CN102943584A - Silo and equipment lifting method - Google Patents

Silo and equipment lifting method Download PDF

Info

Publication number
CN102943584A
CN102943584A CN2012104649958A CN201210464995A CN102943584A CN 102943584 A CN102943584 A CN 102943584A CN 2012104649958 A CN2012104649958 A CN 2012104649958A CN 201210464995 A CN201210464995 A CN 201210464995A CN 102943584 A CN102943584 A CN 102943584A
Authority
CN
China
Prior art keywords
lifting
silo
floor layer
layer
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012104649958A
Other languages
Chinese (zh)
Other versions
CN102943584B (en
Inventor
汪大春
宋桂江
许宁
刘鑫
师伟
宁环波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guoneng Huanghua Port Co ltd
China Shenhua Energy Co Ltd
Original Assignee
China Shenhua Energy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shenhua Energy Co Ltd filed Critical China Shenhua Energy Co Ltd
Priority to CN201210464995.8A priority Critical patent/CN102943584B/en
Publication of CN102943584A publication Critical patent/CN102943584A/en
Application granted granted Critical
Publication of CN102943584B publication Critical patent/CN102943584B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a silo (1), which comprises a silo top platform (2). A material storage chamber (29) and a lifting chamber (21) which are adjacent to each other and are arranged below the silo top platform are arranged in the silo (1). A plurality of floor layers (22) are arranged in the lifting chamber. A lifting hole (23) is arranged in each floor layer. Lifting devices (26) are installed on the lower surface of at least one floor layer of the floor layers above the two bottom layers and the lower surface of the silo top platform. The lifting device on any floor layer is matched with the lifting hole adjacent to the floor layer and below the floor layer to conduct lifting operation. Moreover, the invention additionally discloses an equipment lifting method. The equipment lifting method is conducted in the silo (1). Therefore, influences caused by environmental factors such as wind force are avoided, relatively high-safety lifting operation can be realized and the cost wastage of the lifting operation is not caused.

Description

Silo and equipment hoisting method
Technical field
The equipment that the present invention relates in the silo is installed or area of maintenance, particularly, and the equipment hoisting method that relates to a kind of silo and in this silo, carry out.
Background technology
At present, in storing the silo of coal, discharge operation usually distance ground up to the Cang Ding room more than 43.4 meters in (being on the roof panel of storehouse) carry out.Thereby, be provided with the up and down multiple facilities such as carrying roller group, sweeper of belt conveyor, fire monitor of dump car, belt mode conveyor driving device, cylinder, cover tape and anchoring tensioning apparatus thereof, ribbon conveyer at the storehouse roof panel.
In case the device in the Cang Ding room or equipment need repairing or replacing etc., then need equipment to be safeguarded or device unloading to ground or other maintenance points, and then the equipment after will overhauling or installed and winch to the storehouse roof panel, perhaps need new equipment or the new equipment changed from the ground lifting.Yet, if in these facilities directly were lifted to Cang Ding room more than 43.4 meters from ground, the lifting process is difficulty relatively, has improved to a certain extent maintenance cost.
Summary of the invention
The purpose of this invention is to provide a kind of silo, this silo can carry out the higher lifting operation of safety in silo.
To achieve these goals, the invention provides a kind of silo, this silo comprises the storehouse roof panel, wherein, be provided with between the adjacent storing that is positioned at described storehouse roof panel below in the described silo and between lifting, be provided with the multi-layer floor layer between described lifting, be provided with lifting eye on every layer of described floor layer, on the soffit of the described floor layer of at least one deck of the described floor layer more than two layers and the soffit of described storehouse roof panel boom hoisting is installed, and arbitrarily the described boom hoisting on the described floor layer of one deck and described lifting eye adjacent with this layer floor layer and that be positioned at this layer floor layer below match to carry out lifting operation.
Preferably, the soffit of every layer of described floor layer of two layers of the above floor layer is equipped with boom hoisting.
Preferably, described boom hoisting be positioned at lifting eye on the floor layer described floor layer adjacent and that be positioned at this floor layer below with this boom hoisting place directly over so that described boom hoisting carries out vertical lifting.
Preferably, the lifting eye on the adjacent described floor layer is staggeredly arranged.
Preferably, the arbitrary neighborhood of the ground in the described silo, the described floor layer of multilayer and described storehouse roof panel is provided with stair between the two, and be provided with the stair hole on every layer of described floor layer and the described storehouse roof panel, the top of described stair extend in the described stair hole.
Preferably, be provided with guardrail around described lifting eye and the described stair hole.
Preferably, the silo of described silo is equipped with boom hoisting on the top, and is provided with the lifting eye corresponding with the described boom hoisting on the described silo top on the roof panel of described storehouse.
Preferably, described boom hoisting is electric block.
Another object of the present invention provides a kind of equipment hoisting method, and this equipment hoisting method can carry out in silo safely.
In order to realize above-mentioned another purpose, the invention provides a kind of equipment hoisting method, wherein, this equipment hoisting method carries out in above-mentioned silo, and described equipment hoisting method comprises step a): described lifting thing is lifted to first floor floor layer from ground; With step b): the floor layer that the floor layer of the below of described lifting thing from the described floor layer of adjacent two layers is lifted to the top.
Preferably, described step a) comprises: described lifting thing is by the lifting of the described boom hoisting on the second layer floor layer and pass described lifting eye on the first floor floor layer, then described lifting thing is unloaded on the described first floor floor layer.
Preferably, described step b) comprises: described lifting thing is by top and adjacent with this floor layer described boom hoisting lifting of the floor layer that is positioned at the top and pass described lifting eye on the floor layer of top, then described lifting thing is unloaded on the floor layer of top.
Preferably, on the silo top of described silo boom hoisting is installed, and be provided with the lifting eye corresponding with the described boom hoisting on the described silo top on the roof panel of described storehouse, described equipment hoisting method also comprises step c), and this step c) comprises: described lifting thing is lifted on the roof panel of described storehouse from the described floor layer adjacent with described storehouse roof panel.
Preferably, described step c) comprises: then described lifting thing is unloaded to described lifting thing on the roof panel of described storehouse by being positioned at the described boom hoisting lifting on the described silo top and passing described lifting eye on the roof panel of described storehouse.
The present invention arranges the multi-layer floor layer between the lifting of silo, and the lifting eye be staggeredly arranged is set being adjacent to flaggy, thus the lifting process that successively staggers.Thereby equipment lifting process of the present invention is not subjected to the impact of the environmental factors such as wind-force, can realize the lifting operation that safety is relatively high, and can not cause the cost waste of lifting operation.
Other features and advantages of the present invention will partly be described in detail in the specific embodiment subsequently.
Description of drawings
Accompanying drawing is to be used to provide a further understanding of the present invention, and consists of the part of manual, is used from explanation the present invention with the following specific embodiment one, but is not construed as limiting the invention.In the accompanying drawings:
Fig. 1 is equipment hoisting method in the silo of the present invention and the schematic diagram of silo tackling system.
Description of reference numerals
1 silo, 2 storehouse roof panels
3 silos push up 4 ground
22 floor layers between 21 liftings
23 lifting eyes, 24 stair holes
25 stair, 26 boom hoistings
27 lifting things, 28 guardrails
Between 29 storings
The specific embodiment
Below in conjunction with accompanying drawing the specific embodiment of the present invention is elaborated.Should be understood that, the specific embodiment described herein only is used for description and interpretation the present invention, is not limited to the present invention.
In the present invention, in the situation that do opposite explanation, the noun of locality of use typically refers to upper and lower, left and right in the accompanying drawing such as " upper and lower, left and right "." inside and outside " refers to inside and outside with respect to silo.
Referring to Fig. 1, the present invention relates to a kind of silo 1, this silo 1 comprise with prior art in identical storehouse roof panel 2, what be different from prior art is, be provided with in the silo 1 of the present invention between adjacent storing 29 and lifting between 21, and between storing 29 and lifting between 21 belows that all are positioned at storehouse roof panel 2,29 are used for storing coal between storing, 21 are used for lifting by crane various lifting things 27 between lifting.Described lifting thing 27 mainly refers to the multiple facilities such as dump car, cylinder, anchoring tensioning apparatus.As shown in the figure, still be provided with the lifting appliance (not shown) on storehouse roof panel 2, electric single beam crane for example is used for lifting weigh several tons and lifting thing that must integral lifting.The lifting operation that is undertaken by described lifting appliance mainly is to carry out outside silo.For the lighter lifting thing of relative weight, if adopt above-mentioned lifting appliance outside silo, to lift by crane, very easily be subjected to the impact of the environmental factors such as wind-force, and caused the cost waste of lifting operation.
For this reason, be provided with between lifting 21 in the silo 1 of the present invention, in playing hanging piece 21, multi-layer floor layer 22 be set, be used for carrying out lifting operation.These floor layers 22 mainly are to be fixed between lifting on 21 the wall (indicating).
Further, need to lifting eye 23 be set at every layer of floor layer 22, and the soffit of at least one deck floor layer 22 in the floor layer 22 of needs more than two layers and the soffit of storehouse roof panel 2 are equipped with boom hoisting 26.Certainly, preferably, the soffit of every layer of floor layer 22 of floor layer 22 all is equipped with boom hoisting 26 more than two layers.Like this, arbitrarily the boom hoisting 26 on one deck floor layer 22 just can match with lifting eye 23 adjacent with this layer floor layer 22 and that be positioned at this layer floor layer 22 belows, to carry out lifting operation.Wherein, described boom hoisting 26 can be polytype boom hoisting, is preferably electric block among the present invention, but is not limited to electric block.Be known in those skilled in the art about electric block working method etc., do not give unnecessary details at this.
Be understandable that, in 21, also can boom hoisting 26 be installed at the soffit of first floor floor layer 22, simply to lift by crane task between described lifting.
In the preferred embodiment as shown in Figure 1, boom hoisting 26 be positioned at lifting eye 23 on floor layer 22 floor layers 22 adjacent and that be positioned at these floor layer 22 belows with this boom hoisting 26 places directly over so that boom hoisting 26 carries out vertical lifting.
In one embodiment, the lifting eye 23 that is adjacent on the flaggy 22 can vertical alignment, so that lifting thing 27 passes two or more lifting eyes 23 simultaneously by boom hoisting 26, and will lift by crane on thing 27 is lifted to relatively high floor layer 22 with these a plurality of floor layers 22 in relatively low floor layer 22 intervals from relatively low floor layer 22.
In preferred embodiment shown in Figure 1, the lifting eye 23 on the adjacent floor layer 22 is staggeredly arranged.Like this, lifting thing 27 can only successively lift by crane, and then has increased reliability and the safety of lifting.
In addition, as can be seen from Figure 1, the arbitrary neighborhood of the ground 4 in the silo 1, multi-layer floor layer 22 and storehouse roof panel 2 is provided with stair 25 between the two, and is provided with stair hole 24 on every layer of floor layer 22 and the storehouse roof panel 2, and the top of stair 25 extend in the stair hole 24.By above-mentioned stair 25 and stair hole 24 are set, help the staff to climb and rest at random on the flaggy 22, to lift by crane the loading or unloading task of thing 27.
In order to improve safety, around described lifting eye 23 and stair hole 24, be provided with guardrail 28, to prevent from lifting by crane that thing 27 falls etc.
Certainly, in the situation that condition satisfies, also can be between lifting elevator be set in 21, to realize that the staff arrives the at random purpose of flaggy 22.
In the embodiment described above, lifting thing 27 can only be risen and be winched on any one deck floor layer 22.If, 27 of things of lifting need to be winched on the storehouse roof panel 2, then need to boom hoistings 26 be installed on the silo of silo 1 top 3, and be provided with the lifting eye 23 corresponding with the boom hoisting 26 on the silo top 3 at storehouse roof panel 2.Like this, just can be unloaded to storehouse roof panel 2 after lifting thing 27 passes lifting eye 23 on the storehouse roof panel 2.
By lifting by crane in 21 between the lifting of above-mentioned silo 1, the staff can will lift by crane 27 of things according to need of work and winch on any one deck floor layer 22, or rise and winch to storehouse roof panel 2.When the equipment on the storehouse roof panel 2 need to be delivered to maintenance point on ground 4 or the relevant floor layer 22 and safeguards, the lifting thing 27 after the maintenance can be from ground 4 or relevant floor layer 22 be lifted to layer by layer on the storehouse roof panel 2.Equally, when needing to change relevant device, the lifting thing 27 of replacing can be lifted on the storehouse roof panel 2 layer by layer from ground 4.Therefore, have higher safety by the lifting operation that between lifting, carries out in 21, and be not subjected to the impact of the environmental factors such as wind-force, also can not cause the cost waste of lifting operation.
Based on the structure of above-mentioned silo, the invention still further relates to a kind of equipment hoisting method, this equipment hoisting method carries out in above-mentioned silo 1, and wherein, this equipment hoisting method comprises step a): will lift by crane thing 27 and 4 be lifted to first floor floor layer 22 from ground; And step b)): the floor layer 22 that will lift by crane the below of thing 27 from the floor layer 22 of adjacent two layers is lifted to the floor layer 22 of top.
Particularly, described step a) can comprise: lifting thing 27 is by the lifting of the boom hoisting 26 on the second layer floor layer 22 and pass lifting eye 23 on the first floor floor layer 22, then will lift by crane thing 27 and be unloaded on the first floor floor layer 22.
Further, described step b) can comprise: lifting thing 27 is by the top of the floor layer 22 that is positioned at the top and boom hoisting 26 liftings adjacent with this floor layer 22 and pass lifting eye 23 on the floor layer 22 of top, then will lift by crane on the floor layer 22 of thing 27 above being unloaded to.By repeating this step b), then can finish the process that lifting thing 27 is successively lifted by crane, and, in the situation that the lifting eye 23 that is adjacent on the flaggy 22 is staggeredly arranged, can finish the process that makes lifting thing 27 successively stagger and lift by crane, thereby improve the safety of lifting.
In addition, when needs were lifted to lifting thing 27 on the storehouse roof panel 2, described equipment hoisting method correspondingly comprised lifting thing 27 is lifted to step c) on the storehouse roof panel 2 from the floor layer 22 adjacent with storehouse roof panel 2.Being appreciated that completing steps c) prerequisite is regulated is that silo top 3 at silo 1 is equipped with boom hoisting 26, and be provided with the lifting eye 23 corresponding with the boom hoisting 26 on the silo top 3 on the storehouse roof panel 2.
Further say, described step c) can comprise: then lifting thing 27 will lift by crane thing 27 and be unloaded on the storehouse roof panel 2 by being positioned at boom hoisting 26 liftings on the silo top 3 and passing lifting eye 23 on the storehouse roof panel 2.
Below describe by reference to the accompanying drawings preferred embodiment of the present invention in detail; but; the present invention is not limited to the detail in the above-mentioned embodiment; in technical conceive scope of the present invention; can carry out multiple simple variant to technical scheme of the present invention, these simple variant all belong to protection scope of the present invention.
Need to prove in addition, each concrete technical characterictic described in the above-mentioned specific embodiment in reconcilable situation, can make up by any suitable mode, for fear of unnecessary repetition, the present invention is to the no longer separately explanation of various possible combinations.
In addition, also can carry out any combination between the various embodiment of the present invention, as long as it is without prejudice to thought of the present invention, it should be considered as content disclosed in this invention equally.

Claims (13)

1. silo, this silo (1) comprises storehouse roof panel (2), it is characterized in that, be provided with in the described silo (1) between the adjacent storing that is positioned at described storehouse roof panel (2) below between (29) and lifting (21), be provided with multi-layer floor layer (22) between described lifting in (21), be provided with lifting eye (23) on every layer of described floor layer (22), on the soffit of the described floor layer of at least one deck (22) of the described floor layer (22) more than two layers and the soffit of described storehouse roof panel (2) boom hoisting (26) is installed, and arbitrarily the described boom hoisting (26) on the described floor layer of one deck (22) and described lifting eye (23) adjacent with this layer floor layer (22) and that be positioned at this layer floor layer (22) below match to carry out lifting operation.
2. silo according to claim 1 is characterized in that, the soffit of every layer of described floor layer (22) of two layers of the above floor layer (22) is equipped with boom hoisting (26).
3. silo according to claim 2, it is characterized in that, described boom hoisting (26) be positioned at lifting eye (23) on floor layer (22) the described floor layer (22) adjacent and that be positioned at this floor layer (22) below with this boom hoisting (26) place directly over so that described boom hoisting (26) carries out vertical lifting.
4. silo according to claim 2 is characterized in that, the lifting eye (23) on the adjacent described floor layer (22) is staggeredly arranged.
5. silo according to claim 2, it is characterized in that, the arbitrary neighborhood of the ground (4) in the described silo (1), the described floor layer of multilayer (22) and described storehouse roof panel (2) is provided with stair (25) between the two, and be provided with stair hole (24) on every layer of described floor layer (22) and the described storehouse roof panel (2), the top of described stair (25) extend in the described stair hole (24).
6. silo according to claim 5 is characterized in that, described lifting eye (23) and described stair hole (24) are provided with guardrail (28) on every side.
7. the described silo of any one in 6 according to claim 1, it is characterized in that, on the silo top (3) of described silo (1) boom hoisting (26) is installed, and is provided with the lifting eye (23) corresponding with the described boom hoisting (26) on the described silo top (3) on the described storehouse roof panel (2).
8. silo according to claim 7 is characterized in that, described boom hoisting (26) is electric block.
9. equipment hoisting method, it is characterized in that, this equipment hoisting method carries out in the described silo of any one (1) in according to claim 1 to 5, and described equipment hoisting method comprises step a): (4) are lifted to first floor floor layer (22) from ground with described lifting thing (27); With step b): the floor layer (22) that the floor layer (22) of the below of described lifting thing (27) from the described floor layer (22) of adjacent two layers is lifted to the top.
10. equipment hoisting method according to claim 9, it is characterized in that, described step a) comprises: described lifting thing (27) lifts by crane and passes described lifting eye (23) on the first floor floor layer (22) by the described boom hoisting (26) on the second layer floor layer (22), then described lifting thing (27) is unloaded on the described first floor floor layer (22).
11. equipment hoisting method according to claim 9, it is characterized in that, described step b) comprises: described lifting thing (27) is lifted by crane and is passed the described lifting eye (23) on the floor layer (22) of top by the top of floor layer (22) that is positioned at the top and the described boom hoisting (26) adjacent with this floor layer (22), then described lifting thing (27) is unloaded on the floor layer (22) of top.
12. equipment hoisting method according to claim 9, it is characterized in that, on the silo top (3) of described silo (1) boom hoisting (26) is installed, and be provided with the lifting eye (23) corresponding with the described boom hoisting (26) on the described silo top (3) on the described storehouse roof panel (2), described equipment hoisting method also comprises step c), and this step c) comprises: described lifting thing (27) is lifted on the described storehouse roof panel (2) from the described floor layer (22) adjacent with described storehouse roof panel (2).
13. equipment hoisting method according to claim 12, it is characterized in that, described step c) comprises: described lifting thing (27) lifts by crane and passes described lifting eye (23) on the described storehouse roof panel (2) by being positioned at described boom hoisting (26) on the described silo top (3), then described lifting thing (27) is unloaded on the described storehouse roof panel (2).
CN201210464995.8A 2012-11-16 2012-11-16 Silo and equipment lifting method Active CN102943584B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210464995.8A CN102943584B (en) 2012-11-16 2012-11-16 Silo and equipment lifting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210464995.8A CN102943584B (en) 2012-11-16 2012-11-16 Silo and equipment lifting method

Publications (2)

Publication Number Publication Date
CN102943584A true CN102943584A (en) 2013-02-27
CN102943584B CN102943584B (en) 2015-07-01

Family

ID=47726563

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210464995.8A Active CN102943584B (en) 2012-11-16 2012-11-16 Silo and equipment lifting method

Country Status (1)

Country Link
CN (1) CN102943584B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1006769C2 (en) * 1997-08-13 1999-02-16 Spaans Babcock B V Silo for bulk material
CN2386014Y (en) * 1999-08-23 2000-07-05 张德孔 Three-D storehouse
CN2926399Y (en) * 2006-02-24 2007-07-25 贵阳铝镁设计研究院 Cargo suspending-hole structure for small warehouse
CN201952126U (en) * 2011-03-01 2011-08-31 中国电力工程顾问集团中南电力设计院 Layer-by-layer retreating platform type indoor article lifting system
CN102359299A (en) * 2011-07-26 2012-02-22 中国神华能源股份有限公司 Silo
KR20120052546A (en) * 2010-11-16 2012-05-24 호산엔지니어링(주) Cement silo sampling device
CN102733613A (en) * 2012-06-06 2012-10-17 苏州金螳螂幕墙有限公司 Vertical transportation method
CN202899715U (en) * 2012-11-16 2013-04-24 中国神华能源股份有限公司 Silo

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1006769C2 (en) * 1997-08-13 1999-02-16 Spaans Babcock B V Silo for bulk material
CN2386014Y (en) * 1999-08-23 2000-07-05 张德孔 Three-D storehouse
CN2926399Y (en) * 2006-02-24 2007-07-25 贵阳铝镁设计研究院 Cargo suspending-hole structure for small warehouse
KR20120052546A (en) * 2010-11-16 2012-05-24 호산엔지니어링(주) Cement silo sampling device
CN201952126U (en) * 2011-03-01 2011-08-31 中国电力工程顾问集团中南电力设计院 Layer-by-layer retreating platform type indoor article lifting system
CN102359299A (en) * 2011-07-26 2012-02-22 中国神华能源股份有限公司 Silo
CN102733613A (en) * 2012-06-06 2012-10-17 苏州金螳螂幕墙有限公司 Vertical transportation method
CN202899715U (en) * 2012-11-16 2013-04-24 中国神华能源股份有限公司 Silo

Also Published As

Publication number Publication date
CN102943584B (en) 2015-07-01

Similar Documents

Publication Publication Date Title
CN103979383B (en) Building operation multiple layer up-down plateform system
US20070090074A1 (en) Mobile crane with ballasting
US20140305743A1 (en) Blade handling system with a wheel arrangement and a blade elevator system
CN106144843A (en) The parallel apparatus and method transported and install for elevator components
CN103303771A (en) A method for constructing an elevator and an elevator arrangement
CN102381611B (en) Vertically-lifting hanging basket
EP2192074A4 (en) Refuge support system of double deck elevator
CN107083843A (en) It is a kind of to be used for the mobile platform of high-rise building equipment and material fast transportation
CN207226741U (en) A kind of elevator for improving protection base
US11524838B2 (en) Method for discharging granular powder brought into fixed state inside hollow structure
JP2017077967A (en) Large vessel and super-large elevator for marine plant construction
CN107083855A (en) A kind of Anti-inclining fall arrest locking system and multi-storied garage
CN103352559A (en) Hanging type movable working platform for storage tank maintenance
CN106232516A (en) Traveling hoist
US20160200552A1 (en) Escalator lifting frame and method of using the same
CN103967263B (en) Hydraulic automatic jumping discharging platform
CN202899715U (en) Silo
KR101939162B1 (en) Cable inspection trolley having balance frame and folding-type driving wheel
KR101028631B1 (en) Movable bridge inspection equipment
CN202245865U (en) Head wheel hoisting device of sintering machine
CN102943584B (en) Silo and equipment lifting method
KR101489287B1 (en) Apparatus for installing or dismantling lift for construction and method of installing or dismantling lift for construction
CN107060474A (en) A kind of sleeve-type chimney people goods shunting vertical transferring apparatus and construction method
CN109339399B (en) Sectional construction method of steel structure in elevator hoistway
CN107215748A (en) The special building hoist of hoistway and its installation method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100011 Shenhua building, 22 West Binhe Road, Dongcheng District, Beijing

Patentee after: China Shenhua Energy Co.,Ltd.

Patentee after: Guoneng Huanghua Port Co.,Ltd.

Address before: 100011 Shenhua building, 22 West Binhe Road, Dongcheng District, Beijing

Patentee before: China Shenhua Energy Co.,Ltd.

Patentee before: SHENHUA HUANGHUA PORT Co.,Ltd.

CP01 Change in the name or title of a patent holder