CN103009898A - Ornamental water body giant acrylic glass installation construction method - Google Patents
Ornamental water body giant acrylic glass installation construction method Download PDFInfo
- Publication number
- CN103009898A CN103009898A CN2011102815747A CN201110281574A CN103009898A CN 103009898 A CN103009898 A CN 103009898A CN 2011102815747 A CN2011102815747 A CN 2011102815747A CN 201110281574 A CN201110281574 A CN 201110281574A CN 103009898 A CN103009898 A CN 103009898A
- Authority
- CN
- China
- Prior art keywords
- glass
- acrylic glass
- splicing
- acrylic
- bealock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Joining Of Glass To Other Materials (AREA)
Abstract
The present invention discloses an ornamental water body giant acrylic glass installation construction method, which comprises the following steps: transporting, fitting, splicing, and acrylic glass and structure connection. According to the present invention, a main body casting polymerization method splicing technology is adopted, large scale mechanical equipment is not required, and a treatment surface on a seaming position is smooth; a polymerization reaction gelatification effect tends mild so as to avoid occurrence of flash polymerization phenomenon; and the acrylic glass and structure connection position adopts alum expanding cement and a structure sealant to carry out a treatment, such that seepage resistance and compression resistance of the acrylic glass and structure connection position are ensured with the dual waterproof treatment. With the present invention, a series of effective processes are further adopted, such that a plurality of important and difficult problems during transporting, fitting, splicing and other steps of the giant acrylic glass are effectively solved so as to save cost, shorten a construction time, and create good social benefits and economic benefits for enterprises.
Description
Technical field
The present invention relates to a kind of huge acrylic glass of water body construction method of installation of viewing and admiring.
Background technology
Along with the increase of viewing and admiring the water body scale of construction, the increasing of acryl glass size, the transportation of acryl glass, complicated in place; The acryl glass of viewing and admiring simultaneously water body is installed under water, the plasticity of acryl glass is strong, the pressure that is subject to water produces distortion easily, so one-tenth is attached most importance in being connected also between glass and glass and glass and xoncrete structure, the generation of these problems is so that the installation difficulty of huge acryl glass is increasing.
Summary of the invention
The object of the invention is to provide a kind of step simple, and constructability efficiently solves some heavy difficulties that run in the operations such as the transportation of huge acrylic glass, in place, connection, provides cost savings, and has shortened the duration.
The present invention is achieved by the following technical solutions:
A kind of huge acrylic glass of water body construction method of installation of viewing and admiring, it may further comprise the steps:
A, transportation:
To transport supporting trolley and be connected with bolt with pallet, and do to support with huge glass handling on carrier frame by mobile pin hand, and make the reservation bealock Liang Chu that places mounting glass of carrier frame, mobile transportation supporting trolley is crossed over rectangle bealock obstacle;
B, in place:
After the transportation supported cart walks to acrylic glass and the tunnel bealock aligns, utilize movable Scaffold to do to support with the allocation and transportation of acrylic glass to tunnel bealock place, pacify a chain block fixing point at water body one side roof part that acrylic glass is installed, by the handling of chain block, make acrylic glass carry out in place at reservation bealock place;
C, splicing:
1) at first make framed that splicing seams uses, acrylic glass splicing seams section is processed into roughly the grooves of 15~20 degree, and process totally, two samples are commented into " V " v notch vs of 30~40 degree, and it is wide that about 1mm is left at the tip; Paste glassine paper at the most advanced and sophisticated finedraw of " V " v notch v and two ends breach, opening surface at " V " v notch v is stuck with paste into the not Sheng slurry model of spillage with 3mm polyvinyl chloride panel or other hard materials, glassine paper etc., and framed interior slurries are only contacted with the lucite of glassine paper and wish splicing;
2) acrylic monomer, organic peroxide evocating agent, promoter are added according to a certain ratio in the prepolymerization reactor with mixer, making viscosity with conventional prepolymerization pulp-making method is 10~20 seconds/50~60 ℃ slurries;
3) in two small-sized acryl glass blocks, wear two fraisings with reamer, to be installed in the acryl glue hole drawing adjusting rod, fill the splicing slurries between adjusting rod, small-sized acryl glass blocks and acryl glass in fraising and to drawing, adjusting makes the splicing slurries be polymerized to curing under 20~35 ℃ of conditions to drawing girth member;
Slowly inject after the splicing slurries vacuum defoamation that 4) will configure the Sheng slurry of splicing seams framed in, take slurries not outward overflow as degree, then cover one deck width glassine paper consistent with framed width in slurry surface, get rid of the air bubble between slurry surface and the glassine paper, place under 20~35 ℃ of conditions and be polymerized to curing;
5) after splicing seams solidifies, be as the criterion to insert not feed, peel off pattern-making material, wash the foul of specimen surface off with wipes of alcohol, construction environment is carried out totally-enclosed processing, reduce in the heat treatment process and dispel the heat, then heat-treat by baking oven, oven temperature is controlled at 100~110 ℃, and holding time is 1~2 hour;
The surplus of the splicing projection of skimming after 6) heat treatment is finished is carried out at last sanding and polishing and is processed;
D, acryl glass are connected with structure:
Should to acrylic glass the reservation bealock be installed first before the glass allocation and transportation measures, put the acrylic cushion block of different-thickness according to the same absolute altitude underlay of measuring, and with 504 all-purpose adhesives cushion block is combined with structure, guarantee that acrylic glass can be placed on the same absolute altitude, the acrylic cushion block need carry out level and arrange with vertical both direction; Behind the glass installation in position, need to fill out filling in the place without the acrylic cushion block with alum swelling agent cement, the acrylic glass position is positioned and fixes; After doing, carry out base cleaning, annotate envelope and carry out the structure glue surface treatment with application specific architecture glue at acrylic glass and structural anticorrosion mouth after having cleared up.
Advantage of the present invention is:
Acrylic glass of the present invention adopts body cast polymerization splicing, need not heavy mechanical equipment, and the seam crossing treatment surface is smooth simultaneously, and the gelation effect of polymerisation tends towards stability, and has avoided the generation of sudden and violent poly-phenomenon.Acrylic glass and structure junction adopt alum expanding cement and structure sealant to process, and by the two pass waterproof, have guaranteed antiseepage, the compressive property of acrylic glass and structure junction.Because the present invention has adopted a series of effective techniques, efficiently solve some heavy difficulties that run in the operations such as the transportation of huge acrylic glass, in place, connection, provide cost savings, shortened the duration, for enterprise has created good social and economic effects.
The specific embodiment
Embodiment: view and admire the huge acrylic glass of water body construction method of installation, it may further comprise the steps:
A, transportation:
To transport supporting trolley and be connected with bolt with pallet, and do to support with huge glass handling on carrier frame by mobile pin hand, and make the reservation bealock Liang Chu that places mounting glass of carrier frame, mobile transportation supporting trolley is crossed over rectangle bealock obstacle;
B, in place:
After the transportation supported cart walks to acrylic glass and the tunnel bealock aligns, utilize movable Scaffold to do to support with the allocation and transportation of acrylic glass to tunnel bealock place, pacify a chain block fixing point at water body one side roof part that acrylic glass is installed, by the handling of chain block, make acrylic glass carry out in place at reservation bealock place;
C, splicing:
1) at first make framed that splicing seams uses, acrylic glass splicing seams section is processed into roughly the grooves of 15~20 degree, and process totally, two samples are commented into " V " v notch vs of 30~40 degree, and it is wide that about 1mm is left at the tip; Paste glassine paper at the most advanced and sophisticated finedraw of " V " v notch v and two ends breach, opening surface at " V " v notch v is stuck with paste into the not Sheng slurry model of spillage with 3mm polyvinyl chloride panel or other hard materials, glassine paper etc., and framed interior slurries are only contacted with the lucite of glassine paper and wish splicing;
2) acrylic monomer, organic peroxide evocating agent, promoter are added according to a certain ratio in the prepolymerization reactor with mixer, making viscosity with conventional prepolymerization pulp-making method is 10~20 seconds/50~60 ℃ slurries;
3) in two small-sized acryl glass blocks, wear two fraisings with reamer, to be installed in the acryl glue hole drawing adjusting rod, fill the splicing slurries between adjusting rod, small-sized acryl glass blocks and acryl glass in fraising and to drawing, adjusting makes the splicing slurries be polymerized to curing under 20~35 ℃ of conditions to drawing girth member;
Slowly inject after the splicing slurries vacuum defoamation that 4) will configure the Sheng slurry of splicing seams framed in, take slurries not outward overflow as degree, then cover one deck width glassine paper consistent with framed width in slurry surface, get rid of the air bubble between slurry surface and the glassine paper, place under 20~35 ℃ of conditions and be polymerized to curing;
5) after splicing seams solidifies, be as the criterion to insert not feed, peel off pattern-making material, wash the foul of specimen surface off with wipes of alcohol, construction environment is carried out totally-enclosed processing, reduce in the heat treatment process and dispel the heat, then heat-treat by baking oven, oven temperature is controlled at 100~110 ℃, and holding time is 1~2 hour;
The surplus of the splicing projection of skimming after 6) heat treatment is finished is carried out at last sanding and polishing and is processed;
D, acryl glass are connected with structure:
Should to acrylic glass the reservation bealock be installed first before the glass allocation and transportation measures, put the acrylic cushion block of different-thickness according to the same absolute altitude underlay of measuring, and with 504 all-purpose adhesives cushion block is combined with structure, guarantee that acrylic glass can be placed on the same absolute altitude, the acrylic cushion block need carry out level and arrange with vertical both direction; Behind the glass installation in position, need to fill out filling in the place without the acrylic cushion block with alum swelling agent cement, the acrylic glass position is positioned and fixes; After doing, carry out base cleaning, annotate envelope and carry out the structure glue surface treatment with application specific architecture glue at acrylic glass and structural anticorrosion mouth after having cleared up.
Claims (1)
1. view and admire the huge acrylic glass of water body construction method of installation for one kind, it is characterized in that: it may further comprise the steps:
A, transportation:
To transport supporting trolley and be connected with bolt with pallet, and do to support with huge glass handling on carrier frame by mobile pin hand, and make the reservation bealock Liang Chu that places mounting glass of carrier frame, mobile transportation supporting trolley is crossed over rectangle bealock obstacle;
B, in place:
After the transportation supported cart walks to acrylic glass and the tunnel bealock aligns, utilize movable Scaffold to do to support with the allocation and transportation of acrylic glass to tunnel bealock place, pacify a chain block fixing point at water body one side roof part that acrylic glass is installed, by the handling of chain block, make acrylic glass carry out in place at reservation bealock place;
C, splicing:
1) at first make framed that splicing seams uses, acrylic glass splicing seams section is processed into roughly the grooves of 15~20 degree, and process totally, two samples are commented into " V " v notch vs of 30~40 degree, and it is wide that about 1mm is left at the tip; Paste glassine paper at the most advanced and sophisticated finedraw of " V " v notch v and two ends breach, opening surface at " V " v notch v is stuck with paste into the not Sheng slurry model of spillage with 3mm polyvinyl chloride panel or other hard materials, glassine paper etc., and framed interior slurries are only contacted with the lucite of glassine paper and wish splicing;
2) acrylic monomer, organic peroxide evocating agent, promoter are added according to a certain ratio in the prepolymerization reactor with mixer, making viscosity with conventional prepolymerization pulp-making method is 10~20 seconds/50~60 ℃ slurries;
3) in two small-sized acryl glass blocks, wear two fraisings with reamer, to be installed in the acryl glue hole drawing adjusting rod, fill the splicing slurries between adjusting rod, small-sized acryl glass blocks and acryl glass in fraising and to drawing, adjusting makes the splicing slurries be polymerized to curing under 20~35 ℃ of conditions to drawing girth member;
Slowly inject after the splicing slurries vacuum defoamation that 4) will configure the Sheng slurry of splicing seams framed in, take slurries not outward overflow as degree, then cover one deck width glassine paper consistent with framed width in slurry surface, get rid of the air bubble between slurry surface and the glassine paper, place under 20~35 ℃ of conditions and be polymerized to curing;
5) after splicing seams solidifies, be as the criterion to insert not feed, peel off pattern-making material, wash the foul of specimen surface off with wipes of alcohol, construction environment is carried out totally-enclosed processing, reduce in the heat treatment process and dispel the heat, then heat-treat by baking oven, oven temperature is controlled at 100~110 ℃, and holding time is 1~2 hour;
The surplus of the splicing projection of skimming after 6) heat treatment is finished is carried out at last sanding and polishing and is processed;
D, acryl glass are connected with structure:
Should to acrylic glass the reservation bealock be installed first before the glass allocation and transportation measures, put the acrylic cushion block of different-thickness according to the same absolute altitude underlay of measuring, and with 504 all-purpose adhesives cushion block is combined with structure, guarantee that acrylic glass can be placed on the same absolute altitude, the acrylic cushion block need carry out level and arrange with vertical both direction; Behind the glass installation in position, need to fill out filling in the place without the acrylic cushion block with alum swelling agent cement, the acrylic glass position is positioned and fixes; After doing, carry out base cleaning, annotate envelope and carry out the structure glue surface treatment with application specific architecture glue at acrylic glass and structural anticorrosion mouth after having cleared up.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110281574.7A CN103009898B (en) | 2011-09-21 | 2011-09-21 | Ornamental water body giant acrylic glass installation construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110281574.7A CN103009898B (en) | 2011-09-21 | 2011-09-21 | Ornamental water body giant acrylic glass installation construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103009898A true CN103009898A (en) | 2013-04-03 |
CN103009898B CN103009898B (en) | 2014-08-20 |
Family
ID=47959226
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110281574.7A Active CN103009898B (en) | 2011-09-21 | 2011-09-21 | Ornamental water body giant acrylic glass installation construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103009898B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110181838A (en) * | 2019-07-05 | 2019-08-30 | 浙江横海科技有限公司 | Underwater uniform thickness acrylic hemisphere production method |
CN113863687A (en) * | 2021-10-12 | 2021-12-31 | 中建八局第三建设有限公司 | Installation process of large-volume acrylic plate in limited space |
CN117966913A (en) * | 2024-03-05 | 2024-05-03 | 中建八局第一建设有限公司 | High-altitude integral joint treatment method for ultra-large acrylic member |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001241118A (en) * | 2000-02-25 | 2001-09-04 | Kanebo Ltd | Waterproof sheet and waterproofing method by using the sheet |
CN101435229A (en) * | 2008-11-14 | 2009-05-20 | 上海绿特丹保温工程有限公司 | Heat-insulating layer construction process of formwork method |
CN201330510Y (en) * | 2008-12-19 | 2009-10-21 | 苏州二建建筑集团有限公司 | Transparent acrylic board mounting structure for aquarium |
CN101691784A (en) * | 2009-08-19 | 2010-04-07 | 贵州大学 | Steel structured wide-bay energy-saving residential building with gypsum walls and on-site layering and sectioning manufacturing method |
-
2011
- 2011-09-21 CN CN201110281574.7A patent/CN103009898B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001241118A (en) * | 2000-02-25 | 2001-09-04 | Kanebo Ltd | Waterproof sheet and waterproofing method by using the sheet |
CN101435229A (en) * | 2008-11-14 | 2009-05-20 | 上海绿特丹保温工程有限公司 | Heat-insulating layer construction process of formwork method |
CN201330510Y (en) * | 2008-12-19 | 2009-10-21 | 苏州二建建筑集团有限公司 | Transparent acrylic board mounting structure for aquarium |
CN101691784A (en) * | 2009-08-19 | 2010-04-07 | 贵州大学 | Steel structured wide-bay energy-saving residential building with gypsum walls and on-site layering and sectioning manufacturing method |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110181838A (en) * | 2019-07-05 | 2019-08-30 | 浙江横海科技有限公司 | Underwater uniform thickness acrylic hemisphere production method |
CN113863687A (en) * | 2021-10-12 | 2021-12-31 | 中建八局第三建设有限公司 | Installation process of large-volume acrylic plate in limited space |
CN117966913A (en) * | 2024-03-05 | 2024-05-03 | 中建八局第一建设有限公司 | High-altitude integral joint treatment method for ultra-large acrylic member |
Also Published As
Publication number | Publication date |
---|---|
CN103009898B (en) | 2014-08-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104563573B (en) | A kind of Modular spliced pond | |
CN203583528U (en) | Waterproof structure for joints of sidewall and top and bottom plates of peat soft soil stratum subway station | |
CN103104091A (en) | Sliding mold whole lifting platform and construction method | |
CN103009898A (en) | Ornamental water body giant acrylic glass installation construction method | |
CN202787330U (en) | Post-cast strip template | |
CN203347182U (en) | Water-impermeable structural layer for toilet | |
CN203285056U (en) | Stair formwork supporting base | |
CN201214898Y (en) | Low beam template reinforcement machine | |
CN203795854U (en) | Preformed hole formwork fixing device for bare concrete floor | |
CN203866851U (en) | Multifunctional caisson flotation template | |
CN209337283U (en) | A kind of prefabricated component truck-loading rack | |
CN204021215U (en) | A kind of job platform that is applicable to the excessive big vast tower of Tailings Dam | |
CN204940055U (en) | A kind of presetting system pervious concrete pavement Expandable strip | |
CN207647189U (en) | A kind of construction discharging platform | |
CN205314466U (en) | Take dampproofing ground plate brick of self -adhesive layer | |
CN204238519U (en) | Extension waterproofing materials | |
CN205857241U (en) | Different-thickness raft plate underground structure with post-cast strip | |
CN203904945U (en) | Integrated outside concrete formwork | |
CN205416579U (en) | Response type self -adhered waterproofing membrane's novel applied structure | |
CN103802224A (en) | Squaring method for silicon ingot | |
CN104005388B (en) | A kind of all-in-one-piece outside concrete blinding | |
CN203834954U (en) | Lifting wall-building clamping board | |
CN214739640U (en) | Parapet is built by laying bricks or stones with turning mechanism of plastering | |
CN203626852U (en) | Large-diameter dual-layer channel fast construction flat plate lining trolley | |
CN204935915U (en) | A kind of auxiliary material producing putty adds conveying device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |