CN102926387A - Mounting and guiding device and positioning method for underwater circuit purlins of steel sheet pile cofferdam - Google Patents

Mounting and guiding device and positioning method for underwater circuit purlins of steel sheet pile cofferdam Download PDF

Info

Publication number
CN102926387A
CN102926387A CN2012104047690A CN201210404769A CN102926387A CN 102926387 A CN102926387 A CN 102926387A CN 2012104047690 A CN2012104047690 A CN 2012104047690A CN 201210404769 A CN201210404769 A CN 201210404769A CN 102926387 A CN102926387 A CN 102926387A
Authority
CN
China
Prior art keywords
purlin
steel sheet
sheet pile
enclose
encloses
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012104047690A
Other languages
Chinese (zh)
Other versions
CN102926387B (en
Inventor
李鉴
连井龙
丁勇
胡俊
孙晓伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201210404769.0A priority Critical patent/CN102926387B/en
Publication of CN102926387A publication Critical patent/CN102926387A/en
Application granted granted Critical
Publication of CN102926387B publication Critical patent/CN102926387B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses a mounting and guiding device and a positioning method for underwater circuit purlins of a steel sheet pile cofferdam. The mounting and guiding device comprises vertical guide beams, an upper end transverse support arranged on the inner sides of the tops of the vertical guide beams, a lower end transverse support arranged on the inner sides of the bottoms of the vertical guide beams and elevation positioning brackets arranged on the outer sides of the bottoms of the vertical guide beams; and guide beam lower end supporting arc plates are arranged on the inner sides of the lower end transverse support. According to the mounting and guiding device, single layers of circuit purlins are wholly manufactured in the back, the vertical guide beams are arranged by relying on drilling pile steel casings, the distance among all layers of circuit purlins is guaranteed by vertical supporting rods among the circuit purlins, and the steel sheet pile circuit purlins are wholly arranged layer by layer from bottom to top, so that the technical problems that before steel sheet piles are inserted and knocked, the underwater circuit purlins are invisible during mounting and difficult to position, and the distance among the circuit purlins is difficult to control in the prior art are solved; and the mounting and guiding device and the positioning method have the advantages that the circuit purlin mounting speed is high, and the positioning precision is high.

Description

Steel sheet-pile cofferdam encloses purlin installation and guide device and localization method under water
Technical field
The present invention relates to steel sheet-pile cofferdam and enclose purlin installation Technology field under water, be specifically related to a kind of steel sheet-pile cofferdam and enclose purlin installation and guide device and localization method under water.
Technical background
For the profundal zone steel sheet pile cofferdam construction, traditional job practices is that interim guiding device is set before the inserted to play steel sheet pile, after steel sheet pile inserted to play closure, adopts contrary sequence method, and cofferdam and support bar from top to bottom successively are installed while drawing water.Steel sheet pile is along with the carrying out of pump process, and distortion builds up increase, and internal force increases, and in order to control the deformation and internal stresses of its pump process Steel Sheet Pile, generally is to adopt the mode of enclosing the purlin support system that arranges of encrypting.This has just caused enclosing purlin and has supported more, construct complicated, long construction period.
Summary of the invention
The objective of the invention is for above-mentioned technical problem, provide a kind of steel sheet-pile cofferdam to enclose purlin installation and guide device and localization method under water, these apparatus and method can reduce the quantity of enclosing purlin, reduction of erection time.
For realizing this purpose, the designed steel sheet-pile cofferdam of the present invention encloses the purlin installation and guide device under water, comprise vertical nose girder, be arranged on vertical nose girder inside top the upper end horizontal support, be arranged on inboard, vertical nose girder bottom the lower end horizontal support, be arranged on the elevation location bracket in the vertical nose girder bottom outside, the inboard of described lower end horizontal support is provided with the nose girder lower end and supports arc.
The top of described elevation location bracket is provided with vertical cushion block.
A kind of utilize that above-mentioned steel sheet-pile cofferdam encloses the purlin installation and guide device under water enclose the purlin localization method, it is characterized in that, it comprises the steps:
Step 1: utilize the steel casing of the pier periphery of drilled pile construction stage use, as the guide pile of guiding device;
Step 2: enclose the absolute altitude of purlin and the design attitude of steel sheet-pile cofferdam according to the bottom steel sheet pile, guiding device upper end horizontal support is fixed on the corresponding position of steel casing, the nose girder lower end of guiding device is supported arc and is matched with the steel casing;
Step 3: be fixedly connected with bottom at the top that the bottom steel sheet pile encloses purlin in advance and enclose support bar between purlin;
Step 4: with the bottom steel sheet pile enclose purlin along vertical nose girder lifting, transfer to guiding device elevation location bracket top, again the top layer steel sheet pile is enclosed purlin along vertical nose girder lifting, transfer to bottom and enclose between purlin on the support bar;
Step 5: after steel sheet pile encloses the purlin installation, carry out the construction of steel sheet pile inserted to play, until steel sheet pile cofferdam construction is finished in closure.
Simultaneously be fixedly connected with the intermediate layer at the top that the intermediate layer steel sheet pile encloses purlin in advance in the described step 3 and enclose support bar between purlin; After the bottom steel sheet pile encloses purlin and is mounted to elevation location bracket top, the intermediate layer steel sheet pile is enclosed purlin lift to bottom and enclose between purlin on the support bar in the described step 4, then the top layer steel sheet pile is enclosed purlin and enclose to the intermediate layer between purlin on the support bar along vertical nose girder lifting.
Described intermediate layer steel sheet pile encloses purlin two, with first intermediate layer steel sheet pile enclose purlin lift enclose between purlin on the support bar to bottom after, second intermediate layer steel sheet pile enclosed purlin lifting enclose to the intermediate layer that first intermediate layer steel sheet pile encloses purlin between purlin on the support bar, then the top layer steel sheet pile is enclosed purlin and enclose to the intermediate layer that second intermediate layer steel sheet pile encloses purlin between purlin on the support bar along vertical nose girder lifting.
The top of described elevation location bracket arranges vertical cushion block, in the step 4 the bottom steel sheet pile is enclosed purlin along vertical nose girder lifting to vertical cushion block top.
Described bottom steel sheet pile encloses purlin, top layer steel sheet pile and encloses purlin and intermediate layer steel sheet pile and enclose purlin and be equipped with and enclose the purlin inner bracing piece.
The present invention adopts individual layer to enclose purlin at the back court integral manufacturing, relies on drilled pile steel casing that vertical nose girder is set, and the vertical supporting bar guarantees that each layer encloses the spacing of purlin between purlin by enclosing, and successively the integral installation steel sheet pile encloses purlin from the bottom to top.Overcome in the prior art before the steel sheet pile inserted to play, enclosed the purlin installation under water not visible, the location is difficult, and multilayer is enclosed the difficult technical problem of purlin spacing control.Realized enclosing the beneficial effect that the purlin installation rate is fast, positioning accuracy is high.
Description of drawings
Fig. 1 is structural representation corresponding to method part among the present invention;
Fig. 2 is that A-A of Fig. 1 is to the sectional structure schematic diagram;
Fig. 3 is the use status architecture schematic diagram that structure division is corresponding among the present invention;
Fig. 4 is that A-A of Fig. 3 is to structural representation;
Fig. 5 is that B-B of Fig. 3 is to structural representation;
Fig. 6 is the first installation flow chart of method part among the present invention;
Fig. 7 is the second installation flow chart of method part among the present invention;
Fig. 8 is the 3rd installation flow chart of method part among the present invention;
Fig. 9 is the 4th installation flow chart of method part among the present invention;
Wherein, 1-steel sheet pile, 2-steel sheet pile enclose purlin, 2.1-bottom steel sheet pile and enclose purlin, 2.2-top layer steel sheet pile and enclose purlin, 2.3-intermediate layer steel sheet pile and enclose purlin, 3-steel casing, 4-guiding device, 5-enclose purlin inner bracing piece, 6-steel sheet pile guiding slot port suitable for reading, 7-intermediate layer and enclose support bar between purlin, 7.1-bottom and enclose support bar between purlin, 8-upper end horizontal support, 9-vertical nose girder, 10-vertical cushion block, 11-elevation location bracket, 12-lower end horizontal support, 13-nose girder lower end and support arc.
The specific embodiment
The present invention is described in further detail below in conjunction with drawings and Examples:
Steel sheet-pile cofferdam shown in Fig. 1 ~ 5 encloses the purlin installation and guide device under water, comprise vertical nose girder 9, be arranged on vertical nose girder 9 inside top upper end horizontal support 8, be arranged on inboard, vertical nose girder 9 bottom lower end horizontal support 12, be arranged on the elevation location bracket 11 in the vertical nose girder 9 bottoms outsides, the inboard of lower end horizontal support 12 is provided with the nose girder lower end and supports arc 13.Because the upper end of above-mentioned vertical nose girder 9 is welded on the steel casing 3 more than the water surface, just guaranteed the stable of self, it is in order to guarantee that vertical nose girder 9 is less in flow action lower swing amplitude that nose girder lower end support arc 13 is done camber.
In the technique scheme, the top of elevation location bracket 11 is provided with vertical cushion block 10.Be used for placing steel sheet pile on the vertical cushion block 10 and enclose the purlin assembly.
Above-mentioned upper end horizontal support 8, vertical nose girder 9, vertical cushion block 10, elevation location bracket 11 and lower end horizontal support 12 consist of guiding device 4
A kind of utilize that above-mentioned steel sheet-pile cofferdam encloses the purlin installation and guide device under water enclose the purlin localization method, shown in Fig. 6 ~ 8, it comprises the steps:
Step 1: utilize the steel casing 3 of the pier periphery of drilled pile construction stage use, as the guide pile of guiding device 4;
Step 2: enclose the absolute altitude of purlin 2.1 and the design attitude of steel sheet-pile cofferdam according to the bottom steel sheet pile, guiding device 4 upper end horizontal supports 8 are fixed on the corresponding position of steel casing 3, the nose girder lower end of guiding device 4 is supported arc 13 and is matched with steel casing 3;
Step 3: be fixedly connected with bottom at the top that the bottom steel sheet pile encloses purlin 2.1 in advance and enclose support bar 7.1 between purlin;
Step 4: with the bottom steel sheet pile enclose purlin 2.1 along vertical nose girder 9 liftings, transfer to guiding device 4 elevation location brackets 11 tops, again the top layer steel sheet pile is enclosed purlin 2.2 along vertical nose girder 9 liftings, transfer to bottom and enclose between purlin on the support bar 7.1; (this design is applicable to carry out the cofferdam at depth of water 4-7m place and encloses the purlin construction);
Step 5: after steel sheet pile encloses purlin 2 installations, carry out the construction of steel sheet pile 1 inserted to play, until steel sheet pile cofferdam construction is finished in closure.
In the above-mentioned steps 5, the construction of the inserted to play of steel sheet pile 1 utilizes steel sheet pile guiding slot port 6 guiding suitable for reading.The form of construction work of described steel sheet pile 1 is the construction of monolithic inserted to play.
In the step 3 of technique scheme: simultaneously be fixedly connected with the intermediate layer at the top that the intermediate layer steel sheet pile encloses purlin 2.3 in advance and enclose support bar 7 between purlin; In the described step 4 after the bottom steel sheet pile encloses purlin 2.1 and is mounted to elevation location bracket 11 tops, the intermediate layer steel sheet pile is enclosed purlin 2.3 to be lifted to bottom and encloses between purlin on the support bar 7.1, then the top layer steel sheet pile is enclosed purlin 2.2 and enclose to the intermediate layer between purlin on the support bar 7 along vertical nose girder 9 liftings, (this design be applicable to carry out at the depth of water 7 ~ 10m place cofferdam enclose purlin construct).
In the technique scheme, the intermediate layer steel sheet pile encloses purlin 2.3 two, with first intermediate layer steel sheet pile enclose purlin 2.3 lift enclose between purlin on the support bar 7.1 to bottom after, second intermediate layer steel sheet pile enclosed purlin 2.3 lifting to be enclosed to the intermediate layer that first intermediate layer steel sheet pile encloses purlin 2.3 between purlin on the support bar 7, then the top layer steel sheet pile is enclosed purlin 2.2 and enclose to the intermediate layer that second intermediate layer steel sheet pile encloses purlin 2.3 between purlin on the support bar 7 along vertical nose girder 9 liftings, (this design be applicable to carry out at the depth of water 10 ~ 15m place cofferdam enclose purlin construct).
In the technique scheme, the top of elevation location bracket 11 arranges vertical cushion block 10, in the step 4 the bottom steel sheet pile is enclosed purlin 2.1 along vertical nose girder 9 liftings to vertical cushion block 10 tops.
Technique scheme has successfully overcome before the steel sheet pile inserted to play, encloses the technical problem that the purlin installation is not visible, the location is difficult, multilayer is enclosed purlin spacing control difficulty under water.
In the technique scheme, front according to steel sheet-pile cofferdam design physical dimension in step 1, plan-position and the gradient of in-site measurement drilled pile steel casing, the length dimension of horizontal support 8 and lower end horizontal support 12 on calculating.According to calculated data, vertical nose girder 9, upper end horizontal support 8, lower end horizontal support 12, elevation location bracket 11, nose girder lower end are supported arc 13 and vertical cushion block 10 be assembled into integral body by said structure at processing space.
In the technique scheme, the bottom steel sheet pile encloses purlin 2.1, top layer steel sheet pile and encloses purlin 2.2 and intermediate layer steel sheet pile and enclose purlin 2.3 and be equipped with and enclose purlin inner bracing piece 5.This encloses purlin inner bracing piece 5 and is used for strengthening the intensity that steel sheet pile encloses purlin 2.
The present invention adopts and props up first method construction steel sheet pile cofferdam, namely is in place first at steel sheet pile 1 inserted to play front wall purlin, encloses purlin in directly adopting and supports as steel sheet pile 1 inserted to play guiding device, enclose purlin rigidity large, be not easy distortion, guide effect is good, and steel sheet pile 1 inserted to play quality easily guarantees; Steel sheet pile 1 inserted to play front wall purlin all is in place, and pump process Steel Sheet Pile 1 suffered water pressure is directly delivered to encloses on the purlin; The construction of drawing water can once not finished and need be interrupted, and efficiency of construction is high.
The content that this manual is not described in detail belongs to the known prior art of this area professional and technical personnel.

Claims (7)

1. a steel sheet-pile cofferdam encloses the purlin installation and guide device under water, it is characterized in that: comprise vertical nose girder (9), be arranged on vertical nose girder (9) inside top upper end horizontal support (8), be arranged on vertical nose girder (9) inboard, bottom lower end horizontal support (12), be arranged on the elevation location bracket (11) in vertical nose girder (9) the bottom outside, the inboard of described lower end horizontal support (12) is provided with the nose girder lower end and supports arc (13).
2. steel sheet-pile cofferdam according to claim 1 encloses the purlin installation and guide device under water, it is characterized in that: the top of described elevation location bracket (11) is provided with vertical cushion block (10).
One kind utilize that the described steel sheet-pile cofferdam of claim 1 encloses the purlin installation and guide device under water enclose the purlin localization method, it is characterized in that, it comprises the steps:
Step 1: utilize the steel casing (3) of the pier periphery of drilled pile construction stage use, as the guide pile of guiding device (4);
Step 2: enclose the absolute altitude of purlin (2.1) and the design attitude of steel sheet-pile cofferdam according to the bottom steel sheet pile, guiding device (4) upper end horizontal support (8) is fixed on the corresponding position of steel casing (3), the nose girder lower end of guiding device (4) is supported arc (13) and is matched with steel casing (3);
Step 3: be fixedly connected with bottom at the top that the bottom steel sheet pile encloses purlin (2.1) in advance and enclose support bar between purlin (7.1);
Step 4: the bottom steel sheet pile is enclosed purlin (2.1) lift, transfer to guiding device (4) elevation location bracket (11) top along vertical nose girder (9), again the top layer steel sheet pile is enclosed purlin (2.2) and lift, transfer to bottom along vertical nose girder (9) and enclose on the support bar between purlin (7.1);
Step 5: after steel sheet pile encloses purlin (2) installation, carry out the construction of steel sheet pile (1) inserted to play, until steel sheet pile cofferdam construction is finished in closure.
According to claim 3 utilize that steel sheet-pile cofferdam encloses the purlin installation and guide device under water enclose the purlin localization method, it is characterized in that: be fixedly connected with the intermediate layer at the top that the intermediate layer steel sheet pile encloses purlin (2.3) in advance simultaneously in the described step 3 and enclose support bar between purlin (7); In the described step 4 after the bottom steel sheet pile encloses purlin (2.1) and is mounted to elevation location bracket (11) top, the intermediate layer steel sheet pile is enclosed purlin (2.3) lift to bottom and enclose on the support bar between purlin (7.1), then the top layer steel sheet pile is enclosed purlin (2.2) and enclose on the support bar between purlin (7) to the intermediate layer along vertical nose girder (9) lifting.
According to claim 4 utilize that steel sheet-pile cofferdam encloses the purlin installation and guide device under water enclose the purlin localization method, it is characterized in that: described intermediate layer steel sheet pile encloses purlin (2.3) two, with first intermediate layer steel sheet pile enclose purlin (2.3) lift to bottom enclose support bar between purlin (7.1) upper after, second intermediate layer steel sheet pile enclosed purlin (2.3) lifting to the intermediate layer that first intermediate layer steel sheet pile encloses purlin (2.3) enclose on the support bar between purlin (7), then the top layer steel sheet pile is enclosed purlin (2.2) and enclose on the support bar between purlin (7) to the intermediate layer that second intermediate layer steel sheet pile encloses purlin (2.3) along vertical nose girder (9) lifting.
According to claim 3 or 4 or 5 described utilize that steel sheet-pile cofferdam encloses the purlin installation and guide device under water enclose the purlin localization method, it is characterized in that: the top of described elevation location bracket (11) arranges vertical cushion block (10), in the step 4 the bottom steel sheet pile is enclosed purlin (2.1) along vertical nose girder (9) lifting to vertical cushion block (10) top.
According to claim 5 utilize that steel sheet-pile cofferdam encloses the purlin installation and guide device under water enclose the purlin localization method, it is characterized in that: described bottom steel sheet pile encloses purlin (2.1), top layer steel sheet pile and encloses purlin (2.2) and intermediate layer steel sheet pile and enclose purlin (2.3) and be equipped with and enclose purlin inner bracing piece (5).
CN201210404769.0A 2012-10-22 2012-10-22 Mounting and guiding device and positioning method for underwater circuit purlins of steel sheet pile cofferdam Active CN102926387B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210404769.0A CN102926387B (en) 2012-10-22 2012-10-22 Mounting and guiding device and positioning method for underwater circuit purlins of steel sheet pile cofferdam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210404769.0A CN102926387B (en) 2012-10-22 2012-10-22 Mounting and guiding device and positioning method for underwater circuit purlins of steel sheet pile cofferdam

Publications (2)

Publication Number Publication Date
CN102926387A true CN102926387A (en) 2013-02-13
CN102926387B CN102926387B (en) 2014-11-05

Family

ID=47641304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210404769.0A Active CN102926387B (en) 2012-10-22 2012-10-22 Mounting and guiding device and positioning method for underwater circuit purlins of steel sheet pile cofferdam

Country Status (1)

Country Link
CN (1) CN102926387B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104727331A (en) * 2015-03-04 2015-06-24 中交第二航务工程局有限公司 Round end type steel sheet pile cofferdam structure with arch effect and construction method thereof
CN104895083A (en) * 2015-06-24 2015-09-09 江苏省建筑科学研究院有限公司 Underwater pile-cap foundation pit guide frame and cofferdam support construction method thereof
CN106013192A (en) * 2016-06-15 2016-10-12 中铁港航局集团有限公司 Method of constructing cofferdam after integrally lowering multiple layers of inner bracings of steel sheet pile cofferdam
CN110387872A (en) * 2019-06-11 2019-10-29 中交第二航务工程局有限公司 A kind of novel multi-layer waling steel sheet pile construction method
CN111139848A (en) * 2020-01-02 2020-05-12 中铁二局第五工程有限公司 Steel cofferdam and assembling method thereof
CN114718097A (en) * 2022-04-25 2022-07-08 中交第二航务工程局有限公司 Quick positioning method for deep water steel cofferdam or open caisson
CN115125957A (en) * 2022-05-30 2022-09-30 中建一局集团建设发展有限公司 Deep water cofferdam enclosing purlin and inner support assembling and lowering device and using method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1121908A (en) * 1997-07-03 1999-01-26 Ohbayashi Corp Method of temporary coffering construction and temporary coffering structure
CN2670443Y (en) * 2003-11-27 2005-01-12 中铁工程机械研究设计院 Prestressed concrete tubular pile clipper
KR100753021B1 (en) * 2006-11-13 2007-08-30 주식회사 시티기술단 The subterranean soil flow wall construction method which formed the institution thing installation space part using main girder compression reaction
CN101368389A (en) * 2008-09-24 2009-02-18 中铁大桥局集团第五工程有限公司 Single and double-wall combined steel cofferdam construction method and its single and double-wall combined steel cofferdam
CN102094429A (en) * 2011-01-12 2011-06-15 广东省长大公路工程有限公司 Lowering control method of double-wall steel cofferdam
CN102409688A (en) * 2011-08-16 2012-04-11 中建三局建设工程股份有限公司 Construction method of steel plate pile cofferdam
CN102535534A (en) * 2012-01-05 2012-07-04 江苏海上龙源风力发电有限公司 Construction process for leveling and grouting intertidal zone polygonal bracket fan foundation
CN202925556U (en) * 2012-10-22 2013-05-08 中交第二航务工程局有限公司 Mounting and guiding device for underwater circuit purlins of steel sheet pile cofferdam

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1121908A (en) * 1997-07-03 1999-01-26 Ohbayashi Corp Method of temporary coffering construction and temporary coffering structure
CN2670443Y (en) * 2003-11-27 2005-01-12 中铁工程机械研究设计院 Prestressed concrete tubular pile clipper
KR100753021B1 (en) * 2006-11-13 2007-08-30 주식회사 시티기술단 The subterranean soil flow wall construction method which formed the institution thing installation space part using main girder compression reaction
CN101368389A (en) * 2008-09-24 2009-02-18 中铁大桥局集团第五工程有限公司 Single and double-wall combined steel cofferdam construction method and its single and double-wall combined steel cofferdam
CN102094429A (en) * 2011-01-12 2011-06-15 广东省长大公路工程有限公司 Lowering control method of double-wall steel cofferdam
CN102409688A (en) * 2011-08-16 2012-04-11 中建三局建设工程股份有限公司 Construction method of steel plate pile cofferdam
CN102535534A (en) * 2012-01-05 2012-07-04 江苏海上龙源风力发电有限公司 Construction process for leveling and grouting intertidal zone polygonal bracket fan foundation
CN202925556U (en) * 2012-10-22 2013-05-08 中交第二航务工程局有限公司 Mounting and guiding device for underwater circuit purlins of steel sheet pile cofferdam

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104727331A (en) * 2015-03-04 2015-06-24 中交第二航务工程局有限公司 Round end type steel sheet pile cofferdam structure with arch effect and construction method thereof
CN104895083A (en) * 2015-06-24 2015-09-09 江苏省建筑科学研究院有限公司 Underwater pile-cap foundation pit guide frame and cofferdam support construction method thereof
CN106013192A (en) * 2016-06-15 2016-10-12 中铁港航局集团有限公司 Method of constructing cofferdam after integrally lowering multiple layers of inner bracings of steel sheet pile cofferdam
CN110387872A (en) * 2019-06-11 2019-10-29 中交第二航务工程局有限公司 A kind of novel multi-layer waling steel sheet pile construction method
CN110387872B (en) * 2019-06-11 2021-07-27 中交二航局第一工程有限公司 Multilayer wailing steel sheet pile construction method
CN111139848A (en) * 2020-01-02 2020-05-12 中铁二局第五工程有限公司 Steel cofferdam and assembling method thereof
CN114718097A (en) * 2022-04-25 2022-07-08 中交第二航务工程局有限公司 Quick positioning method for deep water steel cofferdam or open caisson
CN114718097B (en) * 2022-04-25 2023-09-22 中交第二航务工程局有限公司 Quick positioning method for deepwater steel cofferdam or open caisson
CN115125957A (en) * 2022-05-30 2022-09-30 中建一局集团建设发展有限公司 Deep water cofferdam enclosing purlin and inner support assembling and lowering device and using method thereof

Also Published As

Publication number Publication date
CN102926387B (en) 2014-11-05

Similar Documents

Publication Publication Date Title
CN102926387B (en) Mounting and guiding device and positioning method for underwater circuit purlins of steel sheet pile cofferdam
CN202925556U (en) Mounting and guiding device for underwater circuit purlins of steel sheet pile cofferdam
WO2018045772A1 (en) Construction method and construction system for overwater bored piles based on incremental launching movement platform
CN202492848U (en) Invisible attached type low height guide rack
CN202064357U (en) Spacing headframe
CN206204912U (en) The multifunctional girder structure of self-elevating ocean platform
CN104627330B (en) Forward installation construction method for construction platform system of super-huge storage tank
CN102587374B (en) Perpendicularity control process for single-tubular-pile foundation of offshore intertidal wind farm
CN102296581B (en) Method and device for installing longitudinal guide rail
US20150143769A1 (en) Steel-frame building, plant, and method for assembling steel-frame building
CN104527923B (en) Cabin entering mounting method used for main push motor and adopting auxiliary mounting bracket
CN102587656B (en) Super highrise building rectangular steel pipe bending post or tilt column construction
CN101177933B (en) Bridge rib hoisting and supporting rack integral construction method and device
CN204282228U (en) A kind of box steel arch beam Integral horizontal type group is to jig frame special
CN202099239U (en) Accurate positioning device for pre-buried pipe of coke oven foundation top plate
CN104563525B (en) A kind of box steel arch beam Integral horizontal type group is to method
CN102777050A (en) Assembly type jig frame for longspan pipe truss roof girder
CN208899342U (en) A kind of casing decentralization guide and limit structure for underwater support table construction
CN102747747B (en) Construction method for installing underground lattice column
CN109208624B (en) Offshore booster station jacket leveling construction process
CN103615118A (en) Lifting installation method of large arch structure
CN206956752U (en) The assembly of steel cofferdam coxopodite and suspension system
CN101818829B (en) Construction method of cross-valley overhead pipeline
CN202416320U (en) Up-right frame for underwater steel pipe pile foundation in pilling process
CN203795483U (en) Anti-floating anchor rod backward bending device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant