CN102927863A - 一种全岩巷道***施工的新方法 - Google Patents

一种全岩巷道***施工的新方法 Download PDF

Info

Publication number
CN102927863A
CN102927863A CN2011102378482A CN201110237848A CN102927863A CN 102927863 A CN102927863 A CN 102927863A CN 2011102378482 A CN2011102378482 A CN 2011102378482A CN 201110237848 A CN201110237848 A CN 201110237848A CN 102927863 A CN102927863 A CN 102927863A
Authority
CN
China
Prior art keywords
stemming
cannelure
borehole
annular grooves
priming
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102378482A
Other languages
English (en)
Other versions
CN102927863B (zh
Inventor
李立华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201110237848.2A priority Critical patent/CN102927863B/zh
Publication of CN102927863A publication Critical patent/CN102927863A/zh
Application granted granted Critical
Publication of CN102927863B publication Critical patent/CN102927863B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

一种全岩巷道***施工的新方法,本发明涉及到井巷***施工的技术领域,它包括环形槽、炮眼、电***、矿用***、速凝胶、炮泥、放炮线、发爆器等。其特征是:在用特种钻机垂直于工作面钻出的环形槽的内部和外部分别布置与环形槽槽壁的母线平行的炮眼。装药时,对于环形槽内部的炮眼,先装瞬发电***的引药和***,再依次装炮泥、速凝胶和炮泥,或者先装瞬发电***的引药和***,再依次装炮泥、速凝胶、炮泥,延期电***的引药、***和炮泥;对于环形槽外部的炮眼,先装延期时间大于环形槽内部炮眼里电***延期时间的电***的引药,后装炮泥。装药后用普通串联或并联方法连炮和起爆。***后可将环形槽内的岩柱或抛出并崩碎,用这种方法***,不但可以提供必要的岩石碎胀空间实现中深孔***,还可以提高掘进速度0.5-1倍以上。

Description

一种全岩巷道***施工的新方法
技术领域:
本发明涉及到井巷***施工方法。
背景技术:
目前国内外全岩巷道***技术施工钻眼量大,费时、费力、费火药,掘进速度低,多数矿井采掘失调,调整困难,特别是中深孔和深孔***技术由于没有办法解决掏槽问题而不能很好的应用,总的来看,现有的全岩巷道***存在如下缺点:
1、钻眼数量多,装药多,起爆次数多。
2、浪费火药多。
3、产生的有害气体多。
4、***能量大,易导致围岩破碎、冒顶片帮。
5、施工时间长,效率低。
发明内容:
本发明在于设计出一种全岩巷道***施工速度快,效率高,实现中深孔***容易,节省火药,保护围岩效果好的新方法。
本发明的技术方案是:一种全岩巷道***施工的新方法,它包括环形槽、炮眼、瞬发电***、延期电***、矿用***、速凝胶、炮泥、放炮线、发爆器、掏耳勺、冲孔水管和炮棍等。其特征是:在用特种钻机垂直于工作面钻出的环形槽的内部和外部分别布置与环形槽的母线平行的炮眼。环形槽内部的炮眼深度大于环形槽的深度,环形槽外部的炮眼深度与环形槽的深度相等。用掏耳勺和清孔水管清孔后,环形槽内部的炮眼先装瞬发引药和***,再依次装炮泥、速凝胶、炮泥。环形槽外部的炮眼,先装延期电***的引药和***,再装炮泥,装完炮后采用普通的串联或并联方法连炮并可以使环形槽内外的炮眼一次起爆。***时环形槽内部的瞬发引药及***产生的爆轰波将环形槽内底部的岩柱崩断,并靠高温气体产生的压力将环形槽内的岩柱抛出槽外,随后环形槽外部的炮眼起爆,崩落环形槽外部的岩石。
本发明还可以这样实现:
一种岩石巷道***施工的新方法,它包括环形槽、炮眼、瞬发电***、延期电***、矿用***、速凝胶、炮泥、放炮线、发爆器、掏耳勺、冲孔水管和炮棍等。其特征是:在用特种钻机垂直于工作面钻出的环形槽的内部和外部分别布置与环形槽的母线平行的炮眼。环形槽内部的炮眼深度大于环形槽的深度,环形槽外部的炮眼深度与环形槽的深度相等。用掏耳勺和清孔水管清孔后,环形槽内部的炮眼先装瞬发引药和***,再依次装炮泥、速凝胶、炮泥、***、延期电***的引药和炮泥,环形槽外部的炮眼,先装延期时间大于环形槽内部炮眼内电***的延期时间的引药和***,再装炮泥,装完炮泥后采用普通的方法连炮并可以使环形槽内外的炮眼一次起爆。***时环形槽内部的瞬发引药及***产生的爆轰波将环形槽内底部的岩柱崩断,并靠高温气体产生的压力将环形槽内的岩柱抛出槽外并崩碎。环形槽外部的炮眼随后起爆,崩落环形槽外部的岩石。
本发明的主要特点:
1、在工作面首先布置环形槽,把工作面岩体分割成圆柱状结构,在炮眼的周围形成全方位的自由面,改变了***时岩石的受力状态,所以可以达到一炮成洞,两炮成槽的效果。
2、为深孔***提供了破碎岩石膨胀的自由空间。
3、可以实现直眼***,提高炮眼利用率。
4、炮眼崩落岩石的效率高。
5、减少炮眼个数,缩短钻眼时间,节约火药用量,***时产生的有害气体少,减少通风吹散炮烟所用的时间。
6、可以大幅度的提高掘进速度,降低掘进成本,为解决矿井采掘失调开辟出新的途径。
附图说明:
图1:本发明环形槽及炮眼布置具体实施方式的结构示意图
图2:本发明环形槽内炮眼(2)装药结构的具体实施方式示意图
图3:本发明环形槽内炮眼(2)装药结构的具体实施方式示意图
图4:本发明环形槽外炮眼(3)装药结构的具体实施方式示意图
图5:本发明***作业具体实施方式示意图
1、环形槽     2、环形槽内部的炮眼    3、环形槽外部的炮眼
4、***    5、瞬发电***    6、速凝胶    7、炮泥
8、延期时间较短的电***  9、延期时间较长的电***  10、***脚线
11、连接线    12、母线    13、放炮线    14、放炮器
下面结合附图对本发明作进一步描述
具体实施方式:
1、参见图1,a图为环形槽(1)、环形槽内部的炮眼(2)和环形槽外部炮眼(3)的主视图,b图为其侧视图。
参见图2,图2为炮眼(2)的装药结构图,其中(5)为瞬发电***,(4)为***,(6)为速凝胶,(7)为炮泥,(9)为***脚线。
参见图4,图4为炮眼(3)的装药结构图,其中(10)为延期时间较长的电***,(4)为***,(7)为炮泥,(9)为***脚线。
参见图5,图5为***作业图,其中2个环形槽内部的炮眼(2)和3个环形槽外部的炮眼(3)通过脚线(10)在a、b两点并联于连接线(11)上,连接线在c、d两点与母线(12)一端相连接,母线的另一端在e点与放炮线(13)的一端连接,放炮线的另一端与放炮器(14)通过接线柱f、g连接。起动放炮器通电***。
2、参见图1,a图为环形槽(1)、环形槽内部的炮眼(2)和环形槽外部炮眼(3)的主视图,b图为其侧视图。
参见图3,图3为炮眼(2)的装药结构图,其中(5)为瞬发电***,(4)为***,(6)为速凝胶,(7)为炮泥,(8)为延期时间较短的电***,(9)为***脚线。
参见图4,图4为炮眼(3)的装药结构图,(4)为***,(7)为炮泥,(9)为***脚线,(10)为延期时间较长的电***。
参见图5,图5为其中2个环形槽内部的炮眼(2)和3个环形槽外部的炮眼(3)通过脚线(10)在a、b两点并联于连接线(11)上,连接线在c、d两点与母线(12)一端相连接,母线的另一端在e点与放炮线(13)的一端连接,放炮线的另一端与放炮器(14)通过接线柱f、g连接。起动放炮器通电***。

Claims (3)

1.一种全岩巷道***施工的新方法,它包括用特种钻机垂直于工作面钻出的环形槽、炮眼、电***、矿用***、速凝胶、炮泥、放炮线、掏耳勺、冲孔水管、炮棍和发爆器等,其特征在于,在环形槽的内部和外部分别布置与环形槽槽壁的母线平行的炮眼,起爆时先起爆环形槽内部的炮眼,后起爆环形槽外部的炮眼。
2.根据权利要求1所述的一种全岩巷道***施工的新方法,其特征在于环形槽内部炮眼的装药方法为:先装瞬发电***的引药和***,再依次装炮泥、速凝胶、炮泥。
3.根据权利要求1所述的一种全岩巷道***施工的新方法,其特征在于环形槽内部炮眼的装药方法为:先装瞬发电***的引药和***,再依次装炮泥、速凝胶、炮泥、延期电***的引药、炮泥。
CN201110237848.2A 2011-08-11 2011-08-11 一种全岩巷道***施工的新方法 Expired - Fee Related CN102927863B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110237848.2A CN102927863B (zh) 2011-08-11 2011-08-11 一种全岩巷道***施工的新方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110237848.2A CN102927863B (zh) 2011-08-11 2011-08-11 一种全岩巷道***施工的新方法

Publications (2)

Publication Number Publication Date
CN102927863A true CN102927863A (zh) 2013-02-13
CN102927863B CN102927863B (zh) 2016-08-24

Family

ID=47642724

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110237848.2A Expired - Fee Related CN102927863B (zh) 2011-08-11 2011-08-11 一种全岩巷道***施工的新方法

Country Status (1)

Country Link
CN (1) CN102927863B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107178389A (zh) * 2017-06-21 2017-09-19 永城煤电控股集团有限公司 煤矿瓦斯抽采深孔预裂***增透装置及其方法
CN107762399A (zh) * 2017-11-24 2018-03-06 中交第二航务工程局有限公司 ***配合旋挖钻机深层一次成孔施工方法
CN108692622A (zh) * 2018-03-28 2018-10-23 中交公局第三工程有限公司 一种隧道光面***的方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010025583A1 (en) * 1999-12-31 2001-10-04 Shim Dong Soo Center-cut blasting method for tunnel excavation utilizing large unloaded blast holes and a circular pre-split
CN101266123A (zh) * 2007-03-15 2008-09-17 鞍钢集团矿业公司 一种破碎站基坑掘凿方法
CN101441055A (zh) * 2008-12-31 2009-05-27 中煤平朔煤业有限责任公司 一种预裂***方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010025583A1 (en) * 1999-12-31 2001-10-04 Shim Dong Soo Center-cut blasting method for tunnel excavation utilizing large unloaded blast holes and a circular pre-split
CN101266123A (zh) * 2007-03-15 2008-09-17 鞍钢集团矿业公司 一种破碎站基坑掘凿方法
CN101441055A (zh) * 2008-12-31 2009-05-27 中煤平朔煤业有限责任公司 一种预裂***方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107178389A (zh) * 2017-06-21 2017-09-19 永城煤电控股集团有限公司 煤矿瓦斯抽采深孔预裂***增透装置及其方法
CN107178389B (zh) * 2017-06-21 2018-12-21 永城煤电控股集团有限公司 煤矿瓦斯抽采深孔预裂***增透装置及其方法
CN107762399A (zh) * 2017-11-24 2018-03-06 中交第二航务工程局有限公司 ***配合旋挖钻机深层一次成孔施工方法
CN108692622A (zh) * 2018-03-28 2018-10-23 中交公局第三工程有限公司 一种隧道光面***的方法

Also Published As

Publication number Publication date
CN102927863B (zh) 2016-08-24

Similar Documents

Publication Publication Date Title
CN103940309B (zh) 一种井下***成井的方法
CN102878876B (zh) 一种矿井平巷掘进掏槽方法及***主要参数
CN102808622B (zh) 中深孔、深孔联合***技术回收矿柱的方法
CN108007285B (zh) 一种岩石巷道深孔分阶分段高效掏槽***方法
CN103244180B (zh) 一种留小煤柱沿空掘巷围岩控制方法
CN106091848B (zh) 一种实现超长、大倾角隧道锚上台阶***的方法
CN105333778A (zh) 中深孔大断面复合掏槽***结构及方法
CN104482816B (zh) 一种立井周边切缝药包梯度预裂***方法及装置
CN103063094A (zh) 一种井巷快速***的掏槽方法
CN102927866B (zh) 一种露天台阶***控制爆堆前冲的***方法
CN104819670B (zh) 预钻中孔竖井开挖***方法
CN103195466A (zh) 一种定向水压***提高煤层透气性的方法
CN102401616A (zh) 立井***掘进方法
CN108132005B (zh) 一种中深孔上向孔内微差***的方法
CN104406470B (zh) 西部白垩系软岩地区大直径冻结井筒深孔掏槽***方法
CN102168543A (zh) 一种通过***方式增加页岩气采收率的方法及装置
CN101419040A (zh) 大孔径复合掏槽中深孔***方法
CN110067558A (zh) 一种急倾斜特厚煤层回采巷道联合卸压防治冲击矿压方法
CN102967191A (zh) 处理采空区的***方法
CN108362179A (zh) 一种星形节能掏槽方法
CN106643355B (zh) 一种深部煤矿巨厚坚硬顶板的强制放顶方法
CN209230424U (zh) 一种复合型***掏槽
CN102927863B (zh) 一种全岩巷道***施工的新方法
CN102374833A (zh) 矿井平巷掘进***方法
CN103307941A (zh) 一种提高矿山平巷掘进掏槽***效果的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 302 room 3, unit 49, Xiangyang District, pointed mountain, Heilongjiang, Shuangyashan 155100, China

Applicant after: Li Lihua

Address before: 155100 Shuangyashan Province, sharp mountain city, the emerging street, No. 60

Applicant before: Li Lihua

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Li Lihua

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Li Lihua

Document name: Notice of termination of patent right

DD01 Delivery of document by public notice
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

Termination date: 20210811

CF01 Termination of patent right due to non-payment of annual fee