CN102938113A - Power grid failure recovery method and system based on power failure management system platform - Google Patents

Power grid failure recovery method and system based on power failure management system platform Download PDF

Info

Publication number
CN102938113A
CN102938113A CN2012105165158A CN201210516515A CN102938113A CN 102938113 A CN102938113 A CN 102938113A CN 2012105165158 A CN2012105165158 A CN 2012105165158A CN 201210516515 A CN201210516515 A CN 201210516515A CN 102938113 A CN102938113 A CN 102938113A
Authority
CN
China
Prior art keywords
electric network
network fault
fault
maintenance
maintenance resource
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105165158A
Other languages
Chinese (zh)
Inventor
王志佳
郑爱华
黄继伟
严钰君
康小平
沈显伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Electric Power Bureau
Original Assignee
Ningbo Electric Power Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Electric Power Bureau filed Critical Ningbo Electric Power Bureau
Priority to CN2012105165158A priority Critical patent/CN102938113A/en
Publication of CN102938113A publication Critical patent/CN102938113A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The embodiment of the invention discloses a power grid failure recovery method based on a power failure management system platform. The method comprises the following steps of: determining power grid failure through a power failure management system; distributing maintenance resources associated with an area according to the area in which the power grid failure is positioned; and transmitting a maintenance resource distribution result to a power grid failure maintenance terminal, wherein the power grid failure maintenance terminal recovers the power grid failure according to an instruction by utilizing the maintenance resources. The embodiment of the invention also discloses a power grid failure recovery system based on the power failure management system platform. According to the power grid failure recovery method and system based on the power failure management system platform, the power supply stability of a power grid system can be improved.

Description

Electric network fault restoration methods and system based on the Outage Management Systems platform
Technical field
The application relates to technical field of power systems, particularly a kind of electric network fault restoration methods and correspondence system thereof based on OMS (outagemanagement system, Outage Management Systems) platform.
Background technology
Network system is that a huge electric energy supplies communication system, along with the increase of need for electricity, more and more higher to the requirement for electrical stability.The content that comprises two aspects for electrical stability: the one, can continue normal power supply in a long time, the 2nd, even if because power failure appears in a variety of causes, also can recover the normal power supply state within a short period of time.For the former, can be by improving, optimize the functions of the equipments of network system itself, rational deployment power transmission and transformation station (line) reaches the purpose improved for electrical stability.And, for the latter, not only depend on the number of Maintenance Resource itself, but also depend on the dispatching distribution mode to Maintenance Resource.Reasonably the dispatching distribution mode is conducive to shorten the time of power failure, recovers as early as possible normal power supply.
There has been a kind of Outage Management Systems (OMS) in prior art, and this system belongs to the important component part of Distribution Management System (Distribution Management System, DMS), mainly comprises scheduled outage management and fault outage management.When power outage occurring, find out rapidly the information such as the position of fault and coverage by the OMS system, in order to select rational sequence of operation and rescue path, thereby guarantee to restore electricity in time.Yet, although this system can be known the electric network fault point quickly, but prior art can't realize Maintenance Resource and to the efficient association between electric network fault based on this OMS platform: when finding electric network fault, can not effectively search out rational Maintenance Resource is processed it, when processing electric network fault, can not be effectively to OMS platform feedback fault recovery situation.As can be seen here, existing Outage Management Systems platform can not meet real needs, has affected the raising of network system for electrical stability.
Summary of the invention
For solving the problems of the technologies described above, the embodiment of the present application provides a kind of electric network fault restoration methods and system based on the Outage Management Systems platform, reasonably distribute Maintenance Resource with the electric network fault definite for the Outage Management Systems platform, thereby improve the electrical stability that supplies of network system.
The electric network fault restoration methods based on the Outage Management Systems platform that the embodiment of the present application provides comprises:
Determine electric network fault by Outage Management Systems;
Maintenance Resource according to the distribution of described electric network fault region with this zone association;
To distribute the result of Maintenance Resource to send to the electric network fault maintenance terminal, the electric network fault maintenance terminal utilizes Maintenance Resource to repair electric network fault according to indication.
Preferably, described Outage Management Systems has the real-time position information of electric network fault positional information and Maintenance Resource, and the described Maintenance Resource according to the distribution of electric network fault region and this zone association comprises:
Determine the electric network fault region according to the electric network fault positional information, according to the real-time position information of Maintenance Resource, determine the electric network fault region under Maintenance Resource;
Maintenance Resource in selection electric network fault region is as the Maintenance Resource of distributing to electric network fault.
Preferably, if definite electric network fault comprises when a plurality of by Outage Management Systems, judge in a plurality of electric network faults and whether have the electric network fault to identical electrical network trouble spot, if exist, will the electric network fault of identical electrical network trouble spot be merged.
Preferably, described method also comprises:
The electric network fault maintenance terminal will utilize Maintenance Resource to repair the state status Real-time Feedback of electric network fault to Outage Management Systems.
Further preferably, after determining electric network fault by Outage Management Systems, this electric network fault is marked to the relevant position of map, after receiving the state status of utilizing Maintenance Resource reparation electric network fault of electric network fault maintenance terminal feedback, this state status is presented in to the electric network fault position of mark on map.
The embodiment of the present application also provides a kind of Restoring System of Power System Faults based on the Outage Management Systems platform, this system comprises: Outage Management Systems and electric network fault maintenance terminal, described Outage Management Systems comprises electric network fault determining unit, Maintenance Resource allocation units and allocation result transmitting element, described electric network fault maintenance terminal comprises the fault restoration unit, wherein:
Described electric network fault determining unit, for determining electric network fault;
Described Maintenance Resource allocation units, for the Maintenance Resource with this zone association according to the distribution of described electric network fault region;
Described allocation result transmitting element, send to the electric network fault maintenance terminal for the result that will distribute Maintenance Resource;
Described fault restoration unit, repair electric network fault for utilize Maintenance Resource according to indication.
Preferably, described Outage Management Systems also comprises information memory cell, and for storing the real-time position information of electrical network abort situation information and Maintenance Resource, described Maintenance Resource allocation units specifically comprise: subelement, resource selection subelement are determined in zone, wherein:
Subelement is determined in described zone, for according to the electric network fault positional information, determining the electric network fault region, according to the real-time position information of Maintenance Resource, determines the electric network fault region under Maintenance Resource;
Described resource selection subelement, for selecting Maintenance Resource in the electric network fault region as the Maintenance Resource of distributing to electric network fault.
Preferably, if the definite electric network fault of described electric network fault determining unit comprises when a plurality of, described Outage Management Systems also comprises fault judging unit and fault merge cells, wherein:
Whether described fault judging unit, exist the electric network fault to identical electrical network trouble spot for judging a plurality of electric network faults, if exist, triggers the fault merge cells;
Described fault merge cells, for being merged the electric network fault of identical electrical network trouble spot.
Preferably, described electric network fault maintenance terminal also comprises the state status feedback unit, for fault restoration unit by using Maintenance Resource is repaired to the state status Real-time Feedback of electric network fault to Outage Management Systems.
Further preferably, described Outage Management Systems also comprises that mark represents unit, for after determining electric network fault, this electric network fault is marked to the relevant position of map; Also, for after receiving the state status of utilizing Maintenance Resource reparation electric network fault of electric network fault maintenance terminal feedback, this state status is presented in to the electric network fault position of mark on map.
After the embodiment of the present application is determined electric network fault by Outage Management Systems, according to the Maintenance Resource of region allocation and this zone association of electric network fault, the electric network fault maintenance terminal utilizes Maintenance Resource to repair electric network fault according to indication.Compared with prior art, the embodiment of the present application will associate between electric network fault maintenance terminal and Outage Management Systems based on the Outage Management Systems platform, make Outage Management Systems not only can determine electric network fault, and can automatically distribute Maintenance Resource according to electric network fault, in order to utilize this Maintenance Resource to repair electric network fault, be conducive to improve the electrical stability that supplies of network system.In addition, the embodiment of the present application can also be grasped the reparation situation of electric network fault in real time by the status information of electric network fault maintenance terminal feedback, realized the application of maintenance flow closed loop.
The accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present application or technical scheme of the prior art, below will the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described, apparently, the accompanying drawing the following describes is only some embodiment that put down in writing in the application, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain according to these accompanying drawings other accompanying drawing.
The process flow diagram of the electric network fault restoration methods based on the Outage Management Systems platform that Fig. 1 is the application;
The networking structure figure of the example that Fig. 2 is the embodiment of the present application;
The process flow diagram of the example that Fig. 3 is the embodiment of the present application;
The structured flowchart of the Restoring System of Power System Faults based on the Outage Management Systems platform that Fig. 4 is the application.
Embodiment
In order to make those skilled in the art person understand better the technical scheme in the application, below in conjunction with the accompanying drawing in the embodiment of the present application, technical scheme in the embodiment of the present application is clearly and completely described, obviously, described embodiment is only the application's part embodiment, rather than whole embodiment.Embodiment based in the application, those of ordinary skills are not making under the creative work prerequisite the every other embodiment obtained, and all should belong to the scope of the application's protection.
Referring to Fig. 1, the figure shows the flow process of the electric network fault recovery based on the Outage Management Systems platform of the embodiment of the present application.This embodiment comprises:
Step S101: by Outage Management Systems, determine electric network fault;
As mentioned above, Outage Management Systems can be determined electric network fault, it determines that mode can be that the subsystem integrated by Outage Management Systems itself obtains electric network fault information, such as, by 95598 subsystems, to be that electric system is built be set as ripe electric network fault alarm receiving system to this subsystem, can obtain the local electric network fault situation of system by this system, can be also by calling other correlation function system acquisition electric network fault information, such as, by calling CIS (marketing management system) and DSCADA (DistributionSupervisory Control And Data Acquisition, power dispatching data gathers and supervisor control) function system finds out electric network fault.After determining electric network fault, electric network fault information preserves with certain form, and such as reporting work order or repairing work order mode for repairment, its content comprised can be the information such as electric network fault position, electric network fault type, electric network fault reason, electric network fault time.
Step S102: the Maintenance Resource according to the distribution of described electric network fault region with this zone association;
Electric network fault always occurs in certain zone (position), for ease of processing electric network fault, the Outage Management Systems jurisdiction can be divided into to a plurality of zones, each zone is lasted the information such as record and is determined the Maintenance Resource with this zone association according to its electric network fault, in order to can rapidly, reasonably distribute Maintenance Resource when electric network fault occurs.Because Maintenance Resource is relatively in short supply, in some cases, Maintenance Resource may be mobility, in Outage Management Systems, between local zones of different, moves, and Maintenance Resource scheduling at this moment is more complicated.The application preferably carries out the allocation schedule of Maintenance Resource according to following mode: the real-time position information of first by Outage Management Systems, being grasped electric network fault positional information and Maintenance Resource, the electric network fault positional information can be obtained when determining electric network fault, and the real-time position information of Maintenance Resource can obtain by position tracking means such as binding GPS in Maintenance Resource; Then determine the electric network fault region according to the electric network fault positional information, determine again the current Maintenance Resource comprised in the electric network fault zone, determine the electric network fault region under Maintenance Resource according to the real-time position information of Maintenance Resource, Maintenance Resource in an electric network fault zone may comprise a plurality of, at this moment therefrom selects (part) Maintenance Resource in the electric network fault region as the Maintenance Resource of distributing to electric network fault.The Maintenance Resource of the present embodiment can comprise plurality of classes, such as, electric network fault maintenance, maintenance utensil, have the automation equipment of electric network fault maintainability, or engineering technical personnel etc., all think Maintenance Resource as long as can be used for repairing electric network fault.
Step S103: will distribute the result of Maintenance Resource to send to the electric network fault maintenance terminal, the electric network fault maintenance terminal utilizes Maintenance Resource to repair electric network fault according to indication;
After dividing the distribution network failure Maintenance Resource according to abovementioned steps to electric network fault, it is maintenance terminal that this allocation result is sent to electric network fault, and the mode of transmission can adopt wired mode, also can adopt wireless mode.In actual application, be the support information safe transmission, also can be by the 3G gateway of some network system and safe access platform access Intranet.The electric network fault maintenance terminal utilizes Maintenance Resource to repair electric network fault after receiving indication.The electric network fault maintenance terminal here can be the digital tool of the auxiliary personal works such as PDA (Personal Digital Assistant, palm PC).
After the present embodiment is determined electric network fault by Outage Management Systems, according to the Maintenance Resource of region allocation and this zone association of electric network fault, the electric network fault maintenance terminal utilizes Maintenance Resource to repair electric network fault according to indication.Compared with prior art, the embodiment of the present application will associate between electric network fault maintenance terminal and Outage Management Systems based on the Outage Management Systems platform, make Outage Management Systems not only can determine electric network fault, and can automatically distribute Maintenance Resource according to electric network fault, in order to utilize this Maintenance Resource to repair electric network fault, be conducive to improve the electrical stability that supplies of network system.
Above-described embodiment is in actual application, the electric network fault definite by Outage Management Systems may comprise a plurality of electric network faults, and these electric network faults may comprise to same trouble spot repeat determine, such as: report a plurality of electric network fault message of Outage Management Systems platform by 95598 systems, and these message may be the different user electric network fault reports to same fault point, occur thus to same trouble spot repeat determine.If each electric network fault is carried out to the Maintenance Resource distribution without distinction, will cause the waste of Maintenance Resource, also may cause the conflict of Maintenance Resource, thereby be unfavorable for the reparation to electric network fault, reduce generally on the contrary the electrical stability that supplies of electric power system.For this reason, the application provides a kind of more improved procedure, if comprise when a plurality of at the electric network fault definite by Outage Management Systems, first directly these electric network faults are not distributed to Maintenance Resource, but judge in a plurality of electric network faults whether have the electric network fault to identical electrical network trouble spot, if exist, will the electric network fault of identical electrical network trouble spot be merged, then for the electric network fault after merging, distribute a Maintenance Resource.
Above-described embodiment is in actual application, also may have such demand: not only the Outage Management Systems platform is determined electric network fault and is distributed Maintenance Resource, and Outage Management Systems also needs to be grasped how the electrical network maintenance terminal utilizes progress that Maintenance Resource repaired, the reparation situation is as information how, under this situation, the electric network fault maintenance terminal also needs to feed back to for information about Outage Management Systems, and the electric network fault maintenance terminal will utilize Maintenance Resource to repair the state status Real-time Feedback of electric network fault to Outage Management Systems.Further, in order conveniently to consult and to dispatch, Outage Management Systems also wishes by visual diagramatic way, electric network fault to be shown after having determined electric network fault usually, and by the fault restoration progress of electric network fault maintenance terminal feedback, the information such as state are presented in the diagram of electric network fault in the lump, for realizing this purpose, the application is at Outage Management Systems storing map also, after by Outage Management Systems, determining electric network fault, this electric network fault is marked to the relevant position of map, so just, can consult easily whole electric network fault situations of network system, thereby being conducive to Maintenance Resource distributes and dispatches.Similarly, after receiving the state status of utilizing Maintenance Resource reparation electric network fault of electric network fault maintenance terminal feedback, this state status is presented in to the electric network fault position of mark on map.In fact, the information after electric network fault maintenance terminal feedback is not only fed back at the electric network fault place, can also be showed by special list, in order to consult, manage and analysis etc.Grasp in real time the reparation situation of electric network fault by the status information of electric network fault maintenance terminal feedback, realized the application of maintenance flow closed loop.
In order to illustrate further the technical scheme of the embodiment of the present application, below with a detailed example, explained.Referring to Fig. 2 and Fig. 3, wherein: the networking structure figure that Fig. 2 is this example, this structure comprises OMS platform 21, data transmitting server 22, encryption gateway 23, WCDMA wireless network 24 and at least one PDA terminal 25; The flow process that Fig. 3 is this example.
Step S301: by the order of OMS platform fault, determine electric network fault.Receive the electric network fault work order that 95598 systems send in the outage management platform, record and notify 95598 system times of received orders.
Step S302: generate corresponding electric network fault according to electric network fault and repair work order.
Step S303: mark electric network fault point on map.The Outage Management Systems platform goes out electric network fault in the enterprising row labels of map after electric network fault reparation work order is carried out to the fault anticipation.
Step S304: if exist, the electric network fault of same trouble spot is repaired to work order, these electric network faults are repaired to work order and merged into a electric network fault reparation work order.
Step S305: according to the position of Maintenance Resource, with the electric network fault position, distribute the Maintenance Resource associated with this electric network fault; In the situation that Maintenance Resource is mobile, Maintenance Resource feeds back to the Outage Management Systems platform by the GPS equipment of self binding by its positional information.
Step S306: send to electric network fault to repair terminal the Maintenance Resource result of distribution.At this moment also Maintenance Resource can be marked on map.
Step S307: the electric network fault maintenance terminal utilizes Maintenance Resource to carry out fault restoration according to indication.
Step S308: in failover process or after having repaired, by the electric network fault maintenance terminal, the fault restoration state is passed back to the Outage Management Systems platform.The status information content of passback can comprise that electric network fault is repaired the terminal time of received orders, electric network fault is reconnoitred information, electric network fault reparation progress msg etc.
In addition, in actual application, can also need to carry out revising of the functions to electric network fault maintenance terminal PDA according to actual conditions, such as can be for PDA increases the site work function, make PDA support various lists transmission, fill in and print, support is docked with the on-vehicle Bluetooth printer etc.Also such as, can be the relevant wireless camera of PDA configuration, the first-class picture pick-up device of vehicle-mounted pick-up, so that passback is repaired live video to the Outage Management Systems platform.
Above content is the description to the application's embodiment of the method, and correspondingly, the application also provides system embodiment.Referring to Fig. 4, the figure shows the structure of the Restoring System of Power System Faults based on the Outage Management Systems platform.This system embodiment comprises: Outage Management Systems 41 and electric network fault maintenance terminal 42, Outage Management Systems 41 comprises electric network fault determining unit 411, Maintenance Resource allocation units 412 and allocation result transmitting element 413, electric network fault maintenance terminal 42 comprises fault restoration unit 421, wherein:
Electric network fault determining unit 411, for determining electric network fault;
Maintenance Resource allocation units 412, for the Maintenance Resource with this zone association according to the distribution of described electric network fault region;
Allocation result transmitting element 413, send to the electric network fault maintenance terminal for the result that will distribute Maintenance Resource;
Fault restoration unit 421, repair electric network fault for utilize Maintenance Resource according to indication.
The course of work of native system embodiment is: after the electric network fault determining unit 411 of Outage Management Systems 41 is determined electric network fault, Maintenance Resource by Maintenance Resource allocation units 412 according to the distribution of described electric network fault region and this zone association, then, allocation result transmitting element 413 by Outage Management Systems 41 will distribute the result of Maintenance Resource to send to electric network fault maintenance terminal 42 again, and the fault restoration unit 421 of electric network fault maintenance terminal 42 utilizes Maintenance Resource to repair electric network fault according to indication.
After native system embodiment determines electric network fault by Outage Management Systems, according to the Maintenance Resource of region allocation and this zone association of electric network fault, the electric network fault maintenance terminal utilizes Maintenance Resource to repair electric network fault according to indication.Compared with prior art, native system embodiment will associate between electric network fault maintenance terminal and Outage Management Systems based on the Outage Management Systems platform, make Outage Management Systems not only can determine electric network fault, and can automatically distribute Maintenance Resource according to electric network fault, in order to utilize this Maintenance Resource to repair electric network fault, be conducive to improve the electrical stability that supplies of network system.
Outage Management Systems in said system embodiment can also comprise information memory cell, for the real-time position information of storing electrical network abort situation information and Maintenance Resource, described Maintenance Resource allocation units 412 specifically comprise: subelement 4121, resource selection subelement 4122 are determined in zone, wherein: subelement 4121 is determined in zone, for according to the electric network fault positional information, determining the electric network fault region, according to the real-time position information of Maintenance Resource, determine the electric network fault region under Maintenance Resource; Resource selection subelement 4122, for selecting Maintenance Resource in the electric network fault region as the Maintenance Resource of distributing to electric network fault.
If the definite electric network fault of electric network fault determining unit of the Outage Management Systems of said system embodiment comprises when a plurality of, generally can not directly to these electric network faults, carry out the Maintenance Resource distribution, because, these electric network faults may repeat, may be to same electric network fault point repeat determine.Under this situation, the preferred Outage Management Systems of the application can also comprise fault judging unit 414 and fault merge cells 415, wherein: fault judging unit 414, for judging whether a plurality of electric network faults exist the electric network fault to identical electrical network trouble spot, if exist, trigger fault merge cells 415; Fault merge cells 415, for being merged the electric network fault of identical electrical network trouble spot.
In said system embodiment, except Outage Management Systems can be carried out some improvement that meets the reality needs, can also can also be improved the electric network fault maintenance terminal in this system embodiment, to increase new function.Such as electric network fault maintenance terminal 42 can also comprise state status feedback unit 422, for fault restoration unit by using Maintenance Resource is repaired to the state status Real-time Feedback of electric network fault to Outage Management Systems.Further, the Outage Management Systems in said system embodiment can also comprise that mark represents unit, for after determining electric network fault, this electric network fault is marked to the relevant position of map; Also, for after receiving the state status of utilizing Maintenance Resource reparation electric network fault of electric network fault maintenance terminal feedback, this state status is presented in to the electric network fault position of mark on map.
Being divided into various unit with function while for convenience of description, describing above device describes respectively.Certainly, when implementing the application, can realize the function of each unit in same or a plurality of software and/or hardware.Such as, all functional units can be formed to a single unit system, be arranged at base station side, for controlling different user devices, between different downlink transfer patterns, switched.
As seen through the above description of the embodiments, those skilled in the art can be well understood to the mode that the application can add essential general hardware platform by software and realizes.Understanding based on such, the part that the application's technical scheme contributes to prior art in essence in other words can embody with the form of software product, this computer software product can be stored in storage medium, as ROM/RAM, magnetic disc, CD etc., comprise that some instructions are with so that a computer equipment (can be personal computer, server, or the network equipment etc.) carry out the described method of some part of each embodiment of the application or embodiment.
Each embodiment in this instructions all adopts the mode of going forward one by one to describe, and between each embodiment, identical similar part is mutually referring to getting final product, and each embodiment stresses is the difference with other embodiment.Especially, for system embodiment, due to it, substantially similar in appearance to embodiment of the method, so describe fairly simplely, relevant part gets final product referring to the part explanation of embodiment of the method.System embodiment described above is only schematic, the wherein said unit as the separating component explanation can or can not be also physically to separate, the parts that show as unit can be or can not be also physical locations, can be positioned at a place, or also can be distributed on a plurality of network element.Can select according to the actual needs some or all of module wherein to realize the purpose of the present embodiment scheme.Those of ordinary skills in the situation that do not pay creative work, can understand and implement.
The application can be used in numerous general or special purpose computingasystem environment or configuration.For example: personal computer, server computer, handheld device or portable set, plate equipment, multicomputer system, the system based on microprocessor, set top box, programmable consumer-elcetronics devices, network PC, small-size computer, mainframe computer, comprise distributed computing environment of above any system or equipment etc.
The application can describe in the general context of the computer executable instructions of being carried out by computing machine, for example program module.Usually, program module comprises the routine carrying out particular task or realize particular abstract data type, program, object, assembly, data structure etc.Also can in distributed computing environment, put into practice the application, in these distributed computing environment, be executed the task by the teleprocessing equipment be connected by communication network.In distributed computing environment, program module can be arranged in the local and remote computer-readable storage medium that comprises memory device.
The above is only the application's embodiment; it should be pointed out that for those skilled in the art, under the prerequisite that does not break away from the application's principle; can also make some improvements and modifications, these improvements and modifications also should be considered as the application's protection domain.

Claims (10)

1. the electric network fault restoration methods based on the Outage Management Systems platform, is characterized in that, the method comprises:
Determine electric network fault by Outage Management Systems;
Maintenance Resource according to the distribution of described electric network fault region with this zone association;
To distribute the result of Maintenance Resource to send to the electric network fault maintenance terminal, the electric network fault maintenance terminal utilizes Maintenance Resource to repair electric network fault according to indication.
2. method according to claim 1, is characterized in that, described Outage Management Systems has the real-time position information of electric network fault positional information and Maintenance Resource, and the described Maintenance Resource according to the distribution of electric network fault region and this zone association comprises:
Determine the electric network fault region according to the electric network fault positional information, according to the real-time position information of Maintenance Resource, determine the electric network fault region under Maintenance Resource;
Maintenance Resource in selection electric network fault region is as the Maintenance Resource of distributing to electric network fault.
3. method according to claim 1, it is characterized in that, if definite electric network fault comprises when a plurality of by Outage Management Systems, judge in a plurality of electric network faults and whether have the electric network fault to identical electrical network trouble spot, if exist, will the electric network fault of identical electrical network trouble spot be merged.
4. according to any one described method in claims 1 to 3, it is characterized in that, described method also comprises:
The electric network fault maintenance terminal will utilize Maintenance Resource to repair the state status Real-time Feedback of electric network fault to Outage Management Systems.
5. method according to claim 4, it is characterized in that, after determining electric network fault by Outage Management Systems, this electric network fault is marked to the relevant position of map, after receiving the state status of utilizing Maintenance Resource reparation electric network fault of electric network fault maintenance terminal feedback, this state status is presented in to the electric network fault position of mark on map.
6. the Restoring System of Power System Faults based on the Outage Management Systems platform, it is characterized in that, this system comprises: Outage Management Systems and electric network fault maintenance terminal, described Outage Management Systems comprises electric network fault determining unit, Maintenance Resource allocation units and allocation result transmitting element, described electric network fault maintenance terminal comprises the fault restoration unit, wherein:
Described electric network fault determining unit, for determining electric network fault;
Described Maintenance Resource allocation units, for the Maintenance Resource with this zone association according to the distribution of described electric network fault region;
Described allocation result transmitting element, send to the electric network fault maintenance terminal for the result that will distribute Maintenance Resource;
Described fault restoration unit, repair electric network fault for utilize Maintenance Resource according to indication.
7. system according to claim 6, it is characterized in that, described Outage Management Systems also comprises information memory cell, for the real-time position information of storing electrical network abort situation information and Maintenance Resource, described Maintenance Resource allocation units specifically comprise: subelement, resource selection subelement are determined in zone, wherein:
Subelement is determined in described zone, for according to the electric network fault positional information, determining the electric network fault region, according to the real-time position information of Maintenance Resource, determines the electric network fault region under Maintenance Resource;
Described resource selection subelement, for selecting Maintenance Resource in the electric network fault region as the Maintenance Resource of distributing to electric network fault.
8. system according to claim 6, is characterized in that, if the definite electric network fault of described electric network fault determining unit comprises when a plurality of, described Outage Management Systems also comprises fault judging unit and fault merge cells, wherein:
Whether described fault judging unit, exist the electric network fault to identical electrical network trouble spot for judging a plurality of electric network faults, if exist, triggers the fault merge cells;
Described fault merge cells, for being merged the electric network fault of identical electrical network trouble spot.
9. according to any one described system in claim 6 to 8, it is characterized in that, described electric network fault maintenance terminal also comprises the state status feedback unit, for fault restoration unit by using Maintenance Resource is repaired to the state status Real-time Feedback of electric network fault to Outage Management Systems.
10. system according to claim 9, is characterized in that, described Outage Management Systems also comprises that mark represents unit, for after determining electric network fault, this electric network fault is marked to the relevant position of map; Also, for after receiving the state status of utilizing Maintenance Resource reparation electric network fault of electric network fault maintenance terminal feedback, this state status is presented in to the electric network fault position of mark on map.
CN2012105165158A 2012-11-30 2012-11-30 Power grid failure recovery method and system based on power failure management system platform Pending CN102938113A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105165158A CN102938113A (en) 2012-11-30 2012-11-30 Power grid failure recovery method and system based on power failure management system platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105165158A CN102938113A (en) 2012-11-30 2012-11-30 Power grid failure recovery method and system based on power failure management system platform

Publications (1)

Publication Number Publication Date
CN102938113A true CN102938113A (en) 2013-02-20

Family

ID=47697007

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105165158A Pending CN102938113A (en) 2012-11-30 2012-11-30 Power grid failure recovery method and system based on power failure management system platform

Country Status (1)

Country Link
CN (1) CN102938113A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103440549A (en) * 2013-08-20 2013-12-11 国家电网公司 Power failure dispatching control system and control method thereof
CN103761625A (en) * 2014-02-13 2014-04-30 国家电网公司 Outage management system based on information exchange bus and data processing method thereof
CN103955409A (en) * 2014-05-04 2014-07-30 广东怡创科技股份有限公司 Method for operation dispatching
CN103955796A (en) * 2014-05-04 2014-07-30 广东怡创科技股份有限公司 Job resource dispatching method
CN105743688A (en) * 2015-05-11 2016-07-06 中国电力科学研究院 Centrality analysis-based power distribution and utilization communication network source distribution reconfigurable method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020046048A1 (en) * 2000-07-11 2002-04-18 Hidetada Fukushima System, method, computer program, and recording medium for machine-management
CN101488204A (en) * 2009-02-25 2009-07-22 中国网络通信集团公司 Task optimization scheduling system
CN102208048A (en) * 2011-03-15 2011-10-05 福建省电力有限公司 Technology support system of marketing and distribution integration power supply service and method thereof
CN202159369U (en) * 2011-06-08 2012-03-07 上海市电力公司 Information processing device for improving fault repairing work order merging rate of electrical power system
CN102646230A (en) * 2012-02-27 2012-08-22 广东电网公司深圳供电局 Information system for realizing fast power restoration management of power distribution network faults

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020046048A1 (en) * 2000-07-11 2002-04-18 Hidetada Fukushima System, method, computer program, and recording medium for machine-management
CN101488204A (en) * 2009-02-25 2009-07-22 中国网络通信集团公司 Task optimization scheduling system
CN102208048A (en) * 2011-03-15 2011-10-05 福建省电力有限公司 Technology support system of marketing and distribution integration power supply service and method thereof
CN202159369U (en) * 2011-06-08 2012-03-07 上海市电力公司 Information processing device for improving fault repairing work order merging rate of electrical power system
CN102646230A (en) * 2012-02-27 2012-08-22 广东电网公司深圳供电局 Information system for realizing fast power restoration management of power distribution network faults

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103440549A (en) * 2013-08-20 2013-12-11 国家电网公司 Power failure dispatching control system and control method thereof
CN103761625A (en) * 2014-02-13 2014-04-30 国家电网公司 Outage management system based on information exchange bus and data processing method thereof
CN103955409A (en) * 2014-05-04 2014-07-30 广东怡创科技股份有限公司 Method for operation dispatching
CN103955796A (en) * 2014-05-04 2014-07-30 广东怡创科技股份有限公司 Job resource dispatching method
CN103955409B (en) * 2014-05-04 2017-05-17 广东海格怡创科技有限公司 Method for operation dispatching
CN105743688A (en) * 2015-05-11 2016-07-06 中国电力科学研究院 Centrality analysis-based power distribution and utilization communication network source distribution reconfigurable method

Similar Documents

Publication Publication Date Title
CN102938113A (en) Power grid failure recovery method and system based on power failure management system platform
CN104751295A (en) Power distribution network repair mass texting work order processing platform and method
US20120130767A1 (en) Methods and Systems Involving Power System Grid Management
CN105184442A (en) Power distribution network dispatching management statistical analysis system
CN103714437A (en) Power line repair commanding method based on CIS and movable operation
CN102570602A (en) Fault comprehensive processing platform and method of distribution network
EP2472455A1 (en) Method and system for outage restoration
CN102594604A (en) Operation and maintenance management system and method
CN112308246A (en) Power failure notification method and system
HUE032333T2 (en) Method and apparatus for spatiotemporal control of the electric power draw of a telecommunication network on the basis of states of the power supply system
CN104156900A (en) Smart water plant management information monitoring system
CN203193387U (en) Information automatic publishing device based on power distribution network automatic control system
CN104953707A (en) Intelligent error prevention method and system for monitoring operation order
CN103605867A (en) Ship electric system failure recovery method based on multi-agent technology
CN101976886B (en) Distributed data collection partitioning mutual backup method for power dispatching automation system
CN104468586A (en) Photovoltaic power station remote intelligent monitoring communication method based on MODBUS protocol
Li et al. Collaborative cyber-physical restoration for enhancing the resilience of power distribution systems
CN103034932A (en) Multifunctional integrated power failure management system
CN105227639A (en) A kind of transformer station's remote pictures transfer approach and the alarm of a kind of transformer station direct transfer method
CN102185299A (en) Method and device for processing failures of multi-scheme distribution network
CN106655520B (en) Ensure the method that relay protection remote operation securely and reliably executes
CN105743695A (en) Monitoring method and system based on IEC 104 protocol
CN106557986B (en) Photovoltaic power station equipment maintenance method
CN113673903B (en) Task management system for off-site nuclear emergency and control method thereof
CN104657907A (en) Power system information processing method, device and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130220