Water heater
Technical field
The present invention relates to water heater, particularly relate to electric water heater.
Background technology
Water heater has been that the furniture indispensability is electric, and water heater has gas water heater, electric heater, solar water heater etc. usually.
The mode of heating of water heater and electric heater is instant heating, just begins when namely the user need to use hot water to heat up water.
The heater switch of water heater normally judges according to the water velocity of hot-water line, when water velocity reaches pre-set threshold value, understands trigger switch, opens heating function.
In use, in water heater, tap all can have a segment distance, after each user's closed tap, hot-water line to the water between water heater or heat, caused the waste of hot water, and if this moment open tap emit the inside hot water, water heater can restart again heating function, this section hot water always exists, and causes the waste of the energy.
Summary of the invention
Based on this, be necessary to provide a kind of energy-saving water heater.
A kind of water heater comprises: water inlet pipe, and water flow switch, heater, outlet pipe and time delay module,
Described water inlet pipe, described heater and described outlet pipe are communicated with successively, described water flow switch and described water inlet pipe be connected heater and be connected, described time delay module is connected with described water flow switch, described time delay module is connected with described water flow switch;
Described heater is used for the heating of water;
Described current Ka Guan is used for starting described heater when water flow velocity reaches pre-set threshold value, during lower than pre-set threshold value, closes described heater;
Described time delay module is used for beginning timing when described water flow switch closing motion, when described water flow switch opening action, and zero clearing;
Described current Ka Guan is used for after closing, and when water flow velocity reaches pre-set threshold value and described time delay module timing and reaches Preset Time, starts described heater.
In one of them embodiment, described Preset Time is 2 seconds.
In one of them embodiment, described water inlet pipe is used for being communicated with running water pipe.
In one of them embodiment, described outlet pipe is used for being communicated with tap.
So, just define water heater and close the rear time interval that starts to next time at every turn, the user in the process of putting hot water, closed tap, the tap of then fetching boiling water immediately, therefore this time difference does not reach Preset Time, at this moment water flow switch can not start heater, and has discharged residual hot water in pipeline, just can not waste hot water yet, Comparatively speaking, also energy savings more just.
Description of drawings
Fig. 1 is the functional block diagram of the water heater of an embodiment.
The specific embodiment
As shown in Figure 1, it is the functional block diagram of the water heater 10 of an embodiment, comprising: water inlet pipe 101, water flow switch 102, heater 103, outlet pipe 104 and time delay module 105.
Water inlet pipe 101, heater 103 and outlet pipe 104 are communicated with successively, and water flow switch 102 is connected with heater with water inlet pipe 101 and is connected.Described time delay module 105 is connected with water flow switch 102.
Time delay module 105 is connected with water flow switch 102.
Described water inlet pipe 101 is used for being communicated with running water pipe.
Described outlet pipe 104 is used for being communicated with tap.
Described heater 103 is used for the heating of water, and it can be the gas-fired heating, can be also electric heating.
Described current card closes 102 and is used for starting described heater 103 when water flow velocity reaches pre-set threshold value, during lower than pre-set threshold value, closes described heater 103.
Described time delay module 105 is used for beginning timing when described water flow switch 102 closing motion, when described water flow switch 102 opening action, and zero clearing.
Described current card closes 102 and also is used for after closing, and when water flow velocity reaches pre-set threshold value and 105 timing of described time delay module and reaches Preset Time, starts described heater 103.
In the present embodiment, described Preset Time is 2 seconds.
So, just define water heater 10 and close the rear time interval that starts to next time at every turn, the user in the process of putting hot water, closed tap, the tap of then fetching boiling water immediately, therefore this time difference does not reach Preset Time, at this moment water flow switch 102 can not start heater 103, and has discharged residual hot water in pipeline, just can not waste hot water yet, Comparatively speaking, also energy savings more just.
In other embodiment, described water flow switch 102 also can change into and being connected on outlet pipe 104.
The above embodiment has only expressed several embodiment of the present invention, and it describes comparatively concrete and detailed, but can not therefore be interpreted as the restriction to the scope of the claims of the present invention.Should be pointed out that for the person of ordinary skill of the art, without departing from the inventive concept of the premise, can also make some distortion and improvement, these all belong to protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be as the criterion with claims.