CN103075369B - Combined vertical-type submerged long-shaft pump - Google Patents

Combined vertical-type submerged long-shaft pump Download PDF

Info

Publication number
CN103075369B
CN103075369B CN201310023955.4A CN201310023955A CN103075369B CN 103075369 B CN103075369 B CN 103075369B CN 201310023955 A CN201310023955 A CN 201310023955A CN 103075369 B CN103075369 B CN 103075369B
Authority
CN
China
Prior art keywords
pump
probe
water
mounting hole
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310023955.4A
Other languages
Chinese (zh)
Other versions
CN103075369A (en
Inventor
王泽兵
赵彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU XINHENG PUMP MANUFACTURING Co Ltd
Original Assignee
GUANGZHOU XINHENG PUMP MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU XINHENG PUMP MANUFACTURING Co Ltd filed Critical GUANGZHOU XINHENG PUMP MANUFACTURING Co Ltd
Priority to CN201310023955.4A priority Critical patent/CN103075369B/en
Publication of CN103075369A publication Critical patent/CN103075369A/en
Application granted granted Critical
Publication of CN103075369B publication Critical patent/CN103075369B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The invention discloses a combined vertical-type submerged long-shaft pump, which comprises a water inlet section, a radial guide vane, a middle section, a spatial guide vane, a middle protection pipe and a lower protection pipe, wherein the water inlet section, the radial guide vane, the middle section and the spatial guide vane are assembled and connected and compressed through a straining bolt to form a combined pump cavity; the lower protection pipe and a lower connection pipe are respectively matched with spatial guide wave and a lower bearing seat and connected and compressed through a bolt; the middle protection pipe and a middle connection pipe are matched with a bearing seat and connected and compressed through the bolt; a pump support is matched with an upper bearing seat and an upper connection pipe and is connected and compressed through the bolt to form an independent water discharging chamber runner; and detection control conducting wires of a leaked water collection device, a monitoring detection system, an automatic liquid discharging system and an axial force automatic balance system run through a conducting wire pipe, and each detection control conducting wire is connected with a programmable logic controller (PLC) in a water pump integrated control chamber after passing through the conducting wire pipe. The combined vertical-type submerged long-shaft pump is ingenious in design, low in manufacturing and installation repairing cost, long in lift and good in application effect.

Description

Long-shaft pump under a kind of combined vertical solution
Technical field
The present invention and a kind of long-shaft pump, particularly relate to long-shaft pump under a kind of combined vertical solution, belong to electromechanical equipment technical field.
Background technique
Under current existing spatial guide blade formula liquid in long-shaft pump, there is two profiles formula: a kind of is guide bearing structure pattern, and another kind is rolling bearing structure pattern.Long-shaft pump under the spatial guide blade formula liquid of guide bearing structure pattern, is provided with guide bearing and carries out radial fit location, bear the radial force of water pump between pump shaft and spatial guide blade.Pillar coordinates with spatial guide blade and connects, and pump shaft connects with transmission shaft case butt coupling, is placed in pillar and (does not have pillar to be then directly placed in connecting tube), pump medium contact with water pump.Connecting tube arranges bearing support, arranges guide bearing in bearing support, guide bearing and transmission shaft carry out radial fit location, play guide-localization effect.This guide bearing adopts rubber material or composite to make, water pump is very high at running medium speed, usually make guide bearing because of sliding friction serious wear, again because of guide bearing and pump shaft, transmission shaft and pump physical contact between media, lift is as easy as rolling off a log enters guide bearing along with the High Rotation Speed of axle produces for the impurity that medium includes, and makes guide bearing and axle serious wear.Water pump must arrange cooling liquid water pipe, injects cooling liquid and lubricates, lowers the temperature and rinse, thus cause environment unhygienic, waste water resource when water pump operation to guide bearing.Due to the structural limitations of long-shaft pump under the spatial guide blade formula liquid of this structural type, weight and the axial force of the whole rotor part of water pump are all born by the thrust-bearing above pump holder or motor, the cantilever of the axle of water pump is very long, guide bearing and axle easily wear and tear again, matching gap increases, the vibration values of water pump operation increases, thus causes the very fast damage of thrust-bearing or motor.Because the vibration values of this structure water pump increases, the cantilever of the axle of water pump is very long, and therefore the shaft seal of water pump can not adopt mechanical seal, can only adopt packing seal, so the medium that water pump is pumped can leak, affects environment.Water pump because of this structure adopts case butt coupling to carry out spindle, and the concentricity of the axle of water pump is difficult to be guaranteed, and the operational shock value that can strengthen water pump increases, and also can bring the installation, maintenance inconvenience extremely of water pump simultaneously, increase installation and maintenance cost.Axle because of this structure water pump directly contacts with medium and easily corrodes, and water pump is when pumping Korrosionsmedium, and what the axle of water pump all adopted is all stainless steel, causes the manufacture cost of water pump too high.Due to the above-mentioned reason of this structure water pump, cause that the Security of water pump is not high, working life is long, lift is not high, the degree of depth is not long under liquid.
Long-shaft pump under the spatial guide blade formula liquid of rolling bearing structure pattern, at spatial guide blade, between pillar and connecting tube, be provided with rolling bearing assembly, this rolling bearing assembly and spatial guide blade upper end adopt seal with O ring to coordinate, rolling bearing bottom is provided with outside framework oil seal, and rolling bearing assembly and lower end, spatial guide blade cooperation place are provided with outside framework oil seal and black box.This kind of bearing unit is placed in spatial guide blade upper end, adds the jib-length of pump shaft between impeller and bearing, reduces the stiffness of pump shaft.When in the process of water pump at high speed operation, the swing of impeller and pump shaft is very large, thus causes the damage of rolling bearing assembly, affect the normal use of water pump, the working life of reduction water pump.Occur because water pump O shape circle and black box in long-term using process have failure phenomenon, this medium that water pump can be caused to pump enters in rolling bearing assembly, and the working environment destroying rolling bearing damages bearing; Add on bearing unit and exhaust port is not set, during water pump operation, the heat that black box and bearing produce can make the air in pillar expand, pillar cannot be discharged, thus increase the weight of to affect the sealability of water pump and the working life of bearing, affect the normal use of water pump, reduce the working life of water pump, increase the maintenance cost of water pump.Because there being the impact of above reason, make that the degree of depth under the liquid of water pump falls short of, lift is not high enough.
At present under the spatial guide blade formula liquid of existing two kinds of structural types in long-shaft pump, owing to being all directly adopt spatial guide blade to be combined to form pump chamber, because the axial dimension of spatial guide blade is long, so the pump shaft of water pump is long and affect machining accuracy, waste raw material; Water pump spindle is all adopt impeller balance hole to balance to equilibrium of forces, and the phenomenon if equalizing orifice is blocked, then cause axial force balance poor effect, and for making water pump axial force fully be balanced, impeller balance hole design is very large, thus reduces the efficiency of water pump.Therefore the quantity of water pump vane assembling is restricted, and affects water lift of pump.
Summary of the invention
The object of the invention is to the deficiency overcome in the problems referred to above, provide long-shaft pump under a kind of combined vertical solution.
For solving the problems of the technologies described above, technological scheme of the present invention is: long-shaft pump under a kind of combined vertical solution, comprise inlet segment, radial stator, stage casing, spatial guide blade, middle pillar, lower pillar, the second line of a couplet is taken over, middle connecting tube, upper connecting tube, armoured conduit, lower bearing gland, middle motor coupler, pressure reducing sleeve, throw liquid cover, leak water detdction is popped one's head in, suction sleeve I, suction sleeve II, liquid inlet pipe, submersible pump, submersible electromagnetic valve, diving mortor operated valve, diving air pressure detector and submergence pressure detector, inlet segment, radial stator, stage casing and spatial guide blade combined, and connected by turnbuckle and compress, form combined pump chamber, impeller and impeller is provided with in pump chamber,
Compress by Bolt Connection after the adapter of lower pillar, the second line of a couplet coordinates with spatial guide blade, step respectively, compress by Bolt Connection after middle pillar, middle connecting tube coordinate with bottom bracket, compress by Bolt Connection after pump holder coordinates with upper bearing bracket, upper connecting tube, form independently water-supplying chamber's runner;
By there being each detection control wire of collecting apparatus for leakage water, monitor and detection system, automatic drain system and axial force automatic balancing system in armoured conduit, each detection control wire is all connected with the PLC in water pump central station of floating dock by after armoured conduit.
Spatial guide blade is provided with exhaust port, leak water detdction probe mounting holes, bearing temperature detect probe mounting hole and vent;
Lower bearing gland is provided with marine riser, suction sleeve positioning hole, outlet pipe allow fluting, leak water detdction pop one's head in allow fluting, bearing temperature detect probe allow fluting, outlet pipe installation positioning block and 3 water level detecting probe mounting holes.
The positioning hole that second line of a couplet adapter is provided with liquid storage room and installs for bearing support;
Liquid storage room is provided with suction sleeve mounting hole, liquid-discharging tube mounting hole, submersible pump installation position, liquid inlet pipe mounting hole, probe pipe mounting hole and diving air pressure detector mounting hole.
Step is provided with suction sleeve mounting hole, armoured conduit mounting hole, vibration detection probe mounting holes, bearing temperature detect probe mounting hole, flowing hole and mounting-positioning holes;
Upper bearing bracket is provided with inlet hole, vibration detection probe mounting holes and bearing temperature detect probe mounting hole.
Bottom bracket is provided with flowing hole, vibration detection probe mounting holes, bearing temperature detect probe mounting hole and mounting-positioning holes;
Be provided with coupling above middle motor coupler and throw liquid cover; Described bearing gland was provided with chute.
Pressure reducing sleeve is provided with profile of tooth decompressing groove; Described inlet segment 2 is provided with 2 water pipe mounting holes; Be provided with above described pump shaft and throw liquid cover.
Pressure reducing sleeve and spatial guide blade form relief chamber after assembling, and the vent on spatial guide blade installs relief pipe, and relief pipe is connected with the water pipe mounting hole on inlet segment, form water pump axial force balance pipe; 2 submergence pressure detectors installed by water pump axial force balance pipe, in the middle of 2 submergence pressure detectors, 1 diving mortor operated valve is installed, 2 submergence pressure detectors are connected with the PLC in water pump central station of floating dock by armoured conduit with the wire of diving mortor operated valve, form the axial force automatic balancing system of water pump.
Lower bearing gland and spatial guide blade and pump shaft are assembled, outlet pipe allows fluting be connected with the exhaust port on spatial guide blade by the outlet pipe on lower bearing gland, with pipe clamp and bolt, the outlet pipe that outlet pipe is fixed on lower bearing gland is installed on positioning block, lower bearing gland and spatial guide blade cooperation place are provided with O shape and enclose; After the throwing liquid enclosure enters the marine riser cooperation that pump shaft up and down bearing gland is arranged, be fixed on throw liquid cover on pump shaft with Cock screw, throwing liquid cover and pump shaft cooperation place are provided with O shape and enclose;
Leak water detdction probe is fixed on leak water detdction probe mounting holes that spatial guide blade is arranged, and the wire of leak water detdction probe allowing fluting be connected with the PLC in water pump central station of floating dock with the probe wire pipe mounting hole that step is arranged and armoured conduit by the leak water detdction probe that lower bearing gland is arranged;
Suction sleeve I with water suction elbow is connected, suction sleeve I be fixed on step setting suction sleeve mounting hole on and insert in collecting apparatus for leakage water;
Described suction sleeve II is inserted in liquid storage room by suction sleeve mounting hole that liquid storage room is arranged, is fixed on the suction sleeve mounting hole of liquid storage room, and is fastened on suction sleeve mounting hole that step is arranged, makes collecting apparatus for leakage water and the mutual UNICOM of liquid storage room; Submersible pump is arranged on the submersible pump installation position place that liquid storage room is arranged, the inlet tube of submersible pump is connected with the liquid-discharging tube mounting hole that liquid storage room is arranged, the liquid-discharging tube of submersible pump is connected with the water pipe mounting hole that inlet segment is arranged, and the liquid-discharging tube of submersible pump installs 1 submersible electromagnetic valve;
Liquid inlet pipe inserts in liquid storage room by the liquid inlet pipe mounting hole that liquid storage room is arranged, and be fixed on the liquid inlet pipe mounting hole of liquid storage room, exposed liquid inlet pipe outside liquid storage room is provided with 1 submersible electromagnetic valve, submersible electromagnetic valve liquid inlet pipe end is below provided with filter screen; Probe pipe is provided with exhaust port, and 2 groundwater level detect probe are contained in probe pipe, and probe pipe is fixed on the probe pipe mounting hole of liquid storage room setting.
Step, upper bearing bracket and bottom bracket are all provided with vibration detection probe and bearing temperature detect probe; Submersible pump, submersible electromagnetic valve, diving mortor operated valve, diving air pressure detector and submergence pressure detector are all respectively arranged with leak water detdction probe; Described vibration detection probe, bearing temperature detect probe, leak water detdction probe pop one's head ins with the leak water detdction that spatial guide blade is arranged, the wire of bearing temperature detect probe and the water level detecting probe that to be arranged on lower bearing gland the top is all connected with the PLC in water pump central station of floating dock by armoured conduit, the monitor and detection system of formation water pump.
The present invention design ingenious, using effect good, constantly meet the requirement of electromechanical integration, also instead of the guide bearing structure of former long-shaft pump, and completely solve the sealing problem of existing space guide-vane rolling bearing structure type long-shaft pump and bearing and shaft seal and run and cause air to expand the problem that can not discharge.Improve the safety reliability of pump group, extend the working life of pump group.Because design of the present invention is ingenious, unique, also overcome that major axis lift of pump under current existing space guide-vane liquid is low, the degree of depth is short under liquid, pump shaft is long, vibration is large, pump medium and easily leak outside and the difficult problem of installation and maintenance inconvenience, reduce manufacture and installation and maintenance cost, improve the sanitation and hygiene of environment.Under combined vertical solution provided by the present invention, the flow of long-shaft pump can reach 8000m 3/ h, lift can reach 800m, and match power can reach 12500KW, and under liquid, the degree of depth can reach 45m, and impeller quantity can reach 16.Compared with long-shaft pump under current existing multistage spatial guide blade formula liquid, when impeller quantity is identical, the length of pump shaft can shorten 1/3 ~ 1/2.The monitor and detection system of the water pump under combined vertical solution provided by the present invention set by long-shaft pump can clearly demonstrate water pump operation situation, directly can also diagnose out the particular location of fault of water pump, facilitate the maintenance of water pump, greatly can improve maintenance efficiency, reduce maintenance cost.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the present invention is further illustrated.
Fig. 1 is structural representation of the present invention.
Fig. 2 is the structure for amplifying schematic diagram of Fig. 1 hypomere.
Fig. 3 is spatial guide blade structural representation of the present invention.
Fig. 4 is lower link tubular construction schematic diagram of the present invention.
Fig. 5 is the plan view of Fig. 4.
Fig. 6 is lower bearing gland structure schematic diagram of the present invention.
Fig. 7 is the plan view of Fig. 6.
Fig. 8 is lower bearing seat structure schematic diagram of the present invention.
Fig. 9 is the sectional view of Fig. 8.
Figure 10 is bottom bracket structural representation of the present invention.
Figure 11 is upper bearing support structure schematic diagram of the present invention.
Figure 12 is bearing gland structure schematic diagram of the present invention.
Figure 13 is control system logic block-diagram of the present invention.
In Fig. 1: 1, filter screen; 2, inlet segment; 3, impeller nut; 4, impeller; 5, radial stator; 6, stage casing; 7, turnbuckle; 8, spatial guide blade; 9, mechanical seal; 10, drainage system; 11, device for storing liquid; 12, second line of a couplet adapter; 13, step; 14, middle water pump coupler; 15, bottom bracket; 16, bearing gland; 17, middle connecting tube; 18, middle pillar; 19, armoured conduit; 20, pump holder; 21, upper bearing bracket; 22, suction tude; 23, bearing temperature detect probe; 24, vibration detection probe; 25, transmission shaft; 26, collecting apparatus for leakage water; 27, pump shaft; 28, pressure reducing sleeve; 29, impeller; 30, guide blade sleeve; 31, choma; 32, positioning ring; 103, water pipe mounting hole; 105, filter screen; 112, deep groove ball bearing; 117, upper connecting tube; 118, public connecting tube; 119, public pillar; 120, bearing temperature detect probe; 121, vibration detection probe; 122, outside framework oil seal.
In Fig. 2: 33, submersible pump liquid-discharging tube; 34, suction sleeve I; 35, lower pillar; 36, submersible electromagnetic valve; 37, submersible pump inlet tube; 38, submersible pump; 39, suction sleeve II; 40, liquid cover is thrown; 41, bolt; 42, flowing hole; 43, liquid cover thrown by coupling; 44, round nut; 45, axle sleeve; 46, bearing gland; 47, packing ring; 48, wire elbow; 49, O shape circle; 50, submersible electromagnetic valve; 51, diving air pressure detector; 52, liquid inlet pipe; 53, water level detecting probe; 54, water level detecting probe; 55, submergence pressure detector; 56, water level detecting probe; 57, diving mortor operated valve; 58, axle sleeve I; 59, axle sleeve II; 60, water pump axial force balance pipe; 61, relief chamber; 62, submergence pressure detector; 76, lower bearing gland; 94, O shape circle; 95, O shape circle; 96, profile of tooth decompressing groove; 97, transmission boss; 98, axle sleeve III; 99, equalizing orifice; 104, absorb water elbow; 107, leak water detdction probe; 109, roller bearing; 110, tapered roller bearing; 111, deep groove ball bearing; 113, middle motor coupler; 116, bearing temperature detect probe; 123, axle sleeve between impeller.
In Fig. 3: 63, exhaust port; 64, vent; 106, leak water detdction probe mounting holes; 115, bearing temperature detect probe mounting hole.
In Fig. 4, Fig. 5: 65, liquid-discharging tube mounting hole; 66, submersible pump installation position; 67, suction sleeve mounting hole; 68, liquid inlet pipe mounting hole; 69, probe pipe mounting hole; 70, exhaust port; 71, diving air pressure detector mounting hole; 72, water level detecting probe; 73, probe pipe; 74, water level detecting probe; 75, liquid storage room; 100, positioning hole.
In Fig. 6, Fig. 7: 77, suction sleeve mounting-positioning holes; 78, marine riser; 79, water level detecting probe mounting hole; 80, outlet pipe; 81, positioning block installed by outlet pipe; 82, outlet pipe allows fluting; 108, leak water detdction probe allows fluting; 114, bearing temperature detect probe allows fluting.
In Fig. 8, Fig. 9: 42, flowing hole; 83, suction sleeve mounting hole; 84, probe wire pipe mounting hole; 85, bearing temperature detect probe mounting hole; 86, mounting-positioning holes; 101, vibration detection probe mounting holes.
In Figure 10: 87, flowing hole; 88, bearing temperature detect probe mounting hole; 89, mounting-positioning holes; 102, vibration detection probe mounting holes.
In Figure 11: 90, inlet hole; 91, bearing temperature detect probe mounting hole; 92, vibration detection probe mounting holes.
In Figure 12: 93, cross chute.
In Figure 13: 124, automatic liquid storage system; 125, axial force automatic balancing system; 126, monitor and detection system; 127, automatic water replenishing system; 128, automatic drain system; 129, air pressure detects automatic drain system.
Embodiment
As shown in Fig. 1-Figure 13, the present invention includes: filter screen 1, inlet segment 2, impeller nut 3, impeller 4, impeller 29, radial stator 5, stage casing 6, turnbuckle 7, spatial guide blade 8, mechanical seal 9, drainage system 10, device for storing liquid 11, connecting tube (second line of a couplet adapter 12, middle connecting tube 17, upper connecting tube 117), public connecting tube 118, bearing support (step 13, bottom bracket 15, upper bearing bracket 21), middle water pump coupler 14, middle motor coupler 113, bearing gland 16, bearing gland 46, lower bearing gland 76, pillar (middle pillar 18, lower pillar 35), public pillar 119, armoured conduit 19, pump holder 20, suction tude 22, monitor and detection system, transmission shaft 25, collecting apparatus for leakage water 26, pump shaft 27, pressure reducing sleeve 28, guide blade sleeve 30, choma 31, positioning ring 32, outside framework oil seal 122 and axial force automatic balancing system 125 etc.
Outside framework oil seal 122 is placed in spatial guide blade 8, roller bearing 109 outer ring press-in spatial guide blade 8 in and inject lubricating grease, the inner ring hot jacket of roller bearing 109 is on pump shaft 27, pump shaft 27 inserts in spatial guide blade 8, and the inner ring of roller bearing coordinates with the cylindrical roller in the outer ring of roller bearing 109.Leak water detdction probe 107 and bearing temperature detect probe 116 be fixed on respectively on spatial guide blade 8 arrange leak water detdction probe mounting holes 106 and bearing temperature detect probe mounting hole 115 on.Lower bearing gland 76 built-in enter outside framework oil seal, lower bearing gland 76 is inserted on pump shaft 27, make the outlet pipe that lower bearing gland 76 is arranged allow fluting 82, leak water detdction pop one's head in allow after fluting 108 and bearing temperature detect probe allow fluting 114 and the exhaust port 63 that spatial guide blade 8 is arranged and the leak water detdction be arranged on spatial guide blade 8 pop one's head in 107, bearing temperature detect probe 116 is alignd, lower bearing gland 76 is pressed in the bearing mounting hole on spatial guide blade 8 to coordinate with roller bearing 109 and is joined with bolts on spatial guide blade 8.
Lower bearing gland 76 is assembled with spatial guide blade 8 and pump shaft 27, outlet pipe 80 allows fluting 82 be connected with the exhaust port 63 that spatial guide blade 8 is arranged by the outlet pipe that lower bearing gland 76 is arranged, with pipe clamp and bolt, outlet pipe 80 being fixed on the outlet pipe that lower bearing gland 76 is arranged installs on positioning block 81, and lower bearing gland 76 is provided with O shape with the cooperation place of spatial guide blade 8 and encloses 49.Water level detecting probe 53,54 and 56 is fixed on the water level detecting probe mounting hole 79 on the marine riser 78 of setting on lower bearing gland 76 respectively.Throw on liquid cover 40 and insert O shape circle 49, throwing liquid cover 40 is inserted on pump shaft 27, is fixed on pump shaft 27 with Cock screw with after marine riser 78 Spielpassung.After step 13 is inserted outside framework oil seal and O shape circle, pass in the probe wire pipe mounting hole 84 that step 13 is arranged again after respectively the wire of leak water detdction probe 107, bearing temperature detect probe 116 and water level detecting probe 53,54,56 being pierced into wire elbow 48.Wire elbow 48 and water suction elbow 104 are fixed on probe wire pipe mounting hole 84 and suction sleeve mounting hole 83 that step 13 is arranged, and suction sleeve I34 is fixed on water suction elbow 104.Spatial guide blade 8 is inserted O shape circle, and lower pillar 35 is inserted in after pump shaft 27 and coordinates with spatial guide blade 8, and second line of a couplet adapter 12 is inserted in after lower pillar 35 coordinates with spatial guide blade 8, is joined with bolts.Step 13 is inserted in pump shaft 27, the suction sleeve I34 be fixed on water suction elbow 104 is made to insert in the suction sleeve mounting-positioning holes 77 on the marine riser 78 of setting on lower bearing gland 76, step 13 coordinates with lower pillar 35 and second line of a couplet adapter 12, be connected and fixed with the mounting-positioning holes 86 that arranges on step 13 by after positioning hole 100 that second line of a couplet adapter 12 is arranged with bolt 41, formation collecting apparatus for leakage water 26.
Lubricating grease is injected respectively in tapered roller bearing 110 and deep groove ball bearing 111, be pressed into after tapered roller bearing 110, packing ring 47 and deep groove ball bearing 111 being inserted in respectively pump shaft 27 in step 13, bearing gland 46 is inserted O shape circle and outside framework oil seal respectively, in axle sleeve 45, inserts O shape circle; Coordinate with the end face of deep groove ball bearing 111 after axle sleeve 45 being inserted in pump shaft 27, bearing gland 46 is inserted in axle sleeve 45, the chute 93 of crossing that bearing gland 46 is arranged is alignd with the flowing hole 42 that step 13 is arranged, bearing gland 46 is pressed into after coordinating with the end face of deep groove ball bearing 111 in step 13, is joined with bolts.Pump shaft 27 is inserted in lock washer, round nut 44 is screwed in after on pump shaft 27 and coordinate with the end face of axle sleeve 45, the outer tongue of lock washer is snapped in the locking groove of round nut 44.
Choma 31 to be inserted in inlet segment 2, radial stator 5, stage casing 6 and pressure reducing sleeve 28 respectively and fixing, guide blade sleeve 30 to be inserted in radial stator 5 and fixing, in axle sleeve II59, insert O shape enclose 94.Coordinate with the end face of roller bearing 109 after axle sleeve 158 being inserted in pump shaft 27, axle sleeve II59 makes O shape circle 94 coordinate with the end face of axle sleeve I58 after being inserted in pump shaft 27, after pump shaft 27 is inserted in mechanical seal 9, be fixed in spatial guide blade 8.O shape circle 95 is inserted in axle sleeve III98, after axle sleeve III98 is inserted in pump shaft 27, makes O shape enclose 95 and coordinate with the end face of the axle sleeve of mechanical seal 9.Pressure reducing sleeve 28 is inserted in pump shaft 27, profile of tooth decompressing groove 96 is coordinated with axle sleeve III98, be joined with bolts in spatial guide blade 8, form relief chamber 61.After impeller 29 is inserted in pump shaft 27, the groove on impeller 29 wheel hub end face is coordinated with the transmission boss 97 on axle sleeve III98 end face and coordinates with the choma 31 on pressure reducing sleeve 28 with impeller 29, allow impeller 29 drive axle sleeve III98 to rotate.After pump shaft 27 is inserted in stage casing 6, coordinate with impeller 29 and spatial guide blade 8 respectively.After axle sleeve between impeller 123 is inserted in pump shaft 27, coordinate with the wheel hub end face of impeller 29.Radial stator 5 is inserted in pump shaft 27, guide blade sleeve 30 is coordinated with axle sleeve between impeller 123, coordinates with stage casing 6.Impeller 4 is inserted in pump shaft 27, coordinates with axle sleeve between impeller 123 and radial stator 5.After 2 positioning rings 32 are sticked into pump shaft 27, coordinate with the wheel hub end face of impeller 4.After impeller nut 3 is screwed in pump shaft 27, be inserted in positioning ring 32 and coordinate with its end face, being fixed on pump shaft 27 with Cock screw.Inlet segment 2 coordinates with impeller 4, radial stator 5, stage casing 6 respectively, after being connected, with nut, inlet segment 2, stage casing 6, spatial guide blade 8 is fixed together, forms combined pump chamber by turnbuckle 7 with spatial guide blade 8.With bolt, filter screen 1 and inlet segment 2 are connected and fixed, middle water pump coupler 14 is pressed into above pump shaft 27, assembling forms the hypomere of water pump.
Bottom bracket 15 and upper bearing bracket 21 will be inserted respectively O shape circle and outside framework oil seal, bearing gland 16 will be inserted respectively O shape circle and outside framework oil seal, throw liquid cover 43 by the wheel hub of middle motor coupler 113 being inserted in coupling, the bottom end bearing position place hot jacket of transmission shaft 25 is installed deep groove ball bearing.Transmission shaft 25 is pressed in bottom bracket 15 together with deep groove ball bearing, bearing gland 16 is inserted on transmission shaft 25, the chute 93 of crossing that bearing gland 16 is arranged is alignd with the flowing hole 87 that bottom bracket 15 is arranged, bearing gland 16 is pressed into after coordinating with the end face of deep groove ball bearing in bottom bracket 15, is joined with bolts.After middle pillar 18 and middle connecting tube 17 are inserted in transmission shaft 25, coordinate with bottom bracket 15, another bottom bracket 15 is inserted in the upper end of transmission shaft 25, coordinates with middle pillar 18 and middle connecting tube 17, be connected and fixed by the mounting-positioning holes 89 that bottom bracket 15 is arranged with bolt 41.Deep groove ball bearing be inserted in the upper end of transmission shaft 25 and be pressed in bottom bracket 15, another bearing gland 16 is inserted in the upper end of transmission shaft 25, the chute 93 of crossing that bearing gland 16 is arranged is alignd with the flowing hole 87 that bottom bracket 15 is arranged, bearing gland 16 is pressed into after coordinating with the end face of deep groove ball bearing in bottom bracket 15, is joined with bolts.Middle motor coupler 113 and middle water pump coupler 14 are pressed into respectively lower end and the upper end of transmission shaft 25, assembling forms the intermediate section of water pump.
After upper connecting tube 117 is coordinated with pump holder 20, be joined with bolts together.Transmission shaft 25 is pressed in bottom bracket 15 together with deep groove ball bearing, bearing gland 16 is inserted on transmission shaft 25, the chute 93 of crossing that bearing gland 16 is arranged is alignd with the flowing hole 87 that bottom bracket 15 is arranged, after bearing gland 16 is pressed into and is coordinated with the end face of deep groove ball bearing in bottom bracket 15, be joined with bolts.After middle pillar 18 is inserted in transmission shaft 25, together transmission shaft 25 and middle pillar 18 are inserted in upper connecting tube 117 and pump holder 20, the end face of bottom bracket 15 is coordinated with the end face of upper connecting tube 117, is connected and fixed by the mounting-positioning holes 89 that bottom bracket 15 is arranged with bolt 41.Upper bearing bracket 21 is inserted in the upper end of transmission shaft 25, coordinates with middle pillar 18 and pump holder 20, be joined with bolts.Deep groove ball bearing be inserted in the upper end of transmission shaft 25 and be pressed in upper bearing bracket 21, another bearing gland 16 being inserted in the upper end of transmission shaft 25, bearing gland 16 being pressed into after coordinating with the end face of deep groove ball bearing in upper bearing bracket 21, being joined with bolts.Suction tude 22 is fixed on the inlet hole 90 that upper bearing bracket 21 is arranged.Middle motor coupler 113 and water pump coupler are pressed into respectively lower end and the upper end of transmission shaft 25, assembling forms the epimere of water pump.
Public pillar 119 is inserted in respectively on the bottom bracket 15 at the intermediate section two ends of water pump, public connecting tube 118 is inserted on public pillar 119 respectively, after coordinating with the end face of bottom bracket 15, is joined with bolts together.Respectively the hypomere of water pump and epimere are coordinated with the middle motor coupler 113 on the intermediate section of water pump, middle water pump coupler 14, public pillar 119 and public connecting tube 118, be joined with bolts together, long-shaft pump under the combined vertical solution of assembling formation.
Submergence pressure detector 55, diving mortor operated valve 57 and submergence pressure detector 62 are arranged on water pump axial force balance pipe 60 respectively, water pump axial force balance pipe 60 is fixed on the water pipe mounting hole 103 that the vent 64 and inlet segment 2 that spatial guide blade 8 is arranged is arranged respectively.The equalizing orifice 99 that impeller 4 and impeller 29 are arranged, choma 31, profile of tooth decompressing groove 96, relief chamber 61, vent 64 and water pump axial force balance pipe 60 are combined to form the axial thrust balancing devices of water pump.Water level detecting probe 72 and 74 is placed in respectively in probe pipe 73, probe pipe 73 is inserted in liquid storage room 75 and is fixed on probe pipe mounting hole 69.Liquid inlet pipe 52 inserted in liquid storage room 75 and is fixed on liquid inlet pipe mounting hole 68, submersible electromagnetic valve 50 and filter screen 105 being fixed on liquid inlet pipe 52 respectively, being combined to form the device for storing liquid 11 of water pump.Suction sleeve II39 is inserted in liquid storage room 75, is fixed on suction sleeve mounting hole 67 and suction sleeve mounting hole 83 simultaneously.Submersible pump 38 is fixed on submersible pump installation position 66, after submersible pump inlet tube 37 is connected with submersible pump 38, be fixed on liquid-discharging tube mounting hole 65, after submersible electromagnetic valve 36 is connected with submersible pump liquid-discharging tube 33, submersible pump liquid-discharging tube 33 is fixed on the water pipe mounting hole 103 that inlet segment 2 is arranged and in the outlet of submersible pump 38 simultaneously, is combined to form the pumping equipment of water pump with suction sleeve I34, the elbow 104 that absorbs water, suction sleeve mounting hole 83.Vibration detection probe 121 and bearing temperature detect probe 120 are fixed on respectively on the vibration detection probe mounting holes 101 that step 13 is arranged, the vibration detection probe mounting holes 102 arranged on bearing temperature detect probe mounting hole 85 and on bottom bracket 15, bearing temperature detect probe mounting hole 88, vibration detection probe 24 and bearing temperature detect probe 23 are fixed on the vibration detection probe mounting holes 92 and bearing temperature detect probe mounting hole 91 that upper bearing bracket 21 is arranged respectively.Respectively water level detecting probe 53,54,56,72,74, leak water detdction probe 107, bearing temperature detect probe 116,120, vibration detection probe 121, submersible electromagnetic valve 36,50, submersible pump 38, diving air pressure detector 51, submergence pressure detector 55,62, the wire of diving mortor operated valve 57 pierces into successively in armoured conduit 19 and passes from the other end.Armoured conduit 19 to be fixed on successively on second line of a couplet adapter 12, middle connecting tube 17, upper connecting tube 117, the flange of public connecting tube 118 and pump holder 20 and to pass the base plate of pump holder 20.
The wire of above all monitor and detection instruments is all imported in water pump central station of floating dock, and be connected with PLC, thus the liquid storage room automatic liquid storage system 124 of long-shaft pump and the monitor and detection system 126 of automatic water replenishing system 127, collecting apparatus for leakage water auto-collection system, automatic drain system 128, axial force automatic balancing system 125 and water pump under forming combined vertical solution.

Claims (7)

1. long-shaft pump under a combined vertical solution, comprise inlet segment, radial stator, stage casing, spatial guide blade, middle pillar, lower pillar, the second line of a couplet is taken over, middle connecting tube, upper connecting tube, armoured conduit, lower bearing gland, middle motor coupler, pressure reducing sleeve, throw liquid cover, leak water detdction is popped one's head in, suction sleeve I, suction sleeve II, liquid inlet pipe, submersible pump, submersible electromagnetic valve, diving mortor operated valve, diving air pressure detector, submergence pressure detector and pump shaft, it is characterized in that: described inlet segment (2), radial stator (5), stage casing (6) and spatial guide blade (8) combined, and connected by turnbuckle (7) and compressed, form combined pump chamber, impeller (4) and impeller (29) is provided with in pump chamber,
Described pressure reducing sleeve (28) is provided with profile of tooth decompressing groove (96); Described inlet segment (2) is provided with 2 water pipe mounting holes (103); Described pump shaft (27) is provided with above and throws liquid cover (40);
Described leak water detdction probe (107) is fixed on leak water detdction probe mounting holes (106) that spatial guide blade is arranged;
Described suction sleeve I (34) is connected with water suction elbow (104), and suction sleeve I is fixed on the suction sleeve mounting hole (83) that step (13) arranges and goes up and insert in collecting apparatus for leakage water (26);
Described suction sleeve II (39) is inserted in liquid storage room by the suction sleeve mounting hole that liquid storage room is arranged, be fixed on the suction sleeve mounting hole of liquid storage room, and be fastened on suction sleeve mounting hole that step is arranged, make collecting apparatus for leakage water and the mutual UNICOM of liquid storage room;
Described liquid inlet pipe (52) inserts in liquid storage room (75) by the upper liquid inlet pipe mounting hole (68) arranged of liquid storage room (75), and be fixed on the liquid inlet pipe mounting hole of liquid storage room, exposed liquid inlet pipe outside liquid storage room is provided with 1 submersible electromagnetic valve (50);
Described pressure reducing sleeve (28) and spatial guide blade (8) form relief chamber after assembling, vent (64) on spatial guide blade installs relief pipe, relief pipe is connected with the water pipe mounting hole (103) on inlet segment, forms water pump axial force balance pipe (60); 2 submergence pressure detectors (55,62) installed by water pump axial force balance pipe, in the middle of 2 submergence pressure detectors, 1 diving mortor operated valve (57) is installed, 2 submergence pressure detectors are connected with the PLC in water pump central station of floating dock by armoured conduit (19) with the wire of diving mortor operated valve, form the axial force automatic balancing system of water pump;
Described diving air pressure detector (51) device on liquid storage room (75), for detecting the pressure in liquid storage room (75);
Compress by Bolt Connection after described middle pillar (18), middle connecting tube (17) coordinate with bottom bracket (15), compress by Bolt Connection after pump holder (20) coordinates with upper bearing bracket (21), upper connecting tube (117), form independently water-supplying chamber's runner;
By there being each detection control wire of collecting apparatus for leakage water (26), monitor and detection system (126), automatic drain system (128) and axial force automatic balancing system (125) in described armoured conduit (19), each detection control wire is all connected with the PLC in water pump central station of floating dock by after armoured conduit;
Described second line of a couplet adapter (12) is provided with liquid storage room (75);
Described submersible pump (38) is arranged on upper submersible pump installation position (66) place arranged of liquid storage room (75), the inlet tube of submersible pump (38) is connected with the liquid-discharging tube mounting hole (65) that liquid storage room is arranged, the liquid-discharging tube of submersible pump is connected with the upper water pipe mounting hole arranged of inlet segment (2), and the liquid-discharging tube of submersible pump installs 1 submersible electromagnetic valve;
Described submersible electromagnetic valve liquid inlet pipe end is below provided with filter screen (105); Probe pipe (73) is provided with exhaust port (70), and 2 groundwater level detect probe (72,74) are contained in probe pipe, and probe pipe is fixed on the probe pipe mounting hole (69) of liquid storage room setting;
Described lower pillar (35) is inserted in pump shaft (27) and is coordinated with spatial guide blade (8) afterwards, second line of a couplet adapter (12) is inserted in after lower pillar (35) coordinates with spatial guide blade (8), is joined with bolts, step (13) is inserted in pump shaft (27), in the suction sleeve mounting-positioning holes (77) that the suction sleeve I (34) be fixed in water suction elbow (104) is inserted on the upper marine riser (78) arranged of lower bearing gland (76), step (13) is taken over (12) with lower pillar (35) and the second line of a couplet and is coordinated, with bolt (41), by the upper positioning hole (100) arranged of second line of a couplet adapter (12), the upper mounting-positioning holes (86) arranged is connected and fixed with step (13) afterwards, form collecting apparatus for leakage water (26).
2. long-shaft pump under combined vertical solution according to claim 1, is characterized in that: described spatial guide blade (8) is provided with exhaust port (63), leak water detdction probe mounting holes (106), bearing temperature detect probe mounting hole (115) and vent (64);
Described lower bearing gland (76) is provided with marine riser (78), suction sleeve positioning hole (77), outlet pipe allow fluting (82), leak water detdction pop one's head in allow fluting (108), bearing temperature detect probe allow fluting (114), outlet pipe installation positioning block (81) and 3 water level detecting probe mounting holes.
3. long-shaft pump under combined vertical solution according to claim 1, is characterized in that: described second line of a couplet adapter (12) is provided with the positioning hole (100) installed for bearing support;
Described liquid storage room (75) is provided with suction sleeve mounting hole (67), liquid-discharging tube mounting hole (65), submersible pump installation position (66), liquid inlet pipe mounting hole (68), probe pipe mounting hole (69) and diving air pressure detector mounting hole (71).
4. long-shaft pump under combined vertical solution according to claim 1, is characterized in that: described step (13) is provided with suction sleeve mounting hole (83), armoured conduit mounting hole (84), vibration detection probe mounting holes (101), bearing temperature detect probe mounting hole (85), flowing hole (42) and mounting-positioning holes (86);
Described upper bearing bracket (21) is provided with inlet hole (90), vibration detection probe mounting holes (92) and bearing temperature detect probe mounting hole (91).
5. long-shaft pump under combined vertical solution according to claim 1, is characterized in that: described bottom bracket (15) is provided with flowing hole (87), vibration detection probe mounting holes (102), bearing temperature detect probe mounting hole (88) and mounting-positioning holes (89);
Described middle motor coupler (113) is provided with coupling above and throws liquid cover (43); Described bearing gland (16) was provided with chute (93).
6. long-shaft pump under combined vertical solution according to claim 1, it is characterized in that: described lower bearing gland (76) is assembled with spatial guide blade (8) and pump shaft (27), outlet pipe (80) allows fluting (82) be connected with the exhaust port (63) on spatial guide blade by the outlet pipe on lower bearing gland, with pipe clamp and bolt, the outlet pipe that outlet pipe is fixed on lower bearing gland is installed on positioning block (81), lower bearing gland and spatial guide blade cooperation place are provided with O shape and enclose; After described throwing liquid cover (40) is inserted in upper marine riser (78) cooperation arranged in pump shaft (27) up and down bearing gland (76), be fixed on throw liquid cover on pump shaft with Cock screw, throwing liquid cover and pump shaft cooperation place are provided with O shape and enclose;
The probe wire pipe mounting hole (84) that the wire of described leak water detdction probe allows fluting (108) and step (13) go up to arrange by the leak water detdction probe that lower bearing gland is arranged and armoured conduit (19) are connected with the PLC in water pump central station of floating dock.
7. long-shaft pump under combined vertical solution according to claim 1, is characterized in that: described step, upper bearing bracket and bottom bracket are all provided with vibration detection probe and bearing temperature detect probe; Described submersible pump, submersible electromagnetic valve, diving mortor operated valve, diving air pressure detector and submergence pressure detector portion are respectively arranged with leak water detdction probe; Described vibration detection probe, bearing temperature detect probe, leak water detdction probe pop one's head ins with the leak water detdction that spatial guide blade is arranged, the wire of bearing temperature detect probe and the water level detecting probe that to be arranged on lower bearing gland the top is all connected with the PLC in water pump central station of floating dock by armoured conduit, the monitor and detection system of formation water pump.
CN201310023955.4A 2013-01-23 2013-01-23 Combined vertical-type submerged long-shaft pump Expired - Fee Related CN103075369B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310023955.4A CN103075369B (en) 2013-01-23 2013-01-23 Combined vertical-type submerged long-shaft pump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310023955.4A CN103075369B (en) 2013-01-23 2013-01-23 Combined vertical-type submerged long-shaft pump

Publications (2)

Publication Number Publication Date
CN103075369A CN103075369A (en) 2013-05-01
CN103075369B true CN103075369B (en) 2015-07-22

Family

ID=48152019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310023955.4A Expired - Fee Related CN103075369B (en) 2013-01-23 2013-01-23 Combined vertical-type submerged long-shaft pump

Country Status (1)

Country Link
CN (1) CN103075369B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103454048B (en) * 2013-05-30 2016-05-11 明达实业(厦门)有限公司 The testing agency of leaking
CN107939743B (en) * 2017-12-06 2024-06-21 广州市昕恒泵业制造有限公司 Self-cooling centrifugal pump
CN109372758B (en) * 2018-11-23 2023-08-15 广州市昕恒泵业制造有限公司 Vertical submerged long shaft pump
EP3963177A4 (en) 2019-05-02 2023-01-11 Baker Hughes Oilfield Operations LLC Pump bottom bearing with temperature sensor in electrical submersible well pump assembly
CN110043471A (en) * 2019-05-23 2019-07-23 湖南机电职业技术学院 Vertical sectional type long-shaft pump

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2184107Y (en) * 1993-08-11 1994-11-30 博山水泵厂 Upright multilevel pump
JPH102290A (en) * 1996-06-17 1998-01-06 Hitachi Ltd Submerged pump device for liquefied gas tank
CN2475853Y (en) * 2001-04-11 2002-02-06 大连深蓝泵业有限公司 High temp. long axis pump for submerged use
CN101691871A (en) * 2008-08-29 2010-04-07 浙江水泵总厂有限公司 Improvement on axial thrust balancing device of vertical multistage barrel pump
CN201615059U (en) * 2010-02-11 2010-10-27 大连深蓝泵业有限公司 Single-stage horizontal process pump
CN102606540A (en) * 2012-03-27 2012-07-25 上海阿波罗机械股份有限公司 Water pump for factory for nuclear power station
CN202431570U (en) * 2012-01-04 2012-09-12 广州市昕恒泵业制造有限公司 Space guide blade type long shaft pump depressurizing structure
CN203067357U (en) * 2013-01-23 2013-07-17 广州市昕恒泵业制造有限公司 Combined type vertical underwater long-shaft pump

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2184107Y (en) * 1993-08-11 1994-11-30 博山水泵厂 Upright multilevel pump
JPH102290A (en) * 1996-06-17 1998-01-06 Hitachi Ltd Submerged pump device for liquefied gas tank
CN2475853Y (en) * 2001-04-11 2002-02-06 大连深蓝泵业有限公司 High temp. long axis pump for submerged use
CN101691871A (en) * 2008-08-29 2010-04-07 浙江水泵总厂有限公司 Improvement on axial thrust balancing device of vertical multistage barrel pump
CN201615059U (en) * 2010-02-11 2010-10-27 大连深蓝泵业有限公司 Single-stage horizontal process pump
CN202431570U (en) * 2012-01-04 2012-09-12 广州市昕恒泵业制造有限公司 Space guide blade type long shaft pump depressurizing structure
CN102606540A (en) * 2012-03-27 2012-07-25 上海阿波罗机械股份有限公司 Water pump for factory for nuclear power station
CN203067357U (en) * 2013-01-23 2013-07-17 广州市昕恒泵业制造有限公司 Combined type vertical underwater long-shaft pump

Also Published As

Publication number Publication date
CN103075369A (en) 2013-05-01

Similar Documents

Publication Publication Date Title
CN103075369B (en) Combined vertical-type submerged long-shaft pump
CN102606484A (en) Charging pump for nuclear power station
CN107939743B (en) Self-cooling centrifugal pump
CN101363448A (en) Submerged pump for on-line removing leakage liquid
CN201486880U (en) Cantilever type submerged sewage pump
CN201170186Y (en) Emergency pump
CN202597113U (en) Charging pump for nuclear power station
CN204082560U (en) Crude oil pipeline conveying oil line pump
CN201574979U (en) Main circulation pump set for nuclear power plant
CN102828970B (en) Vertical seal-free liquid surface sewage self-sucking pump
CN203067357U (en) Combined type vertical underwater long-shaft pump
CN112475336A (en) Turning liquid static pressure electric spindle
CN202707624U (en) Small flow high-lift pump of hydrogenation device
CN108488073B (en) Environment-friendly slurry circulating pump group
CN102606366B (en) Special built-in cantilever type water turbine for cooling tower
CN203067304U (en) Underwater major axis pump with jet liquor drainage device
CN210565153U (en) Integral core-pulling full-pressure design double-shell high-pressure centrifugal pump
CN204646690U (en) Centrifugal low-pressure water coal slurry pump
CN209326975U (en) A kind of centrifuger differential mechanism experimental rig
CN203067303U (en) Underwater major axis pump with vacuum liquor drainage device
CN106609759A (en) Leak-free centrifugal pump
CN201461460U (en) Submersible motor pump
CN213981206U (en) Pump for nuclear power plant
CN216200269U (en) Vertical centrifuge differential mechanism main shaft bearing lubricating structure
CN214290854U (en) Turning liquid static pressure electric spindle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 510000, Guangdong province Guangzhou economic and Technological Development Zone Open Cloud No. 5

Patentee after: Guangzhou Xinheng Pump Manufacturing Co., Ltd.

Address before: 510000 Guangdong city of Guangzhou province Tianhe District gourd Ling Lu Jinhu Industrial Zone No. 11

Patentee before: Guangzhou Xinheng Pump Manufacturing Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150722

Termination date: 20160123

EXPY Termination of patent right or utility model