CN102943539A - Wall connection part capable of enabling building partition walls to be installed quickly and using method thereof - Google Patents

Wall connection part capable of enabling building partition walls to be installed quickly and using method thereof Download PDF

Info

Publication number
CN102943539A
CN102943539A CN2012104873987A CN201210487398A CN102943539A CN 102943539 A CN102943539 A CN 102943539A CN 2012104873987 A CN2012104873987 A CN 2012104873987A CN 201210487398 A CN201210487398 A CN 201210487398A CN 102943539 A CN102943539 A CN 102943539A
Authority
CN
China
Prior art keywords
partition wall
bone
low carbon
carbon board
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012104873987A
Other languages
Chinese (zh)
Inventor
杨雅静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Easy Virtue (tianjin) Environmental Protection Building Material Co Ltd
Original Assignee
Easy Virtue (tianjin) Environmental Protection Building Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Easy Virtue (tianjin) Environmental Protection Building Material Co Ltd filed Critical Easy Virtue (tianjin) Environmental Protection Building Material Co Ltd
Priority to CN2012104873987A priority Critical patent/CN102943539A/en
Publication of CN102943539A publication Critical patent/CN102943539A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention relates to a wall connection part capable of enabling building partition walls to be installed quickly. The wall connection part comprises an expansion screw and a connection member and is characterized in that the connection member is formed by an upper keel, a lower keel, a bearing part, a partition wall quick installation clamping part and a partition wall quick installation edge-sealing clamping part. The using method of the wall connection part comprises the steps of checking planeness of a wall; respectively firmly connecting the lower keel with the ground, connecting the partition wall quick installation edge-sealing clamping part with the wall and connecting the upper keel with a roof, and performing leveling (enabling the upper keel and the lower keel to be parallel to each other and respectively perpendicular to the partition wall quick installation edge-sealing clamping part); arranging splicing grooves on the left side and the right side of each low-carbon plate; enabling the partition wall quick installation clamping part to be fastened with the upper keel and the lower keel through the bearing part, and enabling a starting low-carbon plate to be connected with the partition wall quick installation clamping part in an inserting mode; and repeating the process until the low-carbon plates are sequentially installed from left to right. The using method of the wall connection part has the advantages that the splicing grooves are prefabricated on the left side and the right side of each low-carbon plate so that the low-carbon plates can be connected with the partition wall quick installation connection part fixed between the upper keel and the lower keel in an inserting mode when the construction is performed.

Description

Wall connecting piece and the using method thereof of building partition wall Fast Installation
Technical field
The invention belongs to building partition wall connecting elements, relate in particular to wall connecting piece and the using method thereof of a kind of building partition wall Fast Installation.
Background technology
The building partition wall adopts light steel gypsum plank or brick practical application extensive.Light steel gypsum plank construction technology process is as follows: (1) light partition wall unwrapping wire (2) is installed door opening frame (3) installation along the top keel and along ground joist (4) vertical keel stepping (5) vertical keel (6) installation lateral keel card shelves (7) is installed gypsum skin plate (8) construction joint way (9) surface construction is installed; Points for attention: the intensity of (1) light steel gypsum plank is lower, can not be used as load bearing wall, and the four sides wall of Finance Department can not be afraid of tide, non-watertight with (2) light steel gypsum plank, in case leak or trickle, partition wall will break down, and the disassembly cost that avoid in the kitchen, the washroom uses (3) light steel gypsum plank secondary to utilize is larger, and the price of dismantling required labour cost and gypsum plank is equally matched, and the old gypsum plank that disassembles also can have influence on again construction, therefore do not advise again utilizing.Brick partition wall processed takes up room larger, and construction is trouble very, if think after brick weight causes greatly that the bad dismounting of effect is cumbersome.Above-mentioned partition wall complicated construction technique is had relatively high expectations to construction environment, and limitation is larger, and construction material is difficult to the secondary utilization; Operating process is time-consuming, effort.Builing industry demands developing a kind of partition wall Fast Installation system that limitation is little, can recycle, be simple and easy to implement of using urgently, can make the partition wall Fast Installation and easily realize the safe and reliable connection of the smooth effect of plate face.
Summary of the invention
The object of the invention is to overcome the deficiency of above-mentioned technology, and provide wall connecting piece and the using method thereof of a kind of building partition wall Fast Installation, be applicable to the building partition engineering, the partition wall Fast Installation system that can recycle, is simple and easy to implement can make the partition wall Fast Installation and easily realize the safe and reliable connection of the smooth effect of plate face.
The present invention for achieving the above object, by the following technical solutions: the wall connecting piece of a kind of building partition wall Fast Installation, comprise setscrew and connecting elements, it is characterized in that: described connecting elements comprise a day bone, bone, supporting, partition wall quick assembly part and partition wall fast-assembling receive the checkpost part, bone lateral cross section shape was bow font section bar in described day, namely connect into integral body by three right angle U-lags, its order of connection is between the right angle U-lag that Open Side Down about the right angle U-lag of opening upwards placed; The profile shapes that described ground bone is connected into by two right angle section bars.
Described supporting shape of cross section is rectangular in shape; The profile shapes that described partition wall quick assembly part is made of affixed strip cavity section bar in the middle of rectangular cavity section bar and its both sides, described partition wall fast-assembling is received the profile shapes that the checkpost part is made of rectangular cavity section bar and the affixed right angle section bar in its both sides.
Described sky bone and ground bone length are 3 meters, adopt light galvanizing steel plate material to make.
Described partition wall quick assembly part length is 3 meters, adopts oxidation plated film aluminum alloy materials to make.
It is 3 meters that described partition wall fast-assembling is received checkpost part length, adopts oxidation plated film aluminum alloy materials to make.
Described supporting adopts prefabricated Zinc-coated angle steel to make, and respectively there are 3 ¢ 6 circular holes on its both sides.
The installation and application of the wall connecting piece of above-mentioned building partition wall Fast Installation, the Specific construction step is as follows, adopts job practices from left to right when low carbon board is installed,
One, checks the planeness of roof, building partition wall position, ground and metope, require the planeness of floated coat in same plane in the 1-5cm scope;
Two, according to the Design Requirement Drawing unwrapping wire, determine original position, respectively ground bone and ground, partition wall fast-assembling are received the checkpost part and are connected firm and leveling with the roof by setscrew with metope, a day bone, and an assurance sky bone, bone parallel and vertical with partition wall receipts checkpost part respectively;
Three, inserting groove is opened on limit, the low carbon board left and right sides for subsequent use;
Four, according to the requirement of material cutting plan paper, with initial low carbon board, two low carbon boards are one group, and every group according to installing first inboard low carbon board, and the order of outside low carbon board is installed again, initial low carbon board is close to the partition wall fast-assembling receives the checkpost part, be stuck in a day bone, between the bone;
Five, by supporting with the partition wall quick assembly part respectively with the sky bone, bone be connected fastening; And with partition wall quick assembly part and the grafting of initial low carbon board;
When six, second group of low carbon board being installed, the right notch of low carbon board being inserted partition wall quick assembly part left end get final product; Successively block-by-block installation of technique above repeating;
Seven, after the installation of whole metope low carbon board is finished, carry out encapsulation process with polyester foamed glue, and carry out surfacing with weather-resistant glue;
Eight, with hairbrush with the best cleaning of all plate faces, installation.
Beneficial effect: traditional partition wall complicated construction technique, construction environment to be had relatively high expectations, limitation is larger, and construction material is difficult to the secondary utilization; Operating process is time-consuming, effort.The present invention only need get final product prefabricated limit, low carbon board left and right sides pre-cast socket with low carbon board and the partition wall quick assembly part grafting that is fixed between day geosyncline during construction.The dry-hanging of mounting low carbon board is for installing at first respectively ground bone, partition wall fast-assembling receipts checkpost part and day bone and leveling in the construction, initial low carbon board is installed, the partition wall quick assembly part is installed, by supporting with the partition wall quick assembly part respectively with the sky bone, bone affixed, the grafting low carbon board.Mounting process simple and fast, but free adjustment make mounting process solid and reliable, and saving of work and time has shortened the duration, greatly reduces installation cost.The technical condition of installing are lower, and quick, the surface finish error of installation is little, good integral strength.
Description of drawings
Fig. 1 is the transverse cross-sectional view that day bone is connected with wall body structure;
Fig. 2 is the transverse cross-sectional view that the ground bone is connected with wall body structure;
Fig. 3 is that wall connecting piece is installed longitudinal sectional drawing;
Fig. 4 is the structural representation of partition wall quick assembly part;
Fig. 5 is the structural representation that the partition wall fast-assembling is received the checkpost part;
Fig. 6 is the structural representation of day bone;
Fig. 7 is the structural representation of ground bone;
Fig. 8 is the structural representation of supporting.
Among the figure: 1, low carbon board, 2, the partition wall quick assembly part, 3, the partition wall fast-assembling receives the checkpost part, 4, day bone, 5, bone, 6, supporting, 7, the stainless steel holding screw, 8, setscrew, 9, wall body structure.
The specific embodiment
Describe the specific embodiment of the present invention in detail below in conjunction with preferred embodiment.
See accompanying drawing 4-8 for details, the wall connecting piece of a kind of building partition wall Fast Installation, comprise setscrew and connecting elements, described connecting elements comprise day bone 4, bone 5, supporting 6, partition wall quick assembly part 2 and partition wall fast-assembling receive checkpost part 3, bone lateral cross section shape was bow font section bar in described day, namely connect into integral body by three right angle U-lags, its order of connection is between the right angle U-lag that Open Side Down about the right angle U-lag of opening upwards placed; The profile shapes that described ground bone is connected into by two right angle section bars.Described supporting shape of cross section is rectangular in shape; The profile shapes that described partition wall quick assembly part is made of affixed strip cavity section bar in the middle of rectangular cavity section bar and its both sides, described partition wall fast-assembling is received the profile shapes that the checkpost part is made of rectangular cavity section bar and the affixed right angle section bar in its both sides.Described sky bone and ground bone length are 3 meters, adopt light galvanizing steel plate material to make.Described partition wall quick assembly part length is 3 meters, adopts oxidation plated film aluminum alloy materials to make.It is 3 meters that described partition wall fast-assembling is received checkpost part length, adopts oxidation plated film aluminum alloy materials to make.Described supporting adopts prefabricated Zinc-coated angle steel to make, and respectively there are 3 ¢ 6 circular holes on its both sides.
See Fig. 1-3 for details, the installation and application of the wall connecting piece of building partition wall Fast Installation, the Specific construction step is as follows, adopts job practices from left to right when low carbon board is installed,
One, checks the planeness of roof, wall body structure 9 partition wall position, ground and metope, require the planeness of floated coat in same plane in the 1-5cm scope;
Two, according to the Design Requirement Drawing unwrapping wire, determine original position, respectively ground bone and ground, partition wall fast-assembling are received the checkpost part and are connected firm and leveling with the roof by setscrew 8 with metope, a day bone, and an assurance sky bone, bone parallel and vertical with partition wall receipts checkpost part respectively;
Three, inserting groove is opened on limit, low carbon board 1 left and right sides for subsequent use;
Four, according to the requirement of material cutting plan paper, with initial low carbon board, two low carbon boards are one group, and every group according to installing first inboard low carbon board, and the order of outside low carbon board is installed again, initial low carbon board is close to the partition wall fast-assembling receives the checkpost part, be stuck in a day bone, between the bone;
Five, by supporting with the partition wall quick assembly part respectively with the sky bone, bone be connected fastening by stainless steel holding screw 7; And with partition wall quick assembly part and the grafting of initial low carbon board;
When six, second group of low carbon board being installed, the right notch of low carbon board being inserted partition wall quick assembly part left end get final product; Successively block-by-block installation of technique above repeating;
Seven, after the installation of whole metope low carbon board is finished, carry out encapsulation process with polyester foamed glue, and carry out surfacing with weather-resistant glue;
Eight, with hairbrush with the best cleaning of all plate faces, installation.
According to installation drawing require respectively ground bone and ground, partition wall fast-assembling to be received first checkpost part and body of wall, a sky bone is connected fastening with the roof and leveling (make a day bone, bone parallel and vertical with partition wall receipts checkpost part respectively); Inserting groove is opened on limit, the low carbon board left and right sides; The partition wall quick assembly part by supporting respectively with the sky bone, bone fastening, initial low carbon board and partition wall quick assembly part are pegged graft; Technique above repeating, the low carbon board that from left to right will hold successively notch successfully is installed on the partition wall quick assembly part.The partition wall quick assembly part can easily the low carbon board of holding notch successfully be fastened on a day bone, between the bone, form and decorate the partition wall effect.The connector functions:
1, supporting: according to drawing that galvanized steel plain sheet is one time punching molded, by the stainless steel holding screw with partition wall quick assembly part and a day bone, bone be connected fastening;
2, partition wall quick assembly part part: according to drawing customization aluminium alloys fastener rear oxidation coating film treatment;
3, the partition wall fast-assembling is received checkpost part part: according to drawing customization aluminium alloys fastener rear oxidation coating film treatment;
4, day bone, bone parts: customize light galvanizing steel steel according to drawing.
General condensed summary is installed:
It bone, bone have the lateral keel effect concurrently, the partition wall quick assembly part has the vertical keel effect concurrently, improves firmness and safety; The low carbon board processing of slotting in advance reduces cost of labor and set-up time.Simple construction, Fast Installation.
The above only is preferred embodiment of the present invention, is not structure of the present invention is done any pro forma restriction.Every foundation technical spirit of the present invention all still belongs in the scope of technical scheme of the present invention any simple modification, equivalent variations and modification that above embodiment does.

Claims (7)

1. the wall connecting piece of a building partition wall Fast Installation, comprise setscrew and connecting elements, it is characterized in that: described connecting elements comprise a day bone, bone, supporting, partition wall quick assembly part and partition wall fast-assembling receive the checkpost part, bone lateral cross section shape was bow font section bar in described day, namely connect into integral body by three right angle U-lags, its order of connection is between the right angle U-lag that Open Side Down about the right angle U-lag of opening upwards placed; The profile shapes that described ground bone is connected into by two right angle section bars.
2. the wall connecting piece of building according to claim 1 partition wall Fast Installation, it is characterized in that: described supporting shape of cross section is rectangular in shape; The profile shapes that described partition wall quick assembly part is made of affixed strip cavity section bar in the middle of rectangular cavity section bar and its both sides, described partition wall fast-assembling is received the profile shapes that the checkpost part is made of rectangular cavity section bar and the affixed right angle section bar in its both sides.
3. the wall connecting piece of building according to claim 1 and 2 partition wall Fast Installation is characterized in that: described day bone and ground bone length are 3 meters, adopt light galvanizing steel plate material to make.
4. the wall connecting piece of building according to claim 3 partition wall Fast Installation, it is characterized in that: described partition wall quick assembly part length is 3 meters, adopts oxidation plated film aluminum alloy materials to make.
5. the wall connecting piece of building according to claim 4 partition wall Fast Installation, it is characterized in that: it is 3 meters that described partition wall fast-assembling is received checkpost part length, adopts oxidation plated film aluminum alloy materials to make.
6. the wall connecting piece of building according to claim 5 partition wall Fast Installation, it is characterized in that: state supporting and adopt prefabricated Zinc-coated angle steel to make, respectively there are 3 ¢ 6 circular holes on its both sides.
7. the installation and application of the wall connecting piece of a building partition wall Fast Installation, it is characterized in that: the Specific construction step is as follows, adopts job practices from left to right when low carbon board is installed,
One, checks the planeness of roof, building partition wall position, ground and metope, require the planeness of floated coat in same plane in the 1-5cm scope;
Two, according to the Design Requirement Drawing unwrapping wire, determine original position, respectively ground bone and ground, partition wall fast-assembling are received the checkpost part and are connected firm and leveling with the roof by setscrew with metope, a day bone, and an assurance sky bone, bone parallel and vertical with partition wall receipts checkpost part respectively;
Three, inserting groove is opened on limit, the low carbon board left and right sides for subsequent use;
Four, according to the requirement of material cutting plan paper, with initial low carbon board, two low carbon boards are one group, and every group according to installing first inboard low carbon board, and the order of outside low carbon board is installed again, initial low carbon board is close to the partition wall fast-assembling receives the checkpost part, be stuck in a day bone, between the bone;
Five, by supporting with the partition wall quick assembly part respectively with the sky bone, bone be connected fastening; And with partition wall quick assembly part and the grafting of initial low carbon board;
When six, second group of low carbon board being installed, the right notch of low carbon board being inserted partition wall quick assembly part left end get final product; Successively block-by-block installation of technique above repeating;
Seven, after the installation of whole metope low carbon board is finished, carry out encapsulation process with polyester foamed glue, and carry out surfacing with weather-resistant glue;
Eight, with hairbrush with the best cleaning of all plate faces, installation.
CN2012104873987A 2012-11-26 2012-11-26 Wall connection part capable of enabling building partition walls to be installed quickly and using method thereof Pending CN102943539A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012104873987A CN102943539A (en) 2012-11-26 2012-11-26 Wall connection part capable of enabling building partition walls to be installed quickly and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012104873987A CN102943539A (en) 2012-11-26 2012-11-26 Wall connection part capable of enabling building partition walls to be installed quickly and using method thereof

Publications (1)

Publication Number Publication Date
CN102943539A true CN102943539A (en) 2013-02-27

Family

ID=47726519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012104873987A Pending CN102943539A (en) 2012-11-26 2012-11-26 Wall connection part capable of enabling building partition walls to be installed quickly and using method thereof

Country Status (1)

Country Link
CN (1) CN102943539A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130711A (en) * 2016-02-29 2017-09-05 北京恒通创新赛木科技股份有限公司 Wall mounting structure and its installation method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4443991A (en) * 1980-10-09 1984-04-24 Donn, Incorporated Demountable partition structure
CN2150267Y (en) * 1993-01-16 1993-12-22 薛仁雄 Conneting device for two partitions
EP0741213A1 (en) * 1995-04-14 1996-11-06 Pierandrea Radaelli Assembly of elements for the construction of adaptable walls for the interior partition of spaces in civil, commercial or industrial buildings
JPH10102646A (en) * 1996-09-25 1998-04-21 Shimizu Corp Construction of partition wall
CN2470434Y (en) * 2000-08-03 2002-01-09 薛益成 Partition screen system with quick assembling function
CN2597580Y (en) * 2003-01-07 2004-01-07 有利华建筑预制件(深圳)有限公司 Skeleton assembly for combining wall system
CN201713964U (en) * 2010-05-14 2011-01-19 王金龙 Partition wall structure
CN102146706A (en) * 2011-01-26 2011-08-10 中国建筑设计研究院 Lightgage steel joist partition wall adaptive to building error of building structural body and construction method thereof
CN102359204A (en) * 2011-11-08 2012-02-22 重庆中瑞鑫安实业有限公司 Light-weight steel composite wall
CN202913528U (en) * 2012-11-26 2013-05-01 易科美德(天津)环保建材有限公司 Wall connecting piece for quickly installing building partition wall

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4443991A (en) * 1980-10-09 1984-04-24 Donn, Incorporated Demountable partition structure
CN2150267Y (en) * 1993-01-16 1993-12-22 薛仁雄 Conneting device for two partitions
EP0741213A1 (en) * 1995-04-14 1996-11-06 Pierandrea Radaelli Assembly of elements for the construction of adaptable walls for the interior partition of spaces in civil, commercial or industrial buildings
JPH10102646A (en) * 1996-09-25 1998-04-21 Shimizu Corp Construction of partition wall
CN2470434Y (en) * 2000-08-03 2002-01-09 薛益成 Partition screen system with quick assembling function
CN2597580Y (en) * 2003-01-07 2004-01-07 有利华建筑预制件(深圳)有限公司 Skeleton assembly for combining wall system
CN201713964U (en) * 2010-05-14 2011-01-19 王金龙 Partition wall structure
CN102146706A (en) * 2011-01-26 2011-08-10 中国建筑设计研究院 Lightgage steel joist partition wall adaptive to building error of building structural body and construction method thereof
CN102359204A (en) * 2011-11-08 2012-02-22 重庆中瑞鑫安实业有限公司 Light-weight steel composite wall
CN202913528U (en) * 2012-11-26 2013-05-01 易科美德(天津)环保建材有限公司 Wall connecting piece for quickly installing building partition wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130711A (en) * 2016-02-29 2017-09-05 北京恒通创新赛木科技股份有限公司 Wall mounting structure and its installation method

Similar Documents

Publication Publication Date Title
CN102003056B (en) Wall connecting part of insertion type integrated insulation board and application method thereof
CN105569251A (en) Device for split-level ceiling and installation method
CN211523693U (en) Vertical lines curtain system of cell cube aluminum plate
CN202913528U (en) Wall connecting piece for quickly installing building partition wall
CN102146703B (en) Installation and fixing method for wallboards
CN107762032B (en) A kind of ceiling system and installation method
CN112814303A (en) Assembled wall hanging plate system
CN102493620B (en) Through long folded fastener type wall body connecting piece of heat insulation integrated plate and mounting method thereof
CN110965684A (en) Small cell body aluminum plate vertical line curtain wall system and installation method thereof
CN201901995U (en) Wall body connecting member of insert-connection type heat insulating integrated board
CN102943539A (en) Wall connection part capable of enabling building partition walls to be installed quickly and using method thereof
CN112324072A (en) Buckled aluminum alloy hook pendant and facing wall construction method
CN202023273U (en) Wallboard positioning and fixing part
CN205242628U (en) Plug -in type activity board house
CN211523694U (en) Vertical lines curtain steelframe system of cell cube aluminum plate
CN101158196A (en) Suspended ceiling structure for mobile house
CN202899532U (en) Connecting component for low carbon plate adhesive clamping combination
CN209260990U (en) Cell curtain wall
CN208441473U (en) Fast-assembling gang form
CN105113684A (en) Unit prefabricated type building outer envelope system provided with strip window and construction method of unit prefabricated type building outer envelope system
CN202324500U (en) Wall body connecting piece of full-length folded clamp heat-preserving integrated plate
CN102936949A (en) Connecting member for integrated bonding and locking of low-carbon boards and application and mounting method thereof
CN211691433U (en) Building construction equipment template
CN211172862U (en) Embedded assembly body
CN216641052U (en) Keel structure with adjustable

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130227