CN102926403A - 盖挖法顶板施工方法 - Google Patents

盖挖法顶板施工方法 Download PDF

Info

Publication number
CN102926403A
CN102926403A CN2012104583823A CN201210458382A CN102926403A CN 102926403 A CN102926403 A CN 102926403A CN 2012104583823 A CN2012104583823 A CN 2012104583823A CN 201210458382 A CN201210458382 A CN 201210458382A CN 102926403 A CN102926403 A CN 102926403A
Authority
CN
China
Prior art keywords
excavation
construction
concrete
support
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012104583823A
Other languages
English (en)
Other versions
CN102926403B (zh
Inventor
吴天凯
亓立刚
赵北航
王海
崔爱珍
郭凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201210458382.3A priority Critical patent/CN102926403B/zh
Publication of CN102926403A publication Critical patent/CN102926403A/zh
Application granted granted Critical
Publication of CN102926403B publication Critical patent/CN102926403B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本发明公开了一种盖挖法顶板施工方法,包括以下步骤:1)从自然地坪向下开挖土方至施工要求标高;2)平整开挖面,在该开挖面上浇筑混凝土施工垫层;3)待所述混凝土施工垫层满足设计强度后,在该混凝土施工垫层上搭设模板支撑架;4)在该模板支撑架上铺设模板;5)在该模板上浇筑混凝土梁板;6)待该混凝土梁板满足设计强度后,拆除所述模板支撑架与所述模板,破除所述混凝土施工垫层,进行下步土方开挖。本发明结合了盖挖和明挖的施工优势,既利用盖挖节约施工空间,又充分利用明挖支撑架体支模施工优势,加快了盖挖结构顶板的施工效率,提高了下步土方的开挖速度,保证了结构顶板的混凝土观感和施工质量,确保了下步工序的施工安全。

Description

盖挖法顶板施工方法
技术领域
本发明关于一种顶板施工方法,尤其是指一种盖挖法顶板施工方法。
背景技术
盖挖法作为一种应用在城市交通繁忙地带施工地下车站、地下广场等地下结构的施工方法,在城市地下空间的建设中得到了广泛的推广应用。随着城市对地下空间深度和广度的拓展,地下结构的使用功能使得结构的梁板截面越来越大。常规盖挖法采用地膜施工结构顶板,土方开挖后往往造成结构顶板混凝土外观较差,地膜垫层和黏附在结构顶板下部的模板的脱落为后续的土方开挖带了施工困难和安全风险。同时,根据施工经验盖挖法土方开挖速度较明挖法施工速度慢,成本高。由于地下结构顶板截面尺寸随着使用功能的拓展要求越来越大,支模体系对下部承载结构的承载力要求就越来越高,尤其在富水软土地区的地下铁道工程中,超厚顶板、超大截面梁施工采用地膜施工难度加大,地膜易发生不均匀沉降,而影响大截面梁板的施工质量。
发明内容
有鉴于上述问题,本发明提供了一种盖挖法顶板施工方法,包括以下步骤:
1)从自然地坪向下开挖土方至施工要求标高;
2)平整开挖面,在该开挖面上浇筑混凝土施工垫层;
3)待所述混凝土施工垫层满足设计强度后,在该混凝土施工垫层上搭设模板支撑架;
4)在该模板支撑架上铺设模板;
5)在该模板上浇筑混凝土梁板;
6)待该混凝土梁板满足设计强度后,拆除所述模板支撑架与所述模板,破除所述混凝土施工垫层,进行下步土方开挖。
进一步的,在所述混凝土施工垫层上搭设所述模板支撑架后,对所述模板支撑架进行加固。
进一步的,在所述模板支撑架上铺设所述模板后,在所述模板上绑扎梁板钢筋,支设梁板侧模。
进一步的,平整所述开挖面后,根据地层含水情况在所述开挖面上留置排水盲沟。
进一步的,在所述开挖面上浇筑所述混凝土施工垫层时,选择强度C15或C20普通硅酸盐混凝土浇筑100mm至200mm厚。
进一步的,待所述混凝土施工垫层的强度达到70%以上后,在开挖的基坑内放出所述混凝土梁板的定位线,根据该定位线搭设所述模板支撑架。
进一步的,所述模板支撑架选择承插型盘扣式脚手架、碗口式钢管脚手架或扣件式钢管脚手架。
本发明的盖挖法顶板施工方法的有益效果是:结合了盖挖和明挖的施工优势,既利用盖挖节约施工空间,又充分利用明挖支撑架体支模施工优势,加快了盖挖结构顶板的施工效率,提高了下步土方的开挖速度,保证了结构顶板的混凝土观感和施工质量,确保了下步工序的施工安全。
附图说明
图1是本发明盖挖法顶板施工方法的流程图。
图2是本发明盖挖法顶板施工方法开挖前结构顶板的结构示意图。
图3是本发明盖挖法顶板施工方法开挖至施工要求标高后的结构示意图。
图4是本发明盖挖法顶板施工方法搭设模板支撑架后的结构示意图。
图5是本发明盖挖法顶板施工方法铺设模板后的结构示意图。
图6是本发明盖挖法顶板施工方法浇筑混凝土梁板后的结构示意图。
具体实施方式
配合参看图1所示,是本发明盖挖法顶板施工方法的流程图,包括以下步骤:
1)结合图2所示,从自然地坪10向下开挖土方至施工要求标高,优选的开挖至结构顶板标高以下3m至5m;
2)结合图3所示,平整开挖面,在该开挖面上浇筑混凝土施工垫层20;进一步的,平整所述开挖面后,根据地层含水情况在所述开挖面上留置排水盲沟21。进一步的,在所述开挖面上浇筑所述混凝土施工垫层20时,选择强度C15或C20普通硅酸盐混凝土浇筑100mm至200mm厚。
3)结合图4所示,待所述混凝土施工垫层20满足设计强度后,在该混凝土施工垫层20上搭设模板支撑架30;进一步的,在所述混凝土施工垫层20上搭设所述模板支撑架30后,对所述模板支撑架30进行加固。进一步的,待所述混凝土施工垫层20的强度达到70%以上后,在开挖的基坑内放出将要浇筑的混凝土梁板的定位线,根据该定位线搭设所述模板支撑架30。进一步的,所述模板支撑架30选择承插型盘扣式脚手架、碗口式钢管脚手架或扣件式钢管脚手架。所述模板支撑架30优先选择承插型盘扣式脚手架。
4)结合图5所示,在该模板支撑架30上铺设模板40与模板支撑的龙骨;进一步的,在所述模板支撑架30上铺设所述模板40后,在所述模板40上绑扎梁板钢筋,支设梁板侧模。
5)结合图6所示,在该模板40上浇筑混凝土梁板50;
6)待该混凝土梁板50满足设计强度后,拆除所述模板支撑架30与所述模板40,破除所述混凝土施工垫层20,即可进行下步土方开挖。
以上所述仅是本发明的较佳实施例而已,并非对本发明做任何形式上的限制,虽然本发明已以较佳实施例揭露如上,然而并非用以限定本发明,任何熟悉本专业的技术人员,在不脱离本发明技术方案的范围内,当可利用上述揭示的技术内容作出些许更动或修饰为等同变化的等效实施例,但凡是未脱离本发明技术方案的内容,依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。

Claims (7)

1.一种盖挖法顶板施工方法,其特征在于包括以下步骤:
1)从自然地坪向下开挖土方至施工要求标高;
2)平整开挖面,在该开挖面上浇筑混凝土施工垫层;
3)待所述混凝土施工垫层满足设计强度后,在该混凝土施工垫层上搭设模板支撑架;
4)在该模板支撑架上铺设模板;
5)在该模板上浇筑混凝土梁板;
6)待该混凝土梁板满足设计强度后,拆除所述模板支撑架与所述模板,破除所述混凝土施工垫层,进行下步土方开挖。
2.如权利要求1所述的盖挖法顶板施工方法,其特征在于在所述混凝土施工垫层上搭设所述模板支撑架后,对所述模板支撑架进行加固。
3.如权利要求1或2所述的盖挖法顶板施工方法,其特征在于在所述模板支撑架上铺设所述模板后,在所述模板上绑扎梁板钢筋,支设梁板侧模。
4.如权利要求3所述的盖挖法顶板施工方法,其特征在于平整所述开挖面后,根据地层含水情况在所述开挖面上留置排水盲沟。
5.如权利要求4所述的盖挖法顶板施工方法,其特征在于在所述开挖面上浇筑所述混凝土施工垫层时,选择强度C15或C20普通硅酸盐混凝土浇筑100mm至200mm厚。
6.如权利要求5所述的盖挖法顶板施工方法,其特征在于待所述混凝土施工垫层的强度达到70%以上后,在开挖的基坑内放出所述混凝土梁板的定位线,根据该定位线搭设所述模板支撑架。
7.如权利要求6所述的盖挖法顶板施工方法,其特征在于所述模板支撑架选择承插型盘扣式脚手架、碗口式钢管脚手架或扣件式钢管脚手架。
CN201210458382.3A 2012-11-15 2012-11-15 盖挖法顶板施工方法 Active CN102926403B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210458382.3A CN102926403B (zh) 2012-11-15 2012-11-15 盖挖法顶板施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210458382.3A CN102926403B (zh) 2012-11-15 2012-11-15 盖挖法顶板施工方法

Publications (2)

Publication Number Publication Date
CN102926403A true CN102926403A (zh) 2013-02-13
CN102926403B CN102926403B (zh) 2015-07-08

Family

ID=47641320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210458382.3A Active CN102926403B (zh) 2012-11-15 2012-11-15 盖挖法顶板施工方法

Country Status (1)

Country Link
CN (1) CN102926403B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741714A (zh) * 2013-12-09 2014-04-23 中国建筑第二工程局有限公司 地下工程全盖挖逆作法施工方法
CN108149922A (zh) * 2017-12-29 2018-06-12 上海市机械施工集团有限公司 一种适用于逆作法施工结构顶板的无排模板施工方法
CN112663619A (zh) * 2020-11-18 2021-04-16 中铁二局集团有限公司 一种基坑盖板及支护体系施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4008577A (en) * 1974-10-31 1977-02-22 Bingham Sidney H Cut and cover construction of subway with utility chamber and air conditioning with minimum street traffic disturbance
CN1687536A (zh) * 2005-06-07 2005-10-26 上海市城市建设设计研究院 利用既有地下室顶板作为天然盖板的暗挖加层施工方法
CN101235649A (zh) * 2008-02-22 2008-08-06 上海市政工程设计研究总院 一种盖挖基坑***
CN101761092A (zh) * 2009-12-30 2010-06-30 中铁十二局集团第二工程有限公司 大跨度深基坑可移动整体大模板侧墙施工方法
CN102477745A (zh) * 2010-11-28 2012-05-30 中建七局第四建筑有限公司 一种梁板结构分体施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4008577A (en) * 1974-10-31 1977-02-22 Bingham Sidney H Cut and cover construction of subway with utility chamber and air conditioning with minimum street traffic disturbance
CN1687536A (zh) * 2005-06-07 2005-10-26 上海市城市建设设计研究院 利用既有地下室顶板作为天然盖板的暗挖加层施工方法
CN101235649A (zh) * 2008-02-22 2008-08-06 上海市政工程设计研究总院 一种盖挖基坑***
CN101761092A (zh) * 2009-12-30 2010-06-30 中铁十二局集团第二工程有限公司 大跨度深基坑可移动整体大模板侧墙施工方法
CN102477745A (zh) * 2010-11-28 2012-05-30 中建七局第四建筑有限公司 一种梁板结构分体施工方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李良生: "深圳地铁岗厦站某路段盖挖半逆作法施工技术", 《西部探矿工程》 *
荣际泉: "某工程超高、大跨度梁板模板支撑架体设计与施工技术", 《建筑安全》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741714A (zh) * 2013-12-09 2014-04-23 中国建筑第二工程局有限公司 地下工程全盖挖逆作法施工方法
CN103741714B (zh) * 2013-12-09 2016-09-14 中国建筑第二工程局有限公司 地下工程全盖挖逆作法施工方法
CN108149922A (zh) * 2017-12-29 2018-06-12 上海市机械施工集团有限公司 一种适用于逆作法施工结构顶板的无排模板施工方法
CN108149922B (zh) * 2017-12-29 2023-06-16 上海市机械施工集团有限公司 一种适用于逆作法施工结构顶板的无排模板施工方法
CN112663619A (zh) * 2020-11-18 2021-04-16 中铁二局集团有限公司 一种基坑盖板及支护体系施工方法

Also Published As

Publication number Publication date
CN102926403B (zh) 2015-07-08

Similar Documents

Publication Publication Date Title
CN105041349B (zh) 一种在地铁区间盾构隧道基础上扩挖车站的暗挖施工方法
CN106907159B (zh) 一种浅埋暗挖地铁车站分离开敞式结构及其施工方法
CN101914925B (zh) 利用优化复合预制拱墙作外墙的地下室
CN104452809B (zh) 一种超浅埋隧道盖挖施工方法
CN108487252A (zh) 一种深基坑明挖顺作施工方法
CN104674846A (zh) 一种利用预制结构盖挖地铁车站的施工方法
CN101418569B (zh) 预制拱片、支护与主体结构结合的优化复合拱墙
CN103981898A (zh) 一种整体明挖节点逆作的地下工程施工方法
CN102966114A (zh) 塔机基础结构及其施工方法
CN102864946B (zh) 型钢加水平拉结杆件支撑既有建筑增设多层地下室工艺
CN107542115A (zh) 地下工程防水结构及其施工方法
CN109183848B (zh) 一种隧道设计和建设方法
CN103103988A (zh) 利用中心岛楼板水平支撑结构的基坑施工方法
CN105839946A (zh) 砖混结构建筑物提升增层方法
CN109750571A (zh) 一种道路塌方应急与永久支挡一体化结构及施工方法
CN109208654A (zh) 牛腿式冠梁与斜型压顶梁组合的抗浮体系及其施工方法
CN110159294A (zh) 一种高陡地形桥隧相接段接长明洞施工方法
CN110004991A (zh) 基于外凸式翼脚板的地下结构抗浮体系及构建方法
CN206752667U (zh) 一种地下室挡墙结构
CN102808627A (zh) 钢管棚暗挖施工方法
CN104652495B (zh) 基坑内支撑立柱与底板节点防水施工工艺
CN102926403B (zh) 盖挖法顶板施工方法
CN204282399U (zh) 一种地铁围护结构
CN204825923U (zh) 一种接力式基坑支护结构
CN105040707A (zh) 用作地下室外墙的组合密排桩深基坑支护围护结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant