CN102995890A - Scaffold hard tying device capable of realizing efficient recycling - Google Patents

Scaffold hard tying device capable of realizing efficient recycling Download PDF

Info

Publication number
CN102995890A
CN102995890A CN201210537878XA CN201210537878A CN102995890A CN 102995890 A CN102995890 A CN 102995890A CN 201210537878X A CN201210537878X A CN 201210537878XA CN 201210537878 A CN201210537878 A CN 201210537878A CN 102995890 A CN102995890 A CN 102995890A
Authority
CN
China
Prior art keywords
steel plate
drawknot
tying
steel pipe
children
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210537878XA
Other languages
Chinese (zh)
Inventor
邱首伟
周红兵
张铭
曹文根
叶敏
张云超
周君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 4 Group Co Ltd
Original Assignee
Shanghai Construction No 4 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 4 Group Co Ltd filed Critical Shanghai Construction No 4 Group Co Ltd
Priority to CN201210537878XA priority Critical patent/CN102995890A/en
Publication of CN102995890A publication Critical patent/CN102995890A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention relates to a scaffold hard tying device capable of realizing efficient recycling. The scaffold hard tying device comprises an embedded screw and a tying steel pipe, wherein the embedded screw is a cutting segment of a counter-tension screw of a welded water sealing steel plate which is embedded in a cast-in-place reinforced concrete shear wall and a column, a connecting steel plate is welded on one end of the tying steel pipe, a bolt hole is formed in the middle of the lower part of the connecting steel plate, and the embedded screw penetrates through the bolt hole of the connecting steel plate of the tying steel pipe to form a fixed hard tying structure. By utilizing the device, the counter-tension screws (the cut counter-tension head screws) which are used for formwork supporting and are treated as scrap iron originally are utilized to the maximum extent, moreover, a tying segment is designed into a fixed product, so that repeated use is facilitated. The whole set of the hard tying device is attractive, practicable and economical and is conductive to environmental conservation.

Description

Can realize the pin stiffness of hand in children drawknot device that high efficiente callback utilizes
Technical field
The present invention relates to a kind of hard draw knot device of scaffold, especially a kind of hard draw knot device of realizing the scaffold that reuses.
Background technology
Traditional pin stiffness of hand in children drawknot is often taked the form of pre-embedded steel slab or short steel pipes, and steel plate or steel pipe need be purchased or monoblock steel plate, long steel pipe etc. be cut in addition, and a large amount of drawknots not only increases cost, and the rate of recovery after pre-buried is lower.Meanwhile, main structure construction often produces again a large amount of screw rods that can't normally use, the Screw arbor with nut at both-ends termination section that particularly steel plate for sealing water has been welded in pre-buried adding in cast-in-situ steel reinforced concrete shear wall, the post, the recycling rate is very low, often is used as scrap iron and processes.Apparatus of the present invention take full advantage of this part screw rod with the silk tooth, and with the supporting regularization product that is designed to of the linkage section of drawknot device, simple, practical, attractive in appearance.
Summary of the invention
The present invention is the reusable technical problem that will solve the hard draw of scaffold knot device, and a kind of pin stiffness of hand in children drawknot device of realizing that high efficiente callback utilizes is provided.
Technical scheme of the present invention is: a kind of pin stiffness of hand in children drawknot device of realizing that high efficiente callback utilizes, comprise pre embedded bolt, the drawknot steel pipe, pre embedded bolt is the cut length that adds the Screw arbor with nut at both-ends that welds steel plate for sealing water pre-buried in cast-in-situ steel reinforced concrete shear wall, the post, drawknot steel pipe one end is welded with junction steel plate, bolt hole is offered in middle part, junction steel plate bottom, and pre embedded bolt penetrates in the junction steel plate bolt hole of drawknot steel pipe and connects with nut screwing clamping, forms fixing hard draw junction structure.
Pre embedded bolt is full flight screw, the plain bar of its diameter 14mm or 16mm, and length adds the spacing steel plate of weldering greater than 20cm at distance screw flight leading section 60mm place
Pre embedded bolt is pre-buried before concreting to be fixed with reinforcing bar spot welding.
The drawknot steel pipe is the building operations scaffold tubes of diameter 48mm, wall thickness 3.5mm, and length is 450-500mm.The diameter of the bolt hole that the middle part, bottom of junction steel plate is offered is 16mm or 18mm.
The invention has the beneficial effects as follows: the present invention farthest uses and makes the formwork Screw arbor with nut at both-ends (the Screw arbor with nut at both-ends head after the cutting) that scrap iron is processed originally, simultaneously the drawknot section is designed to the regularization product, is convenient to turnover and uses.A whole set of hard draw knot device is attractive in appearance, practical, economical, environmental.
Description of drawings
Fig. 1 is structural representation of the present invention;
Fig. 2 is the pre embedded bolt structural representation;
Fig. 3 is drawknot steel tubular structure schematic diagram;
Fig. 4 is the right view of Fig. 3.
The specific embodiment
As shown in Figure 1, a kind of pin stiffness of hand in children drawknot device of realizing that high efficiente callback utilizes comprises pre embedded bolt 1, spacing steel plate 2, junction steel plate 3, drawknot steel pipe 4, nut 6 etc.
Pre embedded bolt 1 penetrates in the junction steel plate bolt hole 5 of drawknot steel pipe 4 and tightens connection with nut 6, forms fixing hard draw junction structure.Effective drawknot when satisfying the pin hand and set up between pin hand and the agent structure.
As shown in Figure 2, pre embedded bolt 1 is to have utilized the split bolt termination section that steel plate for sealing water has been welded in pre-buried adding in cast-in-situ steel reinforced concrete shear wall, the post, and the coupling part of device is designed to the regularization product.Be constructed as follows:
Pre embedded bolt 1: adopt the Screw arbor with nut at both-ends termination section that steel plate for sealing water has been welded in pre-buried adding in the cast-in-situ steel reinforced concrete shear wall cut down, the post, be generally the plain bar of diameter 14mm, 16mm, length is greater than 20cm.Require the silk tooth complete.Adding the wide X of the long X of weldering at distance screw rod silk tooth side end 60mm place thick is the spacing steel plate 2 of 30*30*3, and matching nut 6.
Pre embedded bolt 1 is pre-buried before concreting, fixes in beam, the boring of plate side form, reinforcing bar spot welding.
As shown in Figure 3, drawknot steel pipe 4(is designed to the regularization product): adopt the building operations scaffold tubes of diameter 48mm, wall thickness 3.5mm, length is preferably 450-500mm, and an end is thick with the wide X of long X to be 3 weld all arounds of 100*60*8 junction steel plate.The bolt hole 5(that aperture 16mm or 18mm are offered in the middle part, bottom of junction steel plate 3 sees Fig. 4).

Claims (5)

1. the pin stiffness of hand in children drawknot device that can realize that high efficiente callback utilizes, comprise pre embedded bolt (1), drawknot steel pipe (4), it is characterized in that: described pre embedded bolt (1) is the pre-buried cut length that adds the Screw arbor with nut at both-ends that welds steel plate for sealing water in cast-in-situ steel reinforced concrete shear wall, the post, drawknot steel pipe (4) one ends are welded with junction steel plate (3), bolt hole (5) is offered in junction steel plate (3) middle part, bottom, pre embedded bolt (1) penetrates in the junction steel plate bolt hole (5) of drawknot steel pipe (4) and tightens connection with nut (6), forms the hard draw junction structure of fixing.
2. the pin stiffness of hand in children drawknot device of realizing that high efficiente callback utilizes according to claim 1, it is characterized in that: described pre embedded bolt (1) is full flight screw, its diameter is the plain bar of 14mm or 16mm, length adds weldering spacing steel plate (2) greater than 20cm at distance screw flight leading section 60mm place.
3. the pin stiffness of hand in children drawknot device of realizing that high efficiente callback utilizes according to claim 1, it is characterized in that: described pre embedded bolt (1) is pre-buried before concreting to be fixed with reinforcing bar spot welding.
4. the pin stiffness of hand in children drawknot device of realizing that high efficiente callback utilizes according to claim 1, it is characterized in that: described drawknot steel pipe (4) is the building operations of diameter 48mm, wall thickness 3.5mm scaffold tubes, length is 450-500mm.
5. the pin stiffness of hand in children drawknot device of realizing that high efficiente callback utilizes according to claim 1, it is characterized in that: the diameter of the bolt hole (5) that the middle part, bottom of described junction steel plate (3) is offered is 16mm or 18mm.
CN201210537878XA 2012-12-13 2012-12-13 Scaffold hard tying device capable of realizing efficient recycling Pending CN102995890A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210537878XA CN102995890A (en) 2012-12-13 2012-12-13 Scaffold hard tying device capable of realizing efficient recycling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210537878XA CN102995890A (en) 2012-12-13 2012-12-13 Scaffold hard tying device capable of realizing efficient recycling

Publications (1)

Publication Number Publication Date
CN102995890A true CN102995890A (en) 2013-03-27

Family

ID=47924943

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210537878XA Pending CN102995890A (en) 2012-12-13 2012-12-13 Scaffold hard tying device capable of realizing efficient recycling

Country Status (1)

Country Link
CN (1) CN102995890A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103452304A (en) * 2013-08-08 2013-12-18 广西建工集团第五建筑工程有限责任公司 Inserted type outer frame L-type steel wall connecting piece structure free of scaffold hole and construction method thereof
CN106141981A (en) * 2015-04-07 2016-11-23 五冶集团上海有限公司 For removing instrument of pre-embedded bolt metal sleeve and preparation method thereof and application
CN114151111A (en) * 2021-11-29 2022-03-08 上海建工四建集团有限公司 Water stopping device and water stopping method for long-distance curve jacking pipe

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0473373A (en) * 1990-07-16 1992-03-09 Satake Tekko Kk Method for securing scaffold pipe stanchion
JPH1061171A (en) * 1996-08-21 1998-03-03 Hirohito Tominaga Connecting tool of building and scaffold
CN201103235Y (en) * 2007-10-26 2008-08-20 长业建设集团有限公司 Connection device between wall and scaffold
CN201635381U (en) * 2010-03-19 2010-11-17 宁波建工股份有限公司 Wall connecting piece
CN202544405U (en) * 2012-04-18 2012-11-21 中国十七冶集团有限公司 Water stop split bolt with scaffold wall connection piece
CN203008352U (en) * 2012-12-13 2013-06-19 上海建工四建集团有限公司 Scaffold hard-pulling device capable of achieving efficient recycle

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0473373A (en) * 1990-07-16 1992-03-09 Satake Tekko Kk Method for securing scaffold pipe stanchion
JPH1061171A (en) * 1996-08-21 1998-03-03 Hirohito Tominaga Connecting tool of building and scaffold
CN201103235Y (en) * 2007-10-26 2008-08-20 长业建设集团有限公司 Connection device between wall and scaffold
CN201635381U (en) * 2010-03-19 2010-11-17 宁波建工股份有限公司 Wall connecting piece
CN202544405U (en) * 2012-04-18 2012-11-21 中国十七冶集团有限公司 Water stop split bolt with scaffold wall connection piece
CN203008352U (en) * 2012-12-13 2013-06-19 上海建工四建集团有限公司 Scaffold hard-pulling device capable of achieving efficient recycle

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103452304A (en) * 2013-08-08 2013-12-18 广西建工集团第五建筑工程有限责任公司 Inserted type outer frame L-type steel wall connecting piece structure free of scaffold hole and construction method thereof
CN103452304B (en) * 2013-08-08 2016-08-10 广西建工集团第五建筑工程有限责任公司 Exempt from foot trick plug-in type outrigger L-type steel wall-connecting piece structure and construction method thereof
CN106141981A (en) * 2015-04-07 2016-11-23 五冶集团上海有限公司 For removing instrument of pre-embedded bolt metal sleeve and preparation method thereof and application
CN114151111A (en) * 2021-11-29 2022-03-08 上海建工四建集团有限公司 Water stopping device and water stopping method for long-distance curve jacking pipe
CN114151111B (en) * 2021-11-29 2023-08-22 上海建工四建集团有限公司 Water stopping method for long-distance curve jacking pipe

Similar Documents

Publication Publication Date Title
CN101538939B (en) Construction method for preset nut type steel-reinforced concrete compound pier template fixing device
CN201339313Y (en) Scaffold wall connecting piece
WO2017177470A1 (en) Assembly type steel pipe casing reinforced concrete combined joint and mounting method
CN102383411B (en) Method for positioning template corner
CN104005556B (en) For the fixed form combination shuttering construction technology of expansion joint place shear wall
CN102995890A (en) Scaffold hard tying device capable of realizing efficient recycling
CN201474095U (en) Combined connection device of reverse construction concrete beam steel bar and positive construction type steel column
CN203654710U (en) Instrumental connecting tube for external wall scaffold shearing wall portion
CN207244460U (en) A kind of reinforcing bar binding platform suitable for large size, thin walled hollow pier
CN201386331Y (en) Fastened connection device with steel reinforced concrete joint reinforcing bar and profile steel not welded in between
CN202611223U (en) Recyclable bolt type scaffold wall connection piece
CN201401010Y (en) Fixing device for preset nut type steel reinforced concrete combined column template
CN206319597U (en) A kind of cantilever steel girder erecting device
CN203008352U (en) Scaffold hard-pulling device capable of achieving efficient recycle
CN202430980U (en) Detachably movable type steel pipe fixing insertion column for cantilever scaffold
CN102477799A (en) Masonry structure integrity reinforcing method
CN203475843U (en) Fixing device for concrete conveying pipe
CN204139622U (en) Adjustable segmented column steel bar positioning fixture
CN204326607U (en) A kind of assembled steel reinforced machining shed
CN203603253U (en) Detachable steel corbel structure on reinforced concrete column
CN203412311U (en) Connecting piece for tensioning support frame by own oblique structure
CN214995260U (en) Positioning steel bar position controller
CN202202314U (en) Die plate corner locating device
CN104164934A (en) Simple NZ built-in pipe die anti-floating draw hook device and construction method thereof
CN209369334U (en) A kind of large-span concrete stay in place form support device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130327