CN1029526C - Pile-forming method by hole-leading mud-jacking pile-sinking - Google Patents

Pile-forming method by hole-leading mud-jacking pile-sinking Download PDF

Info

Publication number
CN1029526C
CN1029526C CN 92105033 CN92105033A CN1029526C CN 1029526 C CN1029526 C CN 1029526C CN 92105033 CN92105033 CN 92105033 CN 92105033 A CN92105033 A CN 92105033A CN 1029526 C CN1029526 C CN 1029526C
Authority
CN
China
Prior art keywords
pile
hole
grouting
construction
draw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 92105033
Other languages
Chinese (zh)
Other versions
CN1080681A (en
Inventor
刘兴辰
王洪柱
梁闽
林延增
侯生明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NO 1 PROSPECTING DESIGN INST M
Original Assignee
NO 1 PROSPECTING DESIGN INST M
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NO 1 PROSPECTING DESIGN INST M filed Critical NO 1 PROSPECTING DESIGN INST M
Priority to CN 92105033 priority Critical patent/CN1029526C/en
Publication of CN1080681A publication Critical patent/CN1080681A/en
Application granted granted Critical
Publication of CN1029526C publication Critical patent/CN1029526C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention belongs to the field of civil construction pile foundation construction. The existing pile sinking method is difficult to enter into a hard stratum, and although the spiral drilling and grouting pile forming method can enter into the hard stratum, the manufacturing cost is high. A pile-forming method by drilling and grouting includes such steps as taking out a soil core smaller than pile diameter from foundation difficult to be sunk, pressing in special grout to form protecting wall, and driving pile or vibrating pipe to desired depth. The method has the characteristics of fast hole guiding, stable hole wall, compaction and reinforcement effect on the pile bottom of the side wall, simple and convenient construction, small occupied area for construction, high pile bearing capacity, low manufacturing cost and the like, and can be widely applied to pile foundation construction of various stratums difficult to sink piles.

Description

Pile forming method by hole-leading pulp pressing pilesinking
The invention belongs to the construction of pile foundation in civil building field.
At present, because particularly export-oriented economy develop rapidly of national economy, tall and big heavy dark the increasing of great load building that reach, the control of massif stability of slope, hydraulic engineering, harbour, the development of industry such as road and rail abutment and civil engineering construction, prior art adopts direct pile sinking, the piling method, for the excessive stratum of formation resistance, can't construct, so the employing auger boring method for making pile by grouting into that has recently carries out pile foundation construction to it, this method can make pile foundation enter firm hard formation, but the no sand cement slurry that its mud jacking is to use, invalid cement loss amount is big, and do not have the compacted effect of tamping, so the low construction cost height of pile intensity.
For overcoming the shortcoming of prior art, the invention provides a kind of pile forming method by hole-leading pulp pressing pilesinking (being called for short the HKZ method).
This auger boring method for making pile by grouting into is characterized in that, it is promptly to draw the hole with the core that auger takes out less than the stake hole, be pressed into special slurries retaining wall with slush pump through the augers centre bore simultaneously, mobile rig mast aligns a pipe to draw position, hole vibration sinking tube perfusion pile.
In auger boring method for making pile by grouting into of the present invention, described mud jacking liquid can be that bentonite slurry, clay mortar, cement paste, cement add coal ash pulp and chemical grout, and wherein best is bentonite slurry.
In auger boring method for making pile by grouting into of the present invention, describedly be pressed into special slurries retaining wall from centre bore, its mud jacking apical side height generally is meant the degree of depth in groundwater table or the unlikely hole of collapsing.
In auger boring method for making pile by grouting into of the present invention, the hole facility that draw that described core drilling is used are augers, and preferably long screw auger also can be Churn drill, common abrasion drill, perhaps draws the hole with mode of jet.
The present invention since adopted draw the hole, the pile sinking method of mud jacking retaining wall and vibration sinking tube perfusion pile when drawing the hole, and the three combined, make construction method of the present invention demonstrate unique superiority that its bearing capacity of pile foundation height, cost reduce significantly.
The construction equipment that pile forming method by hole-leading pulp pressing pilesinking of the present invention adopts is the dual-purpose stake of a spiral mud jacking vibration sinking tube machine, sees accompanying drawing 1.When drawing hole mud jacking pile sinking bore forming, it is promptly to draw the hole with the core that long-armed auger (2) at first takes out less than the stake hole, use stock pump (5) mud jacking to be pressed into special slurries retaining wall simultaneously through the augers centre bore, roach and drill bit are proposed, movable mast (1) pours into pile with vibropile pipe (7) along the foramen primum vibration sinking tube.Draw bore open and draw the smaller the betterly deeply, the pressure 200~2000KPa of mud jacking generally determines by the test of local geological conditions.
Realize that best method of the present invention is to do by the operation instruction of accompanying drawing 1.Draw the hole separately as the also available any hole machinery that draws that do not satisfy the requirements, with slurry weight equilibrium method retaining wall, pile sinking gets final product fast.But time-consuming, no crushing.
The hole mud jacking pile sinking bore forming method of drawing of the present invention, in the past few years, through Beijing, many places, ground large-scale petroleum chemical engineering and Other Engineering test piles such as Tianjin, Shandong, Henan, Hebei, Inner Mongol, generally reflection is good, currently gains great popularity more.
For example: the 140000 tons of ethylene projects in Central Plains have adopted pile forming method by hole-leading pulp pressing pilesinking and bored pile method; The 300000 tons of chemical fertilizer engineerings in Central Plains have adopted draws the hole and squeezes into formula preformed pile method; Puyang steam power plant engineering has adopted the auger boring method for making pile by grouting into.
Economic technology contrast about this law and above-mentioned three kinds of prior art "forming columns sees Table four kinds of stake types of 1 Puyang "forming column economic technology comparison sheet:
Four kinds of stake types of Puyang "forming column economic technology comparison sheet table 1
Single pile conversion ten thousand tons of bearing capacities of folk prescription and preformed pile are thrown
The long every linear meter cost construction cost per square meter of stake footpath stake
The required investment money of stake type bearing capacity concrete bearing capacity is compared
(m) (m) (unit/rice) (unit/m 2)
(KN) (KN/m 3) (ten thousand yuan/ten thousand tons) (%)
Drawing the hole squeezes into formula 118.33+20.0(and draws the hole)
0.4×0.4 19 1100 362 864.56 23.88 100
Preformed pile method=138.33
Auger boring
ψ0.4 14 750 426 112.00 891.27 20.92 87.6
Method for making pile by grouting into
Draw hole mud jacking 78.42+20.0(and draw the hole)
ψ0.45 18 1300 454 618.83 13.63 57.1
Pile sinking "forming column=98.42
Draw hole mud jacking 61.96+20.0(and draw the hole)
ψ0.4 18 1100 486 652.22 13.42 56.2
Pile sinking "forming column=81.96
Boring
ψ0.5 18 930 263 113.72 579.17 22.01 92.2
Bored cast-in-situ pile
Annotate: 1. this table cost is according to Henan Province's construction work quota of budgetary estimate in 1989, calculates in conjunction with the concrete condition of Puyang.
2. various stake type "forming columns all are not considered to power factor (PF).
To sum up, compared with prior art, the advantage of pile forming method by hole-leading pulp pressing pilesinking of the present invention is:
This law has the firm hard formation of breaking through difficult construction, not influenced by groundwater table, it is fast to have the hole of drawing, hole wall is stable, oppose side wall has compacted, to the tamping reinforcement effect is arranged at the bottom of the stake, easy construction, the construction occupied ground is little, the bearing capacity of stake is the highest, and cost reduces significantly, can be widely used in various tall and big heavy dark pile engineering and the controls of massif stability of slope that reach the building of great load, hydraulic engineering, harbour, the pile engineering of the abutment of highway and railway and other industry and civilian construction, but adopt this law accelerating construction progress, save construction costs greatly, economic benefit is very considerable, is rated as current ideal pile foundation pile sinking "forming column.
Description of drawings:
The dual-purpose stake of accompanying drawing 1. spiral mud jacking vibration sinking tubes machine
Wherein: 4 machines of 1 mast, 2 long-armed auger 3 vibrating hammers, 5 stock pumps, 6 high-pressure slip-casting pipes, 7 vibropile pipes

Claims (4)

1, a kind of auger boring method for making pile by grouting into is characterized in that, it is promptly to draw the hole with the core that auger takes out less than the stake hole, is pressed into special slurries retaining wall with slush pump through the augers centre bore simultaneously, a pipe is aligned draw position, hole vibration sinking tube perfusion pile.
2,, it is characterized in that described mud jacking liquid can be that bentonite slurry, clay mortar, cement paste, cement add coal ash pulp and chemical grout by the described auger boring method for making pile by grouting into of claim 1.
By claim 1,2 described auger boring method for making pile by grouting into, it is characterized in that 3, describedly be pressed into special slurries retaining wall from centre bore, its mud jacking apical side height generally is meant the degree of depth in groundwater table or the unlikely hole of collapsing.
4, by the described auger boring method for making pile by grouting into of claim 1, it is characterized in that the hole facility that draw that described core drilling is used are augers.
CN 92105033 1992-06-27 1992-06-27 Pile-forming method by hole-leading mud-jacking pile-sinking Expired - Fee Related CN1029526C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 92105033 CN1029526C (en) 1992-06-27 1992-06-27 Pile-forming method by hole-leading mud-jacking pile-sinking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 92105033 CN1029526C (en) 1992-06-27 1992-06-27 Pile-forming method by hole-leading mud-jacking pile-sinking

Publications (2)

Publication Number Publication Date
CN1080681A CN1080681A (en) 1994-01-12
CN1029526C true CN1029526C (en) 1995-08-16

Family

ID=4941150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 92105033 Expired - Fee Related CN1029526C (en) 1992-06-27 1992-06-27 Pile-forming method by hole-leading mud-jacking pile-sinking

Country Status (1)

Country Link
CN (1) CN1029526C (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102330435B (en) * 2011-07-05 2013-09-18 东南大学 Construction method of separation wall for carrying out in situ separation repair on pollution site
CN102493452A (en) * 2011-11-30 2012-06-13 蔡嘉明 Grouting pile-grafting construction method and equipment
CN108532590A (en) * 2018-03-02 2018-09-14 毕建宏 The construction method and apparatus of caisson

Also Published As

Publication number Publication date
CN1080681A (en) 1994-01-12

Similar Documents

Publication Publication Date Title
CN1193141C (en) Combined grouting construction process of reinforcing foundation
CN102011399B (en) PHC pile-based multiple high jet pedestal pile construction method
CN102561361A (en) Ultra-deep T-shaped trench-wall pile in soft-toped hard-bottomed soil layer and trench forming method
CN102383431A (en) Sinking device and novel sinking method of center dug prestressed centrifuge pipe pile (square pile)
CN106917404A (en) A kind of prefabricated screw stake
Brown Practical considerations in the selection and use of continuous flight auger and drilled displacement piles
CN1718937A (en) Technology of non soil taking hole guiding prestressed pipe pile or premade square sunk pile
CN1131912C (en) Variable supporting-plate club-footed embedded pile and its forming method
CN1743561A (en) Column-hammer forced tamping substitution method
CN202519695U (en) Ultra-deep T-shaped slot wall pile used for soil layer with soft top and hard bottom and slot structure thereof
CN108468334B (en) Gravel stratum dry-excavation clay dado pore-forming bored concrete pile construction device
CN1182301C (en) Technology for boring and prefabricating cast piles for foundation of building
CN1827924A (en) Foundation treatment method by static pressure replacement and multi-purpose press pipe thereof
CN1195130C (en) Sand concrete free small pile foundation consolidation process by stone throwing and squeezing
CN1029526C (en) Pile-forming method by hole-leading mud-jacking pile-sinking
CN105672329B (en) The large size prefabricated building enclosure of deep basal pit and construction method
CN105714832B (en) A kind of large size prefabricated building enclosure of deep basal pit and construction method
CN101565955B (en) Micro-stress shelter pile foundation strengthening method for present pile foundation
CN2753797Y (en) Long-spiral pressure-poured concrete core-inserting combined pile
CN214169034U (en) High backfill region digs soon and bores hole and adopts mortar consolidation structure that collapses
CN114837166A (en) Construction method of pile foundation for complex terrain geology in mountainous area
CN106939596A (en) A kind of cast-in-place slub type slurry drilled pile
CN1209489A (en) Construction method for composite foundation by tamping expanding piles and compacting soil around piles
CN101704649A (en) Slurry formula of pile-sinking technique of non-soil borrowing lead-hole prestress pipe pile or prefabricated square pile
CN1076064C (en) Method for handling foundation

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Xingchen

Inventor after: Wang Hongzhu

Inventor after: Liang Min

Inventor after: Lin Yanzeng

Inventor after: Hou Shengming

Inventor before: Liu Xingchen

Inventor before: Liang Min

Inventor before: Lin Yanzeng

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU XINGCHEN; LIANG MIN; LIN YANZENG TO: LIU XINGCHEN; WANG HONGZHU; LIANGMIN; LIN YANZENG; HOU SHENGMING

C14 Grant of patent or utility model
GR01 Patent grant
C15 Extension of patent right duration from 15 to 20 years for appl. with date before 31.12.1992 and still valid on 11.12.2001 (patent law change 1993)
OR01 Other related matters
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee