with the left and right bevel gear, thereby change turning to of leading screw.
The present invention's leading screw used row rope system mainly is made of leading screw 4, the actuating device 1 that is connected with leading screw 4 and the nut 5 that is sleeved on leading screw 4 as shown in Figure 1, also is set with reversing arrangement on described leading screw 4.
Described actuating device 1 is for dragging Pulley.
The two ends of described leading screw 4 are respectively arranged with limiting stopper 6.
Described reversing arrangement mainly is made of the bevel gear 2 and the commutation slide block 3 that are arranged on leading screw 4, and described bevel gear 2 and commutation slide block 3 are meshed.
Described commutation slide block 3 is connected with reverse lever 7.
The above is only preferred embodiment of the present invention, is not the present invention is done any pro forma restriction, and every foundation technical spirit of the present invention, any simple modification, equivalent variations that above embodiment is done are within all falling into protection scope of the present invention.

Claims (3)

1. the leading screw rope-discharging method of well drilling hoist, is characterized in that, comprises the following steps:
(a) at first, open actuating device (1), actuating device (1) drives leading screw (4) rotation;
(b) it is mobile that feed rod (1) rotates drive nut (5), thus the straight-line motion of the row's of generation rope;
(c) after nut (5) moves to end position and limiting stopper (6) collision, change turning to of feed rod (1);
(d) nut (5) moves round about, thereby completes the reciprocating rope-arranging process.
2. the leading screw rope-discharging method of well drilling hoist according to claim 1, is characterized in that, described actuating device (1) is for dragging Pulley.
3. the leading screw rope-discharging method of well drilling hoist according to claim 1, it is characterized in that, described feed rod (1) turns to the change process to be: pull from commutation slide block (3) by reverse lever (7), be meshed with the left and right bevel gear, thereby change turning to of leading screw.
CN 201110405056 2011-11-28 2011-11-28 Method for lead screw rope arrangement of well drilling winch Pending CN103130126A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110405056 CN103130126A (en) 2011-11-28 2011-11-28 Method for lead screw rope arrangement of well drilling winch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110405056 CN103130126A (en) 2011-11-28 2011-11-28 Method for lead screw rope arrangement of well drilling winch

Publications (1)

Publication Number Publication Date
CN103130126A true CN103130126A (en) 2013-06-05

Family

ID=48490657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110405056 Pending CN103130126A (en) 2011-11-28 2011-11-28 Method for lead screw rope arrangement of well drilling winch

Country Status (1)

Country Link
CN (1) CN103130126A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110902474A (en) * 2019-12-12 2020-03-24 江西诺驰科技咨询有限公司 Energy-saving electronic cable winding device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110902474A (en) * 2019-12-12 2020-03-24 江西诺驰科技咨询有限公司 Energy-saving electronic cable winding device

Similar Documents

Publication Publication Date Title
CN103130133A (en) Winch rolling spiral rope arranging method
CN103711431B (en) A kind of for geology core exploration variable-frequency electric drive top drive formula rock-core borer
CN103130121A (en) Hydraulic rope guiding system applicable to drill well winch and hydraulic rope guiding method applicable to drill well winch
CN203655147U (en) Power head for deep-hole core drilling machine
CN203655152U (en) Variable-frequency electric driven top driver type rock core drilling machine for geological core drilling exploration
CN202300240U (en) Single-guide rail dual-hydraulic cylinder high-accuracy bit feeding system
CN103291210B (en) Gate-type double-tower gear-driven drilling machine
CN103130135A (en) Winch rolling spiral rope arranging device and rope arranging method thereof
CN201212362Y (en) Seven-kilometer triaxial DC electric drilling winch
CN103130126A (en) Method for lead screw rope arrangement of well drilling winch
JP2652808B2 (en) Down the hole drill rig
CN103130138A (en) Bidirectional spiral rope guiding system applicable to drill well winch and bidirectional spiral rope guiding system applicable to drill well winch
CN103130136A (en) Bi-directional spiral rope arranging system applicable to well drilling winch
CN103130124A (en) Hydraulic rope guiding system applicable to drill well winch
CN206359160U (en) High-power Active Compensation double-drum winch
CN103130129A (en) Feed rod rope aligning system applied to well drilling winch
CN103130137A (en) Winch rolling spiral rope arranging device
CN103130130A (en) Belt winding displacement method used for well drilling winch
CN103130123A (en) Belt arrangement system used for well drilling winch and belt arrangement method thereof
CN103130127A (en) System and method for lead screw rope arrangement of well drilling winch
CN201258698Y (en) Drill rod for revolving bore filling pile
CN103130125A (en) System for lead screw rope arrangement of well drilling winch
CN103130134A (en) Bi-directional spiral rope arranging method applicable to well drilling winch
CN103130122A (en) Method for cam rope arrangement of well drilling winch
CN103130120A (en) System and method for cam rope arrangement of well drilling winch

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130605