CN103116807A - Functional area power distribution network refined planning method - Google Patents

Functional area power distribution network refined planning method Download PDF

Info

Publication number
CN103116807A
CN103116807A CN201210534771XA CN201210534771A CN103116807A CN 103116807 A CN103116807 A CN 103116807A CN 201210534771X A CN201210534771X A CN 201210534771XA CN 201210534771 A CN201210534771 A CN 201210534771A CN 103116807 A CN103116807 A CN 103116807A
Authority
CN
China
Prior art keywords
sigma
transformer
main transformer
station
functional areas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210534771XA
Other languages
Chinese (zh)
Other versions
CN103116807B (en
Inventor
徐晶
李娟�
谢秦
刘冬梅
刘英英
崔荣靖
王哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Tianjin Electric Power Corp
Original Assignee
State Grid Corp of China SGCC
Tianjin Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Tianjin Electric Power Corp filed Critical State Grid Corp of China SGCC
Priority to CN201210534771.XA priority Critical patent/CN103116807B/en
Publication of CN103116807A publication Critical patent/CN103116807A/en
Application granted granted Critical
Publication of CN103116807B publication Critical patent/CN103116807B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to a functional area power distribution network refined planning method which is characterized by comprising the following steps: (1) confirming a capacity, a location and a power supply range of a high voltage transformer substation by means of collecting a functional area power grid network frame, a load and data of development needs; (2) conducting functional area high voltage power distribution network planning; (3) and conducting functional area medium voltage power distribution network refined planning. The functional area medium voltage power distribution network refined planning comprises the following steps: (1) establishing a typical interconnection structure of a small-scale high-voltage transformer substation; (2) building a functional area power grid transformer substation interconnected structure combined with a high voltage substation location and a power supply range; (3) building a functional area power grid medium voltage network frame scheme; (4) calculating a medium voltage feeder contact situation, and giving the wiring of medium voltage network frame. The functional area power distribution network refined planning method has the advantages of being reasonable in design, high in reliability, capable of saving construction costs, convenient to maintain and the like. In addition, according to the functional area power distribution network refined planning method; scientific evidence is provided for functional area power distribution network refined planning.

Description

A kind of functional areas power distribution network planing method that becomes more meticulous
Technical field
The invention belongs to the distribution network technical field, especially a kind of functional areas power distribution network planing method that becomes more meticulous.
Background technology
Urban distribution network refers to provide and distribute for it general name of electric power networks in city scope.Urban distribution network is the important component part of electric system, is again the load center of electric system, has that power consumption is large, load density is high, safe and reliable and power supply quality requirement high.One of important infrastructure that urban distribution network or urban modernization are built, it is built, transforms and economy and the security of operation had both affected the economic benefit of whole power department and the power supply quality of vast power consumer, has influence on again the normal performance of city allomeric function.According to electric pressure and the difference that plays a role in power supply process thereof, urban distribution network can be divided into power transmission network (220kV and more than), high voltage distribution network (110kV and 35kV), medium voltage distribution network (20kV and 10kV) and low-voltage network (380/220V) etc. usually, is included as simultaneously transformation facility and power generating equipment that they provide power supply.
Hence one can see that, and urban power distribution network is the main body of urban distribution network.Electrical network is the important step of electric energy transmitting in electric system, is the important leverage of effectively utilizing electric energy.Power distribution network is last ring that the user is arrived in electric system, and it and user's relation is the tightst, and is also direct on the impact of customer power supply reliability and power supply quality.In some Main Developed Countries, the proportion of electric grid investment in the electric power gross investment is generally all higher than 50%, and the power distribution network investment is not less than the power transmission network investment.And in China, due to for a long time formed " retransmit, light for, don't work " situation, distribution network construction is in the state of under-capitalization always.The ratio between investments of China's generating before late 1990s, transmission of electricity, distribution is approximately 1:0.21:0.12.Therefore, caused China's generating, transmission of electricity, distribution development to be coordinated not, power plant has electricity can not send, the user need again less than, and the loss of electrical network is high, voltage is low, the power supply unreliable, resist the ability of mishap and disaster a little less than, therefore, electrical network especially the structure of power distribution network weakness become electric system for the bottleneck of electricity consumption.
In recent years, along with deeply carrying out of Electric Power Network Planning work, the power distribution network facility is progressively sound, and distribution net work structure is tending towards rationally, and there has been considerable leap the aspects such as the power supply reliability of power distribution network, the quality of power supply, power supply economics.And along with the development of society, city planning is tending towards compartmentalization, and city function significantly promotes, and town and country looks development essence changes, and the international modernization general layout that shows unique characteristics basically forms.The center of gravity of city planning shifts to the city function section planning gradually, and urban power distribution network planning also requires to shift to the functional areas Electric Power Network Planning.Electrical network common scale in functional areas is less, the electric pressure that relates to and planning center of gravity mainly concentrate in the design of middle pressure network frame, and the planning that becomes more meticulous that how limited for area, distinct characteristics, the fritter urban power distribution network that possesses certain directive property function carry out middle-voltage network is problem in the urgent need to address at present.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, a kind of reasonable in design, functional areas power distribution network that reliability is high planing method that becomes more meticulous is provided.
The present invention solves its technical matters and takes following technical scheme to realize:
Power distribution network planing method that becomes more meticulous in a kind of functional areas comprises the following steps:
Step 1: by the data of collecting function district Net Frame of Electric Network, load and growth requirement, determine capacity, position and the service area of high voltage substation;
Step 2: carry out functional areas high-voltage distribution network planning;
Step 3: carry out the planning that becomes more meticulous of functional areas MV distribution systems, specifically comprise the following steps:
Step 3.1: set up the typical interconnect architecture of high voltage substation group on a small scale;
Step 3.2: layout and service area in conjunction with high voltage substation, constructing function district electricity grid substation interconnect architecture;
Step 3.3: pressure network frame scheme in constructing function district electrical network;
Step 3.4: press feeder line contact situation in calculating, provide the wiring of middle pressure network frame.
And the method that described step 2 is carried out the planning of functional areas high-voltage distribution networks is: the Connection Mode of employing and main wiring mode, set up the power supply of distribution substation in simple functional areas high pressure rack, planning function district.
And the method for described step 3.2 constructing function district electricity grid substation interconnect architecture is:
Step 3.2.1: transformer station in functional areas is set up interconnected in twos structure, successively every transformer station is become all the other transformer stations of traversal and sets up interconnecting relation;
Step 3.2.2: according to the unreasonable interconnecting relation of deletion principle, formation consists of blank contact interconnect architecture by reasonable interconnecting relation;
Step 3.2.3: according to the typical interconnect architecture of small-scale high voltage substation group, transformer station's blank contact interconnect architecture in functional areas is configured to and its most close typical structure a small amount of interconnecting relation by increasing or deleting.
And described deletion principle is:
Delete principle 1: transformer station's interconnecting relation of natural or artificial geographical barrier is crossed in deletion;
Delete principle 2: deletion surpasses critical distance transformer station interconnecting relation;
Delete principle 3: the interconnected transformer station sum that guarantees final arbitrary transformer station is no more than 4, if the interconnected transformer station number of certain transformer station exceeds, and the interconnecting relation that exceeds according to the deletion in turn from big to small of contact distance.
And in described step 3.3 constructing function district electrical network, the method for pressure network frame comprises the following steps:
Step 3.3.1: extract main transformer communication relationship matrix:
N seat transformer station is arranged in functional areas, to i seat station j main transformer renumber into, and will be labeled as the Ni ∑, get N ∑=N1+N2+ ... + Nn, the total number of units of main transformer in presentation function district;
Provide main transformer communication relationship matrix L Link:
L link = L 1,1 . . . L 1 , i . . . L 1 , N Σ . . . . . . . . . . . . . . . L i , 1 . . . L i , i . . . L i , N Σ . . . . . . . . . . . . . . . L N Σ , 1 . . . L N Σ , i . . . L N Σ , N Σ
L wherein i,jRepresent i platform main transformer and j platform main transformer communication relationship (i=1,2,3 ...,, j=1,2,3 ...), get L when communication relationship is arranged i,j=1, otherwise L i,j=0.And there is communication relationship between supposition main transformer and self, i.e. L i,i=1;
Step 3.3.2: analyze and get in touch with the unit power supply capacity:
In main transformer communication relationship matrix, by determining to have with i platform main transformer the main transformer maximum load situation of communication relationship in the capable vector of i, the contact unit maximum load rate matrix that represents of matrix definable following formula according to this:
T = T 1,1 . . . T 1 , i . . . T 1 , N Σ . . . . . . . . . . . . . . . T i , 1 . . . T i , i . . . T i , N Σ . . . . . . . . . . . . . . . T N Σ , 1 . . . T N Σ , i . . . T N Σ , N Σ
In formula:
T i , j = L i , j - ( 1 - Σ j = 1 N Σ L i , j R j - R i Σ j = 1 N Σ L i , j R j )
Step 3.3.3: calculate main transformer contact capacity requirement;
When definition main transformer load transition matrix represents main transformer " N-1 " verification, the load of interconnected main transformer turns the band situation, and main transformer load transition matrix is as shown in the formula definition:
Tr = Tr 1,1 . . . Tr 1 , i . . . Tr 1 , N Σ . . . . . . . . . . . . . . . Tr i , 1 . . . Tr i , i . . . Tr i , N Σ . . . . . . . . . . . . . . . Tr N Σ , 1 . . . Tr N Σ , i . . . Tr N Σ , N Σ
In formula:
Tr i,j=R j(1-T i,j)
Definition s I, jIt is the contact capacity requirement between i platform main transformer and j platform main transformer;
s i,j=s j,i=max(Tr j,i,Tr i,j)
Step 3.3.4: calculate between interconnected transformer station the demand contact and count;
Determine the Connection Mode of medium-voltage line, according to the line load rate requirement of different Connection Modes, calculate every circuit turn for the time available nargin, be shown below:
m=R l(1-t l)
In formula:
M---circuit turns the available nargin when supplying;
R l---the capacity of single line;
t l---the permission running load rate of single line, this numerical value is relevant with the Connection Mode that circuit adopts.
According to contact capacity requirement and circuit between transformer station turn for the time available nargin calculate connectivity number between the station that should set up between main transformer, computing method as shown in the formula:
c i , j = [ Tr i , j m + 1 ]
c inter ( z ) = Σ i = N z + 1 N z + 1 Σ j = 1 N Σ c i , j
In formula:
c I, j---the contact that needs between main transformer i and main transformer j is counted;
c Inter (z)---connectivity number between the z of transformer station total station.
Investigate the total outlet number of transformer station, remove connectivity number between the station, remaining circuit is set up contact in the station, and in standing, connectivity number utilizes following formula to calculate:
c inner ( z ) = N l - c iner ( z ) 2
In formula:
c Inner (z)---contact in the z of transformer station total station;
N l---the total outlet number of number transformer station.
Advantage of the present invention and good effect are:
The present invention is reasonable in design, it is after carrying out the analysis of addressing constant volume to high voltage substation, characteristics simple according to the functional areas electric network composition, utilizing the typical model theory to carry out the High-Voltage Network framework builds with the high voltage substation interconnect architecture and builds, typical model still all has more excellent character from the economy of equipment utilization from the security of operation of power networks, makes functional areas electrical network overall architecture be structured on higher basis; Pressure network frame contact scheme in proposing before middle pressure network frame wiring, middle pressure network frame contact scheme fully takes into account the performance of functional areas mains supply ability, for the power distribution network planning that becomes more meticulous in functional areas provides scientific basis, have reasonable in design, reliability is high, save construction cost and be convenient to the characteristics such as maintenance.
Description of drawings
Fig. 1 is process flow diagram of the present invention;
Fig. 2 is the typical interconnect architecture schematic diagram of small-scale high voltage substation group;
Fig. 3 is the structure process flow diagram of functional areas electricity grid substation interconnect architecture;
Fig. 4 is the main transformer contact structural representation of interconnected transformer station;
Fig. 5 is the addressing result schematic diagram of certain functional areas electricity grid substation;
Fig. 6 is the planning schematic diagram of certain functional areas high pressure rack;
Fig. 7 is the interconnect architecture schematic diagram of certain functional areas high voltage substation;
Fig. 8 is the planning schematic diagram of pressure network frame in certain functional areas.
Embodiment
Below in conjunction with accompanying drawing, the present invention is further described.
Power distribution network planing method that becomes more meticulous in a kind of functional areas as shown in Figure 1, comprises the following steps:
Step 1: by the data of collecting function district Net Frame of Electric Network, load and growth requirement, determine capacity, position and the service area of high voltage substation, the power distribution network planning that becomes more meticulous in functional areas puts before this and carries out;
Step 2: carry out functional areas high-voltage distribution network planning;
According to the requirement of reliability, Connection Mode and the main wiring mode of employing, set up simple functional areas high pressure rack, the power supply of the distribution substation in the planning function district is established in functional areas pressure network frame in transformer station the become more meticulous basis of planning;
Step 3: carry out the planning that becomes more meticulous of functional areas MV distribution systems:
Because functional areas electrical network scale is less, can be relatively simple for structure in the planning that becomes more meticulous of pressure network frame, with the security of guarantee operation of power networks and the economy of equipment utilization.The MV distribution systems planning step that becomes more meticulous is as follows:
Step 3.1: set up the typical interconnect architecture of high voltage substation group on a small scale, as the reference of high voltage substation interconnect scheme;
In this step, the typical interconnect architecture of small-scale high voltage substation group as shown in Figure 2.The small distribution network of functional areas can be applied mechanically typical interconnect architecture construction, and typical interconnect architecture still all has more excellent character from the economy of equipment utilization through proving from the security of operation of power networks.
Step 3.2: layout and service area in conjunction with high voltage substation, constructing function district electricity grid substation interconnect architecture, as shown in Figure 3, the method for constructing function district electricity grid substation interconnect architecture is:
Step 3.2.1: the complete interconnect scheme that builds transformer station in functional areas, namely transformer station in functional areas is set up interconnected in twos structure, successively every transformer station is become all the other transformer stations of traversal and sets up interconnecting relation, if n seat transformer station altogether in functional areas, should form Cn2 interconnecting relation after this step, such interconnect architecture is called get in touch with interconnect architecture fully;
Step 3.2.2: on the basis of getting in touch with interconnect architecture fully, according to the unreasonable interconnecting relation of some criterion deletion, the interconnect architecture that formation is made of reasonable interconnecting relation, such model is called blank contact interconnect architecture, deletes that the principle of interconnecting relation mainly limits, turns around geographic factor the restriction structure that supplies distance limit, reaches transformer station's degree;
In this step, delete that transformer station's interconnecting relation is the main part that functional areas electricity grid substation interconnect architecture builds.Delete that interconnecting relation carries out successively according to following principle:
Delete principle 1: unless special requirement is arranged, transformer station's interconnecting relation of natural or artificial geographical barrier is crossed in deletion.Geographical barrier mainly contains rivers, massif, some special scenic spot etc., and the problem such as crosses over that similar barrier may cause difficulty of construction greatly or engineering cost is higher should be avoided as far as possible.
Delete principle 2: unless special requirement is arranged, deletion surpasses critical distance transformer station interconnecting relation, the critical distance value is chosen as follows, if draft interconnected use overhead transmission line or overground cable hybrid power supply, interconnected critical distance is 4.03km; If draft the pure cable line of interconnected use, interconnected critical distance is 9.16km, critical distance take fault turn for the time feeder line terminal voltage qualified as according to and take into account certain buckling factor and calculate and get.
Delete principle 3: the interconnected transformer station sum that guarantees final arbitrary transformer station is no more than 4, in order to guarantee that the blank structure has the leeway of adjustment when typical structure is drawn close in step (3.2.3), here interconnected transformer station number preferably is controlled at below 3, if the interconnected transformer station number of certain transformer station exceeds, the interconnecting relation that exceeds according to the deletion in turn from big to small of contact distance.Can prove after interconnected transformer station number surpasses 4, the number of interconnection continues to promote the number of interconnection facilitation of power distribution network performance is weakened rapidly.
By above-mentioned steps, construct functional areas electricity grid substation interconnect architecture.
Step 3.2.3: on blank contact interconnect architecture basis, typical interconnect architecture according to small-scale high voltage substation group, by increasing or deleting a small amount of interconnecting relation, transformer station's blank contact interconnect architecture in functional areas is configured to and its most close typical structure, why want the blank construction for electricity to draw close to typical structure, because no matter find security, plant factor angle from power supply through computational analysis, or from economy, simple operation angle, typical structure all can reach the level of optimizing.
Step 3.3: giving full play to functional areas power distribution network power supply capacity as target, pressure network frame scheme in constructing function district electrical network, in constructing function district electrical network, the concrete grammar of pressure network frame is:
In order to bring into play the simple characteristic of functional areas dispatching of power netwoks, exist in step (3.2) and all adopt following connection form between the transformer station of interconnecting relation: any main transformer of transformer station is only got in touch with mutually with a wherein main transformer at offside station.Connection form such as Fig. 4.And specifically need how many bar feeder lines to get in touch with mutually between two main transformers, by following calculative determination:
Step 3.3.1: extract main transformer communication relationship matrix:
N seat transformer station is arranged in functional areas, to i seat station j main transformer renumber into, and will be labeled as the Ni ∑, get N ∑=N1+N2+ ... + Nn, the total number of units of main transformer in presentation function district;
Provide main transformer communication relationship matrix L Link:
L link = L 1,1 . . . L 1 , i . . . L 1 , N Σ . . . . . . . . . . . . . . . L i , 1 . . . L i , i . . . L i , N Σ . . . . . . . . . . . . . . . L N Σ , 1 . . . L N Σ , i . . . L N Σ , N Σ
L wherein I, jRepresent i platform main transformer and j platform main transformer communication relationship (i=1,2,3 ...,, j=1,2,3 ...), get L when communication relationship is arranged i,j=1, otherwise L i,j=0.And there is communication relationship between supposition main transformer and self, i.e. L I, i=1;
Step 3.3.2: analyze and get in touch with the unit power supply capacity:
In main transformer communication relationship matrix, by determining to have with i platform main transformer the main transformer maximum load situation of communication relationship in the capable vector of i, the contact unit maximum load rate matrix that represents of matrix definable following formula according to this:
T = T 1,1 . . . T 1 , i . . . T 1 , N Σ . . . . . . . . . . . . . . . T i , 1 . . . T i , i . . . T i , N Σ . . . . . . . . . . . . . . . T N Σ , 1 . . . T N Σ , i . . . T N Σ , N Σ
In formula:
T i , j = L i , j - ( 1 - Σ j = 1 N Σ L i , j R j - R i Σ j = 1 N Σ L i , j R j )
Step 3.3.3: calculate main transformer contact capacity requirement;
When definition main transformer load transition matrix represents main transformer " N-1 " verification, the load of interconnected main transformer turns the band situation, and main transformer load transition matrix is as shown in the formula definition:
Tr = Tr 1,1 . . . Tr 1 , i . . . Tr 1 , N Σ . . . . . . . . . . . . . . . Tr i , 1 . . . Tr i , i . . . Tr i , N Σ . . . . . . . . . . . . . . . Tr N Σ , 1 . . . Tr N Σ , i . . . Tr N Σ , N Σ
In formula:
Tr i,j=R j(1-T i,j)
Definition s I, jIt is the contact capacity requirement between i platform main transformer and j platform main transformer;
s i,j=s j,i=max(Tr j,i,Tr i,j)
Step 3.3.4: calculate between interconnected transformer station the demand contact and count;
Determine the Connection Mode of medium-voltage line, according to the line load rate requirement of different Connection Modes, calculate every circuit turn for the time available nargin, be shown below:
m=R l(1-t l)
In formula:
M---circuit turns the available nargin when supplying;
R l---the capacity of single line;
t l---the permission running load rate of single line, this numerical value is relevant with the Connection Mode that circuit adopts.
According to contact capacity requirement and circuit between transformer station turn for the time available nargin calculate connectivity number between the station that should set up between main transformer, computing method as shown in the formula:
c i , j = [ Tr i , j m + 1 ]
c inter ( z ) = Σ i = N z + 1 N z + 1 Σ j = 1 N Σ c i , j
In formula:
c I, j---the contact that needs between main transformer i and main transformer j is counted;
c Inter (z)---connectivity number between the z of transformer station total station.
Investigate the total outlet number of transformer station, remove connectivity number between the station, remaining circuit is set up contact in the station, and in standing, connectivity number utilizes following formula to calculate:
c inner ( z ) = N l - c iner ( z ) 2
In formula:
c Inner (z)---contact in the z of transformer station total station;
N l---the total outlet number of number transformer station.
Step 3.4: press feeder line contact situation in calculating, provide the wiring of middle pressure network frame
Press the middle pressure feeder line contact situation that calculates in feeder line situation and above-mentioned steps 3.3 in this step basis, provide the wiring of middle pressure network frame.
The below plans its following electrical network according to the method that the present invention proposes take a certain " industry park " functional areas electrical network as example.
(1) load prediction and Substation Optimization
Adopt traditional load and Substation Optimization method, the result of load prediction and Substation Optimization as shown in Figure 5.
(2) high pressure rack planning
Functional areas electrical network scale is less, is 2 110kV transformer station power supplies in functional areas by 1 220kV transformer station outside functional areas as the high-voltage power supply of functional areas.According to the substation location structure, contrast typical wiring mode construction simple functional areas high pressure rack is established functional areas electrical network the become more meticulous basis of planning, intends adopting the double T wiring construction, and high pressure rack program results as shown in Figure 6.
(3) pressure network frame planning in
This step and traditional distribution network planning are different, and the capacity-load ratio that traditional distribution network planning utilization is estimated limits transformer station's load supply, and rough estimating makes equipment sparing too much, affects the economy that distribution network construction moves; And the present invention reduces the reservation of equipment sparing by the ability of more accurately grasping the medium-voltage line transfer load, improves functional areas power grid construction economy.At first planning determine the whole interconnect scheme of transformer station in functional areas by contrasting typical transformer station interconnect architecture; And then shift the demand of capacity between accurate Calculation interconnected transformer station; Press the contact scheme during the circuit model that last basis is selected and medium-voltage line connection type calculate, press the wiring diagram of feeder line in formation.
(3.1) high voltage substation interconnect architecture
At first will be for better simply substation location in functional areas, contrast some and build the interconnected whole strategy of substation low-voltage side through what prove than Optimizing Mode, only has two, 110kV transformer station in functional areas, at first form interconnected transformer station's interconnect architecture fully, interconnected transformer station spacing satisfies the requirement of deleting principle 1 and 2 in step (3.2), and the number of interconnection of every transformer station is 1.Contrast typical interconnect architecture, with Fig. 2 in the typical interconnect architecture of 2 transformer stations match, can be used as the interconnected ordering plan of substation low-voltage side, as shown in Figure 7.
(3.2) press the contact capacity requirement to calculate in
On transformer station's interconnect architecture basis, functional areas of determining in last step, the main transformer low-pressure side adopts contact scheme shown in Figure 3, according to the contact capacity requirement between the formula calculating main transformer of step (3.3.1) to (3.3.3), result of calculation such as table 1 and table 2.
Table 1 110kV transformer station table
Figure BDA00002568483300121
Press contact capacity requirement table in table 2
Figure BDA00002568483300122
(3.3) press in and get in touch with the calculating of counting
According to the contact capacity requirement in table 2, can calculate contact in how many strip adoptions of substation low-voltage side outlet stations, contact (for guaranteeing the power distribution network Operation safety, not advising adopting the radial line power supply) between how many strip adoptions stations.The 10kV medium-voltage line adopts YJV22-3 * 300, and current carrying capacity of conductor is 552A, and circuit capacity is 9.56MVA, and the unified simply connected network mode of connection that adopts of medium-voltage line is according to the formula in step (3.3.4), result of calculation such as table 3.
Pressure network frame Policy Table in table 3
(3.4) press the feeder line wiring in
According to above computational analysis, provide middle compress line situation, as shown in Figure 8.
Permission load factor such as following table 4 that the grid structure main transformer that builds according to the present invention moves.
The table 4 main transformer running load rate table of comparisons
Can find out, because the functional areas electric network composition is simple, a small amount of transformer station is easy to build with reference to typical module the one-piece construction of high pressure rack and middle pressure network frame, is easy to simultaneously the calculating that becomes more meticulous of centering pressure network frame.The present invention determines height, middle pressure network shelf structure by medelling and becomes more meticulous to press the contact scheme in calculating, and makes the contact of middle pressure network frame build reasonable, in the economy that guarantees to improve on the security basis of operation of power networks the power grid construction O﹠M.
It is emphasized that; embodiment of the present invention is illustrative; rather than determinate; therefore the present invention includes and be not limited to the embodiment described in embodiment; every other embodiments that drawn by those skilled in the art's technical scheme according to the present invention belong to the scope of protection of the invention equally.

Claims (5)

1. functional areas power distribution network planing method that becomes more meticulous is characterized in that: comprise the following steps:
Step 1: by the data of collecting function district Net Frame of Electric Network, load and growth requirement, determine capacity, position and the service area of high voltage substation;
Step 2: carry out functional areas high-voltage distribution network planning;
Step 3: carry out the planning that becomes more meticulous of functional areas MV distribution systems, specifically comprise the following steps:
Step 3.1: set up the typical interconnect architecture of high voltage substation group on a small scale;
Step 3.2: layout and service area in conjunction with high voltage substation, constructing function district electricity grid substation interconnect architecture;
Step 3.3: pressure network frame scheme in constructing function district electrical network;
Step 3.4: press feeder line contact situation in calculating, provide the wiring of middle pressure network frame.
2. a kind of functional areas according to claim 1 power distribution network planing method that becomes more meticulous, it is characterized in that: the method that described step 2 is carried out the planning of functional areas high-voltage distribution networks is: the Connection Mode of employing and main wiring mode, set up the power supply of distribution substation in simple functional areas high pressure rack, planning function district.
3. a kind of functional areas according to claim 1 power distribution network planing method that becomes more meticulous is characterized in that: the method for described step 3.2 constructing function district electricity grid substation interconnect architecture is:
Step 3.2.1: transformer station in functional areas is set up interconnected in twos structure, successively every transformer station is become all the other transformer stations of traversal and sets up interconnecting relation;
Step 3.2.2: according to the unreasonable interconnecting relation of deletion principle, formation consists of blank contact interconnect architecture by reasonable interconnecting relation;
Step 3.2.3: according to the typical interconnect architecture of small-scale high voltage substation group, transformer station's blank contact interconnect architecture in functional areas is configured to and its most close typical structure a small amount of interconnecting relation by increasing or deleting.
4. a kind of functional areas according to claim 3 power distribution network planing method that becomes more meticulous, it is characterized in that: described deletion principle is:
Delete principle 1: transformer station's interconnecting relation of natural or artificial geographical barrier is crossed in deletion;
Delete principle 2: deletion surpasses critical distance transformer station interconnecting relation;
Delete principle 3: the interconnected transformer station sum that guarantees final arbitrary transformer station is no more than 4, if the interconnected transformer station number of certain transformer station exceeds, and the interconnecting relation that exceeds according to the deletion in turn from big to small of contact distance.
5. a kind of functional areas according to claim 1 power distribution network planing method that becomes more meticulous is characterized in that: in described step 3.3 constructing function district electrical network, the method for pressure network frame comprises the following steps:
Step 3.3.1: extract main transformer communication relationship matrix:
N seat transformer station is arranged in functional areas, to i seat station j main transformer renumber into, and will be labeled as the Ni ∑, get N ∑=N1+N2+ ... + Nn, the total number of units of main transformer in presentation function district;
Provide main transformer communication relationship matrix L Link:
L link = L 1,1 . . . L 1 , i . . . L 1 , N Σ . . . . . . . . . . . . . . . L i , 1 . . . L i , i . . . L i , N Σ . . . . . . . . . . . . . . . L N Σ , 1 . . . L N Σ , i . . . L N Σ , N Σ
L wherein i,jRepresent i platform main transformer and j platform main transformer communication relationship (i=1,2,3 ...,, j=1,2,3 ...), get L when communication relationship is arranged i,j=1, otherwise L I, j=0.And there is communication relationship between supposition main transformer and self, i.e. L I, i=1;
Step 3.3.2: analyze and get in touch with the unit power supply capacity:
In main transformer communication relationship matrix, by determining to have with i platform main transformer the main transformer maximum load situation of communication relationship in the capable vector of i, the contact unit maximum load rate matrix that represents of matrix definable following formula according to this:
T = T 1,1 . . . T 1 , i . . . T 1 , N Σ . . . . . . . . . . . . . . . T i , 1 . . . T i , i . . . T i , N Σ . . . . . . . . . . . . . . . T N Σ , 1 . . . T N Σ , i . . . T N Σ , N Σ
In formula:
T i , j = L i , j - ( 1 - Σ j = 1 N Σ L i , j R j - R i Σ j = 1 N Σ L i , j R j )
Step 3.3.3: calculate main transformer contact capacity requirement;
When definition main transformer load transition matrix represents main transformer " N-1 " verification, the load of interconnected main transformer turns the band situation, and main transformer load transition matrix is as shown in the formula definition:
Tr = Tr 1,1 . . . Tr 1 , i . . . Tr 1 , N Σ . . . . . . . . . . . . . . . Tr i , 1 . . . Tr i , i . . . Tr i , N Σ . . . . . . . . . . . . . . . Tr N Σ , 1 . . . Tr N Σ , i . . . Tr N Σ , N Σ
In formula:
Tr i,j=R j(1-T i,j)
Definition s I, jIt is the contact capacity requirement between i platform main transformer and j platform main transformer;
s i,j=s j,i=max(Tr j,i,Tr i,j)
Step 3.3.4: calculate between interconnected transformer station the demand contact and count;
Determine the Connection Mode of medium-voltage line, according to the line load rate requirement of different Connection Modes, calculate every circuit turn for the time available nargin, be shown below:
m=R l(1-t l)
In formula:
M---circuit turns the available nargin when supplying;
R l---the capacity of single line;
t l---the permission running load rate of single line, this numerical value is relevant with the Connection Mode that circuit adopts.
According to contact capacity requirement and circuit between transformer station turn for the time available nargin calculate connectivity number between the station that should set up between main transformer, computing method as shown in the formula:
c i , j = [ Tr i , j m + 1 ]
c inter ( z ) = Σ i = N z + 1 N z + 1 Σ j = 1 N Σ c i , j
In formula:
c I, j---the contact that needs between main transformer i and main transformer j is counted;
c Inter (z)---connectivity number between the z of transformer station total station.
Investigate the total outlet number of transformer station, remove connectivity number between the station, remaining circuit is set up contact in the station, and in standing, connectivity number utilizes following formula to calculate:
c inner ( z ) = N l - c iner ( z ) 2
In formula:
c Inner (z)---contact in the z of transformer station total station;
N l---the total outlet number of number transformer station.
CN201210534771.XA 2012-12-12 2012-12-12 A kind of functional areas power distribution network becomes more meticulous planing method Active CN103116807B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210534771.XA CN103116807B (en) 2012-12-12 2012-12-12 A kind of functional areas power distribution network becomes more meticulous planing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210534771.XA CN103116807B (en) 2012-12-12 2012-12-12 A kind of functional areas power distribution network becomes more meticulous planing method

Publications (2)

Publication Number Publication Date
CN103116807A true CN103116807A (en) 2013-05-22
CN103116807B CN103116807B (en) 2016-03-02

Family

ID=48415176

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210534771.XA Active CN103116807B (en) 2012-12-12 2012-12-12 A kind of functional areas power distribution network becomes more meticulous planing method

Country Status (1)

Country Link
CN (1) CN103116807B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104036343A (en) * 2014-05-12 2014-09-10 广东电网公司电网规划研究中心 Power grid planning method based on multi-core grid construction mode
CN104538959A (en) * 2015-01-06 2015-04-22 国家电网公司 Method for assessing high voltage distribution network load transfer capacity
CN104537580A (en) * 2015-01-27 2015-04-22 四川大学 Method for constructing power distribution network frame based on K-means cluster
CN104766140A (en) * 2015-04-15 2015-07-08 国家电网公司 Layered and segmented modularized power grid scheduling method
CN104809582A (en) * 2015-05-05 2015-07-29 国家电网公司 Power distribution network coordinated planning method considering load transfer channel
CN104881822A (en) * 2015-06-29 2015-09-02 国家电网公司 Evaluation method, device and system
CN105303259A (en) * 2015-11-06 2016-02-03 国网上海市电力公司 Gridding concept based power distribution network planning management method
CN106651129A (en) * 2016-11-16 2017-05-10 合肥普望电子有限责任公司 City power grid operation planning method
CN109661141A (en) * 2018-12-28 2019-04-19 中国能源建设集团广东省电力设计研究院有限公司 Data center's infrastructure management system
CN111952963A (en) * 2020-07-31 2020-11-17 国网陕西省电力公司经济技术研究院 Construction area power distribution network fine planning method
CN112598299A (en) * 2020-12-25 2021-04-02 国网陕西省电力公司经济技术研究院 Load center 750 kV power supply area combined power supply grid structure mode construction method
CN113049919A (en) * 2021-03-23 2021-06-29 绍兴大明电力设计院有限公司 Method and system for identifying diversity of medium-voltage feeder line power supply load characteristics
CN113451930A (en) * 2021-07-27 2021-09-28 广东电网有限责任公司 Electrical design method and design device for 110kV transformer substation in industrial park

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050209906A1 (en) * 2002-04-30 2005-09-22 Bayoumi Deia S Distribution/power transformers customer support, tracking problems and recalls

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050209906A1 (en) * 2002-04-30 2005-09-22 Bayoumi Deia S Distribution/power transformers customer support, tracking problems and recalls

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
冯涛等: "计算机辅助决策***在电网规划中的应用", 《黑龙江电力》, vol. 27, no. 2, 30 April 2005 (2005-04-30) *
朱凤娟: "中压配电网规划实用方法研究", 《万方学位论文》, 30 November 2012 (2012-11-30), pages 41 - 57 *
杨明海等: "中压配电***供电模型研究", 《北京师范大学学报(自然科学版)》, vol. 47, no. 4, 21 April 2011 (2011-04-21), pages 382 - 386 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104036343B (en) * 2014-05-12 2017-06-06 广东电网公司电网规划研究中心 A kind of Electric power network planning method based on multi-core construction network mode
CN104036343A (en) * 2014-05-12 2014-09-10 广东电网公司电网规划研究中心 Power grid planning method based on multi-core grid construction mode
CN104538959A (en) * 2015-01-06 2015-04-22 国家电网公司 Method for assessing high voltage distribution network load transfer capacity
CN104537580A (en) * 2015-01-27 2015-04-22 四川大学 Method for constructing power distribution network frame based on K-means cluster
CN104537580B (en) * 2015-01-27 2018-04-17 四川大学 The construction method of distribution network structure based on K means clusters
CN104766140A (en) * 2015-04-15 2015-07-08 国家电网公司 Layered and segmented modularized power grid scheduling method
CN104809582A (en) * 2015-05-05 2015-07-29 国家电网公司 Power distribution network coordinated planning method considering load transfer channel
CN104809582B (en) * 2015-05-05 2018-03-13 国家电网公司 A kind of power distribution network coordinated planning method for considering load transfering channel
CN104881822A (en) * 2015-06-29 2015-09-02 国家电网公司 Evaluation method, device and system
CN105303259A (en) * 2015-11-06 2016-02-03 国网上海市电力公司 Gridding concept based power distribution network planning management method
CN106651129A (en) * 2016-11-16 2017-05-10 合肥普望电子有限责任公司 City power grid operation planning method
CN109661141A (en) * 2018-12-28 2019-04-19 中国能源建设集团广东省电力设计研究院有限公司 Data center's infrastructure management system
CN111952963A (en) * 2020-07-31 2020-11-17 国网陕西省电力公司经济技术研究院 Construction area power distribution network fine planning method
CN112598299A (en) * 2020-12-25 2021-04-02 国网陕西省电力公司经济技术研究院 Load center 750 kV power supply area combined power supply grid structure mode construction method
CN112598299B (en) * 2020-12-25 2023-08-18 国网陕西省电力公司经济技术研究院 Combined power supply grid pattern construction method for 750 kilovolt power supply area of load center
CN113049919A (en) * 2021-03-23 2021-06-29 绍兴大明电力设计院有限公司 Method and system for identifying diversity of medium-voltage feeder line power supply load characteristics
CN113451930A (en) * 2021-07-27 2021-09-28 广东电网有限责任公司 Electrical design method and design device for 110kV transformer substation in industrial park

Also Published As

Publication number Publication date
CN103116807B (en) 2016-03-02

Similar Documents

Publication Publication Date Title
CN103116807B (en) A kind of functional areas power distribution network becomes more meticulous planing method
Jia et al. Optimal siting and sizing of electric vehicle charging stations
CN102360475B (en) Comprehensive evaluation method for coordination of power supply capacity of urban power transmission and distribution network
CN103049646B (en) The integrated risk appraisal procedure that a kind of electrical network 500kV one-end substation is built
CN105205611A (en) Mesh generation method for power distribution network meshing planning
CN103646286A (en) Data processing method for estimating efficiency of intelligent distribution network
CN105096019B (en) Provincial power grid layered and partitioned typical power supply mode planning method
CN104281736B (en) A kind of selection method of urban track traffic traction power supply-distribution system service cable
WO2023024369A1 (en) Power distribution network power supply reliability assessment method based on digital twin, and device and medium
CN103295167B (en) Residential quarter charging electric vehicle facilities planning method
CN109191009A (en) A kind of method and system of pair of distribution net gridding programme comprehensive assessment
CN105760971A (en) Urban power grid structure optimization method based on reliability comparative analysis
CN111489040B (en) Voltage sequence comprehensive evaluation method based on optimal combination weighting
Liu et al. Practical automatic planning for MV distribution network considering complementation of load characteristic and power supply unit partitioning
CN105514987A (en) 10kV distribution circuit distributed photovoltaic constant volume method and system
CN108665133A (en) A kind of construction method and system of distribution system operational efficiency evaluation model
CN112052601B (en) Optimal fraction radar chart-based power transmission and distribution network voltage sequence optimization method
CN105373893A (en) Scheduling automation system model definition assistant decision-making and risk assessment method
CN110690700B (en) Energy internet planning method based on mixed integer planning
CN104393594B (en) Analytical calculation method for medium voltage network flow of urban rail transit
CN109002938B (en) Double-layer planning method for alternating current-direct current hybrid power distribution network considering N-1 safety criterion
CN104166767B (en) A kind of method that transformer zero sequence test data is converted into calculating Zero sequence parameter
CN105656037B (en) The integrated safe method of calibration of high pressure power distribution network
Zhou et al. Mesh planning optimization for urban distribution network with high reliability
CN108599150A (en) Power distribution network Cost/Benefit Analysis for extensive electric vehicle access area

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant