CN102938539A - Double security arrangement implementation method for GOOSE (Generic Object Oriented Substation Event) virtual loop - Google Patents

Double security arrangement implementation method for GOOSE (Generic Object Oriented Substation Event) virtual loop Download PDF

Info

Publication number
CN102938539A
CN102938539A CN2012103970477A CN201210397047A CN102938539A CN 102938539 A CN102938539 A CN 102938539A CN 2012103970477 A CN2012103970477 A CN 2012103970477A CN 201210397047 A CN201210397047 A CN 201210397047A CN 102938539 A CN102938539 A CN 102938539A
Authority
CN
China
Prior art keywords
goose
pressing plate
empty loop
soft pressing
offside
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103970477A
Other languages
Chinese (zh)
Inventor
陈晓刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Hangzhou Electric Power Bureau
Original Assignee
State Grid Corp of China SGCC
Hangzhou Electric Power Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Hangzhou Electric Power Bureau filed Critical State Grid Corp of China SGCC
Priority to CN2012103970477A priority Critical patent/CN102938539A/en
Publication of CN102938539A publication Critical patent/CN102938539A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a double security arrangement implementation method for a GOOSE (Generic Object Oriented Substation Event) virtual loop. In a process of maintaining an intelligent protection system or replacing a protection device, the defects of a GOOSE sending/receiving soft pressing plate in aspect of reliability, caused by realizing the maintenance through software, can be overcome by using a maintenance soft pressing plate and the GOOSE sending/receiving soft pressing plate in a combined manner. The invention provides a means for safely insulating equipment to be maintained (replaced) from operation equipment. With the adoption of the method provided by the invention, the reliability of relay protection, operation and maintenance of a digital substation can be improved. Therefore, the digital substation is beneficial to further developing.

Description

The empty loop of a kind of GOOSE dual safety measure implementation method
Technical field
The present invention relates to the empty loop of a kind of GOOSE dual safety measure implementation method, belong to the Relay Protection Technology in Power System field.
Background technology
International Electrotechnical Commission (IEC) formulates a communication standard IEC61850 in the Intelligent transformer station that faces the future since nineteen ninety-five.Along with constantly perfect, the intelligent equipment of IEC61850 stipulations and the development of network technology, Intelligent transformer station develops rapidly in China, and China has also issued Intelligent transformer station technical standard DL/T860 simultaneously." Intelligent transformer station " refers in the transformer station information gathering, transmission, processing, the output procedure fully digitalization of electric equipment and secondary electron device, and have the unified data modeling in full station and a data communication platform, realize the interoperability (breaker tripping and closing, start malfunctioning, lock-reclosing lock etc.) between the intelligent apparatus on the basis of this platform.
Safety measure mainly refers in power transformation operation and service work in order to guarantee life, electrical network and device security, Awaiting Overhaul equipment and operational outfit carried out the measure of safety isolation.For secondary specialty, peace arranges emphasis mainly to comprise analog input loop and breaker tripping and closing, remote control, the startup loop etc. of leaving such as malfunctioning.The peace of leaving the loop at conventional substation is arranged the basic concept of implementing always to observe " obviously electrical break point ", namely thinks in breaker tripping and closing, remote control, opens and malfunctioning etc. leave the loop and must seal in respectively hard pressing plate.As shown in Figure 1, route protection is jumped control box, route protection starts malfunctioning and bus differential protection jumping control box is provided with hard pressing plate.In the operating maintenance work of reality, the maintainer just can guarantee can not export in to the maintenance of route protection after the route protection of backing off starts malfunctioning pressing plate, protection output clamping by mistake.
The most crucial technological innovation of Intelligent transformer station technology is to use the Industrial Ethernet technology to replace traditional secondary wiring transmitting digital and analog signal, and the secondary connection of original mutual decoupling zero, tool elephant will be replaced by mutual height coupling, abstract network data flow.
Be provided with serially three kinds of isolating means on the empty loop of the GOOSE of different intelligent transformer station of traditional transformer station, as shown in Figure 2:
1) optical fiber between the device, between will protect and protect physically or the optical fiber between protection and intelligent terminal partition be the most direct isolating means.
2) the soft pressing plate of GOOSE on the protective device body; intelligent protection device (comprise protecting and survey integrated device) all is provided with GOOSE and sends (reception) soft pressing plate; withdraw from corresponding pressing plate later on corresponding GOOSE link will interrupt, no longer send (reception) accordingly GOOSE message (comprising heartbeat message).Concrete pressing plate is set to: the soft pressing plate of GOOSE tripping operation outlet, and the control protection is tripped by intelligent terminal; GOOSE starts malfunctioning soft pressing plate, starts female mistake spirit function; The GOOSE reclosing exports soft pressing plate, and the control protection is closed a floodgate by intelligent terminal; GOOSE receives soft pressing plate, and GOOSE corresponding to control opens into reception.
3) maintenance pressing plate, intelligent protection device and intelligent terminal all are provided with one " protection inspecting state " hard pressing plate, and this pressing plate belongs to adopt to open to throw into the function of mode and moves back pressing plate.When this pressing plate dropped into, the TEST place value of all GOOSE messages that related device sends was TRUE, as shown in Figure 3.
When if protective device drops into " protection inspecting state " pressing plate, also be with the maintenance position in the GOOSE message that protective device sends; If the state consistency of the inspecting state of intelligent terminal and protective device namely is the maintenance attitude or all is not the maintenance attitude, then intelligent terminal is processed the GOOSE message of protective device, allows the operation outlets such as breaker tripping and closing; If the state of the inspecting state of intelligent terminal and protective device is inconsistent, namely a side is not the maintenance attitude for maintenance attitude opposite side, does not then process the GOOSE message of protective device.
Consider that repeatedly the plug meeting is to increasing light mouth attenuation, pollution even destroy the light mouth for optical fiber port, so the optical fiber plug can not be arranged long-term use as a kind of peace.And the realization of the soft pressing plate of GOOSE and maintenance pressing plate all depends on the software of device, and the visual means reliability of software will become peace and arrange the deciding factor of reliability.If in the situation that reliability of software can not reach 100%, any single a kind of peace is arranged and all can't effectively be guaranteed to pacify arrange 100% reliable.Therefore can only rely on the soft pressing plate of GOOSE and the dual peace of maintenance pressing plate to arrange to mix and make to improve the reliability that peace is arranged enforcement.
Summary of the invention
The object of the invention is to overcome the deficiency that prior art exists, and a kind of fail safe that can improve in the intelligent substation service work is provided, reduce the empty loop of the GOOSE dual safety measure implementation method of operating risk.
The objective of the invention is to finish by following technical solution, it may further comprise the steps:
(1) in actual service work, if run into the situation that safety measure is implemented in the empty loop of the GOOSE that needs between Awaiting Overhaul equipment and the operational outfit, at first drops into the maintenance pressing plate of Awaiting Overhaul device;
(2) receive soft pressing plate if need the offside operational outfit of isolation to possess corresponding GOOSE, the corresponding GOOSE that then withdraws from the empty loop of this GOOSE of offside operational outfit receives soft pressing plate, then enters step (4);
(3) if need the offside operational outfit of isolation to receive soft pressing plate without GOOSE or the soft pressing plate of reception in the empty loop of corresponding GOOSE be not set separately, the corresponding GOOSE that then withdraws from the empty loop of this side Awaiting Overhaul equipment GOOSE sends soft pressing plate, then enters step (4);
(4) at first check at offside running gear interface, find to have the empty loop chain rupture of corresponding GOOSE or the inconsistent information of inspecting state; If can't check inspecting state and the chain rupture situation that also can use network analyzer to check the empty loop of corresponding GOOSE message; In the situation that check result is correct, enter step (5);
(5) the dual peace of finishing the empty loop of GOOSE is arranged enforcement.
The present invention is on the basis of existing technology, an improvement of having done, it is that the means that provide a kind of equipment with Awaiting Overhaul (replacings) and operational outfit to isolate safely are provided Intelligent transformer station maintenance repair, periodic check, protection, can overcome by the maintenance of software realization, the soft pressing plate of GOOSE sending/receiving in the deficiency aspect the reliability; Have the fail safe that can improve in the intelligent substation service work, reduce the characteristics such as operating risk.
Description of drawings
Fig. 1 is the safe quarantine measures schematic diagram of obvious electrical break point of traditional circuit protection;
Fig. 2 arranges schematic diagram for the peace of existing intelligent protection system;
Fig. 3 is existing GOOSE message band maintenance position schematic diagram;
Fig. 4 is intelligent substation route protection safety measure schematic diagram of the present invention;
Fig. 5 is the FB(flow block) of safety measure implementation method of the present invention;
Embodiment
The present invention will be described in detail below in conjunction with accompanying drawing: shown in Fig. 4,5, and the empty loop of GOOSE of the present invention dual safety measure implementation method, it may further comprise the steps:
(1) in actual service work, if run into the situation that safety measure is implemented in the empty loop of the GOOSE that needs between Awaiting Overhaul equipment and the operational outfit, at first drops into the maintenance pressing plate of Awaiting Overhaul device;
(2) receive soft pressing plate if need the offside operational outfit of isolation to possess corresponding GOOSE, the corresponding GOOSE that then withdraws from the empty loop of this GOOSE of offside operational outfit receives soft pressing plate, then enters step (4);
(3) if need the offside operational outfit of isolation to receive soft pressing plate without GOOSE or the soft pressing plate of reception in the empty loop of corresponding GOOSE be not set separately, the corresponding GOOSE that then withdraws from the empty loop of this side Awaiting Overhaul equipment GOOSE sends soft pressing plate, then enters step (4);
(4) at first check at offside running gear interface, find to have the empty loop chain rupture of corresponding GOOSE or the inconsistent information of inspecting state; If can't check inspecting state and the chain rupture situation that also can use network analyzer to check the empty loop of corresponding GOOSE message; In the situation that check result is correct, enter step (5);
(5) the dual peace of finishing the empty loop of GOOSE is arranged enforcement.
The present invention is an improvement of having done on the prior art basis, and therefore, related prior art is the technology contents in the embodiment of the invention in implementing process of the present invention, comprises disclosed technology contents in the accompanying drawing.
Embodiment:
The present invention is take certain transformer station shown in Figure 4 as example; if it is unusual that line protective devices occur; need to carry out the line protective devices maintenance; safety in order to ensure service work is carried out smoothly; operational outfit is not produced harmful effect; need to implement safety measure with bus differential protection and the isolation of intelligent terminal isolation safe of line protective devices and operation, specific implementation process is as follows:
(1) line protective devices to be isolated is dropped into the maintenance pressing plate;
(2) the GOOSE message that starts bus differential protection except route protection for bus differential protection is put the maintenance attitude, and the malfunctioning GOOSE of startup that bus differential protection need be received this route protection interval receives soft pressing plate and withdraws from, thereby realizes that dual peace arranges;
(3) because intelligent terminal can't withdraw from GOOSE and accepts soft pressing plate, therefore withdraw from route protection tripping operation GOOSE at line protective devices and send soft pressing plate, thereby realize that dual peace arranges;
(4) peace is arranged check: bus differential protection isolation peace is arranged and is checked and can report inconsistent the carrying out of corresponding interval GOOSE inspecting state by bus differential protection; Intelligent terminal isolation peace arranges check to be undertaken by intelligent terminal interface indicator light demonstration GOOSE chain rupture.
(5) peace is arranged and is implemented to finish.

Claims (1)

1. the empty loop of GOOSE dual safety measure implementation method is characterized in that this safety measure implementation method may further comprise the steps:
(1) in actual service work, if run into the situation that safety measure is implemented in the empty loop of the GOOSE that needs between Awaiting Overhaul equipment and the operational outfit, at first drops into the maintenance pressing plate of Awaiting Overhaul device;
(2) receive soft pressing plate if need the offside operational outfit of isolation to possess corresponding GOOSE, the corresponding GOOSE that then withdraws from the empty loop of this GOOSE of offside operational outfit receives soft pressing plate, then enters step (4);
(3) if need the offside operational outfit of isolation to receive soft pressing plate without GOOSE or the soft pressing plate of reception in the empty loop of corresponding GOOSE be not set separately, the corresponding GOOSE that then withdraws from the empty loop of this side Awaiting Overhaul equipment GOOSE sends soft pressing plate, then enters step (4);
(4) at first check at offside running gear interface, find to have the empty loop chain rupture of corresponding GOOSE or the inconsistent information of inspecting state; If can't check inspecting state and the chain rupture situation that also can use network analyzer to check the empty loop of corresponding GOOSE message; In the situation that check result is correct, enter step (5);
(5) the dual peace of finishing the empty loop of GOOSE is arranged enforcement.
CN2012103970477A 2012-10-18 2012-10-18 Double security arrangement implementation method for GOOSE (Generic Object Oriented Substation Event) virtual loop Pending CN102938539A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103970477A CN102938539A (en) 2012-10-18 2012-10-18 Double security arrangement implementation method for GOOSE (Generic Object Oriented Substation Event) virtual loop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103970477A CN102938539A (en) 2012-10-18 2012-10-18 Double security arrangement implementation method for GOOSE (Generic Object Oriented Substation Event) virtual loop

Publications (1)

Publication Number Publication Date
CN102938539A true CN102938539A (en) 2013-02-20

Family

ID=47697419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103970477A Pending CN102938539A (en) 2012-10-18 2012-10-18 Double security arrangement implementation method for GOOSE (Generic Object Oriented Substation Event) virtual loop

Country Status (1)

Country Link
CN (1) CN102938539A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103346497A (en) * 2013-07-09 2013-10-09 广东电网公司珠海供电局 Intelligent substation electrical virtual circuit isolation method and system
CN104134974A (en) * 2014-08-14 2014-11-05 国家电网公司 Bus protection system of digital substation
CN104730957A (en) * 2015-03-16 2015-06-24 国网山西省电力公司电力科学研究院 Direct recognizing system for intelligent substation transmission line differential protection on/off states
CN105098989A (en) * 2015-09-02 2015-11-25 青海送变电工程公司 Intelligent solution for failure loop of transformer substation
CN105931141A (en) * 2016-05-05 2016-09-07 广东电网有限责任公司电力调度控制中心 Method for modeling soft pressing plate of process level
CN107834705A (en) * 2017-12-01 2018-03-23 国网湖北省电力有限公司电力科学研究院 A kind of intelligent substation secondary safety measure is active to combine the method for deploying troops on garrison duty
CN108828344A (en) * 2018-04-17 2018-11-16 国网河南省电力公司电力科学研究院 One kind is for substation line protective device pressing plate detection alarm method and device
CN113889890B (en) * 2021-10-13 2023-07-18 国网福建省电力有限公司检修分公司 Method for judging overlapping safety measure of secondary screen cabinet

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101854052A (en) * 2010-02-08 2010-10-06 广东电网公司中山供电局 Sampling data passageway switching method and device in main transformer protection of digitalized substation
CN202309046U (en) * 2011-10-23 2012-07-04 许继集团有限公司 Reliable intelligent transformer substation GOOSE tripping protective device
CN202455052U (en) * 2012-01-19 2012-09-26 无锡市科环自动化设备有限公司 Main/standby protective device for track traffic power supply system interval failure
CN102738900A (en) * 2012-06-20 2012-10-17 宁夏电力公司银川供电局 Monitoring method for GOOSE (generic object oriented substation event) link of intelligent converting station

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101854052A (en) * 2010-02-08 2010-10-06 广东电网公司中山供电局 Sampling data passageway switching method and device in main transformer protection of digitalized substation
CN202309046U (en) * 2011-10-23 2012-07-04 许继集团有限公司 Reliable intelligent transformer substation GOOSE tripping protective device
CN202455052U (en) * 2012-01-19 2012-09-26 无锡市科环自动化设备有限公司 Main/standby protective device for track traffic power supply system interval failure
CN102738900A (en) * 2012-06-20 2012-10-17 宁夏电力公司银川供电局 Monitoring method for GOOSE (generic object oriented substation event) link of intelligent converting station

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孔晓峰等: "基于IEC61850标准的数字化继电保护运行方式", 《中国电力》, vol. 43, no. 4, 30 April 2010 (2010-04-30) *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103346497A (en) * 2013-07-09 2013-10-09 广东电网公司珠海供电局 Intelligent substation electrical virtual circuit isolation method and system
CN103346497B (en) * 2013-07-09 2016-09-14 广东电网公司珠海供电局 Intelligent substation electrical virtual circuit isolation method and system
CN104134974A (en) * 2014-08-14 2014-11-05 国家电网公司 Bus protection system of digital substation
CN104730957A (en) * 2015-03-16 2015-06-24 国网山西省电力公司电力科学研究院 Direct recognizing system for intelligent substation transmission line differential protection on/off states
CN104730957B (en) * 2015-03-16 2017-07-18 国网山西省电力公司电力科学研究院 The Direct Recognition system for state of moving back is thrown in the differential protection of intelligent substation transmission line of electricity
CN105098989A (en) * 2015-09-02 2015-11-25 青海送变电工程公司 Intelligent solution for failure loop of transformer substation
CN105098989B (en) * 2015-09-02 2017-09-12 青海送变电工程公司 A kind of intelligent solution in transformer station's failure loop
CN105931141A (en) * 2016-05-05 2016-09-07 广东电网有限责任公司电力调度控制中心 Method for modeling soft pressing plate of process level
CN107834705A (en) * 2017-12-01 2018-03-23 国网湖北省电力有限公司电力科学研究院 A kind of intelligent substation secondary safety measure is active to combine the method for deploying troops on garrison duty
CN107834705B (en) * 2017-12-01 2019-10-25 国网湖北省电力有限公司电力科学研究院 A kind of active joint deployment method of intelligent substation secondary safety measure
CN108828344A (en) * 2018-04-17 2018-11-16 国网河南省电力公司电力科学研究院 One kind is for substation line protective device pressing plate detection alarm method and device
CN113889890B (en) * 2021-10-13 2023-07-18 国网福建省电力有限公司检修分公司 Method for judging overlapping safety measure of secondary screen cabinet

Similar Documents

Publication Publication Date Title
CN102938539A (en) Double security arrangement implementation method for GOOSE (Generic Object Oriented Substation Event) virtual loop
EP3301784B1 (en) Intelligent power server applied to protection and control system for intelligent substation
CN106680634B (en) A kind of intelligent early-warning method of intelligent substation relay protection safety measure
CN106159759B (en) A kind of method for automatically generating secondary system of intelligent substation maintenance safety measure
CN101980418B (en) System for detecting secondary wiring of relay protection system in transformer substation on line
CN102355056B (en) Method for improving closing reliability of remote-terminal-unit-architecture-based substation
CN102025126B (en) Relay protection method of transformer as well as system thereof
CN205105000U (en) Digital relay protection observes and controls and intelligent terminal integrated device
CN101431230A (en) Transforming plant integrated protection system based on IEC61850
CN101609332B (en) Online three-layer synchronous anti-error locking system
CN107611941B (en) A kind of site line protective devices based on function Top-down design
CN102636708A (en) Intelligent substation process layer network simulating system and device simulator
CN103915898A (en) Operation and maintenance method for intelligent substation network
CN105470935A (en) Defect security isolation and auxiliary decision-making method for intelligent substation relay protection equipment
CN105573283A (en) Transformer station equipment function association database establishing method and event association information group filtering method
CN101741145B (en) Traditional switch intelligent interface device for digitized transformer substation
CN110704700B (en) One-key sequence control equipment state intelligent simulation method based on expert knowledge rule base
CN102263820A (en) Intelligent transformer substation network communication structure based on protection independence and information sharing
CN103346617A (en) Error logical judgment prevention system and judgment method considering multiple constraint conditions
CN104638761B (en) Packet sensing and packet simulation verification based GOOSE (generic object oriented substation event) virtual terminal connection method
CN103779958A (en) Coal mine explosion-proof switch device for distant active power disconnection and power transmission and method
CN102708256A (en) Standardization design method for five-prevention blocking function of transformer substation
CN205429886U (en) Automatic the patrolling and examining of relay protection of transformer substation definite value is checked and remote operation device
CN103607044B (en) A kind of relay protection monitoring system and method
CN104601220A (en) LTE (Long Term Evolution) wireless communication intelligent substation test device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130220