CN103046743B - A kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system and construction method - Google Patents

A kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system and construction method Download PDF

Info

Publication number
CN103046743B
CN103046743B CN201210508805.8A CN201210508805A CN103046743B CN 103046743 B CN103046743 B CN 103046743B CN 201210508805 A CN201210508805 A CN 201210508805A CN 103046743 B CN103046743 B CN 103046743B
Authority
CN
China
Prior art keywords
steel
back cord
double flute
screw rod
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210508805.8A
Other languages
Chinese (zh)
Other versions
CN103046743A (en
Inventor
李干椿
彭云涛
詹巍
杨成林
左其园
胥汉武
欧阳旻
李科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN201210508805.8A priority Critical patent/CN103046743B/en
Publication of CN103046743A publication Critical patent/CN103046743A/en
Application granted granted Critical
Publication of CN103046743B publication Critical patent/CN103046743B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system, comprise section steel beam, it is characterized in that: also comprise steel corbel, the main back cord of double flute steel, shaped steel time back cord, screw rod and nut; Described steel corbel is welded on section steel beam both sides, and the main back cord of double flute steel is connected and fixed by screw rod and nut and bracket, and shaped steel time back cord is laid on and on the main back cord of double flute steel, is used for support type steel concrete crossbeam. Its construction method, comprises the following steps: (1) steel corbel and section steel beam welding, lift and set up crosshead by the section steel beam that is welded with steel corbel; (2) mounting rail means for supporting reinforcement steel bar, mounting rail reinforcing bar; (3) the main back cord of double flute steel is in place; (4) place shaped steel time back cord; (5) mounting rail end template, main double flute steel back cord and bracket are connected and fixed with screw rod. The present invention utilize screw rod by the deadweight of steel reinforced concrete crossbeam and construction loads anti-pass in being welded on the bracket of section steel beam, be then passed to the section steel beam that bearing capacity is higher, load is passed to the shuttering supporting form of vertical structure the most at last.

Description

A kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system and construction method
Technical field
The present invention relates to a kind of form bracing system field, relate in particular to a kind of Super High conversion layer steel reinforced concrete crossbeamSuspension type form bracing system and construction method.
Background technology
At present, Super High conversion layer steel reinforced concrete crossbeam form work engineering generally adopts steel pipe support system. The method byIndefinite in Path of Force Transfer, the number of floor levels that need to set up support system is difficult for determining, for guaranteeing safety, generally sets up the number of pliesMany, construction speed is slow, consumes a large amount of turnover rack material lease expenses and labour cost, and this system mainly bears pressure, whenSupport load when larger, unstable phenomenon easily occurs, security performance is poor, very also to the lower contignation of bearing capacity simultaneouslyUnfavorable. Use suspension type form bracing system, effectively ensured the security performance of construction speed and support system.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of template of Super High conversion layer steel reinforced concrete crossbeam and props upSupport body system and construction method, adopt screw rod that main double flute steel back cord is connected with the bracket that is welded on section steel beam both sides, has power transmissionPath is clear and definite, reliable working performance, the feature such as computational methods are easy, and constructing operation is quick, and use cost is low.
Technical problem to be solved by this invention is achieved through the following technical solutions:
A kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system, comprises section steel beam, and its feature existsIn: also comprise steel corbel, the main back cord of double flute steel, shaped steel time back cord, screw rod and nut; Described steel corbel is welded on section steel beam twoSide, the main back cord of double flute steel is connected and fixed by screw rod and nut and bracket, and shaped steel time back cord is laid on the main back cord of double flute steel to be usedCarry out support type steel concrete crossbeam.
Also comprise backing plate, described screw rod and the main back cord of double flute steel and bracket junction all arrange backing plate.
The construction method of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system, is characterized in that comprisingFollowing steps:
(1) steel corbel and section steel beam welding, lift and set up crosshead by the section steel beam that is welded with steel corbel;
(2) mounting rail means for supporting reinforcement steel bar, mounting rail reinforcing bar;
(3) the main back cord of double flute steel is in place;
(4) place shaped steel time back cord;
(5) mounting rail end template, main double flute steel back cord and bracket are connected and fixed with screw rod.
Also be included in after mounting rail reinforcing bar welded grider side Screw arbor with nut at both-ends, the then step of enclosed beam side template.
Until screw rod by main double flute steel back cord and bracket is connected and fixed and enclosed beam side template after carry out concreting.
Described beam steel bracing frame is welded on the top flange of section steel beam.
On the operating platform of described crosshead, all lay sheeting caps.
The present invention has following beneficial effect:
1. need not set up steel pipe support system at multiple floors, greatly reduced workload, and quick construction be protected effectivelyDemonstrate,prove construction speed.
2. can directly load be passed to vertical structure, with respect to traditional steel pipe support system, avoid beam slabIsostructural impact;
3. can effectively reduce turnover rack material lease expenses and labor cost, remarkable in economical benefits.
Brief description of the drawings
Fig. 1 is structure connection diagram of the present invention
Fig. 2-1 is that the A-A in Fig. 1 cuts open figure
Fig. 2-2 are that the B-B in Fig. 1 cuts open figure
Fig. 3-1 is scheme of installation one of the present invention
Fig. 3-2 are scheme of installation two of the present invention
Fig. 3-3 are scheme of installation three of the present invention
Fig. 3-4 are scheme of installation four of the present invention
Fig. 3-5 are scheme of installation five of the present invention
Fig. 3-6 are scheme of installation six of the present invention
Fig. 3-7 are scheme of installation seven of the present invention
Fig. 4 is construction process figure of the present invention
In figure, 1-beam, 2-section steel beam, 3-steel corbel, the main back cord of 4-double flute steel, 5-shaped steel time back cord, 6-screw rod, 7-spiral shellCap, 8-backing plate, 9-beam steel bracing frame, 10-beam steel, 11-crosshead, 12-beam bottom mother plate, 13-operating platform, 14-beam sideScrew arbor with nut at both-ends, 15-side template
Detailed description of the invention
Shown in Fig. 1-3, a kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system, comprises shaped steelBeam, is characterized in that: also comprise steel corbel, the main back cord of double flute steel, shaped steel time back cord, screw rod and nut; Described steel corbel welderingBe connected on section steel beam both sides, the main back cord of double flute steel is connected and fixed by screw rod and nut and bracket, and shaped steel time back cord is laid on double fluteOn the main back cord of steel, be used for support type steel concrete crossbeam.
Also comprise backing plate, described screw rod and the main back cord of double flute steel and bracket junction all arrange backing plate.
The construction method of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system, is characterized in that comprisingFollowing steps:
(1) steel corbel and section steel beam welding, lift and set up crosshead by the section steel beam that is welded with steel corbel;
(2) mounting rail means for supporting reinforcement steel bar, mounting rail reinforcing bar;
(3) the main back cord of double flute steel is in place;
(4) place shaped steel time back cord;
(5) mounting rail end template, main double flute steel back cord and bracket are connected and fixed with screw rod.
Also be included in after mounting rail reinforcing bar welded grider side Screw arbor with nut at both-ends, the then step of enclosed beam side template.
Until screw rod by main double flute steel back cord and bracket is connected and fixed and enclosed beam side template after carry out concreting.
Described beam steel bracing frame is welded on the top flange of section steel beam.
On the operating platform of described crosshead, all lay sheeting caps.
The present invention is made up of section steel beam, steel corbel, the main back cord of double flute steel, shaped steel time back cord, screw rod, nut and backing plate etc.,Its version is mainly: section steel beam both sides welding bracket, bracket is connected by screw rod with the main back cord of double flute steel, at double flute steelOn main back cord, lay shaped steel time back cord, for supporting deadweight and the construction loads of girder with rolled steel section en cased in concrete; Utilize screw rod by shaped steelThe deadweight of concrete beam and construction loads anti-pass, in being welded on the bracket of section steel beam, are then passed to the type that bearing capacity is higherGirder steel, load is passed to the shuttering supporting form of vertical structure the most at last.

Claims (5)

1. a Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system, comprises section steel beam, it is characterized in that:Also comprise steel corbel, the main back cord of double flute steel, shaped steel time back cord, screw rod and nut; Described steel corbel is welded on section steel beam both sides,The main back cord of double flute steel is connected and fixed by screw rod and nut and bracket, and shaped steel time back cord is laid on and on the main back cord of double flute steel, is used forSupport steel reinforced concrete crossbeam; Beam steel bracing frame is welded on the top flange of section steel beam; Treat that screw rod is by main double flute steel back cord and bracketBe connected and fixed and enclosed beam side template after carry out concreting.
2. Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system as claimed in claim 1, its feature existsIn: also comprise backing plate, described screw rod and the main back cord of double flute steel and bracket junction all arrange backing plate.
3. a Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system as claimed in claim 1 or 2Construction method, is characterized in that comprising the following steps:
(1) steel corbel and section steel beam welding, lift and set up crosshead by the section steel beam that is welded with steel corbel;
(2) mounting rail means for supporting reinforcement steel bar, mounting rail reinforcing bar;
(3) the main back cord of double flute steel is in place;
(4) place shaped steel time back cord;
(5) mounting rail end template, main double flute steel back cord and bracket are connected and fixed with screw rod.
4. the construction party of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system as claimed in claim 3Method, is characterized in that: be also included in after mounting rail reinforcing bar welded grider side Screw arbor with nut at both-ends, the then step of enclosed beam side template.
5. the construction party of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system as claimed in claim 3Method, is characterized in that: on the operating platform of described crosshead, all lay sheeting caps.
CN201210508805.8A 2012-12-04 2012-12-04 A kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system and construction method Expired - Fee Related CN103046743B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210508805.8A CN103046743B (en) 2012-12-04 2012-12-04 A kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210508805.8A CN103046743B (en) 2012-12-04 2012-12-04 A kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system and construction method

Publications (2)

Publication Number Publication Date
CN103046743A CN103046743A (en) 2013-04-17
CN103046743B true CN103046743B (en) 2016-05-25

Family

ID=48059574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210508805.8A Expired - Fee Related CN103046743B (en) 2012-12-04 2012-12-04 A kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system and construction method

Country Status (1)

Country Link
CN (1) CN103046743B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714613A (en) * 2019-10-16 2020-01-21 中国一冶集团有限公司 Reinforcing device for ultra-high large-span steel reinforced concrete cast-in-place beam template and construction method

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107083821A (en) * 2017-05-27 2017-08-22 中国建筑第八工程局有限公司 Large span stiff beam exempts from screw-rod structure and its construction method
CN113756571B (en) * 2021-09-09 2022-12-02 陕西建工机械施工集团有限公司 Assembly type self-bearing die carrier device for steel reinforced concrete composite beam
CN114412182B (en) * 2022-02-08 2022-12-09 中建八局第三建设有限公司 Construction method of ultrahigh large-section stiffness inclined column hanging template

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2554431A (en) * 1949-04-01 1951-05-22 Lemuel R Vines Beam form kicker tie
CN101041974A (en) * 2007-04-19 2007-09-26 浙江省建工集团有限责任公司 Structure conversion layer type steel concrete girder mould suspension construction method
CN201254832Y (en) * 2008-09-10 2009-06-10 中国建筑第四工程局有限公司 Self-supporting template apparatus for conversion layer structure
CN201334773Y (en) * 2008-12-30 2009-10-28 中国建筑第八工程局有限公司 Self-supporting device for steel reinforced concrete composite girder
CN101886468A (en) * 2010-03-29 2010-11-17 南京大地建设集团有限责任公司 Construction method of suspension type template support in high-position conjoined structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2554431A (en) * 1949-04-01 1951-05-22 Lemuel R Vines Beam form kicker tie
CN101041974A (en) * 2007-04-19 2007-09-26 浙江省建工集团有限责任公司 Structure conversion layer type steel concrete girder mould suspension construction method
CN201254832Y (en) * 2008-09-10 2009-06-10 中国建筑第四工程局有限公司 Self-supporting template apparatus for conversion layer structure
CN201334773Y (en) * 2008-12-30 2009-10-28 中国建筑第八工程局有限公司 Self-supporting device for steel reinforced concrete composite girder
CN101886468A (en) * 2010-03-29 2010-11-17 南京大地建设集团有限责任公司 Construction method of suspension type template support in high-position conjoined structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714613A (en) * 2019-10-16 2020-01-21 中国一冶集团有限公司 Reinforcing device for ultra-high large-span steel reinforced concrete cast-in-place beam template and construction method

Also Published As

Publication number Publication date
CN103046743A (en) 2013-04-17

Similar Documents

Publication Publication Date Title
CN103161168B (en) Detachable prestress supporting frame system
CN204266590U (en) Sump, hoistway formwork bed die anti-floating system
CN104389419B (en) Encorbelment and prop up mould structure for mounting platform and a constructional method
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN104695979B (en) A kind of method using tall and big chassis whole lateral moving high and big die plate
CN205000974U (en) A tire formula automatic rising equipment rack for tunnel excavation construction
CN103147526A (en) Strip-shaped grate concrete filled steel tube combined structure shear wall and preparation method thereof
CN103046743B (en) A kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system and construction method
CN102493647B (en) Construction method for high-rise concrete structure
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN203640061U (en) Node connecting structure of reinforced concrete column of basement
CN202090577U (en) Template supporting construction platform for lift wells in high-rise buildings
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN103628675A (en) Bailey beam type formwork supporting system and construction method thereof for super high-rise transfer story crossbeam
CN201158932Y (en) Self-chucking platform especially for high-rise building elevator shaft formwork supports
CN203742077U (en) Concrete-filled thin-wall steel tube column with built-in steel bar trusses
CN206800743U (en) A kind of two-way steel plate concrete composite floor
CN202899639U (en) Concrete column structure
CN103061444B (en) Self-supporting deformed steel-encased concrete composite beam
CN202672484U (en) Steel pipe single-post structure
CN204418423U (en) A kind of built-in steel plate composite support shear wall structure
CN204225503U (en) Large span steel truss high altitude bulk conversion beam moulding bed
CN103526698B (en) Cast-in-cantilever construction 0# block concrete supporting system and construction method
CN202707093U (en) Temporary support system for tunnel construction
CN203546623U (en) Cast-in-cantilever construction 0# block concrete supporting system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant