CN103046547A - Anchorage and anchor rod combined retaining structure - Google Patents

Anchorage and anchor rod combined retaining structure Download PDF

Info

Publication number
CN103046547A
CN103046547A CN2012105901221A CN201210590122A CN103046547A CN 103046547 A CN103046547 A CN 103046547A CN 2012105901221 A CN2012105901221 A CN 2012105901221A CN 201210590122 A CN201210590122 A CN 201210590122A CN 103046547 A CN103046547 A CN 103046547A
Authority
CN
China
Prior art keywords
anchor
anchorage
slope
soil
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105901221A
Other languages
Chinese (zh)
Inventor
康景文
史宇
彭明祥
廖海
刘创
董波
林余辉
屈平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southwest Architectural Design and Research Institute Co Ltd
Original Assignee
China Southwest Architectural Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Southwest Architectural Design and Research Institute Co Ltd filed Critical China Southwest Architectural Design and Research Institute Co Ltd
Priority to CN2012105901221A priority Critical patent/CN103046547A/en
Publication of CN103046547A publication Critical patent/CN103046547A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses an anchorage and anchor rod combined retaining structure. The anchorage and anchor rod combined retaining structure comprises a rib column, a soil retaining panel, anchor rods (anchor cables), anchor shaping pull rods and anchorage plates, wherein the anchorage plates are fixed at one ends of the anchor shaping pull rods, and the other ends of the anchor shaping pull rods are fixed on the rib column. During construction, an original slope is trimmed firstly, the anchor rods (the anchor cables) on the lower portion of the slope are constructed, a side slope is excavated to construct the soil retaining panel and the rib column, the side slope soil mass is filled according to compactness of design requirements, grooves are simultaneously excavated at set positions on the soil mass so as to mount the pull rods and the anchorage plates while the side slope soil mass is filled, and finally soil mass on the back of the soil retaining panel is filled and compacted according to design requirements. The anchorage and anchor rod combined retaining structure solves the problem that a lately filled soil layer is low in pulling resistance, side-direction strength of the lately filled and compacted soil mass is fully utilized, engineering cost is saved, and construction progress is accelerated.

Description

The combined retaining structure of anchorage anchor pole
Technical field
The present invention relates to a kind of the realm of building construction, is the combined retaining structure of a kind of anchorage anchor pole specifically.
Background technology
Often can run into unstable sloping body and the embankment slope situation of reinforcing recently at building construction process, the conventional practice is to form retaining structure by anchor pole (anchor cable) in conjunction with retaining panel or rib stanchion, prevents the distortion of loose sloping body and collapses.When slope retaining is carried out in some places of recently banketing, because fill structure is loose recently, the bond stress of the anchoring bodys such as enough frictional force and anchor pole (anchor cable) can't be provided, carry the variation of situation along with time, sloping body water content and sloping top loading, the anchor pole of retaining structure (anchor cable) will not lose efficacy because there being enough anchored force, thereby cause whole retaining structure to lose efficacy the excessive even unstability of slope deforming.Therefore, in order to improve the safety of place slope supporting structure of banketing of newly dying, usually need to strengthen the diameter of the length of anchor pole or anchor pole or the soldier pile of larger cross dimensions is set, realize effective support effect to sloping body with this.But this will certainly increase engineering cost, also is unfavorable for shortening the engineering construction cycle simultaneously.
Summary of the invention
In order to solve the deficiency of existing retaining structure, the invention provides the combined retaining structure of a kind of anchorage anchor pole, not only can play effective support action to loose media, and speed of application is very fast, and can effectively shortens the engineering construction cycle, save the engineering construction cost.
The present invention realizes by following technical proposals: include rib post and retaining panel, be provided with anchor pole (anchor cable) in the bottom of rib post, and be provided with anchorage type pull bar on the top of rib post, wherein grappling type pull bar one end is fixed with anchor plate, the other end is fixed on the rib post, its construction the time is carried out in the steps below: 1., first original state slope body is repaiied the slope, then pore-forming carries out anchor pole (anchor cable) construction of bottom in sloping body; 2., excavation constructed slope construction retaining panel and the rib post of anchor pole (anchor cable), by the compactness embankment slope soil body of designing requirement; 3., filling desired location excavation groove horizontal setting pull bar and form anchor on the compactness slope soil; 4., by designing requirement construction rib post and retaining panel, and fill the compacting retaining panel back soil body.Anchor pole of the present invention (anchor cable) can utilize the friction of former soil layer, and anchorage type pull bar then can take full advantage of the recently lateral strength that produces of fill stratum when the densification soil body, further improves the friction of anchorage type pull bar.
The invention has the beneficial effects as follows: not only can play effective support action to loose sloping body, and can solve and recently fill the low problem of sloping body soil layer uplift resistance, take full advantage of the lateral strength that when densification, produces of recently filling sloping body soil layer, reduce the use amount of anchor pole (anchor cable), shortened simultaneously construction period.Therefore the present invention can effectively save construction cost, reduces difficulty of construction, effectively shortens the engineering construction cycle, and product structure is simple, and easy construction is convenient to promote the use of.
Description of drawings
The present invention is further illustrated below in conjunction with accompanying drawing.
Fig. 1 is cross-sectional view of the present invention.
Code description among the figure: 1-rib post; The 2-retaining panel; 3-anchor pole (anchor cable); 4-anchorage type pull bar; The 5-anchor plate; 6-side slope body; 7-is fill stratum recently; 8-side slope body bottom.
The specific embodiment
As shown in Figure 1, be respectively arranged with rib post (1) and retaining panel (2) in the place ahead of side slope body (6), the bottom of rib stake is provided with anchor pole (anchor cable) (3), and top is provided with anchorage type pull bar (4), and the tail end of anchorage type pull bar is by anchor plate (5) anchoring.Carry out 1. in the steps below during construction, first original state slope body repaiied the slope, then pore-forming carries out anchor pole (anchor cable) construction of bottom in sloping body; 2., excavation constructed slope construction retaining panel and the rib post of anchor pole (anchor cable), by the compactness embankment slope soil body of designing requirement; 3., filling desired location excavation groove horizontal setting pull bar and form anchor on the compactness slope soil; 4., by designing requirement construction rib post and retaining panel, and fill the compacting retaining panel back soil body.Among the present invention, anchor pole (anchor cable) can effectively utilize the recently lateral strength that produces of fill stratum (7) when the densification soil body, improve the uplift resistance that anchor draws member, thereby solved the recently low problem of fill stratum uplift resistance, reduced the use amount of anchor pole (anchor cable), reach the purpose of saving engineering cost, accelerated simultaneously programming.

Claims (2)

1. combined retaining structure of anchorage anchor pole, include rib post and retaining panel, it is characterized in that: be provided with anchor pole (anchor cable) in the bottom of rib post, and be provided with anchorage type pull bar on the top of rib post, wherein grappling type pull bar one end is fixed with anchor plate, and the other end is fixed on the rib post.
2. the combined retaining structure of a kind of anchorage anchor pole according to claim 1 is characterized in that: carry out according to the following steps when construction:
1., first original state slope body is repaiied the slope, then pore-forming carries out anchor pole (anchor cable) construction of bottom in sloping body;
2., excavation constructed slope construction retaining panel and the rib post of anchor pole (anchor cable), by the compactness embankment slope soil body of designing requirement;
3., filling desired location excavation groove horizontal setting pull bar and form anchor on the compactness slope soil;
4., by designing requirement construction rib post and retaining panel, and fill the compacting retaining panel back soil body.
CN2012105901221A 2012-12-31 2012-12-31 Anchorage and anchor rod combined retaining structure Pending CN103046547A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105901221A CN103046547A (en) 2012-12-31 2012-12-31 Anchorage and anchor rod combined retaining structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105901221A CN103046547A (en) 2012-12-31 2012-12-31 Anchorage and anchor rod combined retaining structure

Publications (1)

Publication Number Publication Date
CN103046547A true CN103046547A (en) 2013-04-17

Family

ID=48059385

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105901221A Pending CN103046547A (en) 2012-12-31 2012-12-31 Anchorage and anchor rod combined retaining structure

Country Status (1)

Country Link
CN (1) CN103046547A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603369A (en) * 2013-12-09 2014-02-26 中国石油集团工程设计有限责任公司 Construction method of anchor pile counterfort retaining wall
CN105484160A (en) * 2015-12-11 2016-04-13 中交一公局第三工程有限公司 Method for digging deep foundation pit by gravity anchor
CN114032778A (en) * 2021-11-25 2022-02-11 武汉一冶建筑安装工程有限责任公司 Anti-settling and anti-sliding bridge conical slope construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4226067A1 (en) * 1991-11-08 1993-05-13 Hermann Claus Device and method for stabilising highways in sloping locations - involves vertical injection posts fitted in lowermost stage with externally extending sections provided with inclined posts and steel reinforcement of concrete support wall
JPH111929A (en) * 1997-06-10 1999-01-06 Yahagi Kensetsu Kogyo Kk Method for forming grout for reinforcing steel bar to be penetrated through precast board for retaining wall, and grout injection guide therefor
CN201224889Y (en) * 2008-06-20 2009-04-22 云南省公路规划勘察设计院 High and light type anchoring plate retaining wall in high filling branch block engineering
CN201512810U (en) * 2009-06-08 2010-06-23 广东金辉华集团有限公司 Retaining wall
CN102002957A (en) * 2010-12-16 2011-04-06 广东交通职业技术学院 Slope retaining structure
CN102493465A (en) * 2011-12-12 2012-06-13 中国建筑西南勘察设计研究院有限公司 Anchorage type anchor pile retaining structure for soil filling field

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4226067A1 (en) * 1991-11-08 1993-05-13 Hermann Claus Device and method for stabilising highways in sloping locations - involves vertical injection posts fitted in lowermost stage with externally extending sections provided with inclined posts and steel reinforcement of concrete support wall
JPH111929A (en) * 1997-06-10 1999-01-06 Yahagi Kensetsu Kogyo Kk Method for forming grout for reinforcing steel bar to be penetrated through precast board for retaining wall, and grout injection guide therefor
CN201224889Y (en) * 2008-06-20 2009-04-22 云南省公路规划勘察设计院 High and light type anchoring plate retaining wall in high filling branch block engineering
CN201512810U (en) * 2009-06-08 2010-06-23 广东金辉华集团有限公司 Retaining wall
CN102002957A (en) * 2010-12-16 2011-04-06 广东交通职业技术学院 Slope retaining structure
CN102493465A (en) * 2011-12-12 2012-06-13 中国建筑西南勘察设计研究院有限公司 Anchorage type anchor pile retaining structure for soil filling field

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王燕: "《公路工程施工员培训教材》", 31 October 2010, 中国建材工业出版社 *
陈华等: "山区公路高轻型锚锭板挡土墙病害及整治措施", 《公路交通科技(应用技术版)》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603369A (en) * 2013-12-09 2014-02-26 中国石油集团工程设计有限责任公司 Construction method of anchor pile counterfort retaining wall
CN103603369B (en) * 2013-12-09 2015-07-15 中国石油集团工程设计有限责任公司 Construction method of anchor pile counterfort retaining wall
CN105484160A (en) * 2015-12-11 2016-04-13 中交一公局第三工程有限公司 Method for digging deep foundation pit by gravity anchor
CN114032778A (en) * 2021-11-25 2022-02-11 武汉一冶建筑安装工程有限责任公司 Anti-settling and anti-sliding bridge conical slope construction method

Similar Documents

Publication Publication Date Title
CN103046561B (en) Anchor draws campshed anchorage wall compound retaining structure
CN203639942U (en) Arched retaining wall
CN201762717U (en) Structure for connecting prestressed pipe pile and cushion cap
CN210562157U (en) Post-grouting composite pile
CN206941608U (en) A kind of diaphram wall foundation pit supporting construction
CN203939034U (en) The slope treatment structure that a kind of antislide pile is combined with anchor cable, anchor caverns
CN203022007U (en) Front-dense and rear-sparse double-row pile foundation pit supporting and protecting structure
CN203530973U (en) Composite anchor rod
CN103046547A (en) Anchorage and anchor rod combined retaining structure
CN203200751U (en) Prestress anti-floating pile
CN2398333Y (en) Pile body containing thorn pile
CN201605590U (en) Soft soil foundation pit soil nail supporting structure
CN103266604B (en) A kind of Hoop-type circular-section anchor-rod slide-resistant pile and construction method thereof
CN103993604A (en) Scattered piled anchor foundation pit supporting structure
CN201588214U (en) Grouting concrete soil nail
CN205296186U (en) Side slope cling compound retaining structure
CN103147443A (en) Foundation pit supporting structure and construction method thereof
CN203924054U (en) Variable cross-section anchoring body anchor pole or anchor cable ruggedized construction
CN203855971U (en) Sparse-row pile anchor foundation pit supporting structure
CN203129155U (en) Exposed-beam and hidden-rib lattice anchor cable foundation pit supporting structure
CN202298602U (en) Stiff composite pile
CN201962675U (en) Locally-strengthened and tension-free anchor cable rock mass strengthening device
CN202970747U (en) Hollow bolt-grouting anchor cable for mine
CN101979777A (en) Cast-in-place hollow square pile and combined underground continuous wallboard and construction method thereof
CN202108055U (en) Reinforcement cantilever type retaining wall structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130417