CN103015723A - Secondary casting molding construction method of cast-in-situ concrete stand structure - Google Patents

Secondary casting molding construction method of cast-in-situ concrete stand structure Download PDF

Info

Publication number
CN103015723A
CN103015723A CN2012105829708A CN201210582970A CN103015723A CN 103015723 A CN103015723 A CN 103015723A CN 2012105829708 A CN2012105829708 A CN 2012105829708A CN 201210582970 A CN201210582970 A CN 201210582970A CN 103015723 A CN103015723 A CN 103015723A
Authority
CN
China
Prior art keywords
stand
construction
cast
beams
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105829708A
Other languages
Chinese (zh)
Inventor
张同波
李翠翠
王辉
李文涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingjian Group Co Ltd
Qingdao Bohai Construction Group Co Ltd
Original Assignee
Qingjian Group Co Ltd
Qingdao Bohai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingjian Group Co Ltd, Qingdao Bohai Construction Group Co Ltd filed Critical Qingjian Group Co Ltd
Priority to CN2012105829708A priority Critical patent/CN103015723A/en
Publication of CN103015723A publication Critical patent/CN103015723A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a secondary casting molding construction method of a cast-in-situ concrete stand structure. After oblique beams under a frame column and a stand plate are cast, the stand plate structure is constructed in the second time. The secondary casting molding construction method is subjected to the casting for two times through the adjustment of construction joints, so that the construction difficulty is reduced, the construction of a main component, namely a stand beam is ensured, and a condition is created for the main body construction of other main components in the periphery of the stand beam. During the stand plate construction, the construction for the peripheral main body structures can be carried out continuously at the same time, and a lot of time is saved for the subsequent construction.

Description

Cast-in-situ concrete stand structure second pouring molding construction method
Technical field
The present invention relates to technical field of building construction, be specifically related to a kind of cast-in-situ concrete stand structure second pouring molding construction method.
Background technology
Along with steadily improving of people's living standard, the consciousness that the whole people pursue physical culture, culture life progressively strengthens, and the large-scale utilities buildings such as stadiums in all parts of the country, drama institute are more and more.Grandstand is as the indispensable ingredient of the type building.Its job practices often directly has influence on integral construction speed and the construction quality of this project.
There is no at present the stand structure secondary and build moulding process, but in conjunction with sports center, Qingdao City natatorium and diving pool engineering, studied the construction technology that the grandstand beam slab is divided into two-step pouring, engineering time proves, this technique does not affect the above structure construction of grandstand, greatly accelerating construction progress.
Summary of the invention
Technical problem to be solved by this invention is: a kind of cast-in-situ concrete stand structure second pouring molding construction method is provided, solves Stand Inclined Beams and see when platen is built simultaneously, the cant beam bottom will produce the problem than high thrust.
The technical scheme of technical solution problem of the present invention comprises the steps:
A, Stand Beams formwork erection and support scaffolding;
At the bottom of b, the Stand Beams and a side template install;
C, Stand Beams reinforcing bar and back plate muscle are reserved;
D, Stand Beams opposite side formwork reinforcement also arrange gauze wire cloth;
E, Stand Beams concreting;
F, the cleaning of interface, constuction joint place;
G, viewing platform form board install;
Interface cleaning and the grandstand reinforcing bar binding of h, Stand Beams;
I, grandstand concreting.
Stand Beams concreting among the described step e, use delivery pump directly with concrete conveyance to building a little, reduce the variation of water/binder ratio in the concrete transportation, placement layer by layer in order from low to high, one-time-reach-place, guarantee the continuity of concreting, adjacent sections is built be not more than blanking time concrete initial set time.
Viewing platform form board in the described step g installs, and the measures such as employing sticking two-faced adhesive tape guarantee that the constuction joint seam is tight.
Grandstand concreting in the described step I, before building the constuction joint place clean first wetting, then build 10~15mm thick with concrete with the proportioning mortar, construct again, select the little concrete of the slump to build.
The invention has the beneficial effects as follows: the construction of grandstand beam slab of the present invention, reduced difficulty of construction, guaranteed the construction of main member Stand Beams, for other main member main body construction of Stand Beams periphery creates conditions, when seeing the platen construction, can proceed the construction of perimeter body structure, for the plenty of time has been saved in follow-up construction.Since the greatly shortening of duration, a large amount of saving that brought turnover material tool, overhead cost etc.Prove that by practical engineering application the present invention has preferably techno-economic effect and higher application value.
Description of drawings
Fig. 1 is the viewing platform form board organigram;
Fig. 2 is the sectional drawing along I among Fig. 1-I line;
Fig. 3 is the local stiffening enlarged drawing of A among Fig. 1;
Fig. 4 is that viewing platform form board installs schematic diagram.
Among the figure 1, among Fig. 2,1, scaffold; 2, steel pipe diagonal brace.
The specific embodiment
Below in conjunction with accompanying drawing the present invention is done further disclosure.
Embodiment 1
As shown in Figure 1, Figure 2, Figure 3 and Figure 4, a kind of cast-in-situ concrete stand structure second pouring molding construction method comprises the steps: a, Stand Beams formwork erection and support scaffolding 1; At the bottom of b, the Stand Beams and a side template install; C, Stand Beams reinforcing bar and back plate muscle are reserved; D, Stand Beams opposite side formwork reinforcement also arrange gauze wire cloth; E, Stand Beams concreting, use delivery pump directly with concrete conveyance to building a little, reduce the variation of water/binder ratio in the concrete transportation, placement layer by layer in order from low to high, one-time-reach-place, guarantee the continuity of concreting, adjacent sections is built be not more than blanking time concrete initial set time; F, the cleaning of interface, constuction joint place; G, viewing platform form board install, and the measures such as employing sticking two-faced adhesive tape guarantee that the constuction joint seam is tight; Interface cleaning and the grandstand reinforcing bar binding of h, Stand Beams; I, grandstand concreting, before building the constuction joint place must clean first wetting, then build 10~15mm thick with concrete with the proportioning mortar, construct again, select the little concrete of the slump to build.
The above is not to be limitation of the present invention, and every technical solution of the present invention content that do not break away to any simple modification, equivalent variations and remodeling that above embodiment does, still belongs to the protection domain of technical solution of the present invention according to technical spirit of the present invention.

Claims (2)

1. cast-in-situ concrete stand structure second pouring molding construction method is characterized in that: with frame column and see cant beam below the platen build finish after, the secondary construction is seen and specifically be may further comprise the steps platen structure:
A, Stand Beams formwork erection and support scaffolding;
At the bottom of b, the Stand Beams and a side template install;
C, Stand Beams reinforcing bar and back plate muscle are reserved;
D, Stand Beams opposite side formwork reinforcement also arrange gauze wire cloth;
E, Stand Beams concreting;
F, the cleaning of interface, constuction joint place;
G, viewing platform form board install;
Interface cleaning and the grandstand reinforcing bar binding of h, Stand Beams;
I, grandstand concreting.
2. cast-in-situ concrete stand structure second pouring molding construction method according to claim 1, it is characterized in that: the Stand Beams concreting described in the step e, be placement layer by layer in order from low to high, adjacent sections is built be not more than blanking time concrete initial set time.
CN2012105829708A 2012-12-28 2012-12-28 Secondary casting molding construction method of cast-in-situ concrete stand structure Pending CN103015723A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105829708A CN103015723A (en) 2012-12-28 2012-12-28 Secondary casting molding construction method of cast-in-situ concrete stand structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105829708A CN103015723A (en) 2012-12-28 2012-12-28 Secondary casting molding construction method of cast-in-situ concrete stand structure

Publications (1)

Publication Number Publication Date
CN103015723A true CN103015723A (en) 2013-04-03

Family

ID=47964780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105829708A Pending CN103015723A (en) 2012-12-28 2012-12-28 Secondary casting molding construction method of cast-in-situ concrete stand structure

Country Status (1)

Country Link
CN (1) CN103015723A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103362300A (en) * 2013-06-28 2013-10-23 中建七局第二建筑有限公司 Template structure and method for template support of cast-in-place concrete arc-shaped terrace
CN104295001A (en) * 2014-08-25 2015-01-21 浙江省一建建设集团有限公司 Variable cross-section pre-stress cant beam and construction process thereof
CN106854941A (en) * 2016-12-30 2017-06-16 中国建筑第八工程局有限公司 A kind of construction method of heavy in section Stand Inclined Beams and batter post
CN108396986A (en) * 2018-05-10 2018-08-14 上海建工二建集团有限公司 reinforced structure and construction method of overlapped prefabricated L-shaped prestressed rib beam plate
CN111236720A (en) * 2020-01-20 2020-06-05 中材海外工程有限公司 Construction method for pouring silo decompression cone without construction joint

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1510225A (en) * 2002-12-23 2004-07-07 中国建筑第八工程局中南公司 Method for constructing Y shape pillar and suspended declined beam
CN101025052A (en) * 2007-03-16 2007-08-29 北京城建集团有限责任公司 Cast-in-situ clear-water concrete viewing platform form board and its construction method
JP2008088701A (en) * 2006-10-02 2008-04-17 Maeda Corp Concrete structure construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1510225A (en) * 2002-12-23 2004-07-07 中国建筑第八工程局中南公司 Method for constructing Y shape pillar and suspended declined beam
JP2008088701A (en) * 2006-10-02 2008-04-17 Maeda Corp Concrete structure construction method
CN101025052A (en) * 2007-03-16 2007-08-29 北京城建集团有限责任公司 Cast-in-situ clear-water concrete viewing platform form board and its construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王辉等: "青岛体育中心游泳跳水馆看台施工技术", 《青岛理工大学学报》, vol. 33, no. 4, 31 August 2012 (2012-08-31), pages 40 - 44 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103362300A (en) * 2013-06-28 2013-10-23 中建七局第二建筑有限公司 Template structure and method for template support of cast-in-place concrete arc-shaped terrace
CN103362300B (en) * 2013-06-28 2015-11-18 中建七局第二建筑有限公司 Cast-in-situ concrete arc step viewing platform form board structure and mold method
CN104295001A (en) * 2014-08-25 2015-01-21 浙江省一建建设集团有限公司 Variable cross-section pre-stress cant beam and construction process thereof
CN104295001B (en) * 2014-08-25 2016-04-27 浙江省一建建设集团有限公司 The construction technology of variable cross-section prestressing force cant beam
CN106854941A (en) * 2016-12-30 2017-06-16 中国建筑第八工程局有限公司 A kind of construction method of heavy in section Stand Inclined Beams and batter post
CN106854941B (en) * 2016-12-30 2019-05-10 中国建筑第八工程局有限公司 A kind of construction method of big section Stand Inclined Beams and batter post
CN108396986A (en) * 2018-05-10 2018-08-14 上海建工二建集团有限公司 reinforced structure and construction method of overlapped prefabricated L-shaped prestressed rib beam plate
CN111236720A (en) * 2020-01-20 2020-06-05 中材海外工程有限公司 Construction method for pouring silo decompression cone without construction joint
CN111236720B (en) * 2020-01-20 2022-06-17 中国中材海外科技发展有限公司 Construction method for pouring silo decompression cone without construction joint

Similar Documents

Publication Publication Date Title
WO2020118563A1 (en) Design and rapid construction methods for flush assembly of prefabricated steel beams and floor
CN103015723A (en) Secondary casting molding construction method of cast-in-situ concrete stand structure
CN101818570B (en) Method for constructing girder structure conversion layer of high-rise building
CN111734031B (en) Fast-assembling and fast-disassembling formwork system of building multi-ribbed structure and construction process thereof
CN206616862U (en) Formwork root bracing means
CN108638324A (en) A kind of construction method of prefabricated case beam
CN106065681A (en) Superimposed sheet hoard strip construction method in a kind of overall assembled architecture based on BIM technology
CN105863253A (en) Integral formwork-supporting type asynchronous casting stairwell wall column formwork supporting system and construction method
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN104295003A (en) Structural column construction method
CN202324606U (en) U-shaped force bearing seat
CN105525753A (en) Method and structure for simultaneously constructing constructional column and main body structure
CN110821022A (en) Full-prefabricated high-strength PC floor in steel construction that can install fast
CN206438529U (en) Beam and slab type raft foundation formwork support structure
CN206109960U (en) Steel that can be under construction fast concrete integrated configuration bridge
CN106032704A (en) Construction method for using concrete columns to support structures on both sides of post-pouring strip
CN103758290A (en) Building construction method and device for temporarily supporting mobile split heads
CN102011490B (en) Template supporting construction process of wall after slab for high-rise shear wall structure system
CN204112712U (en) A kind of side root haunch cast-in-place wall model sheetinstallat device
CN208502236U (en) A kind of edge banding apparatus for concrete floor edge in steel construction
WO2018126950A1 (en) Modular stairway
CN102220808A (en) Beam lowering construction method of frame structure
CN205955189U (en) Fold -type structure board post -cast strip seam template construction structures
CN208918257U (en) A kind of assembled architecture PC aluminum template system
CN207296115U (en) A kind of cast-in-situ floor high accuracy positioning control system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130403