CN103091006A - Test method used for rock breaking performance of drill gear ring - Google Patents

Test method used for rock breaking performance of drill gear ring Download PDF

Info

Publication number
CN103091006A
CN103091006A CN 201110374029 CN201110374029A CN103091006A CN 103091006 A CN103091006 A CN 103091006A CN 201110374029 CN201110374029 CN 201110374029 CN 201110374029 A CN201110374029 A CN 201110374029A CN 103091006 A CN103091006 A CN 103091006A
Authority
CN
China
Prior art keywords
drill bit
signal
drill
test
gear ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110374029
Other languages
Chinese (zh)
Inventor
汪建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201110374029 priority Critical patent/CN103091006A/en
Publication of CN103091006A publication Critical patent/CN103091006A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention discloses a test method used for rock breaking performance of a drill gear ring. The test method includes the following steps: (a), first testing the bit pressure, the displacement and the torque of a drill through a pressure sensor, a displacement sensor and a torque sensor; (b), meanwhile testing the rotation speed of a swivel plate and the rotation speed of a cone through a swivel plate rotation speed sensor and a cone rotation speed sensor; (c), converting signals tested in the step (a) through an electrical bridge and transmitting the converted signals to a data collection box through a dynamic strain gauge, and meanwhile transmitting signals tested in the step (b) to the data collection box through a drill tachymeter; (d), collecting the signals transmitted into the data collection box through a data collection card and output by a signal processing circuit; and (e), at last, inputting the signals into a computer for analysis and processing. The test method used for the rock breaking performance of the drill gear ring is short in time of the test process, high in automatic degree, wide in extended functions, little in noise contained in the collected signals and low in production cost.

Description

The method of testing that is used for the broken lithology energy of drill bit gear ring
Technical field
The present invention relates to a kind of method of testing for the broken lithology energy of drill bit gear ring.
Background technology
In petroleum drilling, drill bit is the main tool of ravelly ground rock, is the important means that improves rate of penetration in petroleum drilling engineering, reduces drilling cost.In order to improve the efficiency of breaking rock of drill bit, reach the purpose that reduces costs, just must and select the drill bit that is fit to formation characteristics for different drilling stratum designs.The main method of research drill bit efficiency of breaking rock has site test and shop experiment both at home and abroad at present, site test is exactly the drill bit application at the scene that designs for Different Strata, and then revise design and processing again, and develop like this cycle that a specific character drill bit needs long, cost is high; Indoor main test method has the vertical indentation test of monodentate, the test of drill bit gear ring composite motion broken rock and full gauge bit drilling test.
The test that research is carried out for drill bit at present is mainly full gauge bit test and the test of drill bit gear ring composite motion broken rock, and full head dip test is mainly to detect the Fracture law that new drill creeps into the Different Strata rock; The test of drill bit gear ring composite motion broken rock is mainly the Fracture law of research different drill structure parameters, cutting structure and drilling parameter and formation rock.The test macro of existing full head dip test and the test of drill bit gear ring composite motion broken rock is mainly by drill bit, gear wheel and gear ring rotational speed pulse signal in sensor, tachometry instrument and data collecting card acquisition test process; By drill bit displacement, the pressure of the drill and the simulation torque signal in sensor, dynamic strain indicator and data collecting card acquisition test process.But along with further in-depth of drill bit research, a lot of problems that have existing head dip test test macro can not satisfy the needs of present stage drill bit research and new product development, such as: motion and the stressing conditions of research drill bit and 5 teeth, the analog quantity channel of existing two 8 channel data capture cards is inadequate, can not satisfy the expanded function of test needs comprehensively; Due to the impact of hydraulic system, motor and environment etc., the signal of dynamic strain indicator collection contains a large amount of noises, and the test figure accuracy is not high; The hardware device such as dynamic strain indicator and data collecting card is expensive, the test system hardware high in cost of production.Therefore in the urgent need to setting up a cover based on the head dip test test macro of modern test technology, with can be fast, accurately, motion and the stressing conditions of Real-time Collection drill bit and each tooth, thereby provide important research technique for new product development and the scientific design of drill bit.
The drill bit new product development must be through its performance of verification experimental verification on the basis of theory research, and head dip test has very important effect to the research and development premium quality product.Abroad, U.S. Smith Bits company, Hughes Christensen company, Halliburton company and Britain SchlumbergerCambridge company etc. have all set up the head dip test testing jig, drill bit research experiment newly developed is found out its relative merits, and correspondingly formulated the examination criteria of head dip test; Each company has all applied for corresponding drill bit design of Simulation patent simultaneously, wherein major part is take head dip test as the basis, many achievements in research have been obtained by carrying out head dip test, develop series of characteristics or high-performance drill bit, played very important effect for the mechanical separator speed that improves drill bit, crushing efficiency etc.
1975, built up the test stand of first full-scale simulation conditions down-hole in the salt lake city of Utah, USA, can be used for testing drill bit, subsurface tool and some mud motors.Apply drilling pressure with hydraulic control system, servo-control system can be controlled by the needs of test objective and creep into permanent the pressure of the drill, permanent drilling speed or permanent moment of torsion mode.In drilling process, the data that capable of dynamic is measured have: drilling depth amount and the penetration speed of covering stress, lithostatic stress, pore pressure and the drill bit of the pressure of the drill, rotating speed, moment of torsion, rock.1985, Britain's Schlumberger Cambridge company built up the wellbore test frame of the well-known artificial ground of another world, and this test stand can be simulated the pressure and temperature of well depth 5000m.The collection of its whole experimental implementation control, the control of down-hole simulated conditions and experimental data and the closed-loop control that computer system is all used in processing, its control and test macro are more advanced.
At home, the units such as Jiang-Han Area drill bit joint-stock company, Chengdu exchange factory, Southwest Petrol University, Daqing oil field carry out drill bit new product development and scientific design studies and have all set up corresponding head dip test frame, to improving China's bit performance and research, catching up with world standard and played certain effect.1989, the miniature bur test stand of situation at the bottom of a simulation well was built up in the drilling well of Beijing petroleum exploration and development research institute of China National Petroleum Corporation (CNPC).This test stand can do the following drill bit of 37/8in under 3500m well depth condition drilling test and carry out process of the test in data acquisition and analyzing and processing.The nineties, the drilling technique research institute of Daqing oil field builds up the machinery test stand of a simulation 6000m well depth condition.From 1981, drill bit research institute of Southwest Petrol University just carries out experimental study to point angle speed and gear wheel angular velocity, carry out the full gauge bit experiment on the large-size drill test stand, this test stand can apply the pressure of the drill of 300kN to drill bit, and record pulse signal and simulating signal in process of the test by sensor, input secondary instrument again and computing machine is processed, obtain the signals such as the pressure of the drill, moment of torsion, displacement and drill speed in process of the test.The beginning of the eighties, drill bit research institute of Southwest Petrol University is under the support energetically of China National Petroleum Corporation (CNPC), solving geometry of roller, kinematics series of theories problem, grasp drill bit and touched on the basis of the motion state of end tooth itself and rule thereof, built up the testing equipment that a simulation tooth-wheel bit tooth of initiating is made the hole process both at home and abroad.It can make the sample tooth make identical compound motion with true drill teeth, and by the operating process of control desk Control experiment, acquisition system acquisition test data are inputted computing machine again and carried out analyzing and processing.
These head dip test functions of the equipments imperfections, the operating console that various controls is housed by manually-operated is realized the control of whole process of the test, automaticity is low, particularly test macro adopts the signal of conventional hardware surveying instrument acquisition test process, function singleness, very flexible, expanded function limitation be large, be subject to external interference, collection signal contain a large amount of noises and hardware cost high.Complicated along with the increase of the petroleum drilling degree of depth and formation rock, more urgent according to the research work of Different Strata rock characteristics design and development characteristic drill bit, the importance of head dip test test seems more outstanding, the requirement that existing head dip test test macro does not reach the high-performance drill bit experimental test obviously.
Motion state and stress when tooth-wheel bit is worked in the shaft bottom are very complexes.Drill bit moves in the shaft bottom, except drill bit around self axis rotatablely move as clockwise direction and gear wheel around the bit leg axis is done counterclockwise to rotatablely move, also has the slip of axial longitudinal vibration and gear wheel, the compound motion that these several motions occur simultaneously, combine when being drilling well.Tooth-wheel bit is fractured rock under impact, crushing and the slip shear action that above-mentioned compound motion produces.
Can produce extensional vibration during roller bit cutting, in each vibration, compression lower drilling string when drill bit is up, when drill bit is descending drill string recover former length, its potential energy is converted into the dynamic loading of drill bit.During drill bit work, the power that tooth is applied on rock has static load (being added in the pressure of the drill on drill bit) and dynamic loading (drill bit and lower drilling string are accelerated to descend and the dynamic load of generation), when that is to say tooth impact grinding rock, the reacting force that drill bit is subject to rock also equals static load and dynamic loading sum.Drill bit except being subject to vertical static load and dynamic loading, due to drill string rotating, also will be subject to torsional interaction when underground work.When the pressure of the drill is larger, tooth wedging rock is darker, and especially tooth slides in the shaft bottom when larger, and the moment of torsion that drill bit bears is larger.
When tooth-wheel bit is worked in the shaft bottom, because drill bit produces longitudinal vibration in the shaft bottom, make drill string constantly compression and extension, lower drilling string passes to tooth to this periodic elastic deformation energy, produce tooth to impact, the granulitization of rock, this crumbling method is one of major way of tooth-wheel bit fractured rock.In tooth-wheel bit when work,, because the project organization of drill bit and the impact of stratum frictional resistance produce slip, rotating speed is faster, slippage is larger, and is larger to the shearing-crushing of rock, thereby shears bottom rock by the slip of tooth, improves crushing efficiency.Can find out in the research process of drill bit the brief analysis of tooth-wheel bit in shaft bottom motion, stressed and fractured rock situation according to above-mentioned, must effectively analyze the pressure of the drill, torsional interaction and drill bit that the broken rock motion of drill bit bears and the rotating speed of gear wheel.
In drill bit gear ring composite motion broken rock process of the test, the parameter that needs to measure has: the mean speed of gear wheel, drill bit (being the rock counter-rotating) mean speed, tooth are the vertical force of tooth and rock interphase interaction and the moment of torsion of driven by rotary disc rock clamper rotation to depth of tooth penetration, the pressure of the drill of rock.
Summary of the invention
The object of the invention is to overcome the shortcoming and defect of above-mentioned prior art, provide a kind of for the broken lithology of drill bit gear ring can method of testing, should be used for the broken lithology of drill bit gear ring can test process time of method of testing short, automaticity is high, expanded function is wide, the signal that collects contains that noise is few, low cost of manufacture.
Purpose of the present invention is achieved through the following technical solutions: be used for the method for testing of the broken lithology energy of drill bit gear ring, it is characterized in that, comprise the following steps:
(a) at first, test the pressure of the drill, displacement, the moment of torsion of drill bit by pressure transducer, displacement transducer, torque sensor;
(b) simultaneously, by rotary speed sensor and gear wheel speed probe test rotary speed and gear wheel rotating speed;
(c) signal that records in step (a) is changed through electric bridge, imports data acquisition device after dynamic strain indicator into; Simultaneously, the signal that records in step (b) also imports data acquisition device into after the drill bit knotmeter;
(d) import the signal of data acquisition device into through the signal of data collecting card collection signal modulate circuit output;
(e) last, the input computing machine carries out analyzing and processing.
In described step (a), measure suffered power by resistance strain gage, namely record the pressure of the drill and moment of torsion.
In described step (a), non-contact displacement transducer is measured the depth of tooth penetration signal of tooth, electric bridge is that signal conditioning circuit is changed the signal of sensor output, the signal of dynamic strain indicator, data acquisition device and the output of capture card collection signal modulate circuit, then input computing machine and carry out analyzing and processing.
In described step (b), during dial rotation, probe alternately contacts copper sheet and rotating disk and sends a pulse signal, these signals amplify, count through the tachometry instrument, more just can record the mean speed of drill bit through data acquisition device, capture card and computing machine processing; In like manner can record the mean speed of gear wheel.
The test macro that the present invention is used, mainly by strain transducer, rotary speed sensor, gear wheel speed probe, the dynamic strain indicator that is connected with strain transducer, the drill bit knotmeter that all is connected with rotary speed sensor and gear wheel speed probe, the data acquisition device, the data collecting card that is connected with data acquisition device that all are connected with dynamic strain indicator and drill bit knotmeter and the computing machine that is connected with data collecting card consist of.
Described strain transducer comprises pressure transducer, displacement transducer, torque sensor.
Between described pressure transducer and dynamic strain indicator, between displacement transducer and dynamic strain indicator, be provided with electric bridge between torque sensor and dynamic strain indicator.
In sum, the invention has the beneficial effects as follows: contain in the signal that the process of the test time is short, automaticity is high, expanded function is wide, collect that noise is few, low cost of manufacture.
Description of drawings
Fig. 1 is the structural representation of system for use in carrying of the present invention.
Embodiment
Below in conjunction with embodiment, the present invention is described in further detail, but embodiments of the present invention are not limited only to this.
Embodiment:
The method of testing that is used for the broken lithology energy of drill bit gear ring that the present invention relates to comprises the following steps:
(a) at first, test the pressure of the drill, displacement, the moment of torsion of drill bit by pressure transducer, displacement transducer, torque sensor;
(b) simultaneously, by rotary speed sensor and gear wheel speed probe test rotary speed and gear wheel rotating speed;
(c) signal that records in step (a) is changed through electric bridge, imports data acquisition device after dynamic strain indicator into; Simultaneously, the signal that records in step (b) also imports data acquisition device into after the drill bit knotmeter;
(d) import the signal of data acquisition device into through the signal of data collecting card collection signal modulate circuit output;
(e) last, the input computing machine carries out analyzing and processing.
In described step (a), measure suffered power by resistance strain gage, namely record the pressure of the drill and moment of torsion.
In described step (a), non-contact displacement transducer is measured the depth of tooth penetration signal of tooth, electric bridge is that signal conditioning circuit is changed the signal of sensor output, the signal of dynamic strain indicator, data acquisition device and the output of capture card collection signal modulate circuit, then input computing machine and carry out analyzing and processing.
In described step (b), during dial rotation, probe alternately contacts copper sheet and rotating disk and sends a pulse signal, these signals amplify, count through the tachometry instrument, more just can record the mean speed of drill bit through data acquisition device, capture card and computing machine processing; In like manner can record the mean speed of gear wheel.
The present invention system used as shown in Figure 1, mainly by strain transducer, rotary speed sensor, gear wheel speed probe, the dynamic strain indicator that is connected with strain transducer, the drill bit knotmeter that all is connected with rotary speed sensor and gear wheel speed probe, the data acquisition device, the data collecting card that is connected with data acquisition device that all are connected with dynamic strain indicator and drill bit knotmeter and the computing machine that is connected with data collecting card consist of.
Described strain transducer comprises pressure transducer, displacement transducer, torque sensor.
Between described pressure transducer and dynamic strain indicator, between displacement transducer and dynamic strain indicator, be provided with electric bridge between torque sensor and dynamic strain indicator.
Principle of work of the present invention is as follows:
The realization of pressure and torque measurement: the platform that the rock clamper is made by two-layered steel plates forms, above the test block of one deck clamping rock, below one deck connect below supporting axis, accept the moment of torsion that thrust that fluid cylinder makes progress and rotating disk transmit.Between the up and down is two-layer by three vertical and coupling links three levels upper strata " suspensions " in lower floor's peripheral short three " pillars ".Ball pivot is all used at this six roots of sensation coupling link two ends, belongs to two power bars on mechanics.Six roots of sensation bar has limited the six-freedom degree of upper platform, and it is fixed with respect to lower floor's platform.Measure the suffered power of this six roots of sensation bar with resistance strain gage and can record the pressure of the drill and moment of torsion.
Displacement measurement: in the head dip test process, need to measure tooth to the depth of tooth penetration of rock, non-contact displacement transducer is measured the depth of tooth penetration signal of tooth, electric bridge is that signal conditioning circuit is changed the signal of sensor output, the signal of dynamic strain indicator, data acquisition device and the output of capture card collection signal modulate circuit, then input computing machine and carry out analyzing and processing.
Tachometric survey: paste copper sheet on lower rotary table, because copper sheet is different from the magnetoconductivity of iron, during dial rotation, probe alternately contacts copper sheet and rotating disk and sends a pulse signal, these signals amplify, count through the tachometry instrument, more just can record the mean speed of drill bit through data acquisition device, capture card and computing machine processing; In like manner can record the mean speed of gear wheel.
The above is only preferred embodiment of the present invention, is not the present invention is done any pro forma restriction, and every foundation technical spirit of the present invention, any simple modification, equivalent variations that above embodiment is done are within all falling into protection scope of the present invention.

Claims (4)

1. be used for the method for testing of the broken lithology energy of drill bit gear ring, it is characterized in that, comprise the following steps:
(a) at first, test the pressure of the drill, displacement, the moment of torsion of drill bit by pressure transducer, displacement transducer, torque sensor;
(b) simultaneously, by rotary speed sensor and gear wheel speed probe test rotary speed and gear wheel rotating speed;
(c) signal that records in step (a) is changed through electric bridge, imports data acquisition device after dynamic strain indicator into; Simultaneously, the signal that records in step (b) also imports data acquisition device into after the drill bit knotmeter;
(d) import the signal of data acquisition device into through the signal of data collecting card collection signal modulate circuit output;
(e) last, the input computing machine carries out analyzing and processing.
2. the method for testing for the broken lithology energy of drill bit gear ring according to claim 1, is characterized in that, in described step (a), measures suffered power by resistance strain gage, namely records the pressure of the drill and moment of torsion.
According to claim 1 for the broken lithology of drill bit gear ring can method of testing, it is characterized in that, in described step (a), non-contact displacement transducer is measured the depth of tooth penetration signal of tooth, electric bridge is that signal conditioning circuit is changed the signal of sensor output, the signal of dynamic strain indicator, data acquisition device and the output of capture card collection signal modulate circuit, then input computing machine and carry out analyzing and processing.
According to claim 1 for the broken lithology of drill bit gear ring can method of testing, it is characterized in that, in described step (b), during dial rotation, probe alternately contacts copper sheet and rotating disk and sends a pulse signal, these signals amplify, count through the tachometry instrument, more just can record the mean speed of drill bit through data acquisition device, capture card and computing machine processing; In like manner can record the mean speed of gear wheel.
CN 201110374029 2011-11-07 2011-11-07 Test method used for rock breaking performance of drill gear ring Pending CN103091006A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110374029 CN103091006A (en) 2011-11-07 2011-11-07 Test method used for rock breaking performance of drill gear ring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110374029 CN103091006A (en) 2011-11-07 2011-11-07 Test method used for rock breaking performance of drill gear ring

Publications (1)

Publication Number Publication Date
CN103091006A true CN103091006A (en) 2013-05-08

Family

ID=48203857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110374029 Pending CN103091006A (en) 2011-11-07 2011-11-07 Test method used for rock breaking performance of drill gear ring

Country Status (1)

Country Link
CN (1) CN103091006A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106066220A (en) * 2016-06-08 2016-11-02 中国电建集团成都勘测设计研究院有限公司 Rock mass surface second measuring stress instrument and rock mass surface second stress test method
CN111238692A (en) * 2020-03-11 2020-06-05 四川建安工业有限责任公司 Stress monitoring system for automobile chassis parts
CN113482538A (en) * 2021-08-11 2021-10-08 沧州格锐特钻头有限公司 Roller bit with rotation speed detection function

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106066220A (en) * 2016-06-08 2016-11-02 中国电建集团成都勘测设计研究院有限公司 Rock mass surface second measuring stress instrument and rock mass surface second stress test method
CN111238692A (en) * 2020-03-11 2020-06-05 四川建安工业有限责任公司 Stress monitoring system for automobile chassis parts
CN113482538A (en) * 2021-08-11 2021-10-08 沧州格锐特钻头有限公司 Roller bit with rotation speed detection function
CN113482538B (en) * 2021-08-11 2022-09-06 沧州格锐特钻头有限公司 Roller bit with rotation speed detection function

Similar Documents

Publication Publication Date Title
CN110486007B (en) In-situ testing device and method for mechanical parameters of coal mine surrounding rock while drilling
CN103091082A (en) Full drill rock breaking test system and test method thereof
CN105973551B (en) Drilling power simulated testing system
CN113418795B (en) Drilling test system and method for predicting uniaxial compressive strength of coal rock mass
CN103105290A (en) Test method of rock breaking with full gauge drilling bit
CN103105289A (en) Test system of full gauge drilling bit rock breaking
CN103091006A (en) Test method used for rock breaking performance of drill gear ring
CN103091083A (en) Drill performance parameter test system and test method thereof
CN107843743B (en) Dynamic compaction construction data acquisition method based on impact acceleration
CN103089237A (en) System and method for testing rock breaking performance of gear ring of drill bit
CN103091016A (en) Testing method based on testing hardware system of full bit test
CN103091015A (en) Testing hardware system and testing method of full bit test
CN209324257U (en) A kind of drilling project drilling equipment
CN103104246A (en) Drill-bit performance parameter testing method
CN103091086A (en) Drill experiment control and test system and method thereof
CN103105291A (en) Test method for drill gear ring compound rock breaking
CN103104242A (en) Drill-bit gear-ring combined rock-breaking testing system and testing method thereof
CN103091084A (en) Test system for drill gear ring rock breaking performance
CN103089236A (en) Drill bit performance parameter test system
CN103089235A (en) Drill bit performance test system for oil production process
Wang et al. Development and application of a multifunction true triaxial rock drilling test system
CN102466565A (en) Method for testing rock breaking performance of petroleum drill bit
CN103091080A (en) Test method based on drill gear ring compound motion rock breaking test hardware testing system
CN103091088A (en) Drill test control and test method
CN103104247A (en) Drill-bit gear-ring combined rock-breaking testing system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130508