CN103103972A - Prefabricate type nautical fixed platform and installing method - Google Patents

Prefabricate type nautical fixed platform and installing method Download PDF

Info

Publication number
CN103103972A
CN103103972A CN2013100468905A CN201310046890A CN103103972A CN 103103972 A CN103103972 A CN 103103972A CN 2013100468905 A CN2013100468905 A CN 2013100468905A CN 201310046890 A CN201310046890 A CN 201310046890A CN 103103972 A CN103103972 A CN 103103972A
Authority
CN
China
Prior art keywords
main body
gravel
prefabricate
prefabricated
fixed offshore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100468905A
Other languages
Chinese (zh)
Other versions
CN103103972B (en
Inventor
丁桦
盛国强
沈正
郑瑞芸
续珍立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Industry Technology Chinese Academy of Sciences
China Road and Bridge Corp
Original Assignee
Institute of Industry Technology Guangzhou of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Industry Technology Guangzhou of CAS filed Critical Institute of Industry Technology Guangzhou of CAS
Priority to CN201310046890.5A priority Critical patent/CN103103972B/en
Publication of CN103103972A publication Critical patent/CN103103972A/en
Priority to PCT/CN2014/070734 priority patent/WO2014121684A1/en
Application granted granted Critical
Publication of CN103103972B publication Critical patent/CN103103972B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/04Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a prefabricate type nautical fixed platform and an installing method. The prefabricate type nautical fixed platform and the installing method comprises following steps: 1) a temporary locating step: atoll bulging rocks can be used as a fulcrum, and a winding machine can be used for dragging a platform main body to a construction preinstallion position in a high tide level. A low tide level and a method of injecting water into a ballasting cabin can be used for contacting the bottom of the main body to a surface of a foundation, and locating piles are used for temporarily fixing the main body on the foundation. 2) A sinking leveling step: length that each locating pile extends out of the bottom of the main body can be controlled, and positions and levelness of the bottom of the main body can be adjusted. 3) A sinking fixing step: gravels which are in a gravel cabin can be discharged through a gravel channel to fill gaps between the surface of foundation and the bottom of the main body. Fixing of the prefabricate type nautical fixed platform can be completed. The prefabricate type nautical fixed platform and the installing method has the advantages of being stable in main body structure and low in manufacture cost. The function is easy to level. The prefabricate type nautical fixed platform and the installing method is high in planeness, accurate in fixing location and capable of being installed on the atolls or submerged rocks or sandy beaches. The prefabricate type nautical fixed platform is easy to construct and stable in fixing.

Description

Prefabricated fixed offshore platform and mounting method
Technical field
The present invention relates to a kind of offshore platform technology, especially relate to fixed offshore platform and the mounting method thereof that can be laid in fast on islands and reefs, submerged reef and sandy beach.
Background technology
Along with to constantly the carrying out of ocean exploitation, operating personnel and equipment need to be done long stop near off-lying sea or islands and reefs, therefore need to build fixed job platform or supply platform.Common job practices comprises two kinds, the first is chinampa platform or the caisson platform that sets in advance steel work, tow to operation place by towboat, the chinampa platform is fixed on the sea with ship anchor mooring or piling mode, the caisson platform sinks to the bottom with the half latent end mode of sitting, and then builds operation or the required superstructure of supply on the platform that surfaces.The chinampa platform of this steel work or the construction schedule of caisson platform are long, and investment is large, and the chinampa platform needs certain depth of water fixedly the time, can not directly be fixed on islands and reefs or sandy beach, and poor stability carries out the difficulty of construction that marine mooring or piling fixes high; And complicated operation at the bottom of the seat of caisson platform, the difficulty of construction of ground levelling is high.Another kind of job practices is to be transported to the construction plant with building required constructional materials and the equipment of job platform by tender, directly carry out at the scene foundation dredging and construct, then carry out concreting or steel work setting on ground, the construction of fulfil assignment platform or supply platform.This mode can cause irreversible destruction to the marine environment of job site, and the impact of work progress climate is larger, and the transportation of constructional materials is more difficult in addition, causes building cycle long, and cost is high.
Summary of the invention
The purpose of this invention is to provide a kind of prefabricated fixed offshore platform of can fast construction, being fixedly installed fast.
Another object of the present invention is to provide a kind of mounting method of prefabricated fixed offshore platform.
Technical solution of the present invention is: a kind of prefabricated fixed offshore platform, comprise prefabricated main platform body, separate by bulkhead in described main body and be provided with several watertight compartments, ballast tank and gravel cabin, wherein ballast tank is positioned at the bottom of described main body, watertight compartment is positioned at above ballast tank, gravel bilge section is provided with the gravel passage that is interlinked to the outside with described main body, be respectively equipped with several positioners along described body peripheral edge, be respectively equipped with on each positioner and can extend downward the outer guide pile of described bottom part body.
The agent structure of platform can be made by prefabrication system, its inner space is separated into a plurality of ballast tanks, watertight compartment and gravel cabin with bulkhead, watertight compartment can be used for loading fresh water, fuel oil or equipment, ballast tank is hollow cavity before towing, can provide sail required buoyancy, during installation, can be to water filling in ballast tank, main body is sunk to the bottom, use as fixed platform.Be used for depositing the gravel that smooth filling ground is used in the gravel cabin, can be before towing load gravel in the gravel cabin, also can be when main body is installed load gravel again in the gravel cabin.Positioner is along the body peripheral edge setting, outside guide pile extends bottom part body and when inserting ground, can support main body is liftoff, keep the gap between bottom part body and ground, be used for filling the gravel levelling, when main body sank to the bottom, guide pile can also play the positioning and guiding effect, after the main platform body installation, guide pile can also play the effect of slide.Levelling ground fast, main platform body sinks to the bottom accurate positioning, and fast and easy is arranged on islands and reefs, submerged reef or sandy beach, easy construction, fixation.
Be provided with the preformed hole of some perforations on described main body, suction pile be set in preformed hole or suppress stake.Squeeze into suction pile or suppress stake in ground by preformed hole, main body more firmly is fixed on ground, especially be adapted at using on soft foundation.
Described positioner is provided with to be adjusted described guide pile bottom and extends the conditioning equipment of described bottom part body length.Adjust by conditioning equipment the height that guide pile extends bottom part body, play the effect of adjusting main body and ground gap, make main body remain level.
Described gravel passage in described bottom part body is broadening formation.Facilitate gravel to be scattered to periphery, increase the contact area of layer of gravel and bottom part body.
Described main body is reinforced concrete prefabricated structure.Moulding is fast, and the engineering time is short, low cost of manufacture.
Another technical solution of the present invention is: a kind of mounting method of prefabricated fixed offshore platform, 1), interim positioning step it comprises the following steps:: utilize islands and reefs projection reef as fulcrum, main platform body is towed to the construction predeterminated position by hoist engine when the high water mark, utilize low tide or the method for water filling in ballast tank, make bottom part body primary surface contiguously; By guide pile, main body is temporarily fixed on ground; 2), sink to the bottom the leveling step: control the length that each guide pile extends bottom part body, adjust position and levelness that main body is sat the end; 3), sink to the bottom fixing step: the gravel in the gravel cabin is discharged by the gravel passage, fill space between foundation surface and bottom part body, complete the fixing of prefabricated fixed offshore platform.
main platform body is towed on the construction predeterminated position, first water filling in the ballast tank, make its bottom part body primary surface contiguously, then adjust by positioner the length that each guide pile extends, make main body maintenance level, and be adjusted on suitable position, can there be the gap in subregion between foundation surface and bottom part body at this moment, open the gravel hatch door on the relevant position, gravel is discharged along the gravel passage, fill the space between foundation surface and bottom part body, realize the levelling of ground, simultaneously with stable being supported on foundation surface of main platform body, realized fixing fast.In construction, levelling ground fast, main platform body sinks to the bottom accurate positioning, conveniently is arranged on islands and reefs, submerged reef or sandy beach easy construction, fixation.
In sinking to the bottom fixing step, also comprise the step that layer of gravel is flattened by vibration or local explosion method.Play the effect of closely knit ground, stability fundamental position.
In sinking to the bottom fixing step, also comprise in preformed hole suction pile being set or suppressing the step that stake is fixed.By suction pile being set or suppressing stake, main body more firmly is fixed on ground, the environment that is applicable to construct on soft foundation.
Before described interim positioning step, also comprise the step with coral sand pretreatment ground.When the foundation surface planeness is relatively poor, with coral sand pretreatment ground, adjust the planeness of foundation surface, facilitate the steadily fixing of main platform body.
Before described interim positioning step, also comprise the step with the accurate Ground Treatment of blast mode.When the ground bearing capacity is weak, by the blast mode, ground is carried out closely knitly, be conducive to the fixing stability of main platform body.
Advantage of the present invention is: agent structure is firm, low cost of manufacture, and the ground levelling is easy, and planeness is high, sinks to the bottom stationary positioned accurate, and fast and easy is arranged on islands and reefs, submerged reef or sandy beach, and construction is easy, fixation.
Description of drawings
Accompanying drawing 1 is the structural representation of the embodiment of the present invention;
Accompanying drawing 2 be in Fig. 1 A-A to sectional view;
Accompanying drawing 3 be in Fig. 1 B-B to sectional view;
Accompanying drawing 4 is the enlarged drawing of C section in Fig. 2;
Accompanying drawing 5 is the fixed form schematic diagram of the embodiment of the present invention;
1, main body, 2, bulkhead, 3, ballast tank, 4, watertight compartment, 5, the gravel cabin, 6, the gravel passage, 7, stake hole, 8, guide pile, 9, fixed leg, 10, binding clasp, 11, pulley, 12, wirerope, 13, inlet valve, 14, gravel, 15, ground, 16, preformed hole, 17, connecting portion, 18, suction pile.
The specific embodiment
Embodiment:
consult Fig. 1-4, be a kind of prefabricated fixed offshore platform, comprise prefabricated main platform body 1, separate by bulkhead 2 in main body 1 and be provided with several watertight compartments 4, ballast tank 3 and gravel cabin 5 and preformed hole 16, wherein ballast tank 3 is positioned at the bottom of main body 1, watertight compartment 4 is positioned at the top of ballast tank 3, 5 bottoms, gravel cabin are provided with the gravel passage 6 that is broadening formation that is interlinked to the outside with main body 1, be respectively equipped with several positioners along main body 1 periphery, comprise on each positioner that the guide pile 8 and the capable of regulating guide pile 8 that may extend to outside main body 1 bottom extend the conditioning equipment of main body 1 bottom lengths, this conditioning equipment comprises the stake hole 7 that is arranged on main body 1, pulley 11, wirerope 12 and be arranged on fixed leg 9 and binding clasp 10 on 7 both sides, the top platforms of a hole, guide pile 8 can be along stake hole 7 slips, pulley 11 is arranged on the top of guide pile 8, one end of wirerope 12 is connected on fixed leg 9, the other end is walked around pulley 11 and is connected on binding clasp 10, by adjusting binding clasp 10, control the relative length of wirerope 12, realize adjusting the length that guide pile 8 extends main body 1 bottom.Be provided with suction pile 18 in preformed hole 16 or suppress stake.
In the present embodiment, main body 1 is reinforced concrete prefabricated structure, can form bulkhead 2 by template, the concreting moulding.Also can use the steel work setting.Guide pile 8 can adopt piling bar, also can adopt other structure piles such as concrete pile.Be provided with connecting portion 17 in preformed hole 16, suction pile 18 is installed on connecting portion 17, suction pile 18 can downward opening insertion ground 15 in.
A kind of mounting method of prefabricated fixed offshore platform, it comprises the following steps:
1, carry out field geological investigation, ground 15 is done corresponding pretreatment, if ground 15 surface finishs are relatively poor, select coral sand to carry out pretreatment to ground 15 surfaces, if a little less than the carrying of ground 15, available explosive method is closely processed ground 15.
2, interim positioning step: utilize islands and reefs projection reef as fulcrum, main platform body 1 is towed to the construction predeterminated position by hoist engine when the high water mark, utilize low tide or open water intaking valve 13, to the interior water filling of ballast tank 3, make main body 1 bottom contact ground 15 surfaces, utilize the gravity of main body 1 to be temporarily fixed on ground 15;
3, sink to the bottom the leveling step: use binding clasp 10 to adjust the relative length of wireropes 12, control subject 1 periphery guide pile 8 everywhere extends the outer length in main body 1 bottom, thus the levelness of adjustment main body 1; If the planeness of ground 15 is high, the development length of guide pile 8 is just short, perhaps only use the guide pile 8 of part position, main body 1 base section is regional at this moment contacts with ground 15, not contacting between subregion and ground 15, if ground 15 planeness are not high, is the level that guarantees main body 1, also can heighten main body 1, make the surface of its bottom ground 15 away from keyboard;
4, sink to the bottom fixing step: the gravels 14 in gravel cabin 5 are discharged by gravel passage 6, fill the space between ground 15 surfaces and main body 1 bottom; Make layer of gravel evenly closely knit by vibration or local explosion; Suction pile 18 be set or suppress stake by preformed hole 16 again, strengthening fixing, completing the fixing of prefabricated fixed offshore platform.
Larger at ground 15 bearing capacities, and on physical features position smooth, in easy flights, main body 1 is directly sunk to the bottom be fixed on natural ground 15, rely on the weight of main body 1 self gravitation or content ballast keep main platform body 1 steadily.But actual ground 15 is scraggly often, perhaps there is the obstruction that differs in size, contacting of main body 1 bottom and ground 15 can not be good, can produce larger stress on main body 1 bottom, therefore needs to use gravel 14 to fill ground 15 surface irregularity parts.The bearing capacity of gravel 4 is large, and the support effect of main body 1 is better than coral sand.Gravel 14 can be placed in gravel cabin 5 in advance along with main body 1 pull together, also can arrange in addition to transport ship gravel 14 is transported to the scene, and the gravel passage 6 by gravel cabin 5 falls.
When main platform body 1 sinking is in place on ground 15, the deadweight of main platform body 1 can be pressed into the bottom of suction pile 18 in mud certain depth and form bottom end seal, make the inside and outside pressure differential that produces of suction pile 18 with the pump pumping, suction pile can be pressed in mud until arrive desired depth, complete sinking in place after, the pressure differential in suction pile 18 can fade away with water in the infiltration in soil; Can be used for main platform body 1 fixing on subgrade, also can be used for the braced structures of off-lying sea harbour and trestle.Can adopt mode and the main body 1 of tenon fixing after suction pile 18 installation in position, forever solid with concreting on it.Can directly squeeze into by pile driver in preformed hole 16 and suppress stake, and forever solid with the rear realization of concreting preformed hole 16.
Above-listed detailed description is that this embodiment limits the scope of the claims of the present invention for the illustrating of one of the present invention possible embodiments, and the equivalence that all the present invention of disengaging do is implemented or change, all should be contained in the scope of the claims of this case.

Claims (10)

1. prefabricated fixed offshore platform, comprise prefabricated main platform body, it is characterized in that: separate by bulkhead in described main body and be provided with several watertight compartments, ballast tank and gravel cabin, wherein ballast tank is positioned at the bottom of described main body, watertight compartment is positioned at above ballast tank, gravel bilge section is provided with the gravel passage that is interlinked to the outside with described main body, be respectively equipped with several positioners along described body peripheral edge, be respectively equipped with on each positioner and can extend downward the outer guide pile of described bottom part body.
2. prefabricated fixed offshore platform according to claim 1, is characterized in that: be provided with the preformed hole of some perforations on described main body, suction pile be set in preformed hole or suppress stake.
3. prefabricated fixed offshore platform according to claim 1 and 2 is characterized in that: described positioner is provided with to be adjusted described guide pile bottom and extends the conditioning equipment of described bottom part body length.
4. prefabricated fixed offshore platform according to claim 3, it is characterized in that: the described gravel passage in described bottom part body is broadening formation.
5. prefabricated fixed offshore platform according to claim 4, it is characterized in that: described main body is reinforced concrete prefabricated structure.
6. the mounting method of a prefabricated fixed offshore platform, it is characterized in that: it comprises the following steps:
1), interim positioning step: utilize islands and reefs projection reef as fulcrum, main platform body is towed to the construction predeterminated position by hoist engine when the high water mark, utilize low tide or the method for water filling in ballast tank, make bottom part body primary surface contiguously; By guide pile, main body is temporarily fixed on ground;
2), sink to the bottom the leveling step: control the length that each guide pile extends bottom part body, adjust position and levelness that main body is sat the end;
3), sink to the bottom fixing step: the gravel in the gravel cabin is discharged by the gravel passage, fill space between foundation surface and bottom part body, complete the fixing of prefabricated fixed offshore platform.
7. the mounting method of prefabricated fixed offshore platform according to claim 6, is characterized in that: in sinking to the bottom fixing step, also comprise the step that layer of gravel is flattened by vibration or local explosion method.
8. the mounting method of prefabricated fixed offshore platform according to claim 6, is characterized in that: in sinking to the bottom fixing step, also comprise in preformed hole suction pile being set or suppressing the step that stake is fixed.
9. the mounting method of according to claim 7 or 8 described prefabricated fixed offshore platforms, is characterized in that: before described interim positioning step, also comprise the step with coral sand pretreatment ground.
10. the mounting method of according to claim 7 or 8 described prefabricated fixed offshore platforms, is characterized in that: before described interim positioning step, also comprise the step with the accurate Ground Treatment of blast mode.
CN201310046890.5A 2013-02-05 2013-02-05 Prefabricate type nautical fixed platform and installing method Active CN103103972B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201310046890.5A CN103103972B (en) 2013-02-05 2013-02-05 Prefabricate type nautical fixed platform and installing method
PCT/CN2014/070734 WO2014121684A1 (en) 2013-02-05 2014-01-16 Pre-formed marine fixed platform and method of installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310046890.5A CN103103972B (en) 2013-02-05 2013-02-05 Prefabricate type nautical fixed platform and installing method

Publications (2)

Publication Number Publication Date
CN103103972A true CN103103972A (en) 2013-05-15
CN103103972B CN103103972B (en) 2015-04-22

Family

ID=48312146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310046890.5A Active CN103103972B (en) 2013-02-05 2013-02-05 Prefabricate type nautical fixed platform and installing method

Country Status (2)

Country Link
CN (1) CN103103972B (en)
WO (1) WO2014121684A1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103790171A (en) * 2014-01-26 2014-05-14 广州中国科学院工业技术研究院 Prefabricated caisson and installation method thereof
CN103790146A (en) * 2014-01-26 2014-05-14 广州中国科学院工业技术研究院 Gravel bin of prefabricated fixed offshore platform
CN103911978A (en) * 2014-03-24 2014-07-09 广州中国科学院工业技术研究院 Offshore prefabricated platform and mounting method thereof
WO2014121684A1 (en) * 2013-02-05 2014-08-14 广州中国科学院工业技术研究院 Pre-formed marine fixed platform and method of installation
CN105178273A (en) * 2015-06-17 2015-12-23 广州中国科学院工业技术研究院 Maneuvering bottom resting offshore platform and installation method thereof
CN105201007A (en) * 2015-09-29 2015-12-30 广州中国科学院工业技术研究院 Building on mud flat and building method thereof
CN105350508A (en) * 2015-09-29 2016-02-24 广州中国科学院工业技术研究院 Prefabricated marine fixing platform and installation method
CN105350493A (en) * 2015-11-16 2016-02-24 广州驭蓝驿站工程技术有限公司 Method and structure for rapidly expanding island area

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2806564Y (en) * 2005-07-08 2006-08-16 中国海洋石油总公司 Oil gas processing platform for shoal water zone
CN201593181U (en) * 2009-10-16 2010-09-29 抚州市临川白勇海洋工程有限公司 Self-lifting offshore wind power set mounting platform
WO2011116254A2 (en) * 2010-03-19 2011-09-22 National Oilwell Varco, L.P. Jack-up rig with leg-supported ballast loads

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2863892Y (en) * 2006-01-12 2007-01-31 中交第二航务工程局有限公司 Self-lifting riprap levelling platform boat
WO2008111829A1 (en) * 2007-03-12 2008-09-18 Nadarajah Nagendran C Offshore oil production platform
CN103103972B (en) * 2013-02-05 2015-04-22 广州中国科学院工业技术研究院 Prefabricate type nautical fixed platform and installing method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2806564Y (en) * 2005-07-08 2006-08-16 中国海洋石油总公司 Oil gas processing platform for shoal water zone
CN201593181U (en) * 2009-10-16 2010-09-29 抚州市临川白勇海洋工程有限公司 Self-lifting offshore wind power set mounting platform
WO2011116254A2 (en) * 2010-03-19 2011-09-22 National Oilwell Varco, L.P. Jack-up rig with leg-supported ballast loads

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014121684A1 (en) * 2013-02-05 2014-08-14 广州中国科学院工业技术研究院 Pre-formed marine fixed platform and method of installation
CN103790171A (en) * 2014-01-26 2014-05-14 广州中国科学院工业技术研究院 Prefabricated caisson and installation method thereof
CN103790146A (en) * 2014-01-26 2014-05-14 广州中国科学院工业技术研究院 Gravel bin of prefabricated fixed offshore platform
CN103790146B (en) * 2014-01-26 2015-09-30 广州中国科学院工业技术研究院 A kind of gravel cabin of prefabricated fixed offshore platform
CN103911978A (en) * 2014-03-24 2014-07-09 广州中国科学院工业技术研究院 Offshore prefabricated platform and mounting method thereof
CN103911978B (en) * 2014-03-24 2016-08-17 广州中国科学院工业技术研究院 A kind of marine prefabricated platform and installation method thereof
CN105178273A (en) * 2015-06-17 2015-12-23 广州中国科学院工业技术研究院 Maneuvering bottom resting offshore platform and installation method thereof
CN105201007A (en) * 2015-09-29 2015-12-30 广州中国科学院工业技术研究院 Building on mud flat and building method thereof
CN105350508A (en) * 2015-09-29 2016-02-24 广州中国科学院工业技术研究院 Prefabricated marine fixing platform and installation method
CN105350493A (en) * 2015-11-16 2016-02-24 广州驭蓝驿站工程技术有限公司 Method and structure for rapidly expanding island area

Also Published As

Publication number Publication date
WO2014121684A1 (en) 2014-08-14
CN103103972B (en) 2015-04-22

Similar Documents

Publication Publication Date Title
CN103103972B (en) Prefabricate type nautical fixed platform and installing method
US3896628A (en) Marine structures
CN101962958B (en) Bridge composite foundation consisting of open caisson and pile and construction method
CN103228909B (en) For the method installing offshore tower
AU2017269088B2 (en) A seabed supported unit and method to provide a shallow water drilling terminal
CN102561371B (en) Steel caisson enclosure structure at island-tunnel combination part and construction method thereof
CN102322069B (en) Underwater combination base of open caisson and steel pipe piles and construction method
CN109780325A (en) A kind of water factory's water intaking tunnel submarine pipeline installation method
CN104912045A (en) Hollow cylinder pier used for fixing overwater platform structure at water bottom and installation and construction method thereof
CN109113086A (en) A kind of steel reinforced concrete combined cofferdam construction method in deep water exposed bedrock riverbed area
CN104975612A (en) Novel water open caisson construction technology
RU2310721C1 (en) Protection device to protect self-elevating floating drilling installation for exploratory well drilling in ice conditions and method for protection device construction
CN202626934U (en) Gravity wharf built on silty foundation
KR101703441B1 (en) Cassion manufacturing method of bottom-up, pre-cast and a base plate type using floating dock, system, floating dock and cassion using thereof
CN102561454B (en) Water intake method utilizing pipe jacking vertically
KR19980702272A (en) Bonded low structure and installation method
JP3135208U (en) Towing self-sinking anchor block
CN105350493B (en) The method and structure of rapid expansion islands and reefs area
JP2012180669A (en) Breakwater reinforcing method and reinforced breakwater
KR20100120326A (en) An underwater bridge with inflection point of alignment or ventilating opening
CN207143998U (en) A kind of underwater bridge structure
CN207749530U (en) Self installation combines the settling type basic platform of anchoring pile and consolidated subsoil
CN216973476U (en) Gravity type fan foundation that caisson and steel-pipe pile combine
CN105926659A (en) Pretressed concrete automatic-control pontoon type offshore wind turbine foundation and construction method thereof
CN115897640B (en) Construction method of permeable breakwater

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA ROAD AND BRIDGE CORPORATION

Effective date: 20140210

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Ding Hua

Inventor after: Wang Wei

Inventor after: Ye Juan

Inventor after: Zhang Jianchu

Inventor after: Sheng Guoqiang

Inventor after: Sun Yaoguo

Inventor after: Shen Zheng

Inventor after: Han Jun

Inventor after: Zheng Ruiyun

Inventor after: Tang Feng

Inventor after: Xu Zhenli

Inventor before: Ding Hua

Inventor before: Sheng Guoqiang

Inventor before: Shen Zheng

Inventor before: Zheng Ruiyun

Inventor before: Xu Zhenli

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: CHEN YING ZHOU GUIDOU LUO PINGYA HE XINCHANG XU ZHENLI TO: CHEN YING WEI JUN ZHOU GUIDOU ZHANG JUN LUO PINGYA PENG SHANGPING HE XINCHANG LI ZHENWEI XU ZHENLI YUAN QIUYUE PENG SHIXIANG

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20140210

Address after: 511458 Nansha District Haibin Road, Guangdong, China, No. 1121, No.

Applicant after: Institute of Industry Technology, Chinese Academy of Sciences

Applicant after: China Road & Bridge Corporation

Address before: 511458 Nansha District Haibin Road, Guangdong, China, No. 1121, No.

Applicant before: Institute of Industry Technology, Chinese Academy of Sciences

C14 Grant of patent or utility model
GR01 Patent grant