CN103066594A - Power grid risk pre-controlling method based on province power grid topology and city power grid topology and county power grid topology - Google Patents

Power grid risk pre-controlling method based on province power grid topology and city power grid topology and county power grid topology Download PDF

Info

Publication number
CN103066594A
CN103066594A CN2012105638151A CN201210563815A CN103066594A CN 103066594 A CN103066594 A CN 103066594A CN 2012105638151 A CN2012105638151 A CN 2012105638151A CN 201210563815 A CN201210563815 A CN 201210563815A CN 103066594 A CN103066594 A CN 103066594A
Authority
CN
China
Prior art keywords
power grid
network
dispatching
power
county
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105638151A
Other languages
Chinese (zh)
Inventor
李文启
王红印
付红军
李岩
刘轶
王星海
刘伯康
韩鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN ELECTRIC POWER Co
Original Assignee
HENAN ELECTRIC POWER Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN ELECTRIC POWER Co filed Critical HENAN ELECTRIC POWER Co
Priority to CN2012105638151A priority Critical patent/CN103066594A/en
Publication of CN103066594A publication Critical patent/CN103066594A/en
Pending legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to a power grid risk pre-controlling method based on a province power grid topology and a city power grid topology and a county power grid topology. The power grid risk pre-controlling method based on the province power grid topology and the city power grid topology and the county power grid topology comprises the steps of building a power grid dispatching network model comprising a provincial level power grid dispatching network, a power grid dispatching network model comprising a city level power grid dispatching network and a power grid dispatching network model comprising a county level power grid dispatching network, carrying out fast interconnection and rebuilding of the three power grid dispatching network models, basic dispatching data and historical data are input into a system database through a system server and updating the data in real time, building a province dispatching power grid graph, a city dispatching power grid graph and a county dispatching power grid graph and then building corresponding risk pre-controlling schemes based on the province dispatching power grid graph, the city dispatching power grid graph and the county dispatching power grid graph, carrying out association of the three power grid risk pre-controlling schemes according to a province topology, a city topology and a county topology, and automatically forming an interconnection and interworking grid risk pre-controlling scheme based on the three topologies. According to the power grid risk pre-controlling method based on the province power grid topology and the city power grid topology and the county power grid topology, a dispatching pre-controlling system which is integral, interconnected in the three-level topologies and integral in province and county is built, fast technical support is provided for power grid to respond to emergencies, and emergency processing ability for responding to emergencies is greatly improved.

Description

Power grid risk pre-control method based on province's three grades of power network topologies in ground county
Technical field
The invention belongs to power system dispatching control technology field, especially a kind of power grid risk pre-control method based on province's three grades of power network topologies in ground county.
Background technology
In the power scheduling control system, prediction scheme sequencing, standardization are the important foundations of quick and precisely processing power grid accident.The dispatcher is after obtaining accurately accident information; according to the type of accident and the information such as power failure range behind automatic safety device, protection action situation and the switch trip; start targetedly the corresponding standard prediction scheme set in advance, can fast, accurately carry out accident treatment and restore electricity.For making dispatcher and operations staff that adequate preparation be arranged, the dispatcher orders operation correctly, and it is accurate rapidly that the substation operation personnel carry out instruction, reaches the purpose of power scheduling zero defect.At present in province's three grades of dispatching patchers in ground county of electric power system, the quick Ability of emergency management that how improves the dispatching of power netwoks control system by the power grid risk pre-control method is present problem in the urgent need to address.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, provide a kind of reasonable in design, can quick and precisely carry out the power grid risk pre-control method based on province's three grades of power network topologies in ground county that power grid accident is processed.
The present invention solves existing technical problem and takes following technical scheme to realize:
A kind of power grid risk pre-control method based on province's three grades of power network topologies in ground county may further comprise the steps:
Step 1: foundation comprises three grades of dispatching of power netwoks network models of provincial power network dispatch network, region dispatching of power netwoks network, County Power Grid dispatch network and carries out the quick interconnected reconstruction of three grades of dispatching of power netwoks network models;
Step 2: system server imports in the system database basic data dispatching and historical data and the real-time update data;
Step 3: set up province transfer, transfer, the county transfers and sets up separately Risk Pre-control scheme based on grid graphs at different levels;
Step 4: system carries out association according to province's three grades of topologys in ground county with power grid risk pre-control schemes at different levels;
Step 5: automatically form the power grid risk pre-control scheme that interconnects up and down based on three grades of power network topologies.
And the method for the quick interconnected reconstruction of three grades of dispatching of power netwoks network models of described step 1 is:
⑴ obtain outer net at line model and carry out equivalence at this model and process, and obtains a rational external network equivalent model;
⑵ obtain Intranet SCADA data, gets rid of bad data, carries out the internal electric network state estimation, obtains an in real time interior pessimistic concurrency control with certain accuracy;
⑶ merge External network model and Intranet real-time model, obtain complete electric network model, regulate that outer net relevant generator and load inject so that voltage and the interconnection power match of outer net boundary node voltage and the injecting power boundary node corresponding with Intranet, the state of assurance internal network part is constant.
And described external network equivalent method adopts people having the same aspiration and interest Dynamic Equivalence, and reserve part buffering net is to improve equivalent precision.
And, the method that described step 2 system server imports data is: take energy management system as main reduced model, with the XML file of electrical network CIM topological model and SVG form grid graph file as data medium, with switchgear information, switch history, real time data, once supply history, real time data, frequency is historical, real time data is docked in the system database.
And the method that described step 5 forms automatically based on the power grid risk pre-control scheme that interconnects up and down of three grades of power network topologies is:
For the city transfer, transfer, the county transfers three grades of scheduling weak links to work out corresponding prediction scheme;
⑵ system is associated with document management prediction scheme with figure, figure adopts the signal of key equipment network connection, safeguards that take transformer station as unit figure is with related;
Realize province transfer, transfer, the procedure management such as establishment that the county transfers three grades of scheduling accident predictions, audit, approval, network issue;
⑷ utilize three grades of topological structure of electric to realize the association interlock that the city transfers, the superior and the subordinate's scheduling prediction scheme is transferred in various places.
And, describedly utilize three grades of topological structure of electric to realize that cities transfer, various places transfer the method for the association interlock of the superior and the subordinate's scheduling prediction scheme to be: system according to the dual scheduling boundary point of the superior and the subordinate as the interlock point, power supply backward table according to responsible consumer, it is related that the accident prediction of the city being transferred the voltage levels electrical network administer and area power grid accident prediction partly carry out, and forms vertical interconnected the whole network accident prediction hierarchy of control.
Advantage of the present invention and good effect are:
The present invention is according to province's three grades of topological structure of electric in ground county, the principle of multiple constraints and economic dispatch, adopt the method for full mesh topology analysis and engineering experience combination, finished unified, the superior and the subordinate's topology is interconnected, economize ground integrated scheduling pre-control system, the little regional low frequency control strategy of anticipation system, can the real time monitoring power grid risk dynamically, dynamically adjust the pre-control scheme, the help user makes a good job of work separately, thereby dynamically, efficiently, economical, the operation of safely control decision system, for the electrical network solution of emergent event provides the rapid technology support, increase substantially the solution of emergent event Ability of emergency management.
Embodiment
Below the embodiment of the invention is further described.
A kind of power grid risk pre-control method based on province's three grades of power network topologies in ground county comprises the steps:
Step 1: foundation comprises three grades of dispatching of power netwoks network models of provincial power network dispatch network, region dispatching of power netwoks network, County Power Grid dispatch network and carries out the quick interconnected reconstruction of three grades of dispatching of power netwoks network models;
In this step, the method of setting up three grades of dispatching of power netwoks network models is: whole network system data are divided according to the dispatching of power netwoks administrative area, network system each control centre at different levels sets up respectively data model, if exist related between certain two control centre, then dispatch the equivalent port model of relating dot between these two control centres of definition by the higher level, the equivalent port model external electrical network system related with each this background network system is corresponding; The system operation mode of electrical network adopts subordinate's scheduling newspaper plan, higher level to dispatch adjustment, subordinate's scheduling modification, and the collaboration mode that the higher level dispatches final affirmation carries out; The network system operational mode is carried out the multistage multi-region data model combination after determining, for higher level's scheduling, can obtain data model from the subordinate control centre, replaces corresponding equivalent port model, realizes major network and subsystem data model combination; For the subordinate control centre, can obtain the external electrical network data model corresponding with the equivalent port model of local power grid system relationship by the higher level control centre, realize subsystem and external electrical network data model combination, so that in larger electrical network scale, the local power grid system is analyzed; And the constraint that the combination of data model is arranged by the data model authority, every one-level scheduling can only be made up data model in the extent of competence, and data model can not be accessed beyond the authority; When the event that a certain equipment changes in data model, this variation is adopted model to change coping mechanism and process this event in the full electric network system;
In this step, the method for the quick interconnected reconstruction of three grades of dispatching of power netwoks network models is:
⑴ obtain outer net at line model and carry out equivalence at this model and process, and obtains a rational external network equivalent model.Need to take into account the requirement that static security analysis, transient security analysis and voltage security are analyzed this moment, and external network equivalent adopts people having the same aspiration and interest Dynamic Equivalence, and reserve part buffering net is to improve equivalent precision.
⑵ obtain Intranet SCADA data, gets rid of bad data, carries out the internal electric network state estimation, obtains an in real time interior pessimistic concurrency control with certain accuracy.
⑶ merge External network model and Intranet real-time model, obtain complete electric network model, regulate that outer net relevant generator and load inject so that voltage and the interconnection power match of outer net boundary node voltage and the injecting power boundary node corresponding with Intranet, the state of assurance internal network part is constant.
Step 2: system server imports in the system database basic data dispatching and historical data and the real-time update data;
In this step, the method that system server imports data is: take energy management system as main reduced model, with the XML file of electrical network CIM topological model and SVG form grid graph file as data medium, with switchgear information, switch history, real time data, once supply history, real time data, frequency is historical, real time data is docked in the system database.
Step 3: set up province transfer, transfer, the county transfers and sets up separately Risk Pre-control scheme based on grid graphs at different levels;
Step 4: system carries out association according to province's three grades of topologys in ground county with power grid risk pre-control schemes at different levels;
Step 5: automatically form the power grid risk pre-control scheme that interconnects up and down based on three grades of power network topologies;
When the power grid risk pre-control scheme that interconnects up and down that forms based on three grades of power network topologies, may further comprise the steps:
For the city transfer, transfer, the county transfers three grades of scheduling weak links to work out corresponding prediction scheme;
⑵ system is associated with document management prediction scheme with figure, figure adopts the signal of key equipment network connection, safeguards that take transformer station as unit figure is with related.Can by the related corresponding equipment of point diagram, carry out prediction scheme operation establishment in the establishment prediction scheme process; By the prediction scheme document, can navigate to the relevant key equipment on the figure, on figure, can consult this device-dependent prediction scheme measure.
Realize province transfer, transfer, the procedure management such as establishment that the county transfers three grades of scheduling accident predictions, audit, approval, network issue;
⑷ utilize three grades of topological structure of electric to realize the association interlock that the city transfers, the superior and the subordinate's scheduling prediction scheme is transferred in various places;
In this step, utilize three grades of topological structure of electric to realize that the city transfers, various places transfer the method for the association interlock of the superior and the subordinate's scheduling prediction scheme to be: system can be according to the dual scheduling boundary point of the superior and the subordinate as the interlock point, power supply backward table according to responsible consumer, it is related that the accident prediction of the city being transferred the voltage levels electrical network administer and area power grid accident prediction partly carry out, and forms vertical interconnected the whole network accident prediction hierarchy of control.
It is emphasized that; embodiment of the present invention is illustrative; rather than determinate; therefore the present invention includes and be not limited to the embodiment described in the embodiment; every other execution modes that drawn by those skilled in the art's technical scheme according to the present invention belong to the scope of protection of the invention equally.

Claims (6)

1. power grid risk pre-control method based on the three grades of power network topologies in province ground county is characterized in that: may further comprise the steps:
Step 1: foundation comprises three grades of dispatching of power netwoks network models of provincial power network dispatch network, region dispatching of power netwoks network, County Power Grid dispatch network and carries out the quick interconnected reconstruction of three grades of dispatching of power netwoks network models;
Step 2: system server imports in the system database basic data dispatching and historical data and the real-time update data;
Step 3: set up province transfer, transfer, the county transfers and sets up separately Risk Pre-control scheme based on grid graphs at different levels;
Step 4: system carries out association according to province's three grades of topologys in ground county with power grid risk pre-control schemes at different levels;
Step 5: automatically form the power grid risk pre-control scheme that interconnects up and down based on three grades of power network topologies.
2. the power grid risk pre-control method based on the three grades of power network topologies in province ground county according to claim 1, it is characterized in that: the method for the quick interconnected reconstruction of three grades of dispatching of power netwoks network models of described step 1 is:
⑴ obtain outer net at line model and carry out equivalence at this model and process, and obtains a rational external network equivalent model;
⑵ obtain Intranet SCADA data, gets rid of bad data, carries out the internal electric network state estimation, obtains an in real time interior pessimistic concurrency control with certain accuracy;
⑶ merge External network model and Intranet real-time model, obtain complete electric network model, regulate that outer net relevant generator and load inject so that voltage and the interconnection power match of outer net boundary node voltage and the injecting power boundary node corresponding with Intranet, the state of assurance internal network part is constant.
3. the power grid risk pre-control method based on the three grades of power network topologies in province ground county according to claim 2, it is characterized in that: described external network equivalent method adopts people having the same aspiration and interest Dynamic Equivalence, and reserve part buffering net is to improve equivalent precision.
4. the power grid risk pre-control method based on the three grades of power network topologies in province ground county according to claim 1, it is characterized in that: the method that described step 2 system server imports data is: take energy management system as main reduced model, with the XML file of electrical network CIM topological model and SVG form grid graph file as data medium, with switchgear information, switch history, real time data, once supply history, real time data, frequency is historical, real time data is docked in the system database.
5. the power grid risk pre-control method based on the three grades of power network topologies in province ground county according to claim 1, it is characterized in that: the method that described step 5 forms automatically based on the power grid risk pre-control scheme that interconnects up and down of three grades of power network topologies is:
For the city transfer, transfer, the county transfers three grades of scheduling weak links to work out corresponding prediction scheme;
⑵ system is associated with document management prediction scheme with figure, figure adopts the signal of key equipment network connection, safeguards that take transformer station as unit figure is with related;
Realize province transfer, transfer, the procedure management such as establishment that the county transfers three grades of scheduling accident predictions, audit, approval, network issue;
⑷ utilize three grades of topological structure of electric to realize the association interlock that the city transfers, the superior and the subordinate's scheduling prediction scheme is transferred in various places.
6. the power grid risk pre-control method based on the three grades of power network topologies in province ground county according to claim 5, it is characterized in that: describedly utilize three grades of topological structure of electric to realize that cities transfer, various places transfer the method for the association interlock of the superior and the subordinate's scheduling prediction scheme to be: system according to the dual scheduling boundary point of the superior and the subordinate as the interlock point, power supply backward table according to responsible consumer, it is related that the accident prediction of the city being transferred the voltage levels electrical network administer and area power grid accident prediction partly carry out, and forms vertical interconnected the whole network accident prediction hierarchy of control.
CN2012105638151A 2012-12-20 2012-12-20 Power grid risk pre-controlling method based on province power grid topology and city power grid topology and county power grid topology Pending CN103066594A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105638151A CN103066594A (en) 2012-12-20 2012-12-20 Power grid risk pre-controlling method based on province power grid topology and city power grid topology and county power grid topology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105638151A CN103066594A (en) 2012-12-20 2012-12-20 Power grid risk pre-controlling method based on province power grid topology and city power grid topology and county power grid topology

Publications (1)

Publication Number Publication Date
CN103066594A true CN103066594A (en) 2013-04-24

Family

ID=48109106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105638151A Pending CN103066594A (en) 2012-12-20 2012-12-20 Power grid risk pre-controlling method based on province power grid topology and city power grid topology and county power grid topology

Country Status (1)

Country Link
CN (1) CN103066594A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105808850A (en) * 2016-03-09 2016-07-27 国网安徽省电力公司 Distributed establishment method for provincial and regional power grid device topology structures
CN107231371A (en) * 2017-06-23 2017-10-03 国家电网公司 The safety protecting method of Electricity Information Network, device and system
CN108710807A (en) * 2018-07-16 2018-10-26 国网安徽省电力有限公司亳州供电公司 It is gone beyond one's commission management method and its system based on regional electrical energy system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102184209A (en) * 2011-04-29 2011-09-14 中国电力科学研究院 Simulation data accessing method based on power grid CIM (Common Information Model) interface
CN102184453A (en) * 2011-05-16 2011-09-14 上海电气集团股份有限公司 Wind power combination predicting method based on fuzzy neural network and support vector machine
CN202103486U (en) * 2011-06-07 2012-01-04 天津市电力公司 Two-stage electric-network dispatch-network topology system
CN102361355A (en) * 2011-10-28 2012-02-22 江苏省电力公司常州供电公司 Method for concentratedly acquiring data of city and county scheduling power equipment and monitoring operation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102184209A (en) * 2011-04-29 2011-09-14 中国电力科学研究院 Simulation data accessing method based on power grid CIM (Common Information Model) interface
CN102184453A (en) * 2011-05-16 2011-09-14 上海电气集团股份有限公司 Wind power combination predicting method based on fuzzy neural network and support vector machine
CN202103486U (en) * 2011-06-07 2012-01-04 天津市电力公司 Two-stage electric-network dispatch-network topology system
CN102361355A (en) * 2011-10-28 2012-02-22 江苏省电力公司常州供电公司 Method for concentratedly acquiring data of city and county scheduling power equipment and monitoring operation

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
唐宝: "网省地一体化电网事故处理预案定制管理", 《南方电网技术》 *
王文林: "电网调度运行中的操作流程控制", 《广东输电与变电技术》 *
蒋维勇等: "在线安全预警***中的网络模型重建", 《电力***自动化》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105808850A (en) * 2016-03-09 2016-07-27 国网安徽省电力公司 Distributed establishment method for provincial and regional power grid device topology structures
CN105808850B (en) * 2016-03-09 2018-12-04 国网安徽省电力公司 A kind of provincial power grid device topology distribution construction method
CN107231371A (en) * 2017-06-23 2017-10-03 国家电网公司 The safety protecting method of Electricity Information Network, device and system
CN108710807A (en) * 2018-07-16 2018-10-26 国网安徽省电力有限公司亳州供电公司 It is gone beyond one's commission management method and its system based on regional electrical energy system
CN108710807B (en) * 2018-07-16 2023-06-30 国网安徽省电力有限公司亳州供电公司 Regional electric energy system based override management method and system thereof

Similar Documents

Publication Publication Date Title
CN103955777B (en) Photovoltaic generation accesses power distribution network conceptual design and analysis and evaluation accessory system
CN102938588B (en) Intelligent power grid safety and stability early-warning and control system
CN103296677B (en) A kind of online bulk power grid recovers aid decision-making system
CN108122068A (en) A kind of power distribution network risk-averse retailer method and system
CN104123675A (en) Power distribution network simulation research and analysis system and method based on network-wide data
CN102983629A (en) Auxiliary decision-making method for on-line power system restoration
CN103295163A (en) Chart-model integrated transformer substation and dispatch master station cooperation modeling method
CN103488138A (en) Method and system for generating scheduling item operation order
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN110380412B (en) Main and auxiliary integrated online real-time loop closing analysis method based on CIM/SVG
CN105515011A (en) Coordination control method for combined operation of regional and county automatic voltage control (AVC) systems
CN103823920A (en) Modeling and interaction method of dispatching automation system running supervision information
CN103066594A (en) Power grid risk pre-controlling method based on province power grid topology and city power grid topology and county power grid topology
CN103501056A (en) Regional and county integrated automatic voltage control system
CN107181321A (en) It is a kind of that the quick method for drawing lotus is realized based on topological structure of electric
CN105186686A (en) Full network topology-based power grid dispatching intelligent anti-error strategy system
CN110336303A (en) A kind of electronic analytic method of network stability control regulation and system towards Real-Time Scheduling operation
CN203932958U (en) Power grid integrated intelligence is adjusted and online nucleus correcting system
CN103309312B (en) A kind of voltage security early warning based on multiple information sources and anti-Ore-controlling Role
CN104463462A (en) Power grid future state model maintenance tool
CN104319779A (en) Regional power grid reactive voltage control method
CN107276102A (en) A kind of photovoltaic and wind farm group AVC control systems based on multiple agent
CN202085190U (en) Energy source management device with backup module
CN110188971A (en) Electric Power Network Planning project aid decision-making system
Xiaoyang et al. A New Method of Data Fusion Calculation for Relay Protection Setting Calculation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130424