CN102957209A - 一种智能变电站综合测控装置 - Google Patents

一种智能变电站综合测控装置 Download PDF

Info

Publication number
CN102957209A
CN102957209A CN2012104375337A CN201210437533A CN102957209A CN 102957209 A CN102957209 A CN 102957209A CN 2012104375337 A CN2012104375337 A CN 2012104375337A CN 201210437533 A CN201210437533 A CN 201210437533A CN 102957209 A CN102957209 A CN 102957209A
Authority
CN
China
Prior art keywords
module
control device
intelligent
host cpu
communication
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012104375337A
Other languages
English (en)
Inventor
杜奇伟
蒋正威
丁磊明
江波
龚世敏
章立宗
丁梁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiaxing Electric Power Bureau
State Grid Corp of China SGCC
Zhejiang Electric Power Co
Shaoxing Electric Power Bureau
Original Assignee
Jiaxing Electric Power Bureau
State Grid Corp of China SGCC
Zhejiang Electric Power Co
Shaoxing Electric Power Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaxing Electric Power Bureau, State Grid Corp of China SGCC, Zhejiang Electric Power Co, Shaoxing Electric Power Bureau filed Critical Jiaxing Electric Power Bureau
Priority to CN2012104375337A priority Critical patent/CN102957209A/zh
Publication of CN102957209A publication Critical patent/CN102957209A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

本发明公开了一种智能变电站综合测控装置,包括管理主CPU模块、电源模块、人机交互模块、功能子模块、GPS硬件和网络站控层;其中所述管理主CPU模块通过内部总线分别与电源模块、功能子模块通讯连接;管理主CPU模块通过串行接口与人机交互模块通讯连接;所述的GPS硬件通过网络信号线与管理主CPU模块通讯连接;管理主CPU模块通过时钟同步总线分别与电源模块和功能子模块通讯连接。本发明提供了一种智能变电站综合测控装置,其通过灵活的软硬件配置,满足过程层数字化接入或传统电缆接入方式的要求,满足对全新的智能变电站建设及老站逐步智能化改造的要求。

Description

一种智能变电站综合测控装置
  
技术领域
本发明涉及一种智能变电站综合测控装置。 
  
背景技术
 随着智能变电站建设的不断开展, 有全新的智能变电站实施,也有传统变电站进行智能化改造,针对现有全新的智能变电站建设及老站逐步智能化改造工程,可总结为以下几种实施模式:模式一:站控层实现数字化,与间隔层采用IEC61850 标准,间隔层设备通过GOOSE服务实现间隔联闭锁,过程层设备为传统设备,所有信号通过电缆方式接入测控装置;模式二:站控层与间隔层采用IEC61850 标准,过程层电流电压采集采用非常规互感器实现数字化,通过合并单元按照IEC61850-9或FT3标准接入测控装置采集。其他开入开出为传统电缆连接方式;模式三:站控层与间隔层采用IEC61850 标准,开入开出信号通过传统一次设备就地配置智能终端或智能操作箱就地采集后,在通过过层层GOOSE网络与间隔测控通信,实现开入开出功能;交流采集为传统PT/CT通过电缆接入测控装置采集;模式四:过程层开入/开出/测量采集,都采用光纤连接方式与间隔层测控通信。 
 以上四种实施模式都存在过程层数字化接入或传统电缆接入方式问题,从而造成全新的智能变电站建设及老站逐步智能化改造的困难。 
  
发明内容
 为解决上述问题,本发明的目的在于提供一种智能变电站综合测控装置,其通过灵活的软硬件配置,满足过程层数字化接入或传统电缆接入方式的要求,满足对全新的智能变电站建设及老站逐步智能化改造的要求。 
本发明为达到上述的目的,本发明采用如下技术方案: 
    一种智能变电站综合测控装置,包括管理主CPU模块、电源模块、人机交互模块、功能子模块、GPS硬件和网络站控层;其中所述管理主CPU模块通过内部总线分别与电源模块、功能子模块通讯连接;管理主CPU模块通过串行接口与人机交互模块通讯连接;所述的GPS硬件通过网络信号线与管理主CPU模块通讯连接;管理主CPU模块通过时钟同步总线分别与电源模块和功能子模块通讯连接。
    所述功能子模块包括传统模块和数字化模块,其中所述的传统模块采用智能直流模块、智能开发模块、智能开入模块、智能交流模块的其中一个或多个;所述的数字化模块采用智能GOOSE/SV模块。 
    所述站控层通过两个百兆以太网与管理主CPU模块通讯连接。 
 本发明的有益效果为:本发明提供一种智能变电站综合测控装置,其通过灵活的软硬件配置,满足过程层数字化接入或传统电缆接入方式的要求,满足对全新的智能变电站建设及老站逐步智能化改造的要求。 
  
附图说明
图1是本发明的结构示意图。 
  
具体实施方式
实施例1 
如图1所示,本实施例提供的是一种智能变电站综合测控装置,包括管理主CPU模块1、电源模块2、人机交互模块3、功能子模块4、GPS硬件7和网络站控层8;其中所述管理主CPU模块1通过内部总线5分别与电源模块2、功能子模块4通讯连接;管理主CPU模块1通过串行接口与人机交互模块3通讯连接;所述的GPS硬件7通过网络信号线与管理主CPU模块1通讯连接;管理主CPU模块1通过时钟同步总线6分别与电源模块2和功能子模块4通讯连接。所述功能子模块4包括传统模块和数字化模块,其中所述的传统模块采用智能直流模块10、智能开发模块11、智能开入模块12、智能交流模块13的其中一个或多个;所述的数字化模块采用智能GOOSE/SV模块14。所述站控层8通过两个百兆以太网与管理主CPU模块1通讯连接。
本发明在使用智能变电站综合测控装置进行测试时,通过电源模块2对整个测试装置提供工作电源,在电源模块2内带有一个单片机处理器,并设计电源监视回路,可实时监视内部工作电源(3.3V/5V/24V)输出状态。当人机交互模块3收到外界输入信号时,通过管理主CPU1对功能子模块4进行通讯传递。人机交互模块3采用320X240点阵图形化大液晶显示器输出,输入采用触摸屏方式,输入/输出简洁方便。当GPS硬件7收到外部时钟同步信号时,通过时间同步总线6功能子模块4进行时间调控,使能子模块4时间同步。所述站控层8通过两个百兆以太网与管理主CPU模块1通讯连接,可对外提供双网工作方式。 
 本实施例提供的一种智能变电站综合测控装置,其通过灵活的软硬件配置,满足过程层数字化接入或传统电缆接入方式的要求,满足对全新的智能变电站建设及老站逐步智能化改造的要求。 

Claims (3)

1.一种智能变电站综合测控装置,其特征在于:包括管理主CPU模块(1)、电源模块(2)、人机交互模块(3)、功能子模块(4)、GPS硬件(7)和网络站控层(8);其中所述管理主CPU模块(1)通过内部总线(5)分别与电源模块(2)、功能子模块(4)通讯连接;管理主CPU模块(1)通过串行接口与人机交互模块(3)通讯连接;所述的GPS硬件(7)通过网络信号线与管理主CPU模块(1)通讯连接;管理主CPU模块(1)通过时钟同步总线(6)分别与电源模块(2)和功能子模块(4)通讯连接。
2.根据权利要求1所述的一种智能变电站综合测控装置,其特征在于:所述功能子模块(4)包括传统模块和数字化模块,其中所述的传统模块采用智能直流模块(10)、智能开发模块(11)、智能开入模块(12)、智能交流模块(13)的其中一个或多个;所述的数字化模块采用智能GOOSE/SV模块(14)。
3.根据权利要求1所述的一种智能变电站综合测控装置,其特征在于:所述站控层(8)通过两个百兆以太网与管理主CPU模块(1)通讯连接。
CN2012104375337A 2012-11-06 2012-11-06 一种智能变电站综合测控装置 Pending CN102957209A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012104375337A CN102957209A (zh) 2012-11-06 2012-11-06 一种智能变电站综合测控装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012104375337A CN102957209A (zh) 2012-11-06 2012-11-06 一种智能变电站综合测控装置

Publications (1)

Publication Number Publication Date
CN102957209A true CN102957209A (zh) 2013-03-06

Family

ID=47765618

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012104375337A Pending CN102957209A (zh) 2012-11-06 2012-11-06 一种智能变电站综合测控装置

Country Status (1)

Country Link
CN (1) CN102957209A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103267906A (zh) * 2013-04-18 2013-08-28 国家电网公司 一种基于时间同步***的综合自动化变电站雪崩测试装置
CN103336176A (zh) * 2013-07-12 2013-10-02 湖南省湘电试研技术有限公司 Ft3传输协议自适应接收的智能变电站相位核准装置
CN104022572A (zh) * 2014-06-04 2014-09-03 上海电气集团股份有限公司 一种带网络通信功能的测控装置
CN110504758A (zh) * 2019-09-18 2019-11-26 国网湖北省电力有限公司电力科学研究院 一种基于以太网物理层的变电站设备检测装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050049204A (ko) * 2003-11-21 2005-05-25 한국수자원공사 분산제어국의 전송전력 제어 시스템 및 그 방법
CN102157982A (zh) * 2011-03-31 2011-08-17 国电南瑞科技股份有限公司 电力变压器智能终端
CN102332751A (zh) * 2011-07-13 2012-01-25 国电南京自动化股份有限公司 智能变电站接入双套过程层设备的测控装置及其测控方法
CN202931033U (zh) * 2012-11-06 2013-05-08 浙江省电力公司 一种智能变电站综合测控装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050049204A (ko) * 2003-11-21 2005-05-25 한국수자원공사 분산제어국의 전송전력 제어 시스템 및 그 방법
CN102157982A (zh) * 2011-03-31 2011-08-17 国电南瑞科技股份有限公司 电力变压器智能终端
CN102332751A (zh) * 2011-07-13 2012-01-25 国电南京自动化股份有限公司 智能变电站接入双套过程层设备的测控装置及其测控方法
CN202931033U (zh) * 2012-11-06 2013-05-08 浙江省电力公司 一种智能变电站综合测控装置

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103267906A (zh) * 2013-04-18 2013-08-28 国家电网公司 一种基于时间同步***的综合自动化变电站雪崩测试装置
CN103267906B (zh) * 2013-04-18 2015-06-17 国家电网公司 一种基于时间同步***的综合自动化变电站雪崩测试装置
CN103336176A (zh) * 2013-07-12 2013-10-02 湖南省湘电试研技术有限公司 Ft3传输协议自适应接收的智能变电站相位核准装置
CN104022572A (zh) * 2014-06-04 2014-09-03 上海电气集团股份有限公司 一种带网络通信功能的测控装置
CN110504758A (zh) * 2019-09-18 2019-11-26 国网湖北省电力有限公司电力科学研究院 一种基于以太网物理层的变电站设备检测装置
CN110504758B (zh) * 2019-09-18 2021-04-27 国网湖北省电力有限公司电力科学研究院 一种基于以太网物理层的变电站设备检测装置

Similar Documents

Publication Publication Date Title
CN104280710B (zh) 一种通用便携式卫星供配电***等效器
CN103036216B (zh) 应用于智能化变电站数字化母差保护***及时钟同步方法
CN103944272A (zh) 一种变电站通用测控装置
CN206489484U (zh) 一种嵌入式硬件平台主从架构布局设计
CN102957209A (zh) 一种智能变电站综合测控装置
CN203070010U (zh) 一种用于柔***流输电装置的多功能板卡
CN102738903A (zh) 站用交直流一体化电源监控装置
CN202931033U (zh) 一种智能变电站综合测控装置
CN101902078A (zh) 直流电源***中的集中监控装置
CN103545927A (zh) 一种基于数字化采样的多功能变电站自动控制***
CN204481574U (zh) 一种高集成度智能变电站二次装置
CN103472733A (zh) 一种基于光纤通信的电力***数字实时仿真物理接口装置
CN204068425U (zh) 变电站智能远动机
CN103259334A (zh) 变电站三态综合测控装置
CN105337411A (zh) 一种数字式配电变压器监测终端
CN202353613U (zh) 一种以太网-can总线数据采集接口装置
CN203660662U (zh) 智能变电站单间隔五合一装置
CN103746450A (zh) 一体化电源设备的监控***
CN208367510U (zh) 一种网络式智能环境监测控制设备
CN106535361A (zh) 一种应用于远程监控***的双无线通讯装置
CN202268901U (zh) 一种简洁通信的分布式控制器
CN106708684B (zh) 一种用于变电站的虚拟环境测试硬件***
CN104777391A (zh) 一种新型结构的电能质量检测装置
CN103684932B (zh) 网络检测无线***
CN107797482A (zh) 基于arm‑fpga的采样控制时序***及方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130306