CN103024908A - Method for self-adaptive adjustment on symbol occupation amount of PDCCH (Physical Downlink Control Channel) - Google Patents

Method for self-adaptive adjustment on symbol occupation amount of PDCCH (Physical Downlink Control Channel) Download PDF

Info

Publication number
CN103024908A
CN103024908A CN2011102870439A CN201110287043A CN103024908A CN 103024908 A CN103024908 A CN 103024908A CN 2011102870439 A CN2011102870439 A CN 2011102870439A CN 201110287043 A CN201110287043 A CN 201110287043A CN 103024908 A CN103024908 A CN 103024908A
Authority
CN
China
Prior art keywords
pdcch
professional
symbolic number
satisfaction
execution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102870439A
Other languages
Chinese (zh)
Other versions
CN103024908B (en
Inventor
张书园
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petevio Institute Of Technology Co ltd
Original Assignee
Potevio Institute of Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Potevio Institute of Technology Co Ltd filed Critical Potevio Institute of Technology Co Ltd
Priority to CN201110287043.9A priority Critical patent/CN103024908B/en
Publication of CN103024908A publication Critical patent/CN103024908A/en
Application granted granted Critical
Publication of CN103024908B publication Critical patent/CN103024908B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention provides a method for self-adaptive adjustment on symbol occupation amount of a PDCCH (Physical Downlink Control Channel). The method comprises the following steps of: A, periodically detecting the degree of satisfaction to cell service within a period of time; B, judging whether the degree of satisfaction to the cell service is lower than a first threshold, and if so, executing a step C, otherwise, returning back to execute the step A; C, calculating the occupation rate of cell bandwidth resources, judging whether the occupation rate of the cell bandwidth resources is lower than a second threshold, and if so, executing a step D, otherwise, executing a step E; D, increasing the symbol occupation amount of the PDCCH, and returning back to the step A; E, acquiring the quantity of current system users, and judging whether the user quantity is lower than a third threshold, and if so, executing a step F, otherwise, returning back to the step A; and F, reducing the symbol occupation amount of the PDCCH, and returning back to the step A.

Description

A kind of self adaptation is adjusted the method that PDCCH takies symbolic number
Technical field
The present invention relates to wireless communication technology field, relate in particular to a kind of self adaptation and adjust the method that Physical Downlink Control Channel (PDCCH) takies symbolic number.
Background technology
When UE carries out data traffic transmission, need to obtain the needed physical resource of up-downgoing transfer of data by the Downlink Control Information (DCI, Downlink Control Information) of Hashing algorithm blind check Physical Downlink Control Channel (PDCCH) on public and dedicated search space.The blind check process at first need to take by the PDCCH of Physical Control Format Indicator Channel (PCFICH) channel indication sign resources and PCFICH and physical mixing retransmission indicating chanel (PHICH, Physical Hybrid ARQ Indicator Channel) and take resource situation and calculate control channel particle (CCE) space size and terminal blind check original position ((RNTI) is relevant with Radio Network Temporary Identifier).The residential quarter is successfully established resource grains subgroup (REG) resource that rear PCFICH and PHICH take and fixes, so the sign resources that takies of PDCCH and the CCE quantity that can distribute have linear relationship.
Definite process that PDCCH of the prior art takies symbolic number comprises the steps: as shown in Figure 1
Step 101: obtain cell physical layer identifiers by cell search process;
Step 102: determine the actual resource location that takies of PCFICH channel;
Step 103: obtain the PHICH resource information by system information broadcast, and then the shared resource location of definite PHICH, system bandwidth, antenna port number;
After the resource distribution of step 104:PHICH is determined, by PDCCH channel resource number in the data indication decision systems of the PCFICH of static configuration in advance.
PCFICH channel indication PDCCH takies symbolic number, has determined that PDCCH and PDSCH take symbol space and divide.Pass through static configuration PCFICH value in the prior art, realize the control of PDCCH and PDSCH time-domain resource, because the uncertainty of system user number, number of services and business data transmission characteristic, this simple extensive resource dividing method can not adaptive system load and the dynamic change of traffic performance, cause the limited or Zone satisfaction of power system capacity to descend.
Summary of the invention
The invention provides a kind of self adaptation and adjust the method that PDCCH takies symbolic number, can realize rationally regulating PDCCH and take symbolic number, can improve the Zone satisfaction, improve power system capacity.
A kind of self adaptation that the embodiment of the invention provides is adjusted the method that PDCCH takies symbolic number, it is characterized in that, comprises the steps:
A, periodicity detect the satisfaction of Zone in a period of time;
B, judge whether the satisfaction of Zone is lower than the first threshold value, if, execution in step C, otherwise, execution in step A returned;
The occupancy of C, calculation plot bandwidth resources judges whether the occupancy of bandwidth of cell resource is lower than the second threshold value, if, execution in step D, otherwise execution in step E;
D, increase PDCCH take symbolic number, and return steps A;
E, obtain the number of users of current system, and judge whether number of users is lower than the 3rd threshold value, if, execution in step F, otherwise return steps A;
F, minimizing PDCCH take symbolic number and return steps A.
Preferably, steps A comprises:
A1, judge whether the sense cycle timer expired, if, execution in step A2, otherwise continue execution in step A1;
Professional i provides the satisfaction Sat (i, t) of service at current subframe t to network in the A2, calculation plot, and span is [0~1];
A3, judge whether i equals the current total professional number N of system ServicesIf,, execution in step A4, otherwise, make i=i+1, and return steps A 2;
A4, according to formula Sat ( t ‾ ) = Σ t = t ‾ - N TTI t ‾ Σ i = 1 N service Sat ( i , t ) N TTI * N service * 100 % The satisfaction of calculation plot business, wherein, N TTIBe the duration with the sense cycle timer of number of sub frames metering.
Preferably, if professional i guarantees that for accumulative total is high bit rate type GBR is professional, then professional i provides the satisfaction Sat (i, t) of service to be professional actual transfer rate to network at current subframe t
Figure BDA0000093931450000032
GBR speed GBR with application iRatio Sat ( i , t ) = R ‾ ( i , t ) GBR i .
Preferably, professional if professional i is non-GBR, then according to formula Sat ( i , t ) = Delay _ Timer i - Timer _ threshold WT ( i , t ) Computing service i provides the satisfaction Sat (i, t) of service at current subframe t to network, wherein, and Delay_Timer iFor controlling end to end delay requirement of control protocol layer by the Radio Link of grouped data time-delay budget PDB conversion corresponding to the quality of service class sign QCI grade of logic channel i, unit is millisecond; Timer_threshold is the time delay thresholding that non-GBR business allows at rlc layer, and unit is millisecond; WT (i, t) is that unit is millisecond by the at first stand-by period of the packet of arrival to the professional i of subframe t in descending.
Preferably, the occupancy of the described calculation plot bandwidth resources of step C is: according to formula P t _ use = Σ t = t ‾ - N TTI t ‾ N i , d _ use N TTI * N d _ total * 100 % The occupancy of calculation plot bandwidth resources, wherein: N I, d_useThe stock number that represents i TTI scheduling; N D_totalThe stock number that represents descending permission scheduling.
Preferably, the described increase of step D PDCCH takies before the step of symbolic number, further comprises: whether the PDCCH that judges current configuration takies symbol numbers is maximum, if then PDCCH is taken symbolic number and do not make an amendment, and return steps A; If not, carry out the step that described increase PDCCH takies symbolic number.
Preferably, the described increase of step D PDCCH takies symbolic number and is: the symbolic number that PDCCH is taken adds 1.
Preferably, described maximum is 4.
Preferably, the described minimizing of step F PDCCH takies before the step of symbolic number, further comprises: whether the PDCCH that judges current configuration takies symbol numbers is minimum value, if then PDCCH is taken symbolic number and do not make an amendment, and return steps A; If not, carry out the step that described minimizing PDCCH takies symbolic number.
Preferably, the described minimizing of step e PDCCH takies symbolic number and is: the symbolic number that PDCCH is taken subtracts 1.
Preferably, described minimum value is 1.
Occupancy and the number of users of current access of the present invention program by calculating the professional satisfaction of current area and scheduling resource comes self adaptation to adjust PDCCH to take symbolic number, and then improves the capacity of system and in the satisfaction of line service, realize system's self-optimizing.
Description of drawings
Fig. 1 determines in the prior art that PDCCH takies the schematic flow sheet of symbolic number;
Fig. 2 is that the present invention proposes the method flow schematic diagram that self adaptation adjustment PDCCH takies symbolic number.
Embodiment
The present invention program's basic thought is by the professional satisfaction of calculation plot and system bandwidth resources occupation rate, dynamically adjusts the PDCCH resource size.
The present invention proposes self adaptation and adjusts method flow that PDCCH takies symbolic number as shown in Figure 2, comprises the steps:
Step 201: the satisfaction that periodically detects Zone in a period of time.
Step 202: whether the satisfaction of judging Zone is lower than the first threshold value, if, execution in step 203, otherwise, execution in step 201 returned.
Step 203: the occupancy of calculation plot bandwidth resources.
Step 204: whether the occupancy of judging the bandwidth of cell resource is lower than the second threshold value, if (illustrative system does not take full advantage of schedulable system resource), execution in step 205, otherwise execution in step 206.
Step 205: adjust PDCCH and take symbolic number, increase schedulable professional number, and return step 201.
Step 206: the number of users that obtains current system, and judge whether number of users is lower than the 3rd threshold value, if (illustrate that current system major part or whole customer services belong to the high bit rate type (GBR that guarantees of accumulative total, Guaranteed Bit Rate) business), execution in step 207, otherwise return step 201.
Step 207: adjust PDCCH and take symbolic number, the Physical Downlink Shared Channel that increase can be dispatched (PDSCH) resource, and return step 201.
The above first threshold value and the second threshold value are the simulation parameter value, by the network optimization or planning personnel's configuration.The 3rd threshold value is relevant with the bandwidth of cell configuration, and value adopts the simulation parameter value under the concrete bandwidth, by the network optimization or planning personnel's configuration.
Such scheme has just provided and has adjusted the scheme that PDCCH takies symbolic number, the mode of distributing first PDCCH to take symbolic number is not limited.If distribute first PDCCH to take symbolic number, can adopt the default configuration parameter, by the network optimization or planning personnel's configuration.
The satisfaction method of the business that the present invention can realize by the scheduler module in the base station and statistical system bandwidth resources occupation rate, realize the adjustment of PDCCH resource dynamic, can Effective Raise improve satisfaction and system bandwidth resources occupation rate at line service, and have the low advantage of implementation complexity.
Clearer for the know-why, advantage and the technique effect that make technical solution of the present invention, below by specific embodiment the present invention program is further elaborated.
The embodiment of the invention one provides a kind of implementation of satisfaction of calculation plot access service.The residential quarter satisfaction is to the overall merit of residential quarter to each professional satisfaction, is the average of all professional satisfactions in a period of time, is that current system does not reach the most effective index to residential quarter access service Satisfaction index, is that the PDCCH resource is planned prerequisite again.The Zone satisfaction is the average of current all professional satisfactions in the residential quarter, and it is defined as follows:
Sat ( t ‾ ) = Σ t = t ‾ - N TTI t ‾ Σ i = 1 N service Sat ( i , t ) N TTI * N service * 100 % - - - ( 1 )
Wherein, N TTITime granularity (cycle) for the calculation plot satisfaction rate of number of sub frames metering comprises N TTISubframe; N ServicesBe the current total professional number of system; The professional i of Sat (i, t) expression provides the satisfaction of service at subframe t to network, and span is [0~1].
Below provide a kind of embodiment of step 201:
Step 201-1, judge whether the sense cycle timer expired, if, execution in step 201-2, otherwise continue execution in step 201-1;
Professional i provides the satisfaction Sat (i, t) of service at current subframe t to network in the step 201-2, calculation plot, and span is [0~1];
Step 201-3, judge whether i equals the current total professional number N of system ServicesIf,, execution in step 201-4, otherwise, make i=i+1, and return step 201-2;
Step 201-4, according to the satisfaction of formula (1) calculation plot business, wherein, N TTIBe the duration with the sense cycle timer of number of sub frames metering.
Professional i can have the various definitions mode at the satisfaction Sat of subframe t (i, t), below provides two examples:
Professional for GBR, professional i is obtained by the ratio of the GBR speed of professional actual transfer rate and application at the satisfaction Sat of subframe t (i, t):
Sat ( i , t ) = R ‾ ( i , t ) GBR i - - - ( 2 )
Wherein:
Figure BDA0000093931450000062
Radio interface rate (unit is bits per second (bps)) for t moment logic channel i; GBR iGBR for logic channel i.
Professional for non-GBR, by the ratio acquisition of professional QCI equivalent delay and propagation delay time:
Sat ( i , t ) = Delay _ Timer i - Timer _ threshold WT ( i , t ) - - - ( 3 )
Wherein, Delay_Timer iBe the quality of service class sign (QCI by logic channel i, QoS Class Identifier) grouped data time-delay budget (PDB corresponding to grade, Packet Delay Budget) Radio Link of conversion control control protocol (RLC, Radio Link Control) layer delay requirement end to end, unit be millisecond (ms); Timer_threshold is the time delay thresholding that non-GBR business allows at rlc layer, and unit is millisecond (ms); WT (i, t) is that unit is millisecond (ms) by the at first stand-by period of the packet of arrival to the professional i of subframe t in descending.
But the local resource occupancy refers to scheduling resource amounts of all professional uses of scheduling in a period of time and the ratio of descending scheduling resource, when the local resource occupancy hour, illustrate that current system also has the Deta bearer ability, but scheduler module can not be dispatched more business, therefore needs adjusting PDCCH to take symbol numbers and improves schedulable traffic carrying capacity; If system bandwidth resources occupation rate is larger, then obtain current online user number; If active user's number is fewer, it is professional to illustrate that then current access user great majority belong to high accumulative total GBR, then reduces the symbol numbers that PDCCH takies.
The embodiment of the invention provides a kind of definition of bandwidth of cell resources occupation rate, shown in formula (4):
P t _ use = Σ t = t ‾ - N TTI t ‾ N i , d _ use N TTI * N d _ total * 100 % - - - ( 4 )
Wherein: N I, d_useThe stock number that represents i TTI scheduling; N D_totalThe stock number of descending permission scheduling.
If system bandwidth resources occupation rate is lower than the second threshold value, whether the PDCCH that then further judges current configuration takies symbol numbers is maximum, if so, then PDCCH is taken symbolic number and does not make an amendment, and directly returns step 201; If not, then increase the number that PDCCH takies symbol, preferably, increase a symbol at every turn.The maximum that takies symbol with bandwidth related protocol regulation PDCCH is 4.
If system bandwidth resources occupation rate is greater than the second threshold value, then obtain current online user number, if active user's number is fewer, it is professional to illustrate that then current access user great majority belong to the high GBR of accumulative total, then further judge that current PDCCH takies symbolic number and whether reaches minimum value, if reach, then PDCCH is taken symbolic number and do not make an amendment, directly return step 201; If do not reach, then reduce the symbol numbers that PDCCH takies, preferably, reduce by a symbol at every turn.The minimum value that bandwidth related protocol regulation PDCCH takies symbol is 4.
Occupancy and the number of users of current access of the present invention by calculating the professional satisfaction of current area and scheduling resource comes self adaptation to adjust PDCCH to take symbolic number, and then improves the capacity of system and in the satisfaction of line service, realize system's self-optimizing.
The above only is preferred embodiment of the present invention, and is in order to limit the present invention, within the spirit and principles in the present invention not all, any modification of making, is equal to replacement, improvement etc., all should be included within the scope of protection of the invention.

Claims (11)

1. a self adaptation is adjusted the method that physical downlink control channel PDCCH takies symbolic number, it is characterized in that, comprises the steps:
A, periodicity detect the satisfaction of Zone in a period of time;
B, judge whether the satisfaction of Zone is lower than the first threshold value, if, execution in step C, otherwise, execution in step A returned;
The occupancy of C, calculation plot bandwidth resources judges whether the occupancy of bandwidth of cell resource is lower than the second threshold value, if, execution in step D, otherwise execution in step E;
D, increase PDCCH take symbolic number, and return steps A;
E, obtain the number of users of current system, and judge whether number of users is lower than the 3rd threshold value, if, execution in step F, otherwise return steps A;
F, minimizing PDCCH take symbolic number and return steps A.
2. method according to claim 1 is characterized in that, steps A comprises:
A1, judge whether the sense cycle timer expired, if, execution in step A2, otherwise continue execution in step A1;
Professional i provides the satisfaction Sat (i, t) of service at current subframe t to network in the A2, calculation plot, and span is [0~1];
A3, judge whether i equals the current total professional number N of system ServicesIf,, execution in step A4, otherwise, make i=i+1, and return steps A 2;
A4, according to formula Sat ( t ‾ ) = Σ t = t ‾ - N TTI t ‾ Σ i = 1 N service Sat ( i , t ) N TTI * N service * 100 % The satisfaction of calculation plot business, wherein, N TTIBe the duration with the sense cycle timer of number of sub frames metering.
3. method according to claim 2 is characterized in that, if professional i guarantees that for accumulative total is high bit rate type GBR is professional, then professional i provides the satisfaction Sat (i, t) of service to be professional actual transfer rate to network at current subframe t
Figure FDA0000093931440000021
GBR speed GBR with application iRatio Sat ( i , t ) = R ‾ ( i , t ) GBR i .
4. method according to claim 2 is characterized in that, and is professional if professional i is non-GBR, then according to formula Sat ( i , t ) = Delay _ Timer i - Timer _ threshold WT ( i , t ) Computing service i provides the satisfaction Sat (i, t) of service at current subframe t to network, wherein, and Delay_Timer iFor controlling end to end delay requirement of control protocol layer by the Radio Link of grouped data time-delay budget PDB conversion corresponding to the quality of service class sign QCI grade of logic channel i, unit is millisecond; Timer_threshold is the time delay thresholding that non-GBR business allows at rlc layer, and unit is millisecond; WT (i, t) is that unit is millisecond by the at first stand-by period of the packet of arrival to the professional i of subframe t in descending.
5. method according to claim 2 is characterized in that, the occupancy of the described calculation plot bandwidth resources of step C is: according to formula P t _ use = Σ t = t ‾ - N TTI t ‾ N i , d _ use N TTI * N d _ total * 100 % The occupancy of calculation plot bandwidth resources, wherein: N I, d_useThe stock number that represents i TTI scheduling; N D_totalThe stock number that represents descending permission scheduling.
6. method according to claim 1 is characterized in that, the described increase of step D PDCCH takies before the step of symbolic number, further comprise: whether the PDCCH that judges current configuration takies symbol numbers is maximum, if then PDCCH is taken symbolic number and does not make an amendment, and return steps A; If not, carry out the step that described increase PDCCH takies symbolic number.
7. method according to claim 6 is characterized in that, the described increase of step D PDCCH takies symbolic number and is: the symbolic number that PDCCH is taken adds 1.
8. method according to claim 6 is characterized in that, described maximum is 4.
9. method according to claim 1 is characterized in that, the described minimizing of step F PDCCH takies before the step of symbolic number, further comprise: whether the PDCCH that judges current configuration takies symbol numbers is minimum value, if then PDCCH is taken symbolic number and does not make an amendment, and return steps A; If not, carry out the step that described minimizing PDCCH takies symbolic number.
10. method according to claim 9 is characterized in that, the described minimizing of step e PDCCH takies symbolic number and is: the symbolic number that PDCCH is taken subtracts 1.
11. method according to claim 10 is characterized in that, described minimum value is 1.
CN201110287043.9A 2011-09-23 2011-09-23 Method for self-adaptive adjustment on symbol occupation amount of PDCCH (Physical Downlink Control Channel) Expired - Fee Related CN103024908B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110287043.9A CN103024908B (en) 2011-09-23 2011-09-23 Method for self-adaptive adjustment on symbol occupation amount of PDCCH (Physical Downlink Control Channel)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110287043.9A CN103024908B (en) 2011-09-23 2011-09-23 Method for self-adaptive adjustment on symbol occupation amount of PDCCH (Physical Downlink Control Channel)

Publications (2)

Publication Number Publication Date
CN103024908A true CN103024908A (en) 2013-04-03
CN103024908B CN103024908B (en) 2015-07-22

Family

ID=47972903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110287043.9A Expired - Fee Related CN103024908B (en) 2011-09-23 2011-09-23 Method for self-adaptive adjustment on symbol occupation amount of PDCCH (Physical Downlink Control Channel)

Country Status (1)

Country Link
CN (1) CN103024908B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104348572A (en) * 2013-07-24 2015-02-11 成都鼎桥通信技术有限公司 Physical downlink control channel (PDCCH) symbolic number self-adaptive method and base station
CN105101415A (en) * 2014-05-04 2015-11-25 普天信息技术有限公司 Independent carrier scheduling method in carrier aggregation scene
CN105306385A (en) * 2014-07-31 2016-02-03 腾讯科技(深圳)有限公司 Method and device for controlling downlink network bandwidth
CN106851725A (en) * 2015-12-07 2017-06-13 中兴通讯股份有限公司 Resource regulating method and device in a kind of LTE network
CN107302799A (en) * 2016-04-15 2017-10-27 普天信息技术有限公司 Down control channel bandwidth self-adaption method of adjustment and device
CN112291835A (en) * 2019-07-25 2021-01-29 大唐移动通信设备有限公司 System bandwidth processing method, base station, device and medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101309523A (en) * 2008-06-23 2008-11-19 中兴通讯股份有限公司 Method for transmitting physical downlink channel control signal
CN101754376A (en) * 2008-12-05 2010-06-23 中兴通讯股份有限公司 Method for allocating downlink resources of a orthogonal frequency division multiplexing system
JP2011160376A (en) * 2010-02-04 2011-08-18 Sharp Corp Mobile station device, base station apparatus, and wireless communication system and method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101309523A (en) * 2008-06-23 2008-11-19 中兴通讯股份有限公司 Method for transmitting physical downlink channel control signal
CN101754376A (en) * 2008-12-05 2010-06-23 中兴通讯股份有限公司 Method for allocating downlink resources of a orthogonal frequency division multiplexing system
JP2011160376A (en) * 2010-02-04 2011-08-18 Sharp Corp Mobile station device, base station apparatus, and wireless communication system and method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104348572A (en) * 2013-07-24 2015-02-11 成都鼎桥通信技术有限公司 Physical downlink control channel (PDCCH) symbolic number self-adaptive method and base station
CN104348572B (en) * 2013-07-24 2017-08-25 成都鼎桥通信技术有限公司 Physical Downlink Control Channel symbolic number adaptive approach and base station
CN105101415A (en) * 2014-05-04 2015-11-25 普天信息技术有限公司 Independent carrier scheduling method in carrier aggregation scene
CN105101415B (en) * 2014-05-04 2019-02-12 普天信息技术有限公司 A kind of Independent Carrier Wave dispatching method under carrier aggregation scene
CN105306385A (en) * 2014-07-31 2016-02-03 腾讯科技(深圳)有限公司 Method and device for controlling downlink network bandwidth
CN106851725A (en) * 2015-12-07 2017-06-13 中兴通讯股份有限公司 Resource regulating method and device in a kind of LTE network
CN107302799A (en) * 2016-04-15 2017-10-27 普天信息技术有限公司 Down control channel bandwidth self-adaption method of adjustment and device
CN107302799B (en) * 2016-04-15 2019-12-20 普天信息技术有限公司 Downlink control channel bandwidth self-adaptive adjusting method and device
CN112291835A (en) * 2019-07-25 2021-01-29 大唐移动通信设备有限公司 System bandwidth processing method, base station, device and medium

Also Published As

Publication number Publication date
CN103024908B (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN102088735B (en) Method and equipment for balancing inter-sub-frame traffic load and processing inter-cell interference (ICI)
CN103024908B (en) Method for self-adaptive adjustment on symbol occupation amount of PDCCH (Physical Downlink Control Channel)
CN103024915B (en) A kind of method realizing uplink sounding reference signal periodic time self-adapting
CN102869106A (en) Self-adaption adjusting method and device of PDCCH (physical downlink control channel)
CN101375618A (en) Base station deice and packet scheduling method
CN109963308B (en) Resource scheduling method and device in wireless communication system
US9369925B2 (en) System and methods to achieve optimum efficiency-jain fairness in wireless systems
CN101432983B (en) Use bit rate and the customer service do not completed carry out the methods, devices and systems of power control
WO2015065051A1 (en) Method for controlling transmission power and transmission delay, and communication terminal using same
Atawia et al. Robust resource allocation for predictive video streaming under channel uncertainty
CN101754377A (en) Self-adaptive configuration method of ascending-descending subframes of cell
Wang et al. EPS: energy-efficient pricing and resource scheduling in LTE-A heterogeneous networks
US20150263818A1 (en) Physical downlink control channel (pdcch) inter-cell-interference coordination
Cai et al. Dynamic QoS mapping and adaptive semi-persistent scheduling in 5G-TSN integrated networks
CN102404778B (en) Load estimation method
CN104378785A (en) Uplink and downlink subframe reconfiguration method and devices for small cells
CN104486767A (en) Cluster-based dynamic ABS interference rejection method in heterogeneous cellular network
CN102404745B (en) Method for carrying out dynamic traffic scheduling on users
CN104284426B (en) Picocell ascending-descending subframes reallocating method in a kind of TD-LTE heterogeneous networks system
CN104918333A (en) Scheduling method for Non-GBR service
WO2016197673A1 (en) Component carrier scheduling method and apparatus in carrier aggregation scenario
CN107113745B (en) Method for managing data transmission power in a mobile cellular network
Khan et al. An adaptive RRM scheme for smart grid M2M applications over a WiMAX network
CN102474748B (en) Scheduling method and scheduler
Kong et al. Tradeoff design of radio resource scheduling for power and spectrum utilizations in LTE uplink systems

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA POTEVIO CO., LTD.

Free format text: FORMER OWNER: PUTIAN IT TECH INST CO., LTD.

Effective date: 20130906

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130906

Address after: 100080, No. two, 2 street, Zhongguancun science and Technology Park, Beijing, Haidian District

Applicant after: CHINA POTEVIO CO.,LTD.

Address before: 100080 Beijing, Haidian, North Street, No. two, No. 6, No.

Applicant before: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

ASS Succession or assignment of patent right

Owner name: PUTIAN IT TECH INST CO., LTD.

Free format text: FORMER OWNER: CHINA POTEVIO CO., LTD.

Effective date: 20131204

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20131204

Address after: 100080 Beijing, Haidian, North Street, No. two, No. 6, No.

Applicant after: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

Address before: 100080, No. two, 2 street, Zhongguancun science and Technology Park, Beijing, Haidian District

Applicant before: CHINA POTEVIO CO.,LTD.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150722

Termination date: 20210923

CF01 Termination of patent right due to non-payment of annual fee